Loading...
HomeMy WebLinkAboutSUB201700199 Review Comments Road Plan and Comps. 2018-08-09COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage Plan Review Project title: Foothill Crossing Connector Road Project file number: SUB-2017-00199 Plan preparer: Collins Engineering [scott@collins-engineering.com] Owner or rep.: Foothill Crossing, Inc. Plan received date: 16 November 2017 (Rev. 1) 6 March 2018 (Rev. 2) 11 June 2018 Date of comments: 11 January 2018 (Rev. 1) 4 May 2018 (Rev. 2) 9 August 2018 Reviewers: Matt Wentland Scott, We have reviewed the plans and have the following comments: Engineering 1. The WPO submittal will need to be approved prior to road plan approval. Planning — Rachel Falkenstein 1. [ZMA2016-05] Street trees should be located between the sidewalk and back of curb. 2. [ZMA2016-05] Provide a more legible detail showing the greenway tunnel specifications. Tunnel specifications need to be approved by Parks & Rec and VDOT staff prior to road plan approval. A maintenance agreement for the tunnel will be required prior to approval. Plans are still under construction review with ACSA. VDOT comments were emailed on 7/20/18. E911 and Fire Rescue had no objection. File: SUB201700199 Foothill Crossing Connector Road Review Comments rev2 08-09-18.doc