Loading...
HomeMy WebLinkAboutWPO201700065 Review Comments WPO VSMP 2017-09-08 o, v e,. cAlis fig..7 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 VSMP Permit plan review Project title: Brown Toyota(Umansky Toyota) Project file number: WP0201700065 Plan preparer: Clark Gathright [cgathright@dgarchs.com] Owner or rep.: Virginia First Family of Fine Cars [N/A] Plan received date: 1>!e\ 1 17'A u�a u s t, 201 1,017 Rev 3—3 January 2018 Date of commens: 1 i 7 Rev 2—3"October, 2017 Rev 3—20 February 2018 Reviewers: Rev 1 —I3vuuy Jocz Rev 2—Bobby Jocz Rev 3—Bobby Jocz County Code section 17-410 and Virginia Code§62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is Approved. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A.Stormwater Pollution Prevention Plan (SWPPP) The SWPPP cont;nt requirements can be found in County Code section 17-405. A SWPPP must contain(1)a PPP,(2)an ESCP,(3)a SWMP,and(4)any TMDL measures necessary. 1. Cover sh et should be provided which includes WPO application number[WPO201700065]. Information cu date of topography,parcel details, and a legend for symbols used should be included ,.n this sheet. Rev 2— 'art[ally addressed. Please provide date of topography.Include a legend outlining symbols nd'line types used in plans. Topography must be filed verified by designer within the last y•ar(provide date of last site inspection). 2. No SWP P provided. Please see template located on County website for guidance on SWPPP developm nt. Rev 2—I and disturbance smaller than 10,000 sq-ft. not needed 3. Complete. DEQ Construction General Permit Registration from must be provided. Rev 2-I and disturbance smaller than 10,000 sq-ft.not needed 4. Remove t le existing 1$"pipe from the SWM plan if not to be included in final design. Rev 2— • ddressed 5. Label cm our elevations within parking area for clarity. Rev 2— ddressed 6. Show bin is of gravel and payed parking areas. Rev 2—: ddressed Engineering Review Comments Page 2 of 2 7. Provide square footage or acreage for each drainage area identified. Rev 2—Addressed B.Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. No PPP provided.Please see SWPPP template on County website for guidance. Rev 2—See Comments A.3 and A.2 C. Stormwater Management Plan(SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is Approved,and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. Show limits of land to be placed in SWM Forest and Open Space Easement. Rev 2—Addressed. 2. Underground detention system must be placed in SWM maintenance easement,please show on plans. A SWM Maintenance agreement will be needed. Rev 2—Addressed. Maint.Agreement currently under review. 3. VRRM spreadsheet is filled out incorrectly. Pre-developed forested area should not be included as a pre development condition as it is not currently in conservation. Re-development worksheet needs to be used to determine the amount of phosphorus reduction needed for the change from managed turf/forested area (gravel lot area)to impervious surface.New development worksheet should then he used to determine how muchphosphorous"credit"is gained by conserving forest and open space. The difference in these two values is the amount of phosphorous reduction needed (or exceeded). Rev 2—Addressed. • 4. Provide plan view of riser. Rev 2—Addressed. D.Erosion and Sediment Control Plan(ESCP) Virginia Code§62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is Approved.The erosion control plan content requirements can be found in County Code section 17-402. 1. Inlet protection should be placed around existing grate inlet. Rev 2—Sediment log not approvable E&S measure. Recommend Std.3.07 "Block and Gravel Drop Inlet sediment filter",include detail on sheet 2. 2. Provide engineering details sheet containing the inlet protection, and silt fence engineering details. Rev 2—Addressed Bobby Jocz Albemarle County Community Development—Engineering rjocz@albemarle.org (434)296-5832 ext. 3283 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Brown Toyota Project file number: WP0201700065 Plan preparer: Clark Gathright [cgathright@dgarchs.com] Owner or rep.: Virginia First Family of Fine Cars [N/A] Plan received date: Rev 1— 17' August, 2017 Rev 2 — 8" September, 2017 Date of comments: Rev 1 — 29t' August, 2017 Rev 2 — 3r1 October, 2017 Reviewers: Rev 1 —Bobby Jocz Rev 2 — Bobby Jocz County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is Approved conditional on small corrections detailed below included in final submittal. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. Cover sheet should be provided which includes WPO application number [WP0201700065]. Information on date of topography, parcel details, and a legend for symbols used should be included on this sheet. Rev 2 — Partially addressed. Please provide date of topography. Include a legend outlining symbols and line types used in plans. Topography must be filed verified by designer within the last year (provide date of last site inspection). 2. No SWPPP provided. Please see template located on County website for guidance on SWPPP development. Rev 2 — Land disturbance smaller than 10,000 sq -ft. not needed 3. Completed DEQ Construction General Permit Registration from must be provided. Rev 2 — Land disturbance smaller than 10,000 sq -ft. not needed 4. Remove the existing 18" pipe from the SWM plan if not to be included in final design. Rev 2 — Addressed 5. Label contour elevations within parking area for clarity. Rev 2 — Addressed 6. Show limits of gravel and paved parking areas. Rev 2 — Addressed 7. Provide square ruuLage or acreage for each drainage area identified. Rev 2 — Addressed Engineering Review Comments Page 2 of 3 B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. No PPP provided. Please see SWPPP template on County website for guidance. Rev 2 — See Comments A.3 and A.2 C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is Approved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. Show limits of land to be placed in SWM Forest and Open Space Easement. Rev 2 — Addressed. 2. Underground detention system must be placed in SWM maintenance easement, please show on pl;inc A 0,W1vr Mai„tonnn„ e agreement will be needed. Rev 2 — Addressed. Maint. Agreement currently under review. 3. VRRM spreadsheet is filled out incorrectly. Pre -developed forested area should not be included as a pre development condition as it is not currently in conservation. Re -development worksheet needs to be used to determine the amount of phosphorus reduction needed for the change from managed turf/forested area (gravel lot area) to impervious surface. New development worksheet should then be used to determine how much phosphorous "credit" is gained by conserving forest and open space. The difference in these two values is the amount of phosphorous reduction needed (or exceeded). Rev 2 — Addressed. 4. Provide plan view of riser. Rev 2 — Addressed. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is Approved conditional on small corrections detailed below included in final submittal. The erosion control plan content requirements can be found in County Code section 17-402. 1. Inlet protection should be placed around existing grate inlet. Rev 2 — Sediment log not approvable E&S measure. Recommend Std. 3.07 "Block and Gravel Drop Inlet sediment filter", include detail on sheet 2. 2. Provide engineering details sheet containing the inlet protection, and silt fence ,:ngineering details. Rev 2 — Addressed The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate Engineering Review Comments Page 3 of 3 request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hLtp://www.albemarle.org/deptforms.asp?department--cdengwpo Bobby Jocz, EIT Albemarle County Community Development — Engineering rjocz@albemarle.org (434) 296-5832 ext. 3283 September 8, 2017 Bobby Jocz Senior Planner Community Development County of Albemarle 401 McIntire Rd. Charlottesville,VA 22902 RE: WP0201700065 Brown Auto Group Bobby: The following is a response to the review comments in your review comments dated August 29, 2017: A. SWPPP comments 1. The WPO application number is now on the plan. PP 2. The total proposed disturbed area is approximately 1,375 sq.ft.,so a SWPPP will not be necessary. Ore' 3. See Comment 3 above. 4. The existing 18"pipe is noted to be removed. OP- 5. Additional contour labels are provided. br-Th 6. The gravel area is now shown with a hatched pattern. O 7. The drainage area square footage is provided for the subject drainage relating to the detention calculations.0' B. PPP comments 1. The total proposed disturbed area is approximately 1,375 sq.ft.,so a SWPPP will not be necessary. B.Clark Gathright,P.E. B.Clark Gathright,LLC 100 10th St NE Suite 200 Charlottesville,VA 22902 434-971-8848 cgathright@dgarchs.com COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Brown Toyota Project file number: WP0201700065 Plan preparer: Clark Gathright [cgathright@dgarchs.com] Owner or rep.: Virginia First Family of Fine Cars [N/A] Plan received date: IT" August, 2017 Date of comments: 291 August, 2017 Reviewers: Bobby Jocz County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Cover sheet should be provided which includes WPO application number [WP0201700065]. Information on date of topography, parcel details, and a legend for symbols used should be included on this sheet. 2. No SWPPP provided. Please see template located on County website for guidance on SWPPP development. 3. Completed DEQ Construction General Permit Registration from must be provided. 4. Remove the existing 18" pipe from the SWM plan if not to be included in final design. 5. Label contour elevations within parking area for clarity. 6. Show limits of gravel and paved parking areas. 7. Provide square footage or acreage for each drainage area identified. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. No PPP provided. Please see SWPPP template on County website for guidance. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. Show limits of land to be placed in SWM Forest and Open Space Easement. 2. Underground detention system must be placed in SWM maintenance easement, please show on Engineering Review Comments Page 2 of 3 plans. A SWM Maintenance agreement will be needed. 3. VRRM spreadsheet is filled out incorrectly. Pre -developed forested area should not be included as a pre development condition as it is not currently in conservation. Re -development worksheet needs to be used to determine the amount of phosphorus reduction needed for the change from managed turf/forested area (gravel lot area) to impervious surface. New development worksheet should then be used to determine how much phosphorous "credit" is gained by conserving forest and open space. The difference in these two values is the amount of phosphorous reduction needed (or exceeded). 4. Provide plan view of riser. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Inlet protection should be placed around existing grate inlet. 2. Provide engineering details sheet containing the inlet protection, and silt fence engineering details. The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction Engineering Review Comments Page 3 of 3 conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; htip://www.albemarle. org/deptfomis.asp?department--cdengwno Bobby Jocz, EIT Albemarle County Community Development — Engineering rjocz@albemarle.org (434) 296-5832 ext. 3283