HomeMy WebLinkAboutSUB201800106 Review Comments Road Plan and Comps. 2018-08-03COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
Road and Drainage plan review
Project title: Belvedere Phase Il Amendment #2 — Road Plans
Project file number: SUB201800106 — Amendment to SUB201200152
Plan preparer: Collins Engineering [scott@collins-engineering.com]
Owner or rep.: New Belvedere Inc. []
Date Received: 05 Jun 2018
Date of comments: 03 Aug 2018
Scott,
We have reviewed the above referenced plans and have the following comments:
Engineering (Emily Cox)
1. No objections.
2. Ensure the revised plantings are shown on the as -built for the stormwater facility.
3. Reference this SUB201800106 plan number on the as-builts for the stormwater facility.
Planning (Patricia Saternye)
1. See attached review comment letter dated 08/02/18.
VDOT (Adam Moore)
1. Approved per attached letter dated 7-17-18.
Fire Rescue (Shawn Maddox)
1. No objection.
ACSA (Richard Nelson)
1. Approval recommended. Note that an irrigation application will need to be submitted to ACSA for
the Village Green for an irrigation meter. Note that full water connection fees will be included for
this irrigation meter. (See attached email).
GIS (Elisa Kiewra)
1. No objection.
Zoning (Rebecca Ragsdale)
1. No objection.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to
discuss this review.
Engineering Review Comments
Page 2 of 2
Process;
After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate
request form and fee to the Department of Community Development. One of the plan reviewers will
prepare estimates and check parcel and easement information based on the approved plans. The County's
Management Analyst will prepare bond agreement forms, which will need to be completed by the owner
and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need
to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to
obtain all the correct signatures and forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded.
The County's Management Analyst or other staff will prepare the forms and check for ownership and
signature information. The completed forms will need to be submitted along with court recording fees.
After bonding and agreements are complete, county staff will need to enter project information in a DEQ
database for state application processing. DEQ will review the application information based on local
VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid
directly to the state. For fastest processing, this is done electronically with the emails provided on the
application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the
application, they will issue a permit coverage letter. This should be copied to the county.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference.
Applicants will need to complete the request for a pre -construction conference form, and pay the remainder
of the application fee. The form identifies the contractor and responsible land disturber, and the fee
remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction
conference will be scheduled with the County inspector. At the pre -construction conference, should
everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that
work may begin.
County forms can be found on the county website forms center under engineering;
hqp://www.albemarle.org/deptfonns.asp?department--cdengno
If you have any questions or concerns, please contact me either by email (ecox@albemarle.org) or by
phone at 434-296-5832 ext. 3565.
Sincerely,
Emily Cox, P.E.
Civil Engineer II
County of Albemarle
Department of Community Development
Phone 434-296-5832
401 McIntire Road,
Charlottesville, VA, 22902
Memorandum
To: Emily Cox
From: Paty Saternye, Senior Planner
Division: Planning
Date: August 2, 2018
Subject: SUB201800106 Belvedere Phase II - Road Plans
Fax 434-972-4126
The County of Albemarle Planning Division will grant or recommend approval of the road plans referenced
above once the following comments have been addressed: [Each comment is preceded by the applicable
reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.]
1. [COD] In reference to "Proposed Change" #2, no water related changes have been made to the village
green area. ACSA approval of any required changes to support an irrigation system in the Village
Green is required. It would appear that at least a water meter for the area would be needed, which may
necessitate the addition/extension of the water line easements. Therefore, a revision to the ACSA
easements may be required.
[Comment] In reference to "Proposed Change" #3, address the following:
a) It does not appear that any changes have been made on the plan to show the new fence location.
What is shown is what was shown on the two previous road plans. Revise the fence around
Dabney Park to be what is requested.
b) Specify the type of fence that is proposed on the site plan.
c) Provide a detail of the fence type. There is another fence detail on sheet 11 of the original road
plan. If it is that type of fence specify that it is the "Forest Green Aluminum Fence" specified on
Sheet 11. If it is another type of fence then add a second fence detail to the road plan and
reference it.
d) Ensure that the fence type specified meets Code of Development requirements.
e) Reword the proposed change note to specify the type of fence, color and the location of the fence
detail in the road plan.
3. [Comment] In reference to "Proposed Change" #4, address the following:
a) Replace the playground equipment details on sheet 10 of the road plan with the detail for the
specific playground equipment that will be places in Griffin Park.
b) Remove language in current note for the proposed change #4 and replace it with the details of what
recreation equipment will be installed (manufacture, type of equipment, etc.).
c) Ensure that whatever equipment is specified meets the requirements of 18-4.16.
4. [Comment] Revise all sheet of the road plan what show any of these changes. There are sheets that
were not submitted that must be revised and update. Therefore include them in the amendment set.
5. [Comment] On the coversheet of the road plan, in the title, provide the application number
SUB201800106.
6. [Comment] On the coversheet of the road plan, under the title, in "(Amendment to SUB201200152)"
expand it to also include application number SUB201400079.
7. [Comment] Notes that were in the upper right corner of sheet 3, that were in previous road plans, are
missing. Replace those notes. Please note that except for the changes you have specified no other
changes should be made to the road plan and the sheets representing it.
8. [Comment] Either ensure that the wording of the "Proposed Changes:" list that has been added to
every page are identical or only show them on the coversheet and just reference them, with the clouds
and numbers on the other sheet.
Please contact Paty Saternye in the Planning Division by using psatemyegalbemarle.org or 434-296-5832
ext.3250 for further information.
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper Virginia 22701
Stephen C. Brich, P.E.
Commissioner
July 17, 2018
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn: Emily Cox
Re: Belvedere Phase IIB — Road Plan Amendment #2
SUB -2018-00106
Review #I
Dear Ms. Cox:
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 19
May 2018, and finds it to be generally acceptable. If further information is desired, please
contact Justin Deel at 434-422-9894.
A VDOT Land Use Permit will be required prior to any work within the right-of-way. The
owner/developer must contact the Charlottesville Residency Transportation and Land Use
Section at (434) 422-9399 for information pertaining to this process.
Sincerely,
�4
I
Adam J. Moore, P.E.
Area Land Use Engineer
Charlottesville Residency
Virginia!)OT.org
WE KEEP VIRGINIA MOVING
Emily Cox
From: Richard Nelson <rnelson@serviceauthority.org>
Sent: Thursday, July 05, 2018 9:36 AM
To: Emily Cox
Subject: SUB201800106 (amendment to SUB201200152)
Emily,
I recommend approval for SUB201800106 (amendment to SUB201200152). An irrigation application will need to be
submitted to ACSA for the Village Green for an irrigation meter. Note that full water connection fees will be included for
this irrigation meter.
Thanks,
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434) 977-4511
County of Albemarle
Department of Community Development
Phone 434-296-5832
hof ALg�
VIRGI
401 McIntire Road,
Charlottesville, VA, 22902
Memorandum
To:
Emily Cox
From:
Paty Saternye, Senior Planner
Division:
Planning
Date:
August 3, 2018
Subject:
SUB201800106 Belvedere Phase II - Road Plans
Fax 434-972-4126
The County of Albemarle Planning Division will grant or recommend approval of the road plans referenced
above once the following comments have been addressed: [Each comment is preceded by the applicable
reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.]
1. [COD] In reference to "Proposed Change" #2, no water related changes have been made to the village
green area. ACSA approval of any required changes to support an irrigation system in the Village
Green is required. It would appear that at least a water meter for the area would be needed, which may
necessitate the addition/extension of the water line easements. Therefore, a revision to the ACSA
easements may be required.
[Comment] In reference to "Proposed Change" #3, address the following:
a) It does not appear that any changes have been made on the plan to show the new fence location.
What is shown is what was shown on the two previous road plans. Revise the fence around
Dabney Park to be what is requested.
b) Specify the type of fence that is proposed on the site plan.
c) Provide a detail of the fence type. There is another fence detail on sheet 11 of the original road
plan. If it is that type of fence specify that it is the "Forest Green Aluminum Fence" specified on
Sheet 11. If it is another type of fence then add a second fence detail to the road plan and
reference it.
d) Ensure that the fence type specified meets Code of Development requirements.
e) Reword the proposed change note to specify the type of fence, color and the location of the fence
detail in the road plan.
3. [Comment] In reference to "Proposed Change" #4, address the following:
a) Replace the playground equipment details on sheet 10 of the road plan with the detail for the
specific playground equipment that will be places in Griffin Park.
b) Remove language in current note for the proposed change #4 and replace it with the details of what
recreation equipment will be installed (manufacture, type of equipment, etc.).
c) Ensure that whatever equipment is specified meets the requirements of 18-4.16.
4. [Comment] Revise all sheet of the road plan what show any of these changes. There are sheets that
were not submitted that must be revised and update. Therefore include them in the amendment set.
5. [Comment] On the coversheet of the road plan, in the title, provide the application number
SUB201800106.
6. [Comment] On the coversheet of the road plan, under the title, in "(Amendment to SUB201200152)"
expand it to also include application number SUB201400079.
7. [Comment] Notes that were in the upper right corner of sheet 3, that were in previous road plans, are
missing. Replace those notes. Please note that except for the changes you have specified no other
changes should be made to the road plan and the sheets representing it.
8. [Comment] Either ensure that the wording of the "Proposed Changes:" list that has been added to
every page are identical or only show them on the coversheet and just reference them, with the clouds
and numbers on the other sheet.
Please contact Paty Saternye in the Planning Division by using psatern ekalbemarle.org or 434-296-5832
ext.3250 for further information.