Loading...
HomeMy WebLinkAboutWPO201700065 Application WPO VSMP 2017-08-17 Albemarle C-,inty ..... i Community Development Department so00101 McIntire Road Charlottesville,VA22902-4596 \lige (434)296-5832 Fax:(434)972-4126 Planning Application PARCEL/ OWNER INFORMATION , . . IMP 07800-00-00-0140 Owner(s): VIRGINIA'S FIRST FAMILY OF FINE CARS INC C/O BROWN HO Application# WP021700065 PROPERTY INFORMATION Legal Description 1 ACREAGE ,1 BROWN TOYOTA , 1 Magisterial Dist.iRivanna , Land Use Primary Commercial Current AFD Not in A/F Dilrict—Ei Current Zoning Primary!Highway Commercial Iv] APPLICATION INFORMATION Street Address 1357 RICHMOND RD CHARLOTTESVILLE, 22911 Entered By — Judy Martin Dv Application Type 'Water Protection Ordinances t787 aria 17 Project Brown Toyota -VSMP Received Date 08/17/17 Received Date Final Submittal Date Total Fees 145 Closing File Date Submittal Date Final Total Paid 145 Revision Number Comments ..,. Legal Ad A i SUB APPLICATION(s) Type 1 Sub Applicaiio Comment Star mwater Management/BMP Plan 08/17/17 - .,,, . , , _,, ,,,,,,, ,,,. , , , , ,,,. _ . ,..,,_. 1 ;APPLICANT/CONTACT INFORMATION ContactType N Address CityState .„ Zip Phone PhateC eil 4, .-.,, ,,,....„ ,.,:,.., ,,,.,,,,,,, , ,.,,,,,...„,,,,..„ ,,_ _, , 13 rt,,C zntact CLARK OATH ilia;if 100 10TH ST., NE,STE.200 CHARLOTTESVILL 22902 4349718848 1 Signature of Contractor or Authorized Agent Date . + Mrd rrr/ Virginia Stormwater Management Program (VSMP) Application for Albemarle County Project Name: 3Y-‘5\-1 i--. 'j am (The name should be the same as it appears on plans) Is this an amendment to an approved plan? Yes\til No 0 Is this a revision or resubmission for review? Yes 0 No 0 County File Number:5 bf Z t.11 o o 431 (to be provided by the County for new applications) The following etre required elements of new applications[from code section 17-401]. For revisions or amendments,please indicate which items are being amended. Signatures must be provided for any submission. 0 A. Signature of the Property Owner for each parcel: (Required with every submission or revision,NOT TO BE SIGNED BY AN AGENT OR CONSULTANT) By signing this application as the owner,I hereby certify that all requirements of these plans and permits will be complied with,and I have the authority to authorize the land disturbing activities and development on the subject property. I hereby grant the County of Albemarle the right to enter upon the property as required to ensure compliance with the`approved plans and 1permits. Y iyoiiv�iA+.s Fit-A Foav;Iki of T 1r� CYS Tomoi•kg44.4"- Tax Map&Parcel Prifit Name of Property Owner Signature of Owner Date 8 - L442.t. LA EN Tax Map&Parcel Print Name of Property Owner Signature of Owner ate Tax Map&Parcel Print Name of Property Owner Signature of Owner Date Tax Map&Parcel Print Name of Property Owner Signature of Owner Date Contact Information for the Owner(s)to receive correspondence: Print Name Ci ar G kN)3 'j Address, ,,4Q \'C 'k St_,i'VE- S►.mac►`e 2 ) City cY f 4 �5\!I ��' State VA Zip 2" ' a Daytime Phone(4 'j) E-mail LA< 1-0/"l(1WC-1-CA rA Y r.\N5• 7/1/14,Revised:7/10/14,1/7/14 Page 1 oft fir/ O B. All Fees [Code section 17-208] For new or modified plans;Total acres proposed to be disturbed 0 0 2G Ass._. Acres to be Total Fee Fee Due with this Fee with Transfer or disturbed .. ' . ion modification of permit Less than 1 $290 4111=111W $20 1 and less than 5 $2,700 $1,350 $200 5 and less than 10 $3,400 $1,700 $250 10 and less than 50 $• 4,500 $2,250 $300 50 and less than 100 $• 6,100 $3,050 $450 100 and more $9,600 $4,800 $700 For(minor)amendments to an approved plan;$200 per review Variances;$150(per request) Mitigation Plan;$150 O C. Registration Statement on the official DEQ form. O D. Erosion and Sediment Control Plan satisfying the requirements of code section 17-402. N E. Stormwater Management Plan satisfying the requirements of code section 17-403. O F. Pollution Prevention Plan satisfying the requirements of code section 17-404. O G. Stormwater Pollution Prevention Plan satisfying the requirements of code section 17-405. O H. Mitigation Plan satisfying the requirements of code section 17-406 for any proposed disturbance of stream buffers. O I. Requested Variations or Exceptions as provided in code sections 17-407 and 408. O J. Construction Record Drawings(as-builts) for any existing facilities in the proposal satisfying the requirements of code section 17-422. Provide 2 copies of all plans and any supporting documents. Professional seals must have original signatures. Additional information if not provided on plans and documents: Name of a Contact Person for correspondence(usually the plan preparer,consultant or agent)al Print Name C o -��'�c� 1- pl-, 1 osc,e Address J City State Zip Daytime Phone( ) E-mail *When applications and plans are reviewed,but not approved,and a response to comments is not received within 6 months from the date of county comments,the application will be deemed withdrawn. Applications without valid owner's signatures will not be considered valid. FOR OFFICE USE ONLY WPO# A Fee Amount$ .00 Date Paid Q b41 t1( By who? , 4F W` Receipt# Ck# 1118 By: K� 7/1/14,Revised: 7/10/14, 1/7/14 Page 2 of 2 ore A e. taf YtRCiita�0 Erosion & Sediment Control-Stormwater Management Preconstruction Conference Checklist Name of Plan: 'Baty,r.) —76)(04 Plan No.: WPO 2I ,0O065— Date: 3 -5--/r 1)Copies of approved plan given to: Owner or Authorized Agent l Contractor f 2) Have all the conditions been met? 1/45 3) Responsible Land Disturber: ?64J Zr/, rh /YT�J l ( I 1- er_. Cert./Lic.No.: 371q 'U Type: Address/Phone/ Mobile Phone: 3-2-- e,/ i ,jZ tl 2c)/ Q_4314) 242 (d'-z, 4)Name of Prime Contractor: ifq/k— GA41. rL 4 • C4 GAM( i417L L-t c- Address/Phone/Mobile Phone: Com) 70 "U2 94 V Name of Subcontractor: MerarlDea rtAT 5G/2-0 le S -4°27 5)Persons in Attendance: ?Job $r Name Firm P" Ettrz. 4/be/he:tete C31_401-4._ 21421, I , floiMego Orictr«c - svgs Lil C3 . Go.rk C 41,v;4„--;\ tLc i"fi , /110,14e4 /rL e t g (6)Date Permit Issued: 3-5—1 — (7)Talk about"First Steps" (Perimeter E&S controls and Tree Protection first), Erosion and Sediment Control Narrative and Sequence of Construction (8) Enforcement and Fees: Warnings, NTC and SWO in that order with re-inspection fees of$250 for NTC's and SWO's. (Mud in the roadway will have a NTC issued without a warning) (9) Review Frequency of Inspections: Every 4 business days or every 5 business days and within 48 hours of a major rain event. Major rain event is .25"or more. Less frequent in areas of non-impaired waterways (5 days or every 7days and within 48hours of a major storm event). 1 of 2 Revised 11/29/2011 C:\Users\gelsie\Desktop\Preconstruction Conf Checklist 9-21-17.doc (10) Review Albemarle County ordinance covering 3:1 slopes and the placement of top soil for required stabilization. Recommend Buckwheat for stockpile stabilization and Millet for temporary stabilization. Review the need for vegetative ground cover for slopes 2:1. (11) Review the 9-month County ordinance. Refer to Ordinance below: Article II, section 17-207 B. Each permit shall also be subject to the following: 1. The permitted land disturbing activity shall be deemed to have commenced on the date the permit was issued, provided that the program authority may establish another date of commencement based on documentation submitted by the owner that clearly demonstrates that the land disturbing activity commenced on that date. 2. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced, except for areas that the program authority finds are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non-erosive surface. For the purposes of this section, a "non-erosive surface" includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete; trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures; and such other surfaces that the program authority determines would adequately provide a permanent barrier to erosion. 3. The time limit for installing permanent vegetation as required by paragraph (B)(2) may be extended by either the program authority or the board of supervisors, or both, as follows: a. The program authority may extend the time limit for installing permanent vegetation up to an additional six (6) months, provided the owner submits a written request to the program authority no less than one (1) month prior to the deadline for installing the permanent vegetation. The program authority may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii)the owner had made good faith efforts to comply with the time limit; and (iii)the owner has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In granting an extension, the program authority may impose reasonable conditions. b. The board of supervisors may extend the time limit for installing permanent vegetation for duration it determines to be appropriate, provided the owner submits a written request to the clerk of the board of supervisors no less than two (2) months prior to the deadline for installing the permanent vegetation. The program authority shall provide its opinion to the board as to the condition of the property with respect to compliance with this chapter and an estimate of the minimum time needed to complete grading and install permanent vegetation for the land disturbance covered by this permit. The board may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii)the owner has plans to effectively control or has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In granting an extension, the board shall set a time limit and may impose other reasonable conditions. (12) Review VSMP-SWPPP requirements. Record Keeping, Pollution Prevention requirements, 7-day temporary stabilization requirement, Concrete/Material Washout requirement, recording of pollutants and their location on site, and the documentation of progress. (13) Review required onsite postings — Registration Statement, DEQ Coverage Letter, and information on where SWPPP is located and who to contact to view. Notes: 2 of 2 Revised 11/29/2011 C:\Users\gelsie\DesktopTreconstruction Conf Checklist 9-21-17.doc