Loading...
HomeMy WebLinkAboutSDP201800045 Review Comments Appeal to BOS 2018-08-10County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA, 22902 434-296-5832 Memorandum To: Scott Collins (scott@collins-engineering.com) From: Christopher Perez, Senior Planner Division: Planning Date: August 10, 2018 Subject: SDP2018-45 North Pointe — Northwestern Residential Area — Final Site Plan The County of Albemarle Planning Division will recommend approval of the plan referenced above once the following comments have been satisfactorily addressed (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.): [Each comment is preceded by the applicable reference, which is to the Subdivision/Zoning Ordinances unless otherwise specified.] 1. [4.11.4, SP2002-35, SP2002-47, ZMA2000-91 Access Easement to TMP 32-22K]. Improvements are proposed within the existing access easements serving TMP 32-22K1, DB 1663 PG 648. Revise the plan to omit all proposed improvements from the easements or work with the easement holder to vacate and relocate the access easements. The following improvements shall be removed from the easements: sanitary sewer lines serving the development, retaining walls, residential lot 1 & lots 22-35, stormwater pipes and drainage pipes/easements, a monument sign, two parking spaces, portion of Girard lane (Private Road), and the fire hydrant. As proposed these improvements impede the use of the easements and shall not be permitted. Revise. Final: Remove the turnaround for Girard Lane from the easement. Additionally, inlet and manhole structures shall be located outside of the 50' grading easement leading to the adiacent parcel. Landscaping shall also be removed from the easement. It also appears that pipes 5, 35, and 59 need to be deeper - x , to allow construction of a future road in the easement. A profile and rough design of a o Qp connector road in the easement is needed toQ4� verify that storm and other utilities are shown deep enough. Provide this information for Engineering review and approval prior to final s y. site plan approval. , r 2. [32.7.9.7, 14-401] Double Frontage. Throughout the plan there are numerous lots which are proposed as double frontage lots. This type of lot layout is prohibited. As discussed at the site review meeting, the applicant plans to revise some of the private roads to alleys to avoid some of the double frontage issues. Where double frontage is unavoidable because of the design/layout, either provide 20' of common area between the lot and the second street or request an agent approved variation with required justification in 14-203.1(13). Staff is not compelled to support such a waiver without a 20' buffer planted with screening trees as provided for in Section 32.7.9.7. Final: Comment not adeauatelv addressed. Buildings # 2. 30. 31. 32. and 33 are urovided 20' landscape buffers to avoid the double frontage classification, however, as designed they are not sufficient, as the proposed lots lack the required 6' landscape strips (on Aldrich Lane, Dillon Court, Girard Lane. and Walk Court) and the reauired sidewalks on the drivewav side of the lots (Dillon Court, Girard Lane, and Walk Court). Revise. 3. [32.7.2.2, 14-410(H)] Sidewalks and Landscape Strips. Provide sidewalks and landscape strips on both sides of all private streets throughout the development, regardless of driveways. Final: Comment not addressed. 4. [32.7.2.2, 14-410(H), 14-422(D)] Sidewalk and Landscape Strip Design. The planting strips shall be located between the curb and the sidewalk. Final: Comment not addressed. 5. [32.7.2.2, 14-410(H)] Sidewalks and Landscape Strip. The necessary street improvements, sidewalks and landscape strips, are located outside of the private street right-of-way and instead are located on individual lots in proposed easements. If this design is to remain, all front setbacks shall be measured from the back of these easements. Staff recommends these improvements be placed within the private right-of-ways. Final: Comment not addressed. 6. [ZMA2013-14, ZMA2000-91 Provide 5' wide bike lanes on each side of the Lewis and Clark. Revise. Final: Comment not addressed. Cutsheets for the roads depict a 5' bike lane; however, sheet 5 and 6 label these lanes as 4' wide. VDOT requires a minimum of 5' bike lanes. Revise. 7. [ZMA2013-14, ZMA2000-91 Provide a public access easement along the private street and sidewalks for Aldrich Lane, which will connect to the publicly dedicated path within the greenway dedication area. Final: Comment not adequately addressed. Continue the 20' public access easement along the road and both sidewalk of Aldrich Lane to Lewis and Clark Drive. 8. [ZMA2013-14, ZMA2000-91 Proffer 5.3.1(c)(1). Phase III Road Improvements required to be approved and either build or bonded before final site plan approval. (c) Phase III Road Improvements. Prior to approval of a subdivision plat or site plan for any development of the Neighborhood Investments Property or any portion thereof, Owner shall obtain all associated permits and post all associated bonds required for the construction of the following road improvements (collectively, the "Phase III Road Improvements") to the extent any such road improvements have not already been completed: (1) Northernmost Entrance (opposite Lewis & Clark Drivc) on U.S. Route 9: (i) U.S. Route 29 Southbound — construction of left turn lane with taper. (ii) Northwest Passage from U.S. Route 29 to the south property line of Tax Map 32, Parcel 22K as shown on the Application Plan. (iii) U.S. Route 29 Northbound — construction of a right hand turn lane, the geometries of which will be subject to VDOT approval. (iv) If the traffic signal to be constructed by others is in place prior to Owner commencing work on this Northernmost Entrance, and such traffic signal only includes three legs, Owner shall add the fourth leg to the signal, which shall include additional mast arms, signal heads and ancillary equipment necessary to support Northwest Passage's use of the intersection, as determined by VDOT. If such traffic signal is not in place and the vehicular traffic generated by the Project causes the VDOT signal warrants to be met, and VDOT requires that a traffic signal be installed as a condition of the entrance permit, Owner shall install such traffic signal. Final: Comment not addressed. 9. [ZMA2013-14, ZMA2000-91 Proffer 5.3.3. 5.3.3 Prior to the approval of plans for improvements at any U.S. Route 29 intersection, Owner shall provide VDOT traffic signal network timing plans that VDOT finds acceptably address the impacts of the proposed traffic signals for peak traffic periods. Final: Comment not addressed. 10. [SP2006-34 Condition #3 & ZMA2013-14, ZMA2000-9 Proffer 4.1.] A revised CLOMR showing the change in the floodplain will be required prior to final site plan and VSMP approval. Final: Comment not addressed. Please work with Engineering. 11. [ZMA2013-07 Application Plan] Show areas of greenway and conservation areas from application plan on all relevant sheets of the site plan. The plan should show clear labels and borders for each feature. Areas to be dedicated to public use should be identified throughout the plan. 12. [ZMA2013-07 Application Plan] Once conservation lines are shown. Provide written certification from a licensed surveyor or engineer confirming that the conservation line shown on the application plan for ZMA 2013-07 and the conservation line shown on this site plan are in the exact same location. A note on the plans will suffice. Final: Comment not addressed. 13. [ZMA2013-14, ZMA2000-91 To ensure the long-term implementation of the zoning for the North Pointe development, prior to final site plan approval provide written documentation from the owner of TMP 32-23, Violet Hill Associates C/O Great Eastern Management Co, which states that they are aware and agree to the following, which affect the use of their property. Final: Comment not addressed. Ia. [ZMA2013-14, ZMA2000-9, SP2002-721 Unit Types. The North Pointe development is required to have a minimum of 205 multifamily units. The application plan lists the units in this section of North Pointe (Northwestern Residential) as multifamily units. Currently single-family attached townhomes on individual lots are proposed for this section. This modification in unit type is permitted; however, staff feels it pertinent to notify the other owner of this modification as they will be required to develop the minimum number of multifamily units on their property. Please provide written documentation from the owner of TMP 32-23, Violet Hill Associates C/O Great Eastern Management Co, that they are aware of this modification. Final: Comment not addressed. lb. [ZMA2013-14, ZMA2000-91 Road Alignment. The alignment of Lewis and Clark Drive at the shared property line of TMP 32-22K and TMP 32-23 is shifting locations from what was depicted on the application plan. Provide written documentation from the adjacent property owner, Violet Hill Associates C/O Great Eastern Management Co, that documents they are in agreeance with the shift in alignment as proposed on the site plan under review. Final: Comment not addressed. lc. [ZMA2013-14, ZMA2000-91 Amenities and Open Space. The open space and amenities required throughout the North Pointe development are to be accessible for use by all section of the development. Provide written documentation from the adjacent property owner, Violet Hill Associates C/O Great Eastern Management Co, that documents they understand this criteria. Each of the developments Covenants and Restrictions documents and plans shall make note of this. Final: Comment not addressed. 14. [ZMA2013-14, ZMA2000-91 Proffer 9.1. Prior to final site plan approval, demonstrate to the satisfaction of the County Engineer that stormwater basin 10 (currently labeled as SWM Facility A) has enough room to be redesigned and enlarged to accommodate all stormwater from the future elementary school lot located on TMP 32-23. Depict, label, and dimension all easements necessary for this expansion on the facility, to also include access easements, temporary construction easements, and permanent SWM facility easements. Final: Comment not addressed. Additionally, provide the slope for the SWM access road. This shall meet county design standards. Final: Comment not addressed. 15. [ZMA2013-14, ZMA2000-91 Proffer 8.2. Affordable Housing. Label the 28 units that are to be affordable. Final: Comment not addressed. 16. [Comment] Road Alignment. The current alignment for Lewis and Clark Drive crosses onto a small portion of TMP 32-22P. Prior to final site plan approval a boundary line adjustment shall take place. Final: Comment not addressed. 17. [ZMA2013-14, ZMA2000-91 Revise the tracking of unit type throughout the plan. The proposed unit types are attached townhomes, not multifamily, nor other, specifically list them as "Attached Townhomes". Final: Comment not addressed. 18. [4.12.16] Guest Spaces. Label all guest spaces on the plan. Final: Comment addressed. 19. 14.12.16] Parking Spaces. There is a typographical/math error for the parking provided. 409 is listed; however, it should be 414, which equals parking required. Final: Comment addressed. 20. [Comment] Throughout the plan label and provide acreages of all open space, conservation, greenway, and buffer areas. Final: Comment not addressed. 21. [Comment] Because each driveway varies in size please dimension the driveways for each lot. Please depict, label, and dimension the garages for each lot. Final: Comment not addressed. Also, the driveways for Lot 32 and Lot 33 do not meet the 18' minimum for length requirement. 22. [ZMA2013-14, ZMA2000-91 Setbacks. Revise the setbacks to match the setbacks for the unit type "Attached Townhomes": Front min 8' and max 30', side 6', rear minimum 10' and max none. Garage doorway 18'. Final: Comment not addressed. Currently the plan lists the front setback maximum as 50% however, 30' is the maximum. Revise it to 30' maximum. Also, Lot 143 and 144 do not meet maximum front setbacks. Revise. 23. [Comment] Why is "Building 6" listed as a building type B, when building 1 and 13, located adjacent to it are type A? Ensure all the building types are appropriately labeled throughout the plan. Final: the developer's purview. 24. [SP2006-34] Condition #L County and VDOT approval of the final lane configuration for the Northwest Passage over the stream crossing with the final road plans. Final: Comment not addressed. Road plan still pending. 25. [SP2006-34] Condition #2. County and VDOT approval of final design plans and hydrologic/hydraulic computations for the stream crossing. Final: Comment not addressed. Road plan still pending. 26. [SP2006-34] Condition #9. All of the above noted landscaping shall be shown on the road plans submitted for the Northwest Passage prior to final site plan approval. The plans shall include complete planting schedule key to the plan. The plans are subject to approval of the Design Planner. Final: Comment not addressed. Road plan still pending. 27. [SP2006-34] Condition #5. Provide a stream buffer mitigation plan for approval by the Natural Resources Manager in accordance with this condition. Final: Comment not addressed. 28. [SP2006-34, SP2002-721 Conditions. All conditions of the SPs remain valid and shall be complied with prior to final site plan approval. Final: Comments still relevant. 29. [32.6.2(d)] Water and sewer facilities. Provide profiles and cross sections of all water and sewer lines including clearance where lines cross. Final: Comment addressed. 30. [32.6.2(d)] Water and sewer facilities. Provide the station on the plan to conform to the station shown on the profile and indicate the top and invert elevation of each structure. Final: Comment addressed. 31. [32.6.2(d)] Water and sewer facilities. Provide all sewer appurtenances by type and number. Final: Comment addressed. 32. [32.6.2(e)] Public facilities and utilities. All water and sewer facilities to be dedicated to public use and the easements for those facilities and shall be identified by a statement that the facilities are to be dedicated to the Albemarle County Service Authority. Final: Comment addressed. 33. [32.5.20)] Building 26 does not appear to be served by sewer, as a line does not run along its frontage. Please verify. Final: Building # have been rearranged since initial site plan review. 34. [32.5.2(n) & 4.16] Recreational requirements of section 4.16 are applicable to Planned Development zoning districts. Demonstrate how the recreational regulations will be met and if substitutions will be provided with this portion of the development. Final: Comment partially addressed with the minimum recreational area calculations being provided; however, the minimum facilities are not provided. Revise. 35. [32.6.2(d)] Drainage easements outside of the public right-of-way shall not be dedicated to public use, unless VDOT has agreed to accept and maintain these easements. Final: Comments for informational purposes only. 36. [32.6.20)] Landscape plan. A landscape plan that complies with section 32.7.9 is required with the final site plan. Additionally, landscaping shall also be in conformity with the conditions of approval of SP2006-34, ZMA2013-14. Final: Revise the landscape plan as follows: Sourwood trees are to be 6-7' tall at time of planting. Sargents Crabapple trees are to be 6-7' tall at planting. Also, provide landscape calculations for canopy and street tree calculations. Ensure you also provide required and provided calculations for these figures. 37. [32.7.9.4(b)] Existing trees may be preserved in lieu of planting new plant materials in order to satisfy the landscaping and screening requirements of section 32.7.9, subject to the agent's approval. If you intend to use existing trees to satisfy any of the landscape plan requirements, please include the following: 1. Areas and other features shown on landscape plan. The landscape plan shall show the trees to be preserved, the limits of clearing, the location and type of protective fencing, grade changes requiring tree wells or walls, and trenching or tunneling proposed beyond the limits of clearing. 2. Conservation checklist. The applicant shall sign a conservation checklist approved by the agent to ensure that the specified trees will be protected during construction. Except as otherwise expressly approved by the agent in a particular case, the checklist shall conform to the specifications in the Virginia Erosion and Sediment Control Handbook, pages III-393 through III-413, and as hereafter amended. Final: Comment not addressed. 38. [Comment] The final site plan shall not be approved until all SRC reviewers have approved the plan. Their comments attached. Final: Comment still relevant. Additional Comments on the Final 39. [Comment] Stormwater Basin B depicts proposed grading within the 100' stream buffer. This is not permitted. Revise. 40. [ZMA2013-14, ZMA2000-91 Application Plan. The open space labeled and depicted on the cover sheet (below) is required to be dedicated to the County per the rezoning. Revise. 41. [Proffer 2.11 Depict the entire 40-foot landscaped buffer on the landscape plan. 42. [32.7.9.4(b)] Show trees to be preserved, the limits of clearing, the location and type of tree protective fencing as required by this section. 43. [Comment] Provide the SDP# on the cover sheet: SDP2018-45 North Pointe — Northwestern Residential Area — Final Site Plan Please contact Christopher Perez in the Planning Division by using cperez(c-r�,albemarle.org or 434-296-5832 ext. 3443 for further information. Fire and Rescue — Shawn Maddox 1. Add a fire hydrant near the intersection of Aldrich Terrace and Dillon Court 2. All streets with an unobstructed clear width of less than 28' shall be marked no parking. 3. A fire flow test will be required prior to final acceptance. SNM E911- Elise Kiewra 1. Pages 11 and 32 show Girard Ln and should say Walt Ct, please update these. Building Official — Mike Dellinger 1. Retaining walls greater than 3 feet in height require a separate building permit. Walls exceeding 4 feet in height require an stamped engineered design also. ARB - Margaret Malinewski 1. An ARB final site plan submittal is required, including both site plan and architectural drawings addressing all ARB final site plan checklist items and all comments outlined in the April 5, 2018 ARB action letter. Application, checklists, and guidelines can be found at www.albemarle.org/arb. — juattnew went[ana 1. A revised VSMP plan will need to be approved prior to final site plan approval. 2. Revised road plans will need to be approved prior to FSP approval. 3. All plans related to the Rt. 29 improvements will need to be approved prior to FSP approval. 4. The public road/ROW has been shifted about 20' SW of previously shown locations and improvements are shown on an adjacent parcel. Please provide an easement/BLA and verify that the connection to the rest of North Pointe is still viable. An easement will be needed if the barricade is to be placed on the adjacent parcel. 5. Private roads are shown as being designed to 15mph AASHTO standards and will need to be revised to meet the minimum requirements of the Design Standards Manual for multifamily private streets (K crest is 5 minimum and K sag is 15 minimum). The alley should be designed to these standards as well. [14-412B, DSM] 6. Trees are shown in the site distance easement for Aldrich Terrace at the intersection of Dillon Court. Please include these on the sight distance profiles to verify they are not blocking the sight distance. 7. Provide verification from FEMA that any changes from the approved CLOMR can be addressed later with the LOMR. 8. Show all SWM easements on the plans. Offsite easements will need to be recorded prior to VSMP approval. The access to Facility A will also not work as shown with the 2:1 slopes. 9. Inlet and manhole structures should be located outside of the 50' grading easement leading to the adjacent parcel. Landscaping should also be removed from the easement. It also appears that pipes 5, 35, and 59 should be deeper to allow construction of a future road in the easement. A profile and rough design of a connector road in the easement would be helpful to verify the storm and other utilities are shown deep enough. 10. Show the extents of the geogrid behind the SWM Facility B retaining walls to ensure they are outside of the grading easement. ACSA - Richard Nelson 1. Final Site Plan is currently under review. Comments were returned to Collins June 19th and are waiting on a resubmittal. Also, if there is a future road proposal, we would like it to be shown on the plans to confirm there are no concerns. VDOT - Adam Moore See attached review comments. Stephen C. Brich, P.E. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper Virginia 22701 August 2, 20I8 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Christopher Perez Re: North Pointe Northwest — Final Site Plan SDP-2018-00045 Review # 1 Dear Mr. Perez: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, dated 1 I June 2018, and offers the following comments: 1. As stated in the Initial Site Plan review, the existing access easement to parcel 32-22K1 does not meet corner clearance requirements along the proposed alignment of Lewis & Clark Drive; therefore, allowing a full access entrance for it is not a- requirement. If discussions with the adjoining property owner occur, the Department's recommendation would be for them to connect somewhere through the proposed development where the parcel can have full access. 2. Additionally, regardless of the existing easement, installation of an entrance here will require review by VDOT and a permit (depending on the acceptance status of the roads). 3. As stated in previous reviews of this development, the posted speed limit should be no less than 30 mph. The typical section for Lewis & Clark Drive calls for a posted speed limit of 25 mph. 4. The Route 29 Improvements Plan (SUB201600196) for the entrance of this site, which must be approved in conjunction with this plan, has not been approved. 5. A temporary turnaround is required at the end of Lewis & Clark Drive, or acceptance will end at the AIdrich Terrace intersection. See Appendix F of the Road Design Manual for turnaround design standards, If further information is desired, please contact Justin Deel at 434-422-9894. VirginiaDOT.org WE KEEP VIRGINIA MOVING August 2, 2018 Christopher Perez Page 2 A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, 'o4m- q4j�k' Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING