Loading...
HomeMy WebLinkAboutARB201800097 Application 2018-08-10Community Cevelopment Cepartmerd Albemarle Count*,, 431 V'-Iire Road Charloffesvi Ile, VA22RD2-45%- 1434) 298-5832 Fax: (434) 972-412 3 Planning Application TMP[ 07800-00-00-073AB owner(s). POINT CHURCH Application #I AR82018000.97 PROPERTY INFORMATION Legal Description I 181/18/2DD5 CERTIFICATE 9F RAT PER DS 2M PG 346 Magisterial Dist. 'Rivanna T Land Use Primary Unassigned Current RFD Not 1nA/F District LTA Current Zoning Primary Planned Development KbEad Commercial ]APPLICATION INFORMATION Street Address Entered By Application Type r--2 Judy Martin Architectural Review Board Project Hansen Read Church - Final Received Date Received Date Final Submittal Date 06/2511 Total Fees 1 1075 Closing File Date Submittal Date Final I Total Paid 1075 L Revision Number Comments F Legal Ad SUB APPLICATION(s) -IBM Su Corrrreat Final Plat .. ..... . ....... - ... ..... .. . . ..... .. APPLICANT f CONTACT INFORMATION Nafr& i Address PhML-C--Ilj POINT CHURCH Pima ct USTIN SHIMR 1428 GKEENBFtIER PL i 912 EAST HIGH ST, CH-%rLDTTES%r1LL i 22901 ... .. . .... .... CHARLOTTESVILL .'22..-90.-2 ­2-4642275140 Signature of Contractor or Authorized Agent Date Architectural ..eview Board Applica�L_jn 0 Part A: Applicant, Contact and Parcel Information Project Name: }AaY\ 5'Gh d �'c'k_ Tax neap and parcel(s): TM? 07300— 09'00`-073 A?R Physical Street Address: Contact Person: 7Ji$ �` n ]n �'wn Business Name: 51^t% O - i 1�P_t;ri Address 2 CAs Daytime Phone (IL ZZ7— 15140 City [ Jr �%sf/r JJ� State Fax # �) E-mail �u5i �' VA Zip Zz-'o'Z $ iann-�►Mf��>tir "nox Owner of Record: two i vl� -S Address I (4z -9 G re_en b r(P_r Daytime Phone { _ ) PI-,« City State Fax # E-mail VA Zip 2 z 9 i Part B: Review 'Type and Fee Select review type Review by the Architectural Review Board Conceptual Plan/Advisory Review (for a Special Use Permit or a No Fee Rezoning) Preliminary/Initial Review of a Site Development Plan No Fee Final Review of a Site Development Plan $1075.00 Amendment to an approved Certificate of Appropriateness $ 242.00 Building Permit Review $ 634.00 County -wide Certificate of Appropriateness Structures 750' or more from the EC, no taller than 5 stories No Fee Structures located behind a structure that fronts the EC No Fee Personal wireless service facilities No Fee Fencing or Equipment or Lighting No Fee Additions to ARB-approved buildings No Fee Minor amendments to site or architectural plans No Fee Building permits where the change is 50% or less of the altered elevation No Fee NOTE: For SIGNS, use the combined APPLICATION AND CHEKLIST FOR SIGNS. FOR OFFICE USE ONLY BP# ARB# Fee Amount $ Date Paid By who? Receipt # _Check # By County of Albemarle Dept of Community Development, 401 McIntire Rd, Charlottesville, VA 22902 Voice: (434) 296-5532 Fag: (434) 9724126 10l2015 Page 1 of2 OVER — Part C: Description of Proposal Describe your proposal. Attach a separate sheet if necessary. 6 l- r a rl VZ „net f6sr ch-,r kG !�«-1 Gl- CorY\er OF Mn!50r% " a I W 5+1--e fO[-C"±i l h rordd �4% 1 Cl 1,^ j Part D: Applicant Agreement Applicant must read and sign • Each application package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • Only complete application packages will be scheduled for ARB review. The application package is not complete without the appropriate checklist, completed, signed, and included with the required submittal materials indicated on the checklist I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this application. *See submittal requirements below. I also certify that the information provided on this application and accompanying information is accurate, true, and correct to the best of my knowledge, and that the attached plans contain all information required by the appropriate checklist. S e of owner, owner's representative or contract purchaser F 4— Cn. Printed name, Title Date Y3y-2-7-7-5/Ya Daytime phone number of Signatory *Ownership Information: • If ownership of the property is in the name of any type of legal entity or organization including, but not limited to, the name of a corporation, partnership or association, or in the name of a trust, or in a fictitious name, a document acceptable to the County must be submitted certifying that the person signing above has the authority to do so. • If the applicant is a contract purchaser, a document acceptable to the County must be submitted containing the owner's written consent to the application. • If the applicant is the agent of the owner, a document acceptable to the County must be submitted that is evidence of the existence and scope of the agency. Attach the owner's written consent. 11/2010 Page 2 of 2 OVER —► Architectural Review Board Final Review of a Site Development Plan Submittal Requirements Checklist I Part A: Applicant, Contact and Parcel Information Project Name: 4-�Ln 5 � Tax map and parcel(s): M a7SOOJO-W-0730 Physical street address: Contact Person: Business Name: Address °111 �6. +arwh '51 City C�.A.rivile9v,'I!� State VA Zip Z DZ Daytime Phone HI3 y) -zZ 77— 5140 Fax # C__) Part B: Submittal Requirements E-mail ;.54", �ywip—�.�g,11�Ir„q Important:Submittal packages must oontain 8 collated copies of all information unless otherwise indicated, A. Written description of the proposal Provide a description of the proposal. Identify changes from the preliminary submittal. Indicate specifically how each ARB comment from the preliminary review has been addressed. If there are no changes proposed, then explain why. Explain how the proposal is compatible with the surrounding area and the Entrance Corridor. B. Site plan showing the following (drawn to the scale of 1"=20, cleary legible and folded): Location(s) of proposed building(s) on the site. Location of proposed parking, travelways, walkways and other improvements. Mechanical equipment, trash containers, loading and service areas, other similar features and improvements, and associated screening. Existing and proposed topography drawn with contour intervals of 5-feet or less, and with sufficient off -site topography to describe prominent and pertinent off -site features and physical characteristics, but in no case less than 50-feet outside of the site. Location and size of existing and proposed utilities and easements. Identify type of utility and extent of easement. Stormwater management plan. Location of retaining walls indicating top and bottom elevations, maximum wall height, and proposed materials, with material and color samples. Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and contact information for the firm preparing the drawings in the title block on all drawings. For revised drawings, clearly identify revisions made. 1 OVER y C. Landscape plan showing _..e following (drawn to the scale of 9' =20' or,. per, clearly legible and folded): Proposed landscaping that meets or exceeds the requirements outlined in the ARB guidelines. Existing landscaping to be removed. Include the location, size, and species. Landscape key including all landscape symbols and a description of what they represent. Location of existing and proposed tree lines and tree save areas. �J Location of existing natural features. ® Location of individual trees of 6-inch caliper or greater and all significant groups of trees indicated by botanical name and caliper. ® Location and height of above -ground utilities and associated easements, and location of below - ground utilities and associated easements. R Stormwater facilities. ® Provide a signed, tree conservation checklist with all checklist items drawn on the landscape plans. Include tree protection fencing and limits of work on the landscape, grading and E&S plans. D. Lighting plan showing the following (drawn to the scale of 1' M20' or larger, clearly legible and folded): ® Location of all proposed building and site lighting. Lighting schedule identifying all proposed light fixtures, poles and brackets. Manufacturer's cut sheets illustrating proposed lighting fixtures and information on illumination type, intensity, style, shielding, color, finish, and installation height. Photometric plan addressing all fixtures and indicating that lighting does meet the requirements of Section 4.17 of the Zoning Ordinance. ® Coordination of lighting with landscaping and other site elements. E. Appearance of the building(s) (architectural elevations, color perspective sketches, site sections): ® Dimensioned architectural elevations of the proposed building(s). Elevations must be drawn to the scale of 1/8"=1'-0". Include a building materials schedule and key on the elevation drawings. Submittal of elevations that are not visible from the Entrance Corridor may be required to clarify the overall building design. ® Site sections that clarify proposed changes in topography and illustrate the visibility of the proposed development from the Entrance Corridor. Site sections shall indicate the finish floor elevation(s) and roof height(s) relative to the natural elevations along the Entrance Corridor. ❑ One set of all building materials / colors. W;A be s oom;--Itd -.5ef l�. 1� acc,k;�-rc - A floor plan adequate to show exterior walls, windows and doors. F. Additional material ❑ Provide labeled, color, 8-%" x 11" photographs of the site as seen from both directions on the Entrance Corridor. ❑ Color perspective images (for example: sketches, renderings, photosimulations, etc.) that show the proposed development as seen from the Entrance Corridor are often useful for gaining a clear understanding of the proposal. The ARB may require such images in certain cases when other submitted documents do not answer all questions of building form, building details, materials, context, topography, and/or visibility. ❑ Any additional material that is necessary to address comments made by the ARB at the preliminary review with a memo itemizing how each of the preliminary comments have been addressed. ❑ The applicant is welcome to submit any additional material that will make the final site development review more productive. Drawings or other submittal items that clarify topography, visibility, utilities, landscaping, or other unique or unusual conditions are welcome. 2 OVER —. Par', C: Applicant Agreement Applicant must read and sign Each application package must contain (8) folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. • All information in this checklist is required, unless specifically waived by the ARB, prior to processing a final site development plan review by the ARB. Additional submittal materials may be required, depending on the proposal. • Only complete application packages will be scheduled for ARB review. The application package is not complete without this checklist completed. signed, and included with the re uired submittal materials indicated on the checklist. In representing the above referenced firm submitting this application for review, 1 hereby state that the information provided in this application, and all accompanying information, is accurate, true and correct to the best of my knowledge, and that the attached plans contain all information required by this checklist. ` ?' S ature of person etng checklist Date IL,!±be, .T aas `13`(- 2Z.%- 5110 Printed Named Title —� Daytime phone number of Signatory County of Albemarle Department of Planning and Community Development 401 McIntire Road, Charlottesville, VA 22902-4596 (434) 296-5832 Tel www.albemarle-org revised 10/24/2014 3 OVER Hlh­�� PROJECT Mhj4AGEMENT P CIVIL ENGINEERING r LAID ;?Lr` N1\.1iNG ENGINEER I ! ' June 25th, 2018 Senior Planner Albemarle County Architecture Review Board 401 McIntire Road Charlottesville, VA 22902 RE: Hansen Road Church — Final Site plan To whom it may concern, Please find attached Architectural Review Board Checklist and an accompanying exhibits in considering ARB approval. The site plan proposes a 11,402 SF (ground floor) church to be placed at the corner of Hansen Rd and Rolkin Rd. Street improvements will be provided meeting Entry Corridor requirements (size, spacing, and species) along both roads. The site plan and landscape plan also comply with of the Memorandum of Agreement set forth by the Thomas Jefferson Memorial Foundation for Pantops PD-MC parcels zoned by ZMA 98-20. Additional mixed plantings have been located around the site to encourage a more naturalistic appearance and to mitigate the Monticello viewshed. Building materials and colors have been specified materials to comply with Entrance Corridor requirements. If you have any questions please feel free to contact me via e-mail at peter@shimp-engineering.com or Justin Shimp at Justin@shimp-eng1neering.com or by telephone at 434-227-5140. Sincerely, Peter Russell Shimp Engineering, P.C.