Loading...
HomeMy WebLinkAboutWPO201400073 Bond Release 2018-07-24 .)4tte4414v i/2S/l 5 t Q13tQ COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE PROJECT NAME: 424'5f9 57,...)-A & 40( wito G 1 PLAN/PERMIT No.: Li/ej ?O/(/-O 73 DATE: f 9 Jt , /8 This project has been satisfactorily completed and the stormwater management performance bond may be released at this time if all re-inspection and annual maintenance fees invoiced have been paid. Date As-built plan was approved by Engineering Division: ' 367/A5 or N/A DEQ Termination Date Z7 71 fej or N/A / Engineering Reviewer Community Development Department All fees invoiced on the above project have beeLv d. Director of Community Development/C ufty Engineer 0 /7'/41 ; Date Cc: Ana Kilmer Revised:07/03/2018 pF ALi\ t1 ss County of Albemarle Department of Community Development Memorandum To: Ana Kilmer,Management Analyst Greg Harper,Water Resources Manager From: Mark Hopkins Division: Inspections—E&S Control Date: 18 July 2018 Subject: Conversion to Permanent Stormwater Management Facility The requirements of the stormwater management and water quality component of the water protection performance bond have been satisfactorily completed and this component of the bond may be released at this time. The permanent stormwater management facility(ies) should now be included in the Stormwater Inspection Program. PROJECT NAME: South Rivanna WTP GAC Improvemets TMP: 04500-00-00-068B0 SITE PLAN NUMBER: 2014-07300 FACILITY DESCRIPTION Type(s) and number of BMPs 1 —biofilter (incl.non-structural) #— [click to select type] Description of Outfall Existing storm drain system (Ex:24"RCP from 36"CMP riser) Water Quality ® Yes ❑No Design Storm ❑ 10yr ❑ 2yr Any Additional Information (incl.stream buffer mitigation) A copy of the site plan and details of the BMP(s)are attached. I.\DEP11Community Development\Fonns\Inspections\SWM Bond Release Form-conversion to permanent swm facility REVISED 3 8 2010.doe