Staff has reviewed your resubmittal for a zoning map amendment (ZMA) for the Southwood
redevelopment. We have a number of questions and comments which we believe should be considered
before your ZMA moves forward to the Planning Commission. We would be glad to meet with you to
discuss these issues. Our comments are provided below:
Amending portion of ZMA200500017 Biscuit Run included on TMP 90A1-1 E:
Previous comments regarding the amendment of the Biscuit Run NMD were acknowledged by
the applicant and they have indicated that a proffer statement will be submitted. This statement
will be reviewed and comments may be given when it is submitted. According to Section
33.2.b.1(a) and (b), signatures of other property owners are not required but written notice shall
be required to other property owners subject to the same proffers within the Biscuit Run planned
development. This will be completed by County staff.
General Application Comments:
1. A work session with the Planning Commission and the Board of Supervisors will take place on
August 7th. After this work session, additional comments may be provided based on the
feedback received.
2. Affordable Housing: for this first phase a commitment needs to be made that 15% will be
affordable to meet the policy. There is a scenario in which less than 15% will be provided. The
worksession with the Planning Commission and the Board may provide additional guidance.
3. The term "transect" is a specific planning term that describes how development occurs over a
large area and not just one development. It is recommended that the COD be revised to state
the areas as "character area 1-5 (C1, C2, etc) so as not to provide confusion. Also, the way that
the transects are proposed (1-5) regarding density and level of development is the opposite of
how the terms are described/used around the country- T-1 is the least dense area and
increasing in density/level of development as the number gets to 5-6.
httD://www.doz.com/Initiatives/Transect
Application Plan/Code of Development:
Code of Development: Planning/Zoning (Megan Nedostup; Rebecca Ragsdale):
1. Note that items under the Neigborhood Model analysis (below) that are bolded should be
addressed in the COD.
2. Page 17 of the COD ("Consistency with the Comprehensive Plan") says that UDR allows up to
35 du/acre, while the actual limit is 34 du/acre.
3. Page 18-19-Affordable Housing- Additional narrative, examples, and detail has been provided
to outline the overall goals and approach, which is helpful. Following input from the Board and
Planning Commission in their August 7 work session, a regulatory table must be added that
establishes the minimum number of affordable units required by block. The narrative is
confusing as to what the minimum will be for each block. Typically, affordable housing
commitments have been 2-fold for for -sale units where the income of the qualified purchaser
and sale price are reviewed by the Housing Director. For rental units, the Housing Director has
provided maximum rental rates.
4. Page 21-Carriage units: Previous comment has been partially addressed. If carriage houses
will not count towards density and be considered accessory units, typically there is a standard,
either percentage (35%-50% gfa of the primary dwelling) or max sq. ft. that limits their size.
5. Page 21: Please list these two uses separately so there is no confusion. Home occupation class
A's are not allowed in accessory structures. Also, delete sheds as a use. Sheds are covered by
the accessory uses and buildings category.
a. Accessory uses and buildings including storage buildings
b. Home occupation, Class A, where the district includes residential uses
6. Page 21-Daily vehicle trip count limit -Enforceable standards (How, what, who?) must be
established in the code of development so it is clear how the 5,000 vtpd regulation is to be
administered during site plan, subdivision, and zoning clearance reviews.
7. Page 22-Move Home Occupation Class A and Class B to the residential chart on Page 21.
8. Page 22 and Non -Residential Uses by Block: Based on RLUIPA and the uses allowed in this
COD, it would not be permitted to totally exclude religious assembly. RLUIPA states that
religious uses cannot be treated differently than secular institutional uses (e.g. a school
compared to a church). They must be treated on equal terms. RLUIPA does allow for a zoning
district to completely exclude religious uses, as long as they are allowed somewhere in the
jurisdiction and do not have unreasonable burdens. However, if a zoning district allows for other
institutional uses, such as schools or clubs and lodges, it must also allow for religious uses.
Religious uses do not only include churches; they may also include rooms used for meetings,
soup kitchens, religious gatherings in homes, and schools with both religious and secular uses.
Considering that the COD allows for private schools, clubs and lodges, event halls and
community centers, it would seem that religious uses should be allowed as well. The COD could
restrict institutional uses to certain areas, as long as all institutional uses were treated
equally.
9. Page 23-Parking (Rebecca)- I have no objection to the modification request. The parking
space location table must be revised/simplified so it is easier to read and administer. Also, the
requirement that parking must be located within a 200' radius must be added as a note to the
regulatory table, not included in the narrative. I recommend that the 200' radius be measured
from the building, not the lot. Also, previous comments that safe pedestrian access (paths,
sidewalks) be provided from parking to the use have not been included.
10. Page 23 Parking- What is public way? Do you mean right of way? When not adjacent to
building, but adjacent to residential areas, parking should be screened as well. Will the
screening requirement be per the existing ordinance? Or what will the requirement be?
11. Page 27-Tree Preservation Area -This must also be added to the Application Plan. Clearly
show, to -scale, on the application plan where the tree preservation area is located. The code of
development must specify standards for this area. Where is the 30' measured from? Is this
supposed to be an undisturbed buffer area? Can it be disturbed and replanted? What are the
planting standards?
12. Page 28- the title has been fixed, however the description says "units facing", not "lots facing".
13. Page 31- The Comprehensive Plan and discussions concerning the size of the center have
been centered/recommended that the center in Southwood be a Neighborhood Service Center.
The regulations proposed for T-1 especially, and also T-2 provide for a much larger center than
just Neighborhood Service. While the Southern and Western neighborhoods do not have a table
describing the centers, Places29 Master Plan does and Southwood should follow those
recommendations. See attached table. The maximum building height recommended is 3 stories
and a single footprint of 15,OOOsf. What is proposed is way above these recommendations, and
is more in line with a "Destination Center" which has not been the understanding, and what has
been heard from the residents thus far. It is recommended that T-1 and T-2 be revised to fit with
a Neighborhood Service designation.
14. Page 31- Footnote E is not clear on what the design would be. An illustration should be
provided to show what is intended.
15. Page 31- Stepbacks should be provided after the 3rd story in T-1. In addition, 5 feet is not a
sufficient stepback to provide variation/breaks along the street. Five feet would not be
noticeable to a pedestrian. It is recommended that the stepback be set at 15' which is consistent
with the zoning ordinance and also is being recommended for Rio29 Small Area plan.
16. Page 31- Maximum front setbacks should be provided for T-4 and T-5 in order to be in line with
the Neighborhood Model.
17. Page 30- More specificity needs to be given for regulated parking. Does this mean to the side
and rear of buildings/units?
18. Page 29-32-Setbacks, Height and other lot regulations- The standards must be enforceable
and they cannot be modified without a special exception approved by the Board of Supervisors.
Notes C and D need to be removed. Note E will need to be clarified, perhaps with an illustration
on how this would be developed. "Side Corner" is not a term in the ordinance, a corner lot has
two front and two sides according to the zoning ordinance. Please clarify the intent for how
corner lots would be treated (side setback applying to one of the fronts?) Following the work
session on August 7, staff will provide more detailed comments on necessary revisions to this
section of the code of development or if it should be removed and a more simplified table added
back. If page 30 remains, it will need revision to include regulatory language to define what is
expected for the street edge, etc. Examples can be provided by staff.
Application Plan
1. Previous comment: Sheet A1.01 and A1.02-To simplify the plan set and to address ordinance
requirements, consolidate these sheets.Typically the tax map parcel number, zoning, and use of
adjacent parcels are labeled on the regional context or existing conditions sheets. When
addressing this comment, please be sure to include the following:
• If the project is to amend an existing planned development district and the proposed
amendment would affect less area than the entire district, the applicant shall submit a
map showing the entire existing planned development district and identifying any area to
be added to or deleted from the district, or identifying the area to which the amended
application plan, code of development, proffers or any special use permit or special
exception would apply.
2. Sheet A2.01-Emergency Access -What are the minimum standards for the secondary
emergency access? Add a note that specifies the standard, or a note as determined by the Fire
Marshal.
Transportation (Adam Moore (VDOT): Comments forthcoming
Fire/Rescue (Shawn Maddox):
1. I don't quite understand the one way streets widening to 20' at 150' increments. If the primary
access to a structure is on the one way road then the entire length of the road must meet the 20'
requirement unless previously discussed allowances are made.
2. Thank you for addressing the second entrance/exit. Fire Rescue will work with the applicant
during the road plan/site plan process to meet the intent of the codes and the project.
Engineering (Frank Pohl):
1. Provide conceptual locations of stormwater facilities. Facilities must not be located within stream
buffers, steep slopes, or floodplain limits.
2. Floodplain Study must be submitted to FEMA to modify floodplain mapping. Modeling does not
appear to be calibrated with FEMA mapping. If grading (i.e. for trails) is expected to occur within
the limits of the floodplain, the regulated floodway must also need be determined because
grading is not allowed within the floodway, but is allowed within the floodplain fringe. The
regulated floodway does not appear to be shown on the 100 YR FLOOD MAP", even though it
is included in the legend. This can be done as part of the VSMP permitting process and is not
required for the ZMA application.
Proffers:
1. A proffer for the greenway trail should be offered. Staff will provide standard language for
modification/discussion.
Planning
Planning staff's comments are organized as follows:
• How the proposal relates to the Comprehensive Plan
• The Neighborhood Model analysis
• Additional comments from reviewers (See attached)
Comprehensive Plan. Comments on how your project conforms to the Comprehensive Plan will be
provided to the Planning Commission and Board of Supervisors as part of the staff report that will be
prepared for a work session or public hearing.
These parcels are within the Southern and Western Neighborhood Master Plan and are designated as
Urban Density Residential (residential (6.01-34 units/acre); supporting uses such as religious
institutions, schools, commercial, office and service uses) with a Center designated along Old
Lynchburg Road. The number of units proposed is within the recommended density in the Comp Plan,
also there is a mixture of uses in Block B that could provide for a Neighborhood Center to be located
within the development.
Neighborhood Model
General comments on how well the proposed development meets the principles of the Neighborhood
Model are provided here. Please note that those comments bolded should be addressed. More
detailed comments may be provided at a later date if changes are made and/or after more detailed
plans are provided.
Pedestrian . While sidewalks are provided in all street sections, some of the sections allow for
Orientation sidewalks up against the curb without a planting strip in between the curb and
sidewalk.
• The planting strips provided in some of the sections are not wide enough
for a tree to be planted. A tree cannot survive in less than 6'.
• Where there is no planting strip, the sidewalk should be a minimum of 8 feet
wide.
If the sidewalks are intended to serve as multi -use paths, the minimum
width should be 10 feet.
As stated above, Block B should have a stepback requirement, in addition
stepbacks should be a minimum of 15', as the pedestrian is not going to be
able to distinguish that small of a setback from the street.
A maximum setback should be provided for in T-4 and T-5
Will lighting be provided? If so, please note that full cut-off fixtures are
required per Section 4.17 of the Zoning Ordinance.
Mixture of Uses . A mix of uses is proposed in Block A and Block B
. Block A non-residential uses are scaled so that they are neighborhood oriented,
where Block B allows more flexibility for uses that could draw outside residents.
. Screening for the off -site parking should be considered if located near
residences.
. The uses proposed were developed and vetted by the residents and the more
intense non-residential uses were decided to be located in Block B.
Neighborhood
. The Southern and Western Neighborhoods Master Plan indicates that a
Centers
i Center should be provided here. This center was discussed as being
neighborhood focused and not necessarily serving the outside community.
• The scale and requirements listed for Block B would allow a much larger
I center than neighborhood and should be scaled back to be more inline with
the recommendations for a neighborhood center (number or stories,
stepbacks, maximum footprint)
• A feature should be considered to idenitify Block B as a center. Some
examples: special landscaping, corner plaza, public art.
--
Mixture of
. One scenario for this rezoning would allow for less than 15% affordable to
Housing Types
be provided. A commitment should be for 15% to be provided.
and
. A mix of housing types is permitted within all blocks, but nothing in the code
Affordability
requires a mix of housing types within the development.
Interconnected . Connections to existing trails on adjacent properties should be made where
Streets and possible. A future connection to Biscuit Run park should also be provided
Transportation upon demand of the County.
Networks . Cul-de-sacs are not mentioned in the code. A statement regarding
interconnected streets should be provided in the code. Example language:
"Cul-de-sacs shall not be utilized unless it is not feasible to connect streets
due to existing environmentally sensitive areas, stormwater management
I facilities, steep terrain, grade separations, and/or street design
requirements that prohibit a grid form or connections as determined by the
Director of Planning in consultation with VDOT, Fire/Rescue, and County
Engineer when appropriate"
Multi -modal
. Most of the streets are local/neighborhood streets where bike riders can
Transportation
ride within the lane, however the section for Hickory Street should consider
Opportunities
having designated bike lanes.
An existing bus stop is located within Southwood. Additional opportunities should
be explored for another bus stop to be located within Phase 1.
Parks,
. Open space is being provided along the stream buffers where a trail will be
Recreational
located.
Amenities, and
. Additional recreational areas will be provided within Block A and Block B in
Open Space
accordance with 4.16 of the Zoning ordinance with the exception of one tot lot
being replaced by the trail system in Block A.
Additional open space and recreational areas exist in the existing portion of
Southwood that will remain for Phase 1.
Buildings and . See previous comments above regarding regulations for the Character
Space of Areas
Human Scale . Consider maximum building setbacks so buildings are located adjacent to
the street with relegated parking and pedestrian -oriented entrances (see
new setbacks Section 4.19-4.20 and Downtown Crozet District 2013.3 for
guidance).
Provide rules for relegation of parking (see relegated parking comments
below).
Relegated . Parking should be relegated to the back or side of buildings. See comments
Parking I above regarding relegation of parking and clarifying the
permissions/requirements.
• Parking areas located adjacent to the street should be screened from
I streets.
• Provide a setback for front loaded garages from the porch or front of the
house (3-5 feet).
Redevelopment This first phase of redevelopment for Southwood is located on property that is
currently not developed, therefore, for Phase I, this principle does not apply.
Respecting . Avoid disturbances to preserved steep slopes where possible.
Terrain and . Information should be provided that retaining walls in the community
Careful should meet the design standards required for the disturbance of managed
Grading and I slopes in section 30.7.5 of the Zoning Ordinance.
Re -grading of
Terrain
Clear More detail needs to be provided for the buffer along Old Lynchburg Rd.
Boundaries See above comments.
with the Rural
Area
Action after Receipt of Comments
After you have read this letter, please take one of the actions identified in the attachment "Action After
Receipt of Comment Letter."
Resuhmittal
If you choose to resubmit, please use the attached form. The resubmittal will require a fee of $1,344.
The resubmittal date schedule is provided for your convenience.
Notification and Advertisement Fees
Applicants are required to pay for the notification costs for public hearings. Prior to scheduling a public
hearing with the Planning Commission:
$ 215.00 Cost for newspaper advertisement
$ 476.00 Cost for notification of adjoining owners (minimum $200 + actual postage/$1 per owner after
50 adjoining owners)
$ 691.00 Total amount due prior to Planning Commission public hearing
Prior to the Board of Supervisor's public hearing, payment of the newspaper advertisement for the
Board hearing needed.
$ 476.00 Additional amount due prior to Board of Supervisors public hearing
$ 1167.00 Total amount for all notifications Fees may be paid in advance. Payment for both the
Planning Commission and Board of Supervisors public hearings may be paid at the same time.
Additional notification fees will not be required unless a deferral takes place and adjoining owners need
to be notified of a new date.
Feel free to contact me if you wish to meet or need additional information. My phone number is (434)
296-5832, x. 3004, and my email address is: mnedostup@albemarle.org.
Sincerely,
'^1'rr- 1ce^
Megan Nedostup, AICP
Principal Planner
Planning Services
FOR OFFICE USE ONLY SP # or ZMA #
Fee Amount $ Date Paid By who? Receipt # Ck# By
Resubmittal of information for Special Use Permit or �u k
Zoning Map Amendment
PROJECT NUMBER: 2_A-2QP)—C)3 PROJECTNAME: Skj, rltiWtic,� Pk I
9 Resubmittal Fee is Required ❑ Per Request
Name of Applicant
Signature
FEES
❑ Resubmittal Fee is Not Required
Phone Number
Date
Resubmittal fees for Special Use Permit -- original Special Use Permit fee of $1,075
❑ First resubmission
FREE
❑ Each additional resubmission
$538
Resubmittal fees for original Special Use Permit fee of $2,150
❑ First resubmission
FREE
❑ Each additional resubmission
$1,075
Resubmittal fees for original Zoning Map Amendment fee of $2,688
❑ First resubmission
FREE
At Each additional resubmission
$1,344
Resubmittal fees for original Zoning Map Amendment fee of $3,763
❑ First resubmission
FREE
❑ Each additional resubmission
$1.881
❑ Deferral of scheduled public hearing at applicant's request — Add'l notice fees will be required
$194
To be paid after staff review for Dublic notice:
Most applications for Special Use Permits and Zoning Map Amendment require at least one public hearing by the Planning Commission
and one public hearing by the Board of Supervisors. Virginia State Code requires that notice for public hearings be made by publishing
a legal advertisement in the newspaper and by mailing letters to adjacent property owners. Therefore, at least two fees for public notice
are required before a Zoning Map Amendment may be heard by the Board of Supervisors. The total fee for public notice will be
provided to the applicant after the final cost is determined and must be paid before the application is heard by a public body.
1V1Ar,L IaELR3 1 V CV V rN l Y VP ALI9LMA1(LL/rAY MEIN I A f UVMMUNI I VE V ELVYMENT COUNTER
Preparing and mailing or delivering up to fifty (50) notices $215 + actual cost of first-class postage
D Preparing and mailing or delivering each notice after fifty (50) $1.00 for each additional notice+ actual
cost of first-class postage
D Legal advertisement (published twice in the newspaper for each public hearing) Actual cost
(minimum of $280 for total of 4 publications)
County of Albemarle Department of Community Development
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126
1/24/17 Page 1 of 1
FOR OFFICE USE ONLY SP #
Fee Amount S Date Paid By %%ho° Receipt Ck# Bv:
Resubmittal of information for
Zo
Amendment
0
PROJECT NUMBER THAT HAS BEEN ASSIGIED: y�201g COS
Owner/Applicant Must Read and Sign
I hereby certify that the infortnation provided with this resubmittal is what has been requested fi•om staff
Signature of Owner. Contract Ptuchaser
Print Name
FEES that may apply:
Date
Daytime phone number of Signatory
❑
Deferral of scheduled public hearing at applicant's request
$194
Resubmittal fees for original Zoning Map Amendment fee of $2,688
❑
First resubmission
FREE
Each additional resublllissioll (O BE PAID WHEN THE RESUBMISSION IS 1LADE TO L\TAKE STAFF)
1 $1.344
Resubmittal fees for original Zoning Map Amendment fee of $3,763
❑
First resubinission
FREE
❑
Each additional resubmission (TO BE PAID WHEN THE RESUBMISSION IS ALADE TO INTAKE STAFF) 1
$1.881
To be Dald after staff review for Dublic notice:
Most applications for a Zoning Map Amendment require at least one public hearing by the Planning Commission and one public
hearing by the Board of Supervisors. Virginia State Code requires that notice for public hearings be made by publishing a legal
advertisement in the newspaper and by mailing letters to adjacent property owners. Therefore, at least two fees for public notice
are required before a Zoning Map Amendment may be heard by the Board of Supervisors. The total fee for public notice will be
provided to the applicant after the final cost is determined and must be paid before the application is heard by a public body.
Y Preparing and mailing or delivering up to fifty (50) notices
$215 + actual cost of fast -class postage
Preparing and mailing or delivering each notice after fifty (50)
$1.08 for each additional notice + actual
cost of first-class postage
Legal advertisement (published twice in the newspaper for each public hearing)
Actual cost
(averages between $150 and $350)
County of Albemarle Department of Communiy Development
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126
Rmsed 11 02 2015 Page 1 of t
2018 Submittal and Review Schedule
Special Use Permits and Zoning Map Amendments
Resubmittal Schedule
Resubmittal Dates
Comments to applicant
for decision on whether
to proceed to Public
Hearing
Payment Due for Public
Hearing Legal Ad
Planning
Commission Public
Hearing No sooner than"
COB Auditorium
Monday
Wednesday
Friday
Tuesday
Dec 18 2017
Jan 17 2018
Jan 26
Feb 20
Wed Jan 03
Jan 31
Feb 09
Mar 06
Jan 15
Feb 14
Feb 23
Mar 20
Jan 29
Feb 28
Mar 16
Apr 10
Feb 05
Mar 07
Mar 16
Apr 10
Tue Feb 20
Mar 21
Mar 30
Apr 24
Mar 05
Apr 04
Apr 06
May 01
Mar 19
Apr 18
A r 27
Ma 22
Apr 02
Ma 02
May 18
Jun 12
Apr 16
May 16
Jun 01
Jun 26
Apr 30
May 30
Jun 01
Jun 26
May 07
Jun 06
Jun 15
Jul 10
May 21
Jun 20
Jun 29
Jul 24
Jun 04
Thu Jul 05
Jul 13
Aug 07
Jun 18
Jul 18
Jul 27
Aug 21
Ju102
Aug01
Aug10
Sep 04
Jul16
Aug15
Aug31
Sep 25
Jul 30
Aug29
Aug 31
Sep 25
Aug 06
Sep 05
Sep 14
Oct 09
Aug 20
Sep 19
Sep 28
Oct 23
Tue Sep 04
Oct 04
Oct 05
Oct 30
Sep 17
Oct 17
Oct 19
Nov 13
Oct 01
Oct 31
Nov 09
Dec 04
Oct 15
Nov 14
Nov 20
Dec 18
Oct 29
Nov 28
Dec 21
Jan 15 2019
Nov 05
Dec 05
Dec 21
Jan 15 2019
Nov 19
Dec 19
Dec 21
Jan 15 2019
Dec 03
Jan 02 2019 1
Jan 04 2019
Jan 29 2019
Dec 17
Jan 16 2019
Jan 25 2019
Feb 19 2019
Jan 07 2019
Feb 06 2019
Feb 08 2019
Mar 05 2019
Bold italics = submittal/meeting day is different due to a holiday.
Dates with shaded background are not 2018.
2019 dates are tentative.
Off -date to accommodate holidays.
'Public hearing dates have been set by the Planning Commission: however, if due to unforeseen
circumstances the Planning Commission is unable to meet on this date, your project will be moved to the
closest available agenda date.
CrNthng and
winC6Mnectinjt
Cam�nwait9ea HBrlhlr-m Albemarle
Table LU 1: Land Uses in Centers and the Uptown
Primary &Secondary Uses .L
=Thetown (Up)
=Neighborhoodrvice Center (NS)
Community Center (C)
Destination Center (D)
Residential
Single family attached & detached, multifamily
• Single family attached, multifamily
• Single family attached, multifamily
• Single family attached, multifamily
• Density: 3 — 20 units/acre
• Density: 6.01 — 34 units/acre
• Density: 6.01 — 60 units/acre
• Density: 6.01 — 80 units/acre
• Maximum building height: 3 stories
• Maximum building height: 4 stories
• Maximum building height: 5 stories
• Maximum building height: 6 stories
Neighborhood Retail
• Maximum single building footprint: 15,000 SF
• Maximum single building footprint: 60,000 SF
• Maximum single building footprint: 50,000 SF
• Maximum single building footprint: 25,000 SF
Community & Regional Retail
• Maximum building height 3 stories; no more than 2 stories
• Maximum building height 4 stories; no more than 2
• Maximum building height 5 stories, no more than
• Maximum building height: 6 stories
General Commercial Service
for retail -only buildings
stories for retail -only buildings
3 stories for retail -only buildings
■ First floor may be retail, commercial, or
residential; upper floors may be office or
residential
Auto Commercial Sales &
• All activities must be within a building, except for customer/
• All activities must be within a building, except for
• All activities must be within a building, except for
Service
employee parking, loading, and gas pumps.
customer/employee parking, loading, and gas pumps.
customer/employee parking, loading, and gas
• Evidence must be provided that noise, odors, and other
• Evidence must be provided that noise, odors, and
pumps.
potential nuisances do not adversely affect surrounding uses
other potential nuisances do not adversely affect
• Evidence must be provided that noise, odors,
Not permitted
• Maximum single building footprint: 7,500 SF
surrounding uses.
and other potential nuisances do not adversely
• Maximum single building footprint: 7,500 SF
affect surrounding uses.
• Maximum single building footprint: 7,500 SF
Office
■ Maximum single building footprint: 15,000 SF
• Maximum single -building footprint: 20,000 SF
• Maximum single building footprint: 20,000 SF
• Maximum single -building footprint: 25,000 SF;
R&D/Flex
Maximum building height for retail -only buildings: 2 stories
• Maximum building height for retail -only buildings: 2
• Maximum building height for retail -only buildings:
may increase to 40,000 SF by exception
■ Maximum building height if retail on ground floor only: 3
stories
3 stories
• Maximum building height for retail -only buildings:
stories, with residential units or office uses above retail
■ Maximum building height if retail on ground floor only:
• Maximum building height if retail on ground floor
3 stories
■ Maximum height of office only building: 2 stories, unless by
3 stories, with residential units or office/commercial
only: 5 stories, with residential units or
• Maximum building height if retail on ground floor
exception where up to 4 stories may be allowed if consistent
uses above retail
office/commercial uses above retail
only: 6 stories, with residential units or
with surrounding uses
office/commercial uses above retail
Light Manufacturing/Storage/
Not Permitted, unless by exception where there are no impacts
Distribution
on surrounding uses and where consistent with the character of
Not Permitted
Not Permitted
Not Permitted
surrounding uses.
Heavy Manufacturing/
Storage/ Distribution
Not Permitted
Not Permitted
Not Permitted
Not Permitted
Warehousing/ Distribution
Not Permitted
Not Permitted
Not Permitted
Not Permitted
Institutional
■ Maximum single -building footprint: 15,000 SF
■ Maximum single -building footprint: 20,000 SF
■ Maximum single -building footprint: 20,000 SF;
■ Maximum single -building footprint: 20,000 SF
larger by exception
Open Space
• Minimum of 1 small green park conveniently located
• Minimum of 1 green usable park, centrally located
• Same as Community Center, although minimum
• Minimum of 1 usable park required
(Each Center needs a minimum of 10
• Park is intended to be a central, focal point of the Center
• Park is intended to be a focal point of the Center
size of single park may be'A acre if at least two
• Intended to be a central, focal point of Uptown
percent usable open space. Each
• Minimum size of park: 1/4 to 1/2 acre
• Minimum size of park: 1/4 to 1 acre.
parks are provided. Allows for two focal points, if
. Minimum size of single space: 1/4 acre.
development needs to provide at least 10%
. Additional open space may be necessary, depending on the
■ Additional open space may be necessary, depending
design of Destination Center permits.
■ Playgrounds should be provided with residential
or show where the equivalent area is
intensity and mix of uses. This additional open space may
on the intensity and mix of uses. This additional open
■ Plazas and formal lawns: same as Community
already provided on another property.)
be in the form of a plaza, minimum size: 2,500 SF.
space may be a: plaza (5,000 SF min.), greenway,
■ Additional open space(s) are strongly
formal lawns in front of public buildings (1/4 acre
encouraged. Amount of open space required will
min.), or a playground (1/4 acre min.)
be determined during preparation of the Small
Area Plan for Airport Road Corridor Area.
021 2011