COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,North Wing
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE
PROJECT NAME: 424'5f9 57,...)-A & 40( wito G 1
PLAN/PERMIT No.: Li/ej ?O/(/-O 73
DATE: f 9 Jt , /8
This project has been satisfactorily completed and the stormwater management performance bond may
be released at this time if all re-inspection and annual maintenance fees invoiced have been paid.
Date As-built plan was approved by Engineering Division: ' 367/A5 or N/A
DEQ Termination Date Z7 71 fej or N/A
/
Engineering Reviewer
Community Development Department
All fees invoiced on the above project have beeLv
d.
Director of Community Development/C ufty Engineer
0 /7'/41 ;
Date
Cc: Ana Kilmer
Revised:07/03/2018
pF ALi\
t1
ss
County of Albemarle
Department of Community Development
Memorandum
To: Ana Kilmer,Management Analyst
Greg Harper,Water Resources Manager
From: Mark Hopkins
Division: Inspections—E&S Control
Date: 18 July 2018
Subject: Conversion to Permanent Stormwater Management Facility
The requirements of the stormwater management and water quality component of the water protection
performance bond have been satisfactorily completed and this component of the bond may be released
at this time. The permanent stormwater management facility(ies) should now be included in the
Stormwater Inspection Program.
PROJECT NAME: South Rivanna WTP GAC Improvemets
TMP: 04500-00-00-068B0
SITE PLAN NUMBER: 2014-07300
FACILITY DESCRIPTION
Type(s) and number of BMPs 1 —biofilter
(incl.non-structural) #— [click to select type]
Description of Outfall Existing storm drain system
(Ex:24"RCP from 36"CMP riser)
Water Quality ® Yes ❑No
Design Storm ❑ 10yr ❑ 2yr
Any Additional Information
(incl.stream buffer mitigation)
A copy of the site plan and details of the BMP(s)are attached.