BOND INSPECTION REQUEST
APPROVED PLAN # 2 p/g 0000 g
PROJECT NAME: (r eHMory /LZC—
(As listed on the approved plan)
This is to request that an inspection be performed by the County. Where fees are assessed,a fee is required for
each inspection. Please check the inspections requested.
idVSMPNESCP Erosion Control,Stormwater Management and/or Mitigation per
Water Protection Ordinance section 17-207&208 $250
❑ Subdivision (roads,drainage,etc.)per Subdivision Ordinance section 14-435 and 14-438; $269
❑ Water& Sewer per Subdivision Ordinance section 14-435 $26i9
❑ Site Development Performance bond(Incomplete Site Work& Landscape Maintenance) $301
TOTAL FEES IP Zso
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville,
VA 22902,Attention: Management Analyst-Phone 434-296-5832; Fax 434-972-4126. All roads and
stormwater facilities will require construction record drawings, inspection reports,and completion processes
through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection
documentation per the state requirements and county's published procedures. A minimum 20%of the original
posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if
landscape installation is part of the bonded incomplete site work,a request for reduction should only be made
once all site work is complete.
The revised estimate should be sent to;
EMAIL: Jeff€tend i/`IY
OR REGULAR MAIL ADDRESS:
J
It.4 a
Signature of Owner/Developer
44041i4//4 q/1//
Print Name Date
Re$tsed 7/15/2014.7/20/2015, 11/3/2015
Internal Use oi
Mikii
Date ReceivedQ//rFee Paid: t�157-""#." A
Received by: � ^' lli's'l• "' a W2412CVK
Intake: Forward to Management Analyst s�
//afr4A— 41/61-11.4
•
frJ. ly1Ppp ea,i, 6/2'1/Lø' r
BOND INSPECTION REQUEST t.- ..")
APPROVED PLAN # WPO - 2-0(C— 00oO 9
PROJECT NAME: Ge440' ,rc. kCZC Ta, $ C4rro 1 Gv
,I,...
(As listed on the approved plan)
This is to request that an inspection be performed by the County. Where fees are assessed,a fee is required for
each inspection. Please check the inspections requested.
194SMP/VESCP Erosion Control,Stormwater Management and/or Mitigation per
Water Protection Ordinance section 17-207& 208 $250
❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435 and 14-438; S269
❑ Water&Sewer per Subdivision Ordinance section 14-435 $269
❑ Site Development Performance bond(Incomplete Site Work&Landscape Maintenance) S301
TOTAL FEES °I.5-0. OD
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville,
VA 22902, Attention: Management Analyst- Phone 434-296-5832; Fax 434-972-4126. All roads and
stormwater facilities will require construction record drawings, inspection reports,and completion processes
through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection
documentation per the state requirements and county's published procedures. A minimum 20%of the original
posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if
landscape installation is part of the bonded incomplete site work, a request for reduction should only be made
once all site work is complete.
The revised estimate should be sent
�to;
�
EMAIL: Jess rotepeit4de • C41/ii
OR REGULAR MAIL ADDRESS:
CVLt/��j�e�,
��-- Signature of Owner/Developer
7;11 A hee.14at.4i 6/100
Print Name Date
Revised 7/15/2014.7/20/2015. 11/3/2015
I
COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
VALLEY REGIONAL OFFICE David K. Paylor
P.O. Box 3000, Harrisonburg, Virginia 22801 Director
Located at 4411 Early Road, Harrisonburg, Virginia 22801 Amy Thatcher Owens
�
Molly Joseph Ward
(540) 574-7800 Fax (540) 574-7878 Regional Director
Secretary of Natural Resources www.deq.virginia.gov
December 20, 2017
Glenmore Partners LLC
c/o Mr. Jess Achenbach SENT VIA E-MAIL
PO Box 645 RECEIPT CONFIRMATION REQUESTED
Charlottesville, VA 22902
Email: jess@reddirtdev.com
RE: Virginia Water Protection (VWP) General Permit Number WP4-15-0200
Glenmore Leake, Augusta County, Virginia
Notice of Termination
Dear Mr. Achenbach:
The Virginia Department of Environmental Quality (DEQ) received your request to terminate the subject permit
authorization on November 8, 2017 and additional information received through December 20, 2017. DEQ has
terminated the VWP General Permit coverage referenced above in accordance with 9 VAC 25-690-90.A.4.a. The
termination of coverage is effective immediately.
As provided by Rule 2A:2 of the Supreme Court of Virginia, you have thirty days from the date you received this
decision within which to appeal this decision by filing a notice of appeal in accordance with the Rules of the
Supreme Court of Virginia with the Director, Virginia Department of Environmental Quality.
Alternatively, in accordance with § 62.1-44.25 of the State Water Control Law, any owner, aggrieved by any action
of the State Water Control Board taken without a formal hearing, or by inaction of the Board, may demand in
writing a formal hearing of such owner's grievance, provided a petition requesting such hearing is filed with the
Board. Said agreement must meet the requirements set forth in § 1.23 (b) of the Board's Procedural Rule No. 1.
If you have any questions, please call Eric Millard at (540) 574-7813 or eric.millard@deq.virginia.gov
Sincerely,
B. Keith Fowler
Deputy Regional Director
cc: Vincent Pero, U.S. Army Corps of Engineers — VIA EMAIL
VWP CONSTRUCTION INSPECTION REPORT
Project Name:
Glenmore Leake
Permit Number:
WP4-15-0200
Project Address:
Carrol Creek Road
County/City:
Albemarle
Permittee:
Glenmore Partners LLC
Weather (Wet/Dry/Rain):
Dry, Sunny
Inspector:
E. Millard
Inspection Date:
12/5/17 Time: 9:30 AM
SPGP: ❑ Yes ❑ No
Reporting Only: ❑ Yes ❑ No
Stage of Construction:
❑ Pre -Construction ❑ Initial Clearing and Grading
❑ Final Grading ❑ Final Stabilization
❑ Rough Grading ❑ Building Construction
0 Notice of Termination ❑ Other:
Nature of Project:
0 Residential/Commercial/Mixed
❑ Other:
❑ Linear Transportation
Re -inspection
0 Yes ❑ No
Impacts: ❑ PFO
❑ PSS ❑ PEM 0 Stream Channel ❑ Open Water ❑ Withdrawal
IN COMPLIANCE?
YES NO N/A Applicable Permit Condition
0 ❑ ❑ Construction activities are not substantially disrupting the movement of aquatic life.
0 ❑ ❑ Proper E&S controls are present, properly maintained, and functioning adequately.
0 ❑ ❑ Stormwater measures are present and properly preventing stormwater runoff.
0 ❑ ❑ Surface waters temporarily affected by construction activities have been restored to
original elevations and appropriately stabilized.
❑ ❑ 0 Utility line work in surface waters was performed to minimize disturbance to surface
waters and the area was returned to original contours and appropriately stabilized.
❑ ❑ 0 In -stream work is being performed in the dry with the appropriate use of cofferdams
sheetpiling etc, to minimize disturbance of the stream bottom and increases in turbidity.
0 ❑ ❑ Pipes and/or culverts for road crossings are countersunk a minimum of six inches to
provide for the re-establishment of a natural stream bottom and low flow channel.
❑ ❑ 0 Wetlands outside the construction areas are clearly marked to prevent additional
unpermitted wetland impacts and no additional wetland impacts have occurred.
D ❑ ❑ Stream banks have been adequately stabilized.
❑ ❑ 0 Time -of -year restrictions regarding impacts to surface waters are being adhered to.
0 ❑ ❑ No additional impacts to surface waters have occurred.
GENERAL COMMENTS:
DEQ staff met with Mr. Jess Achenbach for the site inspection to observe site conditions prior to processing a
termination request for the permit. DEQ staff observed conditions at the main Carrol Creek crossing and a small
impact in the residential section for the installation of a stormwater management BMP and outfall. Both impacts
appear to be taken as described in the JPA.
GENERAL NON-COMPLIANCE ITEMS NOTED:
Erosion and sediment controls are still present at the Carrol Creek crossing. DEQ staff requested that all E&SC be
removed and the entire site stabilized prior to processing termination of the permit. Mr. Achenbach indicated
that he will check with the County and remove the E&SC if they agree site is adequately stabilized. Mr. Achenbach
indicated that he would provide photos when complete.
VWP SITE INSPECTION PHOTO LOG
Project Name: Glenmore Leake Permit Number: WP4-15-0200 Date: 12/5/17
r
taM
Y �
bt
Photo 1: Carrol Creek crossing standing on top and looking Photo 2: Carrol Creek crossing culvert inlet looking
upstream (u/s); Orientation: N downstream (d/s); Orientation: SW
1 �
r�
•
~'
t
- .
Photo 3: Carrol Creek crossing standing on top and looking Photo 4: Carrol Creek crossing culvert outlet looking u/s.
d/s; Orientation: S E&SC present in Photos 1-4; Orientation: NW
,E
t
t^�
r
taM
Y �
bt
Photo 1: Carrol Creek crossing standing on top and looking Photo 2: Carrol Creek crossing culvert inlet looking
upstream (u/s); Orientation: N downstream (d/s); Orientation: SW
1 �
r�
•
~'
t
- .
Photo 3: Carrol Creek crossing standing on top and looking Photo 4: Carrol Creek crossing culvert outlet looking u/s.
d/s; Orientation: S E&SC present in Photos 1-4; Orientation: NW
qu
a !
'r P . ti .ni
4
a
Photo 5: Outlet of Stormwater Management BMP looking u/s;
Orientation: N
aa
,r. r k
Photo 6: Looking d/s from Stormwater management BMP
looking d/s; Orientation: S
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP/VESCP PERMIT SITE INSPECTION REPORT
Project Name:
Northtown Phase
Yes
Project/WPO Number:
WP02006-00050
Project Address:
Gander Drive
DEQ Permit Number (if
a licable):
VAR107210
Project Operator:
United Land Corp
9
Operator Telephone #:
434-975-3334
Project Contact:
Hunter Wood
Contact Telephone #:
434-996-0063
Contact E -Mail:
graham�collins-engineeringcom
Qualified Personnel (QP):
Hunter Wood — RLD36080
Inspector:
Jonney Otto
Weather (Wet/Dry/Rain):
Disturbed Acreage:
3.9
Inspection Date & Time:
Single -Family: ❑ Yes o
Notice of the location of the SWPPP is posted near the site's entrance, if
Stage of Construction: LJ Pre -Construction Meeting
❑ Building Construction ❑ Final Grading ❑
❑ Notice of Termination ❑ Other:
LJ Initial Clearing & Grading LJ Rough Grading
Construction of SWM FacilitiesFinal Stabilization
Re -Inspection:
❑ Yes L]Ko
3
Page 1 of 7
COVERAGE & POSTING REQUIREMENTS
Yes
No
N/A
Reviewed during re -inspection? []Yes L340
Comments/Descrfpttion
9
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300,17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Yes
No
N/A
Reviewed during re -inspection? ❑Yes No
Comments/Description
4
The SWPPP is on-site or made available during the inspection? (CGP
Part II D.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
(CGP Part II A-1 a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part It A.1.b & c)
Page 1 of 7
The SWPPP includes a narrative description of the nature of the
7 construction activity, including the function of the project? (CGP Part II
A.1.d)
The SWPPP includes a legible site plan identifying all appropriate
8 measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part 11 A.1.e(1-7))
9 1 The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
107 The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11 existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 111.13 ❑ ILC ❑
12 The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part I1.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13 concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a -b))
14 Delegation of Authority is provided and signed in accordance with Part II I
K? (CGP Part II A.7)
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
15 11 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES IYesl No IN/AI Reviewed during inspection? ❑Yes 01�0
INSPECTIONS AND CORRECTIVE ACTIONS IYesl No I N/A I Reviewed during inspection? []Yes No
Page 2 of 7
Is the SWPPP being amended whenever there is a change in the design,
16
construction, operation, or maintenance that has a significant effect on the
discharge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870-
G)
Has the SWPPP been amended if inspections or investigations by the
0
17
perator's qualified personnel, or by local, state or federal officials find that
existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18
Contractor(s) that will implement and maintain each control measure are
f
denfified? (CGP Part It B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
mplementation have occurred, including a record of dates when major
19
grading activities occur, construction activities temporarily or permanently
ease on a portion of the site or stabilization measures are initiated? (CGP
Part II B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part II B.4(b))(9VAC25-870-54.G)
21
Is the SWPPP updated to indicate areas that have reached final
f
stabilization? (CGP Part II B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22
egal control of the operator and the dates on which the operator no longer
f
ad legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
4.G)
Does the SWPPP identify the date of any prohibited discharges, the
23
olume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part II B.4(e-0) (9VAC25-870-54.G)
24
Amendments, modifications, or updates to the SWPPP are signed in
accordance with Part III K? (CGP Part 11 B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS IYesl No I N/A I Reviewed during inspection? []Yes No
Page 2 of 7
Inspections required by the SWPPP are conducted at the required
25 frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26 Inspection reports are completed and signed in accordance with CGP
Part II F (3-4)? (CGP Part II F (3-4))
27 Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
//
ESC AND SWM PLAN IMPLEMENTATION
Yes
No
N/A
Reviewed during inspection? 2 es []No
Comments/Descrlpblon
28 Have stream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29 approved erosion and sediment control plan and stormwater management
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
30 approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part I I
A.2(c)) (9VAC25-870-54. B)
A permanent vegetative cover has been established that is uniform,
32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
ka 3
33 disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
s'
54.13)
Are sediment traps and basins installed in accordance with MS-6 and the
35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
/
A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36 excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54. B)
Is concentrated runoff down cut or fill slopes contained in an adequate
37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part 11
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
38 (9VAC 25-840-40.9) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
l
54. B)
Do all operational storm sewer inlets have adequate inlet protection?
39 (9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54. B)
Are stormwater conveyance channels adequately stabilized with channel
40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part 11 A.2(c))
(CGP 11 E(1-2)) (9VAC25-870-54.B)
Is in-stream construction conducted using measures to minimize channel
41 damage? (9VAC 25-840-40.12) (CGP Part 11 A.2(c)) (CGP II E(1-2))
}�
(9VAC25-870-54.13)
Are temporary stream crossings of non-erodible material installed where
42 applicable? (9VAC 25-840-40.13) (CGP Part 11 A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
43 Is necessary restabilization of in-stream construction complete? (9VAC
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Page 3 of 7
Lhspector Signature: Date: '_/ /S_/
Page 4 of 7
Are utility trench operations conducted and stabilized in accordance with
44
MS -16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are soil and mud kept off paved or public roads to minimize the transport
45
of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Have all temporary control structures that are no longer needed been
46
removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part 11 A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are properties and waterways downstream from development adequately
from damage in the
47
Protected erosion, sediment and accordance with
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25 -840-
40.19(a -n))
48
Permanent control measures included in the SWPPP are in place?
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Yes
No
N/A
Reviewed during inspection? ❑Yes r;O
Comments/Description
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part I II G?
(CGP Part 11 A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4. a (2)) (9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,,
59
detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part 11 A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
.
52
and equipment washing, wheel wash water, and other types of washing?
s
(CGP Part II A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54
storage, handling, and disposal of construction products, materials, and
(y
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56
pollutant -generating activities not addressed above, when applicable?
�r
(CGP Part II A.4.e(8))(9VAC25-870-56)
Lhspector Signature: Date: '_/ /S_/
Page 4 of 7
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP/VESCP PERMIT SITE INSPECTION REPORT
Project Name:
Glenmore Carroll Creek Road
ProjectlWPO Number:
WP02016-00008
Project Address:
Carroll Creek Dr
DEQ Permit Number (if
applicable):
VAR10J069
Project Operator:
Jess Achenbach
Operator Telephone #:
434-242.4802
Project Contact:
Dino Goodman
Contact Telephone #:
540-872-5105
Contact E -Mail:
goodmanexcavatingllc@gmail.com
Qualified Personnel (QP):
Justin Shimp
Inspector:
Jonney Otto
Weather (WetfDry/Rain):
Sunny
Disturbed Acreage:
26.0
Inspection Date & Time:
414198 2:00
Single -Family: ❑ Yes ZINo
a of Construction: LJ Pre -Construction Meeting LJ Initial Clearing & Grading LJ Rough Grading
Building Construction p Final Grading ❑ Construction of SWM Facilities Final Stabilization
i
❑ Notice of Termination ❑ Other:
Re -Inspection:
❑ Yes JN o
Page 1 of 7
COVERAGE & POSTING REQUIREMENTS
Yes
No
N/A
Reviewed during re-inspection?zes ❑No
Commenfs/Descripdon
1
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
yes
No
N/A
Reviewed during re -inspection? OYes.ETN"o
Commenfs/Descripfion
4
The SWPPP is on-site or made available during the inspection? (CGP
Part II D.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
(CGP Part 11 A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part 11 A. 1.b & c)
Page 1 of 7
Page 2 of 7
The SWPPP includes a narrative description of the nature of the
7
construction activity, including the function of the project? (CGP Part II
A.1.d)
The SWPPP includes a legible site plan identifying all appropriate
8
measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
9
The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part li A.6)
10
The SWPPP contains an approved erosion and sediment control pian?
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11
existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.13 ❑ ILC ❑
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a -b))
14
Delegation of Authority is provided and signed in accordance with Part III
K? (CGP Part II A.7)
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
11 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Yes No N/A Reviewed during inspection? []Yes 0110
Comments/Description
Is the SWPPP being amended whenever there is a change in the design,
16
onstruction, operation, or maintenance that has a significant effect on the
ischarge of pollutants to surface waters? (CGP Part II B(1))(9VAC25-870-
4. G)
Has the SWPPP been amended if inspections or investigations by the
17 operator's
qualified personnel, or by local, state or federal officials find that
xisting control measures are ineffective in minimizing pollutants in
discharges?
(CGP Part II B(2))(9VAC25-870-54.G)
18 Contractor(s) that will implement and maintain each control measure are
dentified? (CGP Part II B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
mplementation have occurred, including a record of dates when major
19
rading activities occur, construction activities temporarily or permanently
ase on a portion of the site or stabilization measures are initiated? (CGP
Part li B.4(a))(9VAC25-870-54.G)
20 Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part it B.4(b))(9VAC25-870-54.G)
21 Is the SWPPP updated to indicate areas that have reached final
tabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22 egal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part Il B.4(d))(9VAC25-870-
G)
Does
the SWPPP identify the date of any prohibited discharges, the
23 volume released, actions taken to minimize the impact of the release and
measures
taken to prevent the recurrence of any prohibited discharge?
CGP Part II B.4(e-0) (9VAC25-870-54.G)
24 Amendments, modifications, or updates to the SWPPP are signed in
accordance with Part III K? (CGP Part 11 B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS Yes No N/A Reviewed during inspection? ❑Yes 2 o
Comments/Descripdon
Page 2 of 7
Page 3 of 7
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
Part II F (3-4)? (CGP Part II F (3-4))
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION Yes No N/A
Reviewed during inspection? 04s []No
CommentsMescription
28
Have stream buffers and steep slopes been protected as shown on the
plan?
Sequencing of the project is implemented in accordance with the
29
approved erosion and sediment control plan and stormwater management
plans? (9VAC25-870-54.13 and C)
Have all denuded areas requiring temporary or permanent stabilization
been stabilized, and have stabilization requirements for impaired waters,
30
approved TMDL(s), pollutants of concern and exceptional waters, when
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
AX) 5_rriCs �,zn•e,� ni „
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
C.�. CA
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part II A.2(c)) (CGP II
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34
(9VAC 25-840-40.5) (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-
54. B)
Are sediment traps and basins installed in accordance with MS-6 and the
35
approved plan? (9VAC 25-840-40.6) (CGP Part 11 A.2.c (9)) (CGP Part 11
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.13)
Are finished cut and fill slopes adequately stabilized to prevent or correct
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part 11 A.2(c)) (CGP 11 E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part 11
A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54.13)
Is adequate drainage or other protection provided for water seeps?
38
(9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
39
(9VAC 25-840-40.10) (CGP Part 11 A.2(c)) (CGP it E(1-2)) (9VAC25-870-
54.13)
Are stormwater conveyance channels adequately stabilized with channel
QjnJ"mac v-
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part 11 A.2(c))
(CGP 11 E(1-2)) (9VAC25-870-54.B)
&-ck
Is in-stream construction conducted using measures to minimize channel
41
damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are temporary stream crossings of non-erodible material installed where
42
applicable? (9VAC25-840-40.13) (CGP Part 11 A.2(c)) (CGP 11 E(1-2))
(9VAC25-870-54.8)
43
Is necessary restabilization of in-stream construction complete? (9VAC
25-840-40.15) (CGP 11 E(1-2)) (9VAC25-870-54.B)
Page 3 of 7
'-� 4
hspector Signature: Date:�23�c�
Page 4 of 7
Are utility trench operations conducted and stabilized in accordance with
44
MS -16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are soil and mud kept off paved or public roads to minimize the transport
/
45
of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
ex
Have all temporary control structures that are no longer needed been
46
removed and disturbed soil resulting from their removal permanently
stabilized? (9VAC 25-840-40.18) (CGP Part 11 A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B)
Are properties and waterways downstream from development adequately
47
protected from erosion, sediment and damage in accordance with the
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25 -840-
40.19(a -n))
48
Permanent control measures included in the SWPPP are in place?
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Yes No N/A Reviewed during inspection? ❑Yes : lKo
Comments/Descrlp8on
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part I I
f
A.4.e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51
detergents, and wash water from construction materials, including the
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part 11 A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part 11 A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
settling basin? (CGP Part 11 A.4.e(5))(9VAC25-870-56)
`
Practices are in place to minimize the discharge of pollutants from
54
storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part 11 A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56
pollutant -generating activities not addressed above, when applicable?
(CGP Part 11 A.4.e(8))(9VAC25-870-56)
'-� 4
hspector Signature: Date:�23�c�
Page 4 of 7
Notes:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name: Permit Number (if applicable): Date:
Regulatory
Checklist # Citation/Legal
Occurrence
Observation/Recommended Corrective Action
requirement'
Observation:
Recommended Co►recdve Action:
GM-Z^C� %)c( re- 3ccixxt.a�Od>I+/ S�+2Li��fYa�J�tir�fjSi3
Observation: .)Ptf11P
Recommended Corrective Action:
CxA-tse.-�- 0.( 5 a P P I fGA r
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
r Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62:1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 7