HomeMy WebLinkAboutSUB201300096 Other Road Plan and Comps. 2014-06-11 OF A/ ,_ -Pirrigrp COUNTY OF ALBEMARLE 491 .Agi Department of Community Development ._` lE& 401 McIntire Road frra Charlottesville,Virginia 22902 Subdivision Bond Inspection Bond Title: Old Trail Village—Ashlar Avenue File Number: SUB2013-000096 Date of inspection: TBD Reviewer: Bobby Jocz Original Bond Amount: $454,350 [20%=$90,870] Phone: (434) 296-5832 Current Bond Amount: $454,350 Your bond inspection request has been processed. This list contains an update on the items received and approved. Received Approved Y N Y N NSA VDOT • ❑ Completed inspection request and fee • 0 0 0 • 0 As-built plan, updated, sealed to current date, per As-built policy 0 • ❑ ❑ • ❑ Copies of recorded plats for right-of-way, easements A ❑ 0 0 • '❑ VDOT approval AM-4.3, or partial completion via punchlist I4, 0 0 0 • 0 Letter from P.E. certifying improvements are built to plan A 0 0 0 ❑ • Current certification form completed by owner/developer 0 cic 0 ❑ ❑ , CBR test reports for each road 0 ❑ ❑ fi ❑ X Stone depth and material inspection reports (or core tests) ❑ ❑ 0 cA Pt ❑ Pavement depth and material inspection reports (or core tests) 0 0 0 ix, c( 0 Compaction test reports for fill areas under road 0 0 0 Q4 ❑ ■ Pipe trench inspection reports 0 0 ■ 0 ■ ❑ Pipe interior inspections reports and video 0 0 0 0 ❑ • Concrete test reports for structural concrete, curbing, aprons, etc. 0 ❑ ❑ 7 ❑ ■ Structural inspection reports for any bridges or box culverts, 0 0 ■ ❑ ❑ • county road name signs and posts, or a sign agreement for alt. posts 0 0 • Updated bond amount based on completed work: Checklist Items Unit Notes Completed Repair Not Built/1°010" - Ashlar Ave 11+25 to 16+66 9a o Aggregate Base(Pub) 330.8 Ton Field Check(FC) i( 0 0 o Aggregate Base(PVT) 721.5 Ton 0 0 o Asphalt Base(Pub) 173.7 Ton 0 0 o Asphalt Base(PVT) 378.8 Ton i4 ❑ 0 o Asphalt Surface 254.5 Ton 0 0 o 2"Asphalt overlay 55.1 Ton X 0 0 o Curb CG-2 600.0 ft 0 o Curb CG-6 720.0 ft 0 0 o Sidewalk Concrete 5' 1320.0 ft 0"17 1/30 LLsip� 0 0 X o Sidewalk Brick Pavers 6300.0 Sq-ft ff ei f/icdt 0 g,,4+,") o Ramp CG-12 8 each OM, c fititso , FL- El ❑ o Bumper Blocks 6 each thtAt , F Np sip ❑ CI o Street Name Sign 3 each Only .1 / '- Fe ,. El ElfI o Traffic Control Sign 20 each Qn)/Y i$y4.jww,I Fe— ❑ 0 1;g3J o Street Landscape 25 each El X. o Drop or grate inlet 13 each K ❑ 0 o Standard Manhole 1 each X 0 0 o Manhole Structure 5 ft Ixi" ❑ 0 o Pipe,RCP,CMP 697.0 ft 4 El ❑ o As-built Drawings 1 X 0 ❑ o Survey and Layout 1 1N• 0 ❑ o Mobilization 1 X ❑ ❑ o Materials Testing 2 each X ❑ El o Compaction Testing 2 each 79 ❑ ❑ o CBR Reports 2 each A ❑ ❑ o Stone Depth Inspections 2 each X ❑ ❑ + o Pavement Inspections 2 each A ❑ ❑ o VDOT Surety 2 lanes AV/{-Puerto 'El- ❑ X o VDOT Maintenance Fee 2 lanes N, -11-eC4 n n o VDOT admin Costs 2 lanes fro- Nit MO1 ❑ 0 X` Notes: - As Built: o 0•••4 Se ,i;J:roe fc dtl4 , hei 4 S4� S,ka�� sc�1,�s / ,LnJ;'.1 (C-Z 6-G cvib a.4A.1 , Qo11 toed6vb tweets) A5110' -7 lab /{ No#4 1-1 LP1e I A4 bw lip,,,. /`b1" vitd�brf 1 p.3?o,:h. ..0 Fo...cAlemei,j S, Pi Aps.") - l^Siall el —firlaWSH ,, tom °' r7�' o (WSaloe on.e 441c4 WS f/Ovila o7�/^� c� O A-'L Jam* "for fi S dJJ +0 4— a 6 c rot'%�'SJAl1.d (1 rt.A .wl ivi)(50" d 1 5r7Mc 5�� It�,. • fb ;c� ?�'41' ,( y ?re vi k. (di of- 04141A..1A.. -Po rnv — liv1( rel el, avi fiki oil ;1:ikt /et" 1/DDr31.#c.A Please refer to on-line content at http://www.albemarle.org/deptforms.asp?department=cdengwpo for checklists and procedures. Virginia Department of Transportation ) -,; Road Inspection Report& Land Developement South-Charlottesville Punch List 701 VDOT Way Charlottesville,Virginia 22911 aft 434-531-2877 Date: March 16, 2017 Developer: March Mountain Properties, LLC. Subdivision: Old Trail Village Blocks 1B and 3C Address: 1005 Heathercroft Circle,Suite 100 County: Albemarle Crozet,Virginia 22932 Attendance: Dennis Seale;VDOT Phone: 434-977-0205 RGA Jeremy Fox RGA Cell: Dan Staples RGA Email: Fax General Notes: ❑ Stabilize all reconstructed,repaired,and bare areas within the right-of-way with fertilizer,seed and mulch. ❑ Sweep the road of loose stones and debris prior to final inspection. 8 N/A All post larger than 4"x 4"shall be drilled with a hole configuration equivalent to VDOT standard 602.3 _ N/A Mailboxes are to be 18"from the edge of pavement to the post. ❑ Mow all areas within the right-of-way ❑ N/A Grade all shoulders and ditch lines to the approved plan cross section. ❑ N/A Inlet and outlets of all culverts are to be graded and cleared of debris to provide positive drainage. All bent or damaged culverts to be repaired or replaced. ❑ NEED Permits and Quit claims of any companies with facilities In the right of way Contact the utility companies who will complete and submit forms to VDOT. Comcast 1-888-266-2278, ACSA 977-4511, Dominion Virginia Power 1-888-667-3000, Embarq 1-888-723-8010, Charlottesville Gas 970-3815, Rappahanock Electric 1-540-825-8373 O Reviewed A video camera inspection is required for all storm sewers and culverts that are deemed inaccessible to VDOT inspections and are to be accepted into VDOT's maintenance program and ownership.The video inspection shall be conducted in accordance with VDOT's video camera inspection procedure. O HAVE Two normal size copies of the recorded subdivision plat for this section. ❑ eed Plat Two copies of the recorded plat and as-Built plans 8.5 inches by 11 inches. [] HAVE Two copies of As-Built Plan for this section. Note: 45 Day Inspection Street: Ashlar Avenue AS-BUILTS and PLATS to be reviewed for easements,road centerline,grade to see if other problems are In need of adjustment.Will be reviewed and comments provided If there are adjustments to be made. These items will be updated on punch list and resent after review for correction if needed. AS-Builts are Required to show existing grades,planned grades and finished grades of roadway along with drainage items and easements. 1) Backfill and Stabilize all areas seed and straw behind the sidewalk and curb and gutter. 2)Straigten all stop signs that are loose and leaning.Tops should be cut to have 16"above the top of post only. 3)Clean and Sweep the road and curb and gutter. Flush all DI throats. 4)Curb and Gutter, Sidewalk will be re-inspected on areas of road where house construction is taking place for damage. 5)See Attached Video Report that has been reviewed with clean out needed. 6) Need Quit Claims from Utility companies in right of way. Z of 3 7) Need copy of recorded plats with date,time,deed book and page numbers. �- 8)A final inspection will be required after clean up of Ashlar Avenue. 9)Need copy of CBR and Pavement Design Worksheet. Street: AS-BUILTS and PLATS to be reviewed for easements,road centerline, grade to see if other problems are in need of adjustment.Will be reviewed and comments provided if there are adjustments to be made. These items will be updated on punch list and resent after review for correction if needed. Street: Misc. Items ALL STREETS 1)All stop signs will need to be 30"with 16"above the top of stop sign for VDOT route markers to be placed and 7'from the bottom of stop sign to the ground for pedesrtian head clearence. 2)All speciality signs,plantings, irrigation equipment that is in the right of way will need to have a maintneance agreement with a permit to keep in place and will need to be completed after the road officially is in the state system. 3)Other problems that may exist or have occurred since thie review that is not on this 45 day punch list will be added. Metal Post for State Signs will have a 7 gauge base and 10 gauge post.Wood post 4x4 can be used as well. 4)County 911 Signs are to be located to the left of the intersection on there own post. Street: Mandatory Testing Needed 1)All Subgrade Density Test and CBR Test.HAVE 2)All Roller Patterns and Density Test for#21-A or B Stone. HAVE 3)All Roller Patterns and Density Test for Sm-9.5A.And BM-25.0 Have. 4)All Density test for Fills. HAVE 5)All Pipe Backfill test reports.HAVE 6)All CD and UD types and sizes will be required prior to final overlay to have a video camera inspection to check for problem GENERAL NOTES: All asIhalt re•airs will be milled and saved at the existins "rade of 'fanned roadwa desk n.An se- ction not marked during this review does not relieve the developer of the responsibility of other places that have settled or intersections that have been overlayed above the designed grade of the remaining sections of roadway that have not been disturbed for open cuts and overlayed with out being milled and paved property. Developer will review and call if futher review of a section or spot in the field is needed from VDOT to be marked between the final inspection. Notes: All test reports for Subgrade Test, Asphalt and Stone density and roller patterns and structure backfill test, fill reports.CHECK AND GRADE ALL AREAS AND MAKE SURE THEY WILL DRAIN PROPERLY. STABILIZATION MATTING OR RIP RAP SHALL BE USED TO STABILIZE WHEN NEEDED. ALL AREAS SHALL BE STABILIZED WITH GRASS GROWING BEFORE FINAL ACCEPTANCE. All CBR re•orts for all roads with a ass halt desi•n attached will need to be sent in as well • '•r to s avi •. ""'READ AND COMPLETE ALL GENERAL NOTES AS LISTED ABOVE EXCEPT FOR THE CHECKED OFF ITEMS. oic -7 Old Trail Village Blocks iB and 3C Video Review Report for Repair and Clean Out as listed below. 2 to 1 1) Clean piles of rock,concrete and other debris out of pipe. 2) Flush after cleaning entire section of pipe and re-video. 4 to 2 Good.Clean and no problems at joints or at structure. 4 to 6 Good.Clean and no problems at joints or at structure. 4 to 16 1) Clean mud,rocks and trash out of pipe and structure.Several inches of mud at the half way point down and into structure. 2) Flush clean and re-video. 6 to 8 1) Remove rocks and several inches of mud from pipe and remove rock that was blocking pipe at 10.3'into pipe. 2) Unable to see any more of the pipe. 3) Clean and flush pipe and structure and re-video. 25 to 27 1) Pipe is a 14 full of rock,mud,straw and trash including structure. 2) Clean entire pipe and structure and flush and re-video. Todd Shifflett From: Todd Shifflett Sent: Wednesday, April 05, 2017 1:59 PM To: David James Cc: Frank Pohl Subject: BIR; SUB201300096-Old Trail Village-Ashlar Avenue Road Construction Plan David, This Bond Inspection Request was assigned to you a while back in a meeting. I just received the VDOT Punch List today. That's partially my fault. I had it holding because I though I had reminded Bill Ledbetter we needed it and apparently I didn't. My apologies. We have received the following 1. Bond Inspection Request and Fee 2. VDOT Punch List 3. As-Builts 4. Pipe Video 5. Deeds and Easements. I will bring these to your office. Thank You, Todd From:Todd Shifflett Sent:Wednesday,April 05, 2017 10:54 AM To: 'Bill Ledbetter'<BLedbetter@roudabush.com> Cc:Jeremy Fox<JFox@roudabush.com> Subject: RE: Bond Inspection for Old Trail-Ashlar I don't see it in the package or on the list on the submittal sheet. Yes, please send that too me. Thanks! From: Bill Ledbetter[mailto:BLedbetter@roudabush.com] Sent:Wednesday,April 05,2017 10:48 AM To:Todd Shifflett<tshifflett@albemarle.org> Cc:Jeremy Fox<JFox@roudabush.com> Subject: RE: Bond Inspection for Old Trail-Ashlar Todd Pretty sure it was in the package. Let me get Jeremy to resend it to you. Please confirm this is Ashlar that is part of Block 1/3 and not Ashlar that is part of 28/29B. Thanks Bill 1 Bill Ledbetter Roudabush, Gale and Associates 914 Monticello Road Charlottesville, Virginia 22902 434-977-0205 office 540-649-0190 cell 434-296-5220 fax From: Todd Shifflett [mailto:tshifflett@albemarle.orq] Sent: Wednesday, April 05, 2017 10:51 AM To: Bill Ledbetter Subject: Bond Inspection for Old Trail -Ashlar Bill, Have you all submitted the VDOT punch list for this Bond Inspection Request? I'm still not showing it has been submitted. Do you know when we should expect that? Thank You, Todd 2 PHONE(434)977-0205 FAX(434)296-5220 INFOQROUDABUSH.COM ROUDABUSH, GALE &ASSOCIATES, INC. LAND SURVEYING A PROFESSIONAL CORPORATION ENGINEERING Serving Virginia Since 1956 LAND PLANNING 914 MONTICELLO ROAD CHARLOTTESVILLE,VIRGINIA 22902 WILLIAM J.LEDBETTER,L.S. BRIAN D.JAMISON,L.S. JIM L.TAGGART,P.E. DAVIS A JORDAN,L.S. DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S. AMMY M.GEORGE,L.A. March 14, 2017 Albemarle County Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 RE: Old Trail Village Blocks 1B & 3C As-Built Road Plan I have made an inspection and performed asbuilt surveys of the roads in Old Trail Village Blocks 1B & 3C. I certify that the roads have been built in accordance with the approved construction plans. Asbuilt public road plans dated June 9, 2015 and last revised on March 14, 2017 were prepared based on field surveys of the final constructed improvement locations. The plans have been submitted to the Virginia Department of Transportation and County of Albemarle. The asbuilt plans show both the final horizontal and vertical alignments for the roads, the locations and elevations of storm drainage pipes, the locations of all stormwater conveyance channels and easements and all public road signage. All horizontal and vertical variations between the approved plans and the asbuilt features are indicated on the asbuilt plans. k ►/ yti -TH o William J. Ledbetter, L.S. v0 & WII UAM J.L EDHk7TER • • Lie.No.1Q07-B l' 4 e SUR • • PHONE(434)977-0205 FAX(434)296-5220 INFO@ROUDABUSH.COM ROUDABUSH, GALE &ASSOCIATES, INC. A PROFESSIONAL CORPORATION LAND SURVEYING Serving Virginia Since 1956 ENGINEERING 914 MONTICELLO ROAD LAND PLANNING CHARLOTTESVII I E,VIRGINIA 22902 WILLIAM J.LEDBEIIER,L.S. BRIAN D.JAMISON,L.S. JIM L.TAGGART,P.E. DAVIS A JORDAN,L.S. DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S. AMMY M.GEORGE,L.A. TO: Albemarle County Community Development DATE: March 14,2017 JOB#: 8053 ATTN: Ana Kilmer,Management Analyst County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville,VA 22902 X Attached under separate cover via the following items: #of Copies Date Job# Description 1 03/14/17 8053 Digital Copy of F&R Reports&Pipe Videos for OTV Blocks 1&3 1 03/14/17 8053 Full Size As-built Plan for OTV Blocks 1&3(SUB201300096) 1 03/14/17 8053 Full Size Subdivision Plat for OTV Blocks 1&3(SUB201300096) 1 03/14/17 8053 All Copies of Associated Deeds&Easements for Blocks 1&3(SUB201300096) 1 03/14/17 8053 BIR&Submittal Check($269)&Signed&Sealed Letter of As-built Certification These are transmitted as checked below: For Approval/Signature _For your use _Please return X Bond Reduction Resubmitted w/revisions _Review/Comment For Bids due Other REMARKS: Please let me know if you need any accompanying paperwork.Thank you. SIGNED: (201444.7 ) Jeremy L.Fox If enclosures are not as noted,kindly notify us at once. Internal Use Oaly /tea (��� Date Received: - Fee Pat p` 61' 4‘;411111A� l V 1 v llll.����0000���� �// C�/G�/ Received by: Intake: Forward to Maaageueat Analyst BOND INSPECTION REQUEST APPROVED PLAN#SUB201300096 PROJECT NAME: Old Trail Village Block 1 Phase B & Block 3 Phase C Road &Utility Plan (As listed on the approved plan) This is to request that an inspection be performed by the County. Where fees are assessed,a fee is required for each inspection. Please check the inspections requested. O VSMP/VESCP Erosion Control,Stormwater Management and/or Mitigation per Water Protection Ordinance section 17-207&208 5250 L ;J t ❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435 and 14-438; 5269 ❑ Water&Sewer per Subdivision Ordinance section 14-435 $269 ❑ Site Development Performance bond(Incomplete Site Work& Landscape Maintenance) $301 TOTAL FEES $269 Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville, VA 22902,Attention:Management Analyst-Phone 434-296-5832;Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings, inspection reports,and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures. A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is complete. The revised estimate should be sent to; EMAIL: bills roudabush.com OR REGULAR MAIL ADDRESS: 914 Monticello Rd. Charlottesville VA 22902 i '1 Signa re of Owner/Developer Bill Ledbetter-Plan Preparer 03/14/2017 Print Name Date Revised 7/15/2014,7/20/2015,11/3/2015 • Ana Kilmer From: Ana Kilmer Sent: Tuesday, March 14, 2017 4:04 PM To: Bill Ledbetter Cc: Todd Shifflett Subject: Bond Inspection request submitted today for otv block 1 phase b & block 3 phase c Bill: We have a wpo bond with that project name. we don't have a road bond with that project name. could it be that you are referring to Old Trail Village Ashlar Avenue Road Construction Plan subdivision bond. I am going to pass the request to Todd. Please confirm correct bond and project name. Thank you Ana D. Kilmer Management Analyst Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer@albemarle.org 1