Loading...
HomeMy WebLinkAboutSUB201400196 Plan - Approved Road Plan and Comps. 2016-03-314 SITE DATA OWNER / DEVELOPER: MARCH MOUNTAIN PROPERTIES LLC CONTACT: DAVE BROCKMAN PLANNING / ZONNING 1005 HEATHERCROFT CIRCLE, SUITE 100 OLD TRAIL VILLAGE CROZET VA, 22932 CELL: (702)-985-9088 dave@oldtrailvillage.com PLAN PREPARER: ROUDABUSH, GALE, & ASSOCIATES _O vi 914 MONTICELLO ROAD W CHARLOTTESVILLE, VA. 22902 FIRE RESCUE (434)-977-0205 TAX MAP PARCEL No: A PORTION OF 055EO-01-00-000A1 ZONING: NEIGHBORHOOD MODEL DISTRICT IN ACCORDANCE WITH PROFFERS VA. DEPARTMENT OF TRANSPORTATION OF ZMA-04-024 APPROVED ON SEPTEMBER 14, 2005 USE: 18 SINGLE FAMILY DETACHED UNITS t LOTS 10-18 INCLUDE 9 DETACHED, CARRIAGE HOUSE APARTMENTS / CONDOMINIUMS BUILDING HEIGHT: NOT TO EXCEED 2.5 STORIES FOR SINGLE FAMILY USE SETBACKS: FRONT SIDE REAR Jfvw0 10' 7.5' 15' G AN APPLICATION HAS BEEN SUBMITTED FOR A WAIVER MODIFICATION TO REDUCE o R v �d THE SIDE SETBACK FROM 7.5' TO 5', TO REDUCE THE FRONT SETBACK FROM 10' t. TO 5', AND TO REDUCE THE REAR SETBACK FROM 15' TO 5', AREA SUMMARIES: LOTS 1.7 Ac. W_j OPEN SPACE 0.0 Ac. (.) RIGHT OF WAY 1.0 Ac. PRIVATE ALLEY 0.2 Ac. � TOTAL AREA 2.9 Ac. LOT AREAS: MINIMUM LOT SIZE IS 4,000 S.F. LOT 1 4485.8 Sq. Feet LOT 2 4433.1 Sq. Feet LOT 3 4277.9 Sq. Feet LOT 4 4452.1 Sq, Feet LOT 5 4285.8 Sq. Feet O LOT 6 4028.0 Sq. Feet LOT 7 3975.9 Sq. Feet F_ LOT 8 3932.4 Sq. Feet LOT 9 3961.8 Sq. Feet U) LOT 10 4261.6 Sq. Feet LOT 11 4135.8 Sq. Feet LOT 12 4017.0 Sq. Feet LOT 13 4065.1 Sq. Feet LOT 14 4052.3 Sq. Feet LOT 15 4084.4 Sq. Feet LOT 16 4093.3 Sq. Feet LOT 17 4076.5 Sq. Feet LOT 18 4107.7 Sq. Feet AN APPLICATION HAS BEEN SUBMITTED FOR A WAIVER MODIFICATION TO ALLOW THE AREAS OF LOTS 7, 8, AND 9 TO BE BELOW THE MINIMUM LOT SIZE OF 4,000 S.F. (SPECIFIED IN THE OLD TRAIL VILLAGE CODE OF DEVELOPMENT). GROSS RESIDENTIAL 6.2 DWELLING UNITS PER ACRE DENSITY: PARKING PROVIDED: 18 SURFACE SPACES + 36 GARAGE SPACES ADITIONAL PARKING AVAILABLE ON PUBLIC STREETS(APPROX. 48 SPACES) PROPOSED 2.02 ACRES IMPERVIOUS AREA: MAGISTERIAL DISTRICT: WHITE HALL MAGISTERIAL DISTRICT DRAINAGE DISTRICT: LICKINGHOLE CREEK WATERSHED: LICKINGHOLE CREEK TOPOGRAPHY: LOUISA AERIAL SURVEYS, AUGUST 2012 DATUM: VERTICAL - NAVD 88, HORIZONTAL - NAD 83 CRITICAL SLOPES: NO CRITICAL SLOPES EXIST WITHIN THE PROJECT LIMITS. FLOODPLAIN: THIS PROJECT IS NOT LOCATED WITHIN FLOODPLAIN LIMITS AS SHOWN ON FLOOD INSURANCE RATE MAP COMMMUNITY PANEL NUMBER 510006 0237 D. EFFECTIVE DATE: FEBRUARY 4, 2005. EROSION CONTROL: PHASE I EROSION CONTROL PROVIDED BY THE EXISTING SEDIMENT BASIN CONSTRUCTED WITH BLOCK 11 AND EXPANDED WITH BLOCK 14. STORMWATER: ORIGINAL SWM BIO -RETENTION POND, BLOCK 14, WPO 2012-0013 LANDSCAPING: SEE LANDSCAPING PLAN FOR PLANTINGS, SCHEDULE AND SPECIFICATIONS, NOTES AND DETAILS. LIGHTING: ALL PROPOSED LIGHTING WILL NOT EXCEED 3,000 LUMENS. NO EVIDENCE OF A BURIAL SITE WAS FOUND ON THIS PORTION OF PARCEL Al. THE STREAM BUFFER(S) SHOWN HEREON SHALL BE MANAGED IN ACCORDANCE WITH THE ALBEMARLE COUNTY WATER PROTECTION ORDINANCE. THIS SITE IS NOT LOCATED WITHIN AN AGRICULTURAL -FORESTAL DISTRICT. L Q:\%'GA\`fMPROJ\OLD TRIM L-80581BLOCI< 12 & 'I S\1-INAL SITE&SUBD. PL.AN\STORM PLAN -PROFILE BLOCI< 15, DVVG, 3/31/2016 8;05:43 AM BLOCK 15 1 I[, - � '� � � _� "��M I M � MM W� � - 7qwmw SU 6201400196 VICINITY MAP SCALE: 18=1000 FEET 1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENT OF THE PERMIT SHALL GOVERN. VDOT MUST BE CONTACTED AT LEAST 48 HOURS IN ADVANCE OF THE START OF CONSTRUCTION. 2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED. CSR's SHALL BE SUBMITTED TO VDOT FOR REVIEW & APPROVAL. 3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED) IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED, AND MULCHED. 5. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTAL: VERTICAL).. WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED. 6. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 7. TRAFFIC CONTROL SIGNS SHALL CONFORM TO THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. B. UNLESS OTHERWISE NOTED, ALL CONCRETE PIPES SHALL BE REINFORCED CONCRETE PIPE -CLASS III. 9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR CONSTRUCTION INDUSTRY (29 CFR PART 1926). 10. VISIBILITY OF ALL MECHANICAL EQUIPMENT FROM THE ENTRANCE CORRIDOR SHALL BE ELIMINATED. Rte 250 Of'11ALTH OF D j� �V" Christopher C. Mulligan Lic. No. 031672 SSS/ONAL ENG 1., CONSTRUCTION INSPECTION OF ALL PROPOSED ROADS WITHIN THE DEVELOPMENT WILL BE MADE BY THE COUNTY. THE CONTRACTOR MUST NOTFY THE DEPARTMENT OF COMMUNITY DEVELOPMENT (296-5832) 48 HOURS IN ADVANCE OF THE START OF CONSTRUCTION. 2. UPON COMPLETION OF FINE GRADING AND PREPARATION OF THE ROADBED SUBGRADE, THE CONTRACTOR SHALL HAVE CBR TESTS PERFORMED ON THE SUBGRADE SOIL. THREE (3) COPIES OF THE TEST RESULTS SHALL BE SUBMITTED TO THE COUNTY IF A SUBGRADE SOIL CBR OF 10 OR GREATER IS NOT OBTAINABLE, A REVISED PAVEMENT DESIGN SHALL BE MADE BY THE DESIGN ENGINEER AND SUBMITTED WITH THE TEST RESULTS TO VDOT FOR APPROVAL. 3. SURFACE DRAINAGE AND PIPE DISCHARGE MUST BE RETAINED WITHIN THE PUBLIC RIGHT-OF-WAY OR WITHIN EASEMENTS PRIOR TO ACCEPTANCE BY THE COUNTY. ALL DRAINAGE OUTFALL EASEMENTS ARE TO BE EXTENDED TO A BOUNDARY LINE OR A NATURAL WATERCOURSE. 4. GUARDRAIL LOCATIONS ARE APPROXIMATE. EXACT LENGTH, LOCATION, AND APPROPRIATE END TREATMENTS WILL BE FIELD VERIFIED AT THE TIME OF CONSTRUCTION. ADDITIONAL GUARDRAIL MAY BE REQUIRED AT LOCATIONS NOT SHOWN WHEN, IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY. WHEN GUARDRAIL IS REQUIRED, IT SHALL BE INSTALLED FOUR (4) FEET OFFSET FROM THE EDGE OF PAVEMENT TO THE FACE OF GUARDRAIL, AND ROADWAY SHOULDER WIDTHS SHALL BE INCREASED TO SEVEN (7) FEET. 5. WHERE URBAN CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT CG -9(A, B, OR C). 6. WHERE RURAL CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT STANDARD PE -1. 7. COMPLIANCE WITH THE MINIMUM PAVEMENT WIDTH, SHOULDER WIDTH, AND DITCH SECTIONS, AS SHOWN ON THE TYPICAL PAVEMENT SECTION DETAIL, SHALL BE STRICTLY ADHERED TO. 8. ROAD PLAN APPROVAL FOR SUBDIVISIONS IS SUBJECT TO FINAL SUBDIVISION PLAT VALIDATION. SHOULD THE FINAL PLAT FOR THIS PROJECT EXPIRE PRIOR TO SIGNING AND RECORDATION, THEN APPROVAL OF THESE PLANS SHALL BE NULL AND VOID. 9. ALL SIGNS OR OTHER REGULATORY DEVICES SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES AND THE ALBEMARLE COUNTY ROAD NAMING AND PROPERTY NUMBERING ORDINANCE AND MANUAL. 10. TRAFFIC CONTROL OR OTHER REGULATORY SIGNS OR BARRICADES SHALL BE INSTALLED BY THE DEVELOPER WHEN, IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, THEY ARE DEEMED NECESSARY IN ORDER TO PROVIDE SAFE AND CONVENIENT ACCESS. 11. THE SPEED LIMITS TO BE POSTED ON SPEED LIMIT SIGNS ARE TO BE 5 MPH BELOW THE DESIGN SPEED, OR AS DETERMINED BY VDOT FOR PUBLIC ROADS. 12. VDOT STANDARD CD -1 OR CD -2 CROSS -DRAINS ARE TO BE INSTALLED UNDER THE SUBBASE MATERIAL AT ALL CUT AND FILL TRANSITIONS AND GRADE SAG POINTS AS SHOWN ON THE ROAD PROFILES. 13. A VIDEO CAMERA INSPECTION IS REQUIRED FOR ALL STORM SEWERS AND CULVERTS THAT ARE DEEMED INACCESSIBLE TO VDOT OR COUNTY INSPECTIONS. THE VIDEO INSPECTION SHALL BE CONDUCTED IN ACCORDANCE WITH VDOT'S VIDEO CAMERA INSPECTION PROCEDURE AND WITH A VDOT OR COUNTY INSPECTOR PRESENT. 14. INSPECTION & TESTING OF ALL ROADS DEDICATED FOR PUBLIC US SHALL BE COORDINATED WITH VDOT FOR ACCEPTANCE INTO THE STATE SYSTEM. SHEET INDEX SHEET 1 ---------- COVER SHEET SHEET 2 ---------- STORM SEWER FIELD REVISION APPROVED by the Albemarle Countbj Community Development Department Date -_'f NOTEFile � Y APPROVALS: 1. VDOT APPROVES CHANGES AS SUBMITTED ON PLAN SHEET MARKED BLOCK 15 OF OLD TRAIL WITH A DATE OF FEBRUARY 17, 2016. [D. SEAL/VDOT-EMAIL, 24 FEB 2016] 2. ALBEMARLE COUNTY ENGINEERING DIVISION REVIEWED CHANGES AND APPROVES WITHOUT FURTHER REQUEST FOR REVISION. [ALBEMARLE COUNTY -EMAIL, 25 FEB 2016] APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNING / ZONNING �i VICINITY MAP SCALE: 18=1000 FEET 1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENT OF THE PERMIT SHALL GOVERN. VDOT MUST BE CONTACTED AT LEAST 48 HOURS IN ADVANCE OF THE START OF CONSTRUCTION. 2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED. CSR's SHALL BE SUBMITTED TO VDOT FOR REVIEW & APPROVAL. 3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED) IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED, AND MULCHED. 5. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTAL: VERTICAL).. WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED. 6. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 7. TRAFFIC CONTROL SIGNS SHALL CONFORM TO THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. B. UNLESS OTHERWISE NOTED, ALL CONCRETE PIPES SHALL BE REINFORCED CONCRETE PIPE -CLASS III. 9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR CONSTRUCTION INDUSTRY (29 CFR PART 1926). 10. VISIBILITY OF ALL MECHANICAL EQUIPMENT FROM THE ENTRANCE CORRIDOR SHALL BE ELIMINATED. Rte 250 Of'11ALTH OF D j� �V" Christopher C. Mulligan Lic. No. 031672 SSS/ONAL ENG 1., CONSTRUCTION INSPECTION OF ALL PROPOSED ROADS WITHIN THE DEVELOPMENT WILL BE MADE BY THE COUNTY. THE CONTRACTOR MUST NOTFY THE DEPARTMENT OF COMMUNITY DEVELOPMENT (296-5832) 48 HOURS IN ADVANCE OF THE START OF CONSTRUCTION. 2. UPON COMPLETION OF FINE GRADING AND PREPARATION OF THE ROADBED SUBGRADE, THE CONTRACTOR SHALL HAVE CBR TESTS PERFORMED ON THE SUBGRADE SOIL. THREE (3) COPIES OF THE TEST RESULTS SHALL BE SUBMITTED TO THE COUNTY IF A SUBGRADE SOIL CBR OF 10 OR GREATER IS NOT OBTAINABLE, A REVISED PAVEMENT DESIGN SHALL BE MADE BY THE DESIGN ENGINEER AND SUBMITTED WITH THE TEST RESULTS TO VDOT FOR APPROVAL. 3. SURFACE DRAINAGE AND PIPE DISCHARGE MUST BE RETAINED WITHIN THE PUBLIC RIGHT-OF-WAY OR WITHIN EASEMENTS PRIOR TO ACCEPTANCE BY THE COUNTY. ALL DRAINAGE OUTFALL EASEMENTS ARE TO BE EXTENDED TO A BOUNDARY LINE OR A NATURAL WATERCOURSE. 4. GUARDRAIL LOCATIONS ARE APPROXIMATE. EXACT LENGTH, LOCATION, AND APPROPRIATE END TREATMENTS WILL BE FIELD VERIFIED AT THE TIME OF CONSTRUCTION. ADDITIONAL GUARDRAIL MAY BE REQUIRED AT LOCATIONS NOT SHOWN WHEN, IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY. WHEN GUARDRAIL IS REQUIRED, IT SHALL BE INSTALLED FOUR (4) FEET OFFSET FROM THE EDGE OF PAVEMENT TO THE FACE OF GUARDRAIL, AND ROADWAY SHOULDER WIDTHS SHALL BE INCREASED TO SEVEN (7) FEET. 5. WHERE URBAN CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT CG -9(A, B, OR C). 6. WHERE RURAL CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT STANDARD PE -1. 7. COMPLIANCE WITH THE MINIMUM PAVEMENT WIDTH, SHOULDER WIDTH, AND DITCH SECTIONS, AS SHOWN ON THE TYPICAL PAVEMENT SECTION DETAIL, SHALL BE STRICTLY ADHERED TO. 8. ROAD PLAN APPROVAL FOR SUBDIVISIONS IS SUBJECT TO FINAL SUBDIVISION PLAT VALIDATION. SHOULD THE FINAL PLAT FOR THIS PROJECT EXPIRE PRIOR TO SIGNING AND RECORDATION, THEN APPROVAL OF THESE PLANS SHALL BE NULL AND VOID. 9. ALL SIGNS OR OTHER REGULATORY DEVICES SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES AND THE ALBEMARLE COUNTY ROAD NAMING AND PROPERTY NUMBERING ORDINANCE AND MANUAL. 10. TRAFFIC CONTROL OR OTHER REGULATORY SIGNS OR BARRICADES SHALL BE INSTALLED BY THE DEVELOPER WHEN, IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, THEY ARE DEEMED NECESSARY IN ORDER TO PROVIDE SAFE AND CONVENIENT ACCESS. 11. THE SPEED LIMITS TO BE POSTED ON SPEED LIMIT SIGNS ARE TO BE 5 MPH BELOW THE DESIGN SPEED, OR AS DETERMINED BY VDOT FOR PUBLIC ROADS. 12. VDOT STANDARD CD -1 OR CD -2 CROSS -DRAINS ARE TO BE INSTALLED UNDER THE SUBBASE MATERIAL AT ALL CUT AND FILL TRANSITIONS AND GRADE SAG POINTS AS SHOWN ON THE ROAD PROFILES. 13. A VIDEO CAMERA INSPECTION IS REQUIRED FOR ALL STORM SEWERS AND CULVERTS THAT ARE DEEMED INACCESSIBLE TO VDOT OR COUNTY INSPECTIONS. THE VIDEO INSPECTION SHALL BE CONDUCTED IN ACCORDANCE WITH VDOT'S VIDEO CAMERA INSPECTION PROCEDURE AND WITH A VDOT OR COUNTY INSPECTOR PRESENT. 14. INSPECTION & TESTING OF ALL ROADS DEDICATED FOR PUBLIC US SHALL BE COORDINATED WITH VDOT FOR ACCEPTANCE INTO THE STATE SYSTEM. SHEET INDEX SHEET 1 ---------- COVER SHEET SHEET 2 ---------- STORM SEWER FIELD REVISION APPROVED by the Albemarle Countbj Community Development Department Date -_'f NOTEFile � Y APPROVALS: 1. VDOT APPROVES CHANGES AS SUBMITTED ON PLAN SHEET MARKED BLOCK 15 OF OLD TRAIL WITH A DATE OF FEBRUARY 17, 2016. [D. SEAL/VDOT-EMAIL, 24 FEB 2016] 2. ALBEMARLE COUNTY ENGINEERING DIVISION REVIEWED CHANGES AND APPROVES WITHOUT FURTHER REQUEST FOR REVISION. [ALBEMARLE COUNTY -EMAIL, 25 FEB 2016] APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNING / ZONNING ENGINEERING INSPECTIONS _O vi ARCHITECTUAL REVIEW BOARD W FIRE RESCUE 0 ALBEMARLE COUNTY SERVICE AUTHORITY W VA. DEPARTMENT OF TRANSPORTATION CC Z t T f 5 I>�e Jfvw0 G o R v �d 0 t. U VICINITY MAP SCALE: 18=1000 FEET 1. PRIOR TO ANY CONSTRUCTION WITHIN ANY EXISTING PUBLIC RIGHT-OF-WAY, INCLUDING CONNECTION TO ANY EXISTING ROAD, A PERMIT SHALL BE OBTAINED FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). THIS PLAN AS DRAWN MAY NOT ACCURATELY REFLECT THE REQUIREMENTS OF THE PERMIT. WHERE ANY DISCREPANCIES OCCUR THE REQUIREMENT OF THE PERMIT SHALL GOVERN. VDOT MUST BE CONTACTED AT LEAST 48 HOURS IN ADVANCE OF THE START OF CONSTRUCTION. 2. ALL MATERIALS AND CONSTRUCTION METHODS SHALL CONFORM TO CURRENT SPECIFICATIONS AND STANDARDS OF VDOT UNLESS OTHERWISE NOTED. CSR's SHALL BE SUBMITTED TO VDOT FOR REVIEW & APPROVAL. 3. EROSION AND SILTATION CONTROL MEASURES SHALL BE PROVIDED) IN ACCORDANCE WITH THE APPROVED EROSION CONTROL PLAN AND SHALL BE INSTALLED PRIOR TO ANY CLEARING, GRADING OR OTHER CONSTRUCTION. 4. ALL SLOPES AND DISTURBED AREAS ARE TO BE FERTILIZED, SEEDED, AND MULCHED. 5. THE MAXIMUM ALLOWABLE SLOPE IS 2:1 (HORIZONTAL: VERTICAL).. WHERE REASONABLY OBTAINABLE, LESSER SLOPES OF 3:1 OR BETTER ARE TO BE ACHIEVED. 6. PAVED, RIP -RAP OR STABILIZATION MAT LINED DITCH MAY BE REQUIRED WHEN IN THE OPINION OF COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY IN ORDER TO STABILIZE A DRAINAGE CHANNEL. 7. TRAFFIC CONTROL SIGNS SHALL CONFORM TO THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES. B. UNLESS OTHERWISE NOTED, ALL CONCRETE PIPES SHALL BE REINFORCED CONCRETE PIPE -CLASS III. 9. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR CONSTRUCTION INDUSTRY (29 CFR PART 1926). 10. VISIBILITY OF ALL MECHANICAL EQUIPMENT FROM THE ENTRANCE CORRIDOR SHALL BE ELIMINATED. Rte 250 Of'11ALTH OF D j� �V" Christopher C. Mulligan Lic. No. 031672 SSS/ONAL ENG 1., CONSTRUCTION INSPECTION OF ALL PROPOSED ROADS WITHIN THE DEVELOPMENT WILL BE MADE BY THE COUNTY. THE CONTRACTOR MUST NOTFY THE DEPARTMENT OF COMMUNITY DEVELOPMENT (296-5832) 48 HOURS IN ADVANCE OF THE START OF CONSTRUCTION. 2. UPON COMPLETION OF FINE GRADING AND PREPARATION OF THE ROADBED SUBGRADE, THE CONTRACTOR SHALL HAVE CBR TESTS PERFORMED ON THE SUBGRADE SOIL. THREE (3) COPIES OF THE TEST RESULTS SHALL BE SUBMITTED TO THE COUNTY IF A SUBGRADE SOIL CBR OF 10 OR GREATER IS NOT OBTAINABLE, A REVISED PAVEMENT DESIGN SHALL BE MADE BY THE DESIGN ENGINEER AND SUBMITTED WITH THE TEST RESULTS TO VDOT FOR APPROVAL. 3. SURFACE DRAINAGE AND PIPE DISCHARGE MUST BE RETAINED WITHIN THE PUBLIC RIGHT-OF-WAY OR WITHIN EASEMENTS PRIOR TO ACCEPTANCE BY THE COUNTY. ALL DRAINAGE OUTFALL EASEMENTS ARE TO BE EXTENDED TO A BOUNDARY LINE OR A NATURAL WATERCOURSE. 4. GUARDRAIL LOCATIONS ARE APPROXIMATE. EXACT LENGTH, LOCATION, AND APPROPRIATE END TREATMENTS WILL BE FIELD VERIFIED AT THE TIME OF CONSTRUCTION. ADDITIONAL GUARDRAIL MAY BE REQUIRED AT LOCATIONS NOT SHOWN WHEN, IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, IT IS DEEMED NECESSARY. WHEN GUARDRAIL IS REQUIRED, IT SHALL BE INSTALLED FOUR (4) FEET OFFSET FROM THE EDGE OF PAVEMENT TO THE FACE OF GUARDRAIL, AND ROADWAY SHOULDER WIDTHS SHALL BE INCREASED TO SEVEN (7) FEET. 5. WHERE URBAN CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT CG -9(A, B, OR C). 6. WHERE RURAL CROSS SECTIONS ARE INSTALLED, ALL RESIDENTIAL DRIVEWAY ENTRANCES SHALL CONFORM TO VDOT STANDARD PE -1. 7. COMPLIANCE WITH THE MINIMUM PAVEMENT WIDTH, SHOULDER WIDTH, AND DITCH SECTIONS, AS SHOWN ON THE TYPICAL PAVEMENT SECTION DETAIL, SHALL BE STRICTLY ADHERED TO. 8. ROAD PLAN APPROVAL FOR SUBDIVISIONS IS SUBJECT TO FINAL SUBDIVISION PLAT VALIDATION. SHOULD THE FINAL PLAT FOR THIS PROJECT EXPIRE PRIOR TO SIGNING AND RECORDATION, THEN APPROVAL OF THESE PLANS SHALL BE NULL AND VOID. 9. ALL SIGNS OR OTHER REGULATORY DEVICES SHALL CONFORM WITH THE VIRGINIA MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES AND THE ALBEMARLE COUNTY ROAD NAMING AND PROPERTY NUMBERING ORDINANCE AND MANUAL. 10. TRAFFIC CONTROL OR OTHER REGULATORY SIGNS OR BARRICADES SHALL BE INSTALLED BY THE DEVELOPER WHEN, IN THE OPINION OF THE COUNTY ENGINEER, OR DESIGNEE, THEY ARE DEEMED NECESSARY IN ORDER TO PROVIDE SAFE AND CONVENIENT ACCESS. 11. THE SPEED LIMITS TO BE POSTED ON SPEED LIMIT SIGNS ARE TO BE 5 MPH BELOW THE DESIGN SPEED, OR AS DETERMINED BY VDOT FOR PUBLIC ROADS. 12. VDOT STANDARD CD -1 OR CD -2 CROSS -DRAINS ARE TO BE INSTALLED UNDER THE SUBBASE MATERIAL AT ALL CUT AND FILL TRANSITIONS AND GRADE SAG POINTS AS SHOWN ON THE ROAD PROFILES. 13. A VIDEO CAMERA INSPECTION IS REQUIRED FOR ALL STORM SEWERS AND CULVERTS THAT ARE DEEMED INACCESSIBLE TO VDOT OR COUNTY INSPECTIONS. THE VIDEO INSPECTION SHALL BE CONDUCTED IN ACCORDANCE WITH VDOT'S VIDEO CAMERA INSPECTION PROCEDURE AND WITH A VDOT OR COUNTY INSPECTOR PRESENT. 14. INSPECTION & TESTING OF ALL ROADS DEDICATED FOR PUBLIC US SHALL BE COORDINATED WITH VDOT FOR ACCEPTANCE INTO THE STATE SYSTEM. SHEET INDEX SHEET 1 ---------- COVER SHEET SHEET 2 ---------- STORM SEWER FIELD REVISION APPROVED by the Albemarle Countbj Community Development Department Date -_'f NOTEFile � Y APPROVALS: 1. VDOT APPROVES CHANGES AS SUBMITTED ON PLAN SHEET MARKED BLOCK 15 OF OLD TRAIL WITH A DATE OF FEBRUARY 17, 2016. [D. SEAL/VDOT-EMAIL, 24 FEB 2016] 2. ALBEMARLE COUNTY ENGINEERING DIVISION REVIEWED CHANGES AND APPROVES WITHOUT FURTHER REQUEST FOR REVISION. [ALBEMARLE COUNTY -EMAIL, 25 FEB 2016] APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNING / ZONNING ENGINEERING INSPECTIONS _O vi ARCHITECTUAL REVIEW BOARD W FIRE RESCUE 0 ALBEMARLE COUNTY SERVICE AUTHORITY W VA. DEPARTMENT OF TRANSPORTATION CC 11 as Q ..W N= Z Q `° N m � N¢ °� Qr �° 0 ac W E @ Z pU Wo r� S Q. �z o w W 2 Z �Q r W 08Q C �,Z -j cm ¢( O rz 0),cr- 000 a W� oU_ v, Z J lY) �w W 0%-. 15o ZN W 4.W COD W Z Q 0w I� REVISIONS COUNTY COMMENTS March 16, 2016 COUNTY COMMENTS March 30, 2016 DATE February 25, 2016 FILE NUMBER 8053 SHEET 1 OF 2 z _O vi W > 0 W CC Z WLf)a:W - T -J 5 I>�e WZ Jfvw0 U.o LL 0 rf - U % O F- J W_j (.) J � �W/� � Q O F_ U) FILE NUMBER 8053 SHEET 1 OF 2 om REVISION TO: ori �j STORM SEWER PROFILE RAINFALL EX. ##34 - #55 DIn3ADIn3A INVERT -1 SLOPE DIAM. CAPACITY 7 FLOW TIME Z X.34,, INCR. 32A�EX.55� POINT POINT (ACRES) W MINUTES 0 O O� O (n r N O I- iZl CFS H MIN. C) 59 61 0.03 0.95 680 0.03 5.00 6.67 680 659.60 659.10 34.45 1675 15 7.78 I I 0.22 675 11 I Ii 63 II 0.90 0.10 0.13 I 6.59 0.84 0 656.50 m I 15 3.0 ;II LF � � Ex 34 ®0.58 EXISTING STR #34 TO PROPOSED MH #32A. r IIS. � `S 4. NEW 24" 0 670 670 , 667.70 57.00 0.58% 24 II STORM SEWER DESIGN AND SCHEDULES WERE OBTAINED FROM BLOCK 14 ASBUILTS AND New MH n MH 32A BLOCK 15 oc THE RE -ALIGNMENT OF HDPE ,nr 667.70 667.70 0.00 0.00% 24 1 MH 32A �1 0.09 665 9 3.00 OF 24" HDPE 665 14.69 667.60 666.75 73.00 1.16% 24 24.40 8.07 0.15 0 55 51 0.03 zz 0.03 Zz 12.74 4.88 14.75 664.75 M 660 Q 82.89 0.90% 24 660 7.29 0.19 Block 15 53 51 0.43 0.55 0.24 Y 5.00 6.67 1.58 0 M0 66.35 0.75% 0o. _ M 0.28 Block 15 r M II Z Z o Z Z z 0+00 +50 1+00 +50 Horizontal Scale = 1 :50 Vertical Scale = 1 :5 - - - - -'EXISTING GRADE om a� DA ori �j � T, RAINFALL RUN-OFF INVERT INVERT LENGTH SLOPE DIAM. CAPACITY VELOCITY FLOW TIME REMARKS INCR. ACCUM. POINT POINT (ACRES) W MINUTES O O� UPPER O FEET % I- iZl CFS H MIN. F- 59 61 0.03 0.95 0.03 0.03 5.00 6.67 0.19 659.60 659.10 34.45 1.45% 15 7.78 I I 0.22 Block 15 11 I Ii 63 II 0.90 0.10 0.13 I 6.59 0.84 0 656.50 118.89 57.0 LF 15 3.0 ;II LF `� 4 HDPE Ex 34 ®0.58 EXISTING STR #34 TO PROPOSED MH #32A. VJ IIS. � `S 4. NEW 24" HDPE SHALL BE INSTALLED FROM 668.03 667.70 57.00 0.58% 24 5. STORM SEWER DESIGN AND SCHEDULES WERE OBTAINED FROM BLOCK 14 ASBUILTS AND New MH MH 32A MH 32A BLOCK 15 oc THE RE -ALIGNMENT OF HDPE ,nr 667.70 667.70 0.00 0.00% 24 MH 32A 55 0.09 0.85 0.08 3.00 12.59 4.90 14.69 667.60 666.75 73.00 1.16% 24 24.40 8.07 0.15 Block 15 55 51 0.03 zz 0.03 Zz 12.74 r STORM SEWER DESIGN ROUDABUSH, GALE & ASSOCIATES, INC. ENGINEERS, SURVEYORS AND LAND PLANNERS 914 MONTICELLO ROAD - CHARLOTESVILLE, VIRGINIA 22902 Phone: (434) 977-0205 - Fax. (434)296-5220 - EMAIL INFO@ROUDABUSH.COM NAME: BLOCK 12 & 15 Job# : 8053 DGN: RD Date: REIVSED 02/17/16 EXISTING ---' VARIABLE WIDTH DRAINAGE ESMT. TO BE VACATED I NEW VARIABLE WIDTH DRAINAGE ESMT iVA OR 10 YEAR FREQUENCY FROM TO DA C CA T, RAINFALL RUN-OFF INVERT INVERT LENGTH SLOPE DIAM. CAPACITY VELOCITY FLOW TIME REMARKS INCR. ACCUM. POINT POINT (ACRES) W MINUTES IN/HR CFS UPPER LOWER FEET % INCHES CFS F.P.S. MIN. 667.60 59 61 0.03 0.95 0.03 0.03 5.00 6.67 0.19 659.60 659.10 34.45 1.45% 15 7.78 2.62 0.22 Block 15 61 63 0.11 0.90 0.10 0.13 5.22 6.59 0.84 659.00 656.50 118.89 2.10% 15 9.36 4.67 0.42 Outfall Ex 34 MH 32A EXISTING STR #34 TO PROPOSED MH #32A. VJ 4. NEW 24" HDPE SHALL BE INSTALLED FROM 668.03 667.70 57.00 0.58% 24 5. STORM SEWER DESIGN AND SCHEDULES WERE OBTAINED FROM BLOCK 14 ASBUILTS AND New MH MH 32A MH 32A BLOCK 15 FOR A PROPOSED MH #32A AND THE RE -ALIGNMENT OF HDPE FROM EXISTING 667.70 667.70 0.00 0.00% 24 MH 32A 55 0.09 0.85 0.08 3.00 12.59 4.90 14.69 667.60 666.75 73.00 1.16% 24 24.40 8.07 0.15 Block 15 55 51 0.03 0.90 0.03 3.02 12.74 4.88 14.75 664.75 664.00 82.89 0.90% 24 21.51 7.29 0.19 Block 15 53 51 0.43 0.55 0.24 0.24 5.00 6.67 1.58 667.50 667.00 66.35 0.75% 15 5.60 3.94 0.28 Block 15 STORM SEWER SCHEDULE PIPE # FROM TO ,PIPE DESCRIPTION 60 59 61 34 L. F. of H. P. D. E. 15 " Storm Pipe 62 61 63 119 L.F. of H. P. D. E. 15 " Storm Pipe 56 MH 32A 55 73 L. F. of H. P. D. E. 24 " Storm Pipe STORM SEWER SCHEDULE E # ROM To ­TION' SCRIP IP E PP F P ED I TION' 37 38 36 43 L. F. of H. D. P. E. 18" Storm Pipe 35 36 34 39 L. F. of H. D. P. E. 24" Storm Pipe 33 34 MH 32A 57 L. F. of H. D. P. E. 24" Storm Pipe :\RGA\TMPROJ\OLD TR,NL-8053\BI._0CI{ 12 & 151F[NAL SITE&SUBD. FLAN\STORM PLAN -PROFILE BLOCK 15.DWG, 3/31/20`16 8:06:37 AM �,TH OF vr� U 1- � -�_9 Christopher C. Mulligan Lic. No. 031672 <v� / 0NAL �j I • U � W 0 <�* 0 CQ � NQ ZO 10CW 29@) Z OU Wo �g az �Z rc Z 0 W 2 r W 08 {J') Z -=JN W �� Qo 000 o 4;LL vJ .1,J LL W � ac W �� p W a W 2 °) �o W Z o OW a. REVISIONS COUNTY COMMENTS March 16, 2016 COUNTY COMMENTS March 30, 2016 DATE February 25, 2016 SCALE 1 "'=20' CONTOUR INTERVAL 2 Feet REIVSED 02/17/16 Z SLOPE IN 0 OUT J �. U) 1.45% INV(IN)= 659.60 INV(OUT)= 659.10 ir () W 2.10% INV(IN)= 659.00 INV(OUT)= 656.50 w Z Lf)u � 1.16% INV(IN)= 667.60 INV(OUT)= 666.75 �� V LLO �Q0 CcW REVISED 02/17/16 NOTES: WSJ W� oPE°',. IN :ouTrc 1. EXISTING STIR #32 (BLOCK 14 ASB�UILTS) IS TO BE REMOVED IN ITS ENTIRETY. it 1.27% INV(IN)= 0.49% INV(IN)= 669.43 668.38 INV(OUT)= INV(OUT)= 668.88 2. 668.19 EXISTING 24" HDPE BETWEEN STR 34 AND # STR 32 IS TO BE REMOVED # IN ITS ENTIRETY. 0.58% INV([N)= 668.03 INV(OUT)= 667.70 3. NEW 24 HDPE SHALL BE INSTALLED FROM EXISTING STR #34 TO PROPOSED MH #32A. VJ 4. NEW 24" HDPE SHALL BE INSTALLED FROM PROPOSED MH #32A TO STR #55. 5. STORM SEWER DESIGN AND SCHEDULES WERE OBTAINED FROM BLOCK 14 ASBUILTS AND BLOCK 15 FOR A PROPOSED MH #32A AND THE RE -ALIGNMENT OF HDPE FROM EXISTING STR #34 & #55. �j I • U � W 0 <�* 0 CQ � NQ ZO 10CW 29@) Z OU Wo �g az �Z rc Z 0 W 2 r W 08 {J') Z -=JN W �� Qo 000 o 4;LL vJ .1,J LL W � ac W �� p W a W 2 °) �o W Z o OW a. REVISIONS COUNTY COMMENTS March 16, 2016 COUNTY COMMENTS March 30, 2016 DATE February 25, 2016 SCALE 1 "'=20' CONTOUR INTERVAL 2 Feet FILE NUMBER 8053 SHEET 2OF2 Rev. Sheet 3 Z W 0 J �. U) O W > ir () W CL Z w Z Lf)u � - > T ->> LLI Z �� V LLO �Q0 CcW WSJ W� W Q W U) m a J 20 it 2 0 cr F- 0 VJ FILE NUMBER 8053 SHEET 2OF2 Rev. Sheet 3