Loading...
HomeMy WebLinkAboutWPO201800055 Plan - VSMP WPO VSMP 2018-08-02REVISIONS AUG 1, 2018 DATE JULY 9, toys V w SITE DATA W OWNER: TMP 055EO-01-3C-000AO 0) I E r W CORNERSTONE FUND 1 LLC Q 04 co 400 LOCUST AVE #3 a� Z UZ a QOM@ CHARLOTTESVILLE, VA. 22902 Og E _ o TMP 055EO-01-00-000EO JA-ZAN LLC 1150 PEPSI PL CHARLOTTESVILLE VA 22901 M V LAI N- w p� —V Q UQ OW J g Z DEVELOPER.-FUNDRA CORNERSTONE 1 LLC 400 LOCUST AVE #3 N LO 1 > CHARLOTTESVILLE, VA. 22902 C-4 o T � V At ') w20 BLOCK 1 1.� HAS & OCK 3 HAS CC 0� PLAN PREPARER: ROUDABUSH, GALE, & ASSOCIATES ' o U \W / CC a � N OZ 914 MONTICELLO ROAD a 0 pR�� ,A CHARLOTTESVILLE, VA. 22902 (434)-977-0205 LAN (AM ND M NT TO W 0201300052) :; OLD TRAIL >Qa TAX MAP PARCEL No: 055EO-01-3C-000AO & 055EO-01-00-000EO w O_ { o VILLAGE � ;i Z EXISTING PARCEL AREA: 55E -01 -JC -A 0.21 ACRES FINAL SITE PLAN #SDP 201300044, ROUDABUSH, GALE & ASSOC. ENGINEERING PLANS LAST Z DATED 5-16-2014 ® 04 55E -02-E 0.47 ACRES % � 0 T CURRENT'WP0201800055 PROPOSED PARCEL AREA: 55E -01 -JC -A 0.24 ACRES 55E -02-E 0.44 ACRES U Eq ZONING: NEIGHBORHOOD MODEL DISTRICT IN ACCORDANCE WITH' PROFFERS 0 5Z OF ZMA-2015-00001 APPROVED ON FEBRUARY 10, 2016 OVERALL AMOUNT OF REQUIRED- J — t — VICINITY MAP VARIATION #10 APPROVED TO REDUCE THE m BLOCK A PHASE IF E OLD MAL SMI CLUB 1'-1000 ET NON-RESIDENTIAL SQUARE FOOTAGE /N BLOCK 3 FROM 10,000 SF TO 7,000 SF, -,A, APPROVED DECEMBER 5, 2012. USE 1, 727 SF RETAIL 'C LANE_ " 2,02J SF OFFICE \� 9 2& 3 BR RESIDENCES BLOCK 4 PHASE ID 4 1 -BR RESIDENCE GAP/J \ TOTAL NON-RESIDENTIAL USE BLOCK 3 9,232 SF BLOCK 4 PHASEB ` \, POOL 5,482 SF BLOCK 3C 3, 750 SF SHEET I N DE)IC BUILDING HEIGHT. 4 -STORIES SETBACKS: ALL MIN/MUM SETBACKS FOR RESIDENTIAL & COMMERCIAL ARE 0 FEET SHEETI---------- COVER SHEET AREA SUMMARIES: 6,490 SF BUILD/NG FOOTPRINT 0� SHEET 2 EXISTING CONDTIONS & DEMOLITION PLAN GROSS RESIDENTIAL DENSITY. 13 APARTMENT UNITS = 54.17 DU/AC 1 \ + + \ J \ < ; ' \ �, ' SHEET 3 ----- EROSION CONTROL PLAN , MAGISTERIAL DISTRICT. WHITE HALL / o \ �. \ \ DRAINAGE DISTRICT. LICK/NGHOLE CREEK j �� �� ! SHEET 4 SWM DRAINAGE COMPLIANCE MAP S. RIVANNA RESERVOIR WATERSHED: SHEET 5 VSMP NOTES &DETAILS "OLD STORMWATER MANAGEMENT: SEE APPROVED SDP2009-093 TRAIL BLOCK 3B- FINAL SITE PLAN" & WPD-2008-0014 OLD TRAIL VILLAGE BLOCK 3 STORMWATER MANAGEMENT PLAN�� j . PROJECT AIREA TOPOGRAPHY.- EXISTING BLOCK 3C TOPOGRAPHY COMPILED FROM RGA AS -BUILT SURVEY DATA DATED JUNE, 2016 �1'l H op D EXISTING CONDITIONS: THIS PLAN SHOWS THE AS -BUILT CONDITIONS FOR THEEXISTING UTILITIES AND AND GRADES. +8 � o�4P rrp� INFRASTRUCTURE Z- 0 kr BENCHMARK: CENTER SS MH. LID ELEV. 692.06 i0 �► �' DATUM: VERTICAL — NAVD 88, HORIZONTAL — NAD 83 WILLIAM J:—L-EDBETTER Lic. No. 1507—B CRITICAL SLOPES: NO CRITICAL SLOPES EXIST WITHIN THE PROJECT AREA LANt %o� FLOODPLAIN: THIS PROJECT AREA IS NOT LOCATED WITHIN FLOODPLAIN LIMITS AS SHOWN ON FLOOD S D sux�E INSURANCE RATE MAP COMMUNITY PANEL NUMBER 510006 0237 D. EFFECTIVE DATE.• FEBRUARY 4, 2005 GENERAL EROSION AND SEDIMENT CONTROL NOTES PARKING: THE SUBJECT PARCELS AREA PART OF A SHARED COMMUNITY PARK/NG AGREEMENT FOR BLOCKS 1, 2 AND J. SEE PARKING SUMMARY AND ANIALYSIS. ES -1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND PARK/NG REQUIRED: PROJECT AREA (BLOCK 3C) RETAIL 12.5 SPACES PER 1000 SF SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED (1,727/1000) * 1.2.5 = 17 SPACES ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA OFFICE 1 SPACE PER 200 SF NET EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR (2,023*0.8)/200 = 8 SPACES 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 2 & 3 -BEDROOM APARTMENT - 2.25 SPACES PER UNIT 9*2.25 = 20 SPACES OLD TRAIL VILLAGE ES -2: THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE 1 -BEDROOM APARTMENT - 1.75 SPACES PER UNIT PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF 4*1.75 = 7 SPACES BLOCK 1, PHASE B & BLOCK 3 PHASE C LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. BLOCK 81 SPACES 1 = 100' EXISTING BLOCK 3B ES -3: ALL EROSION .AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO EXISTING BLOCK 3D 9 SPACES OR AS THE FIRST STEP IN CLEARING. EXIST/NG BLOCK 3A 68 SPACES TOTAL 210 SPACES ES -4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE PARKING PROVIDED: 199 SPACES SEE PARKING SUMMARY AND ANALYSIS FOR LOCATION AND BREAK DOWN. MAINTAINED ON THE SITE AT ALL TIMES. LANDSCAPING: SEE LANDSCAPING PLAN /N FINAL SITE PLAN IISDP 201300044, BLOCK 1, PHASE B & EROSION & SEDIMENT CONTROL LEGEND ES -5: PRIOR TO COWMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN BLOCK 3 PHASE C FOR PLANTINGS, SCHEDULE AND SPECIFICATIONS, NOTES AND DETAILS. INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION LIGHTING: ALL PROPOSED LIGHTING WILL NOT EXCEED 3,000 LUMENS. CONTROL PLPTO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN REVIEWING AUTHORITY.NO EVIDENCE OF A BURIAL SITE WAS FOUND ON THE SUBJECT PARCELS. THE SUBJECT PARCELS ARE NOT PART OF THE ALBEMARLE COUNTY WATER PROTECTION OVERLAY DISTRICT. CE 3.02 � o CONSTRUCTION ENTRANCETS 3.31 TS TEMPORARY SEEDING ES -6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN R EVIEWING AUTHORITY. THE SUBJECT PARCELS ARE NOT PART OF THE THE AGRICULTURAL -FORESTAL DISTRICT. THIS SITE IS LOCATED WITHIN THE WATERSHED OF A PUBLIC WATER SUPPLY RESERVOIR. SF 3.05 �(� X SILT FENCE PS 3.32 PS PERMANENT SEEDING ES -7• AALL ARES ADDI T MES DUR NG ARETO LANDDRAIN TORBING APPROTIE D AND SEDIMENT DURICONTROL MEASURES G SE DEVELOPMENT UNTIL FINAL STABILIZATION HAS BEEN ACHIEVED. P 3.07 INLET PROTECTION DC 3.39 DC DUST CONTROL ES -8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. GENERAL CONSTRUCTION NOTES FOR TOTAL DISTURBED AREA - - 0.30 ACRES ES -9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS STORMWATER MANAGEMENT PLANS OR CLEANUP 70 MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 1. ALL DAMS AND CONSTRUCTED FILL TO BE WITHIN 95% OF MAXIMUM DRY DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL TO BE APPROVED BY A GEOTECHNICAL ENGINEER. A GEOTECHNICAL ENGINEER IS TO BE PRESENT DURING CONSTRUCTION OF DAMS. 2. PIPE AND RISER JOINTS ARE TO BE WATERTIGHT WITHIN STORMWATER ��� T, ,� MANAGEMENT FACILITIES. 3. FOR TEMPORARY SEDIMENT TRAPS OR BASINS WHICH ARE TO BE CONVERTED TO adl 1j.�� 9'���s � � �jL,9rjj' PERMANENT STORMWATER MANAGEMENT FACILITIES; CONVERSION IS NOT TO TAKE un ty N� Community �l� ,r U � i 3 � 'r1i Dfzp�jr rf_,, PLACE UNTIL THE SITE IS STABILIZED, AND PERMISSION HAS BEEN OBTAINED FROM THE COUNTY EROSION CONTROL INSPECTOR. py-' y ------ _,__ J � REVISIONS AUG 1, 2018 DATE JULY 9, toys V w W ..W 0) o U W Z Q 04 co to a� Z UZ QOM@ Og ccW>LL o M r 010 N- w p� —V Q UQ OW J g Z •I 2 N LO > 0 co C-4 o T � V w20 LL 1.� °� m 0� wo o U \W / CC a � N OZ a 0 ,A w W U >Qa w O_ Z a ® 04 W % 0 T REVISIONS AUG 1, 2018 DATE JULY 9, toys FILE NUMBER 8053 SHEET 1 of 5 U W 0) Q a W M �— W Y g Z WO J0 2 U�+ 00 > 1.� °� m C = o U \W / W� a 0 ,A w W U >Qa � J 0 T U 0 J m FILE NUMBER 8053 SHEET 1 of 5 JA V a w ..W O U W N � n CD cot O g Cc Lu Q �N ; 2 o W VCY rz Q �W V V! J Z O N or "C-4 o .. j LL O � 0� w8 w a: V N aW O� W % A4 W W 2 Z Q c� ° a.OW REVISIONS AUG 1, 2018 DATE JULY 9, 2018 1 SCA;EO' CONTOUR INTERVAL 2 FEET Z Q J d. W Z Q 02 °- W 0 v Q MUZ ma.>Z [L 0 Z m Q O W�ir a P (DW Z� 2 O a. J 1 0 r Z �U U)O _J w m FILE NUMBER 8053 SHEET 2 of 5 .t 0?- \ p\A TO C�l po 05 '77 P`G S \ ?� `. � �, �J A�,� I `r -------moi ,\:�• �,/ry � >, P n `D P�1,51 f BENCHMARK _. ".. . CENTER SS MH. LID f� \ W �0'p ELEV. 692.06 - \ \\ V, \ WASHRACK ("WR") SHALL BE INSTALLED AS p /r NECESSARY INCONJUNCTION WITH THE CONSTRUCTION F ENTRANCE AND SLOPE TO TEMPORARY DRAIN.��,, �\ \ j --13 Z o -a , GG rj 1 \ ' Q / ; `• /� TEMP. DRAIN PIT,) G U fL` '� �% -Y' \ \ , / r \ /11 0 40P o _ 694AV ' / -/ pO O \ N taA \ 501,50 9 51 5D \ � e \ a o V �a \\ LIMITS OF DISTURBANCE 7 MPE-0 1- -4C-A — �J 30 ACRES ca PRP SPT <`✓ `!; \ `,.\ \ j J,� /h\ `/ br v / SF Tlh r, z / `' '� OLD 'TRAIL HEIGHTS LLC: ' 'ONE: NMD / USE.- G'ACAN7- 2 r; CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE Cl 25.00' 39.27' 35.36' S 14.57'09" W 90'00'00.00" C2 70.00' 94.59' 87.56' S 73'07'48" E 77'2529.00" C3 9.76' 9.64' 9.26' N 82'41 '08" W 56'37'07" * PUBLIC DRAINAGE EASEMENT LOCATED ON BLOCK JC TO BECOME A PRIVATE DRAINAGE EASEMENT THAT WILL BE OWNED AND MAINTAINED BY THE OLD TRAIL HOA. SCALE 1"=10' 10 0 10 20 SCALE IN FEET LINE I BEARING I DISTANCE L1 I N 30'02'29" W 1 4.08' 0*7�AtiTx of ;j� f o � WILLIAM J. LEDBETTER Lic. No. 1507—B 9ND SURVE��� �I REVISIONS AUG 1, 2018 DATE JULY 9, 2018 SCA 1Eo, CONTOUR INTERVAL 2 FEET U* 4co rrw VJ U ZQ 2 N CO J CL Z� ON NQ g= Z U� w Q� O� otW @ >o J 00Z y Q.Z Z � �r1 0 aa J Q UQ �W O 0 cum)i UN 0� o V Lu 0 LL Z(f) LL 0� wo OC �.m w a Q. Lu V N orz >p< 0 a. J 0 W O 2 a OW wY U REVISIONS AUG 1, 2018 DATE JULY 9, 2018 SCA 1Eo, CONTOUR INTERVAL 2 FEET FILE NUMBER 8053 SHEET 3of5 rrw VJ ZQ 2 ga w J 00Z y a z 0 J > z°��= 0-() o Um QJ Z(f) w OC �.m a 0 >p< 0 a. J 0 T wY U 0 co FILE NUMBER 8053 SHEET 3of5 S� mAw X A N, m MAIN' m"ll 10� . ...... . rr k, POST -DEVELOPMENT i� DRAINAGE AREA i. c A' 0 -3 S6 . .... . . . .. P . . . . . . .... . .. .. .. ... .......... . ...... ---- ..... . ..... ... . ..... LEGEND E � � E DRAINAGE AREA FROM APPROVED SWM MASTER PLAN (WP0201600009) lml� a m DRAINAGE AREA TO EXISTING RETENTION BASIN L-1 ���I,T H OF WILLIAM J. LEDBETTER Lic. No. 1507-B 1%6cZ.11/vD SUR14013:40� SCALE I" = 100' 100 50 0 100 200 SCALE IN FEET • a.10 0 wW CM C0 8 5 Y N 1<0 < s) w Z CL 0 (D cc j< 1 5@ co 2 OU (L Wo Z cn ly Q J co z Q %j UQ w > 0m 00 (L u rr aU 06 J qw W (0h % L4 (III waC cl it W uj -j , -1 L0 cf LL w cm (L r J 9 0 a� (L LU 0 w z 0 m (L 0 U) LEGEND E � � E DRAINAGE AREA FROM APPROVED SWM MASTER PLAN (WP0201600009) lml� a m DRAINAGE AREA TO EXISTING RETENTION BASIN L-1 ���I,T H OF WILLIAM J. LEDBETTER Lic. No. 1507-B 1%6cZ.11/vD SUR14013:40� SCALE I" = 100' 100 50 0 100 200 SCALE IN FEET REVISIONS AUG 1, 2018 DATE JULY 9, 2018 SCALE AS SHOWN CONTOUR INTERVAL NA • a.10 0 wW CM C0 8 5 N 1<0 < s) w Z CL 0 (D cc Lu rt Lu 5@ co 2 OU (L Wo Z cn ly Q J co z Q %j UQ w > 0m 00 (L u rr aU 06 J qw W (0h 0 L4 (III waC 0 u- it W uj -j , -1 L0 cf LL w cm (L r J 9 0 a� (L LU 0 w z 0 m (L 0 REVISIONS AUG 1, 2018 DATE JULY 9, 2018 SCALE AS SHOWN CONTOUR INTERVAL NA FILE NUMBER 8053 SHEET 4 of 5 a.10 W w Lu Z < co JZ ly z 0 J > 0m (L > z 06 J :) 0 W L4 (III waC it W > (L J a� 0 0 U) J FILE NUMBER 8053 SHEET 4 of 5 o Vll^J , TEMPORARY SEEDINGS BY RATES, DEPTHS, AND DATES 175-200 LBS. EQF'I _ E Planting depth � Seedingzones 2 and Seeding Date 3 g Species M Per .<.,c.,,.. HIGH MAINTENANCE LAWN _3 S A, M A "I{r LT 3 6a and 5b AG SS 2/1- 5/1- 8/15- FX IS 110 5/1- . C,3ir jtn.ti� Ci�. 3/15- Imo, ,� i ,11.�rrNr-� A',,11', NIT 9.2 acre Sq. ft (Inches) 30-10-10 MEASURES. LBS/1000SF. INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER 0.. 4/30 1 8/14 11/30 °t$lis EXJEND HUILsAd }I I ,r��� }i TEMPORARY SEEDING MIXTURES FOR Ts THE PIEDMONT AREA TABLE 26 TEMPORARY SEEDINGS BY RATES, DEPTHS, AND DATES 175-200 LBS. EQF'I _ E Planting depth � Seedingzones 2 and Seeding Date 3 g Species M Per Lbs/1000 HIGH MAINTENANCE LAWN C3F, 6b 6a and 5b AG SS 2/1- 5/1- 8/15- 3/1- 5/1- . C,3ir jtn.ti� Ci�. 3/15- Imo, ,� i ,11.�rrNr-� A',,11', R, M" 9.2 acre Sq. ft (Inches) 30-10-10 MEASURES. LBS/1000SF. INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER 0.. 4/30 1 8/14 11/30 °t$lis EXJEND HUILsAd }I I ,r��� }i OF !NC, SS d a l_a FG SS 7/31 10/31 r=RAT }.; 9.2 following establishment RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE PLA fI. REPAIRED IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET TEMPORARY SEEDING MIXTURES FOR Ts THE PIEDMONT AREA D SILT FENCE CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE S UPPOR T) 1. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES IIj"! 6'MAX. III FLOW 4- 3. STAPLE FILTER MATERIAL 4. BACKFILL AND COMPACT TO STAKES AND EXTEND THE EXCAVATED SOIL. IT INTO THE TRENCH. fl i i �I III '"�" • =III SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) FLOW FLOW A A B SILT FENCE -I _ . �o I =1 I- I I -III -I -1 I I -I I- °'-� SF/STONE NOT REQUIRED AFTER SLOPES ARE STABILIZED DOWNSLOPE OF OUTFALL POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control,VA. DSWC PLATE. 3.10-2 SUGGESTED TEMPORARY SEEDING MIXTURE FERTILIZER: 10-20-10: 1,000 LBS/ACRE SEPTEMBER -FEBRUARY 15-50% ANNUAL RYE & 50% WINTER RYE 100 LBS/ACRE FEBRUARY 16 -APRIL 30: ANNUAL RYE 100 LBS/ACRE MAY -AUGUST: GERMAN MILLET 50 LBS/ACRE OTHER OPTIONS EXIST, SEE VA EROSION AND SEDIMENT CONTROL HANDBOOK. SUGGESTED PERMANENT SEEDING MIXTURE LIME: 2 TONS/ACRE FERTILIZER: 10-20-10 1,000 LBS/ACRE MARCH -MAY 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE MAY 16 -AUGUST 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, FOXTAIL MILLET 20 LBS/ACRE AUGUST 16 -OCTOBER: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE NOVEMBER -FEBRUARY: KENTUCKY 31 FESCUE 200 LBS/ACRE, WINTER RYE 20 LBS/ACRE GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS),THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAY'S OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:00 AM TO 9:00 PM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES, WHERE APPLICABLE, ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. PERMANENT SEEDING MIXTURES FOR PS THE PIEDMONT AREA TABLE 25 TABLE 26 TEMPORARY SEEDINGS BY RATES, DEPTHS, AND DATES 175-200 LBS. Seeding Rate Planting depth � Seedingzones 2 and Seeding Date 3 g Species M Per Lbs/1000 HIGH MAINTENANCE LAWN 7a and 7b 6b 6a and 5b GENERAL SLOPE (3:1 OR LESS) 2/1- 5/1- 8/15- 3/1- 5/1- - SEASONAL NURSE CROP* 3/15- 6/1- 8/1- 9.2 acre Sq. ft (Inches) 30-10-10 MEASURES. LBS/1000SF. INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER 0.. 4/30 1 8/14 11/30 4/30 8/14 18/15- 11/15 5/31 7/31 10/31 Choose one: 9.2 following establishment RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE Birdsfooit trefoil REPAIRED IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET BY STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE and every 4-5 BY m DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE BY Barley 2.5 bu. 2.80 1-2 X - 10/15 X - 10/15 X - 10/1 Oats 3 bu. 2.21 1-2 X - - X - - X - and every 4-5 Rye (4) 2.5 bu. 3.22 1-2 X - X X - X X - X arley or Rye Plus 150 lbs. 3.45 1 X X 10/15 X X 10/15 X X 10/1 Foxtai° and every 3-4 X X X X X X X X X millet 5 5.8 September, 30 Mow no closer than 2" for red fescue and Ky fescue, Kentucky days later December, May bluegrass; and closer g bluegrass, hard fescue mixture: 2.0-10-10 100 Weeping 4lbs. 0.09 1/4-1/2 - X - - X - - X - lovegrass61 Annual ryeg rasS 50 lbs. 1.15 1/4-1/2 X - 11/1 X - 11/1 X - 8/15 Millet (7) 50 lbs. 1.15 1/2 - X - - X - - X - (1) Applicable on slopes of 3:1 or flatter (2) Refer to figure A -Adopted from USDA, ARS Miscellaneous Publication #1475, January 1990 (3) Between fall and spring seeding dates, use mulch only if ground is frozen and reseed when thawed (4) May be used as a nurse crop for late fall/early winter permanent seedings, add 56 lbs/ac. to the permanent seeding mixture (4) Maryland State Highway Administration Temporary Seed Mix (5) May be used as a nurse crop for mid -summer permanent seedings. Add 2 lbs/ac to permanent seed mix. (6) May be used as a nurse crop for mid -summer permanent seedings. Add 10 lbs/ac. to the permanent seeding mix. D SILT FENCE CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE S UPPOR T) 1. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES IIj"! 6'MAX. III FLOW 4- 3. STAPLE FILTER MATERIAL 4. BACKFILL AND COMPACT TO STAKES AND EXTEND THE EXCAVATED SOIL. IT INTO THE TRENCH. fl i i �I III '"�" • =III SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) FLOW FLOW A A B SILT FENCE -I _ . �o I =1 I- I I -III -I -1 I I -I I- °'-� SF/STONE NOT REQUIRED AFTER SLOPES ARE STABILIZED DOWNSLOPE OF OUTFALL POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) SOURCE: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control,VA. DSWC PLATE. 3.10-2 SUGGESTED TEMPORARY SEEDING MIXTURE FERTILIZER: 10-20-10: 1,000 LBS/ACRE SEPTEMBER -FEBRUARY 15-50% ANNUAL RYE & 50% WINTER RYE 100 LBS/ACRE FEBRUARY 16 -APRIL 30: ANNUAL RYE 100 LBS/ACRE MAY -AUGUST: GERMAN MILLET 50 LBS/ACRE OTHER OPTIONS EXIST, SEE VA EROSION AND SEDIMENT CONTROL HANDBOOK. SUGGESTED PERMANENT SEEDING MIXTURE LIME: 2 TONS/ACRE FERTILIZER: 10-20-10 1,000 LBS/ACRE MARCH -MAY 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE MAY 16 -AUGUST 15: KENTUCKY 31 FESCUE 200 LBS/ACRE, FOXTAIL MILLET 20 LBS/ACRE AUGUST 16 -OCTOBER: KENTUCKY 31 FESCUE 200 LBS/ACRE, ANNUAL RYE 20 LBS/ACRE NOVEMBER -FEBRUARY: KENTUCKY 31 FESCUE 200 LBS/ACRE, WINTER RYE 20 LBS/ACRE GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS),THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED, DESIGNATED BORROW AREA. 11. ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAY'S OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14. BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:00 AM TO 9:00 PM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAT MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 16. THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES, WHERE APPLICABLE, ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. PERMANENT SEEDING MIXTURES FOR PS THE PIEDMONT AREA TABLE 25 TOTAL LBS. PER ACRE MINIMUM CARE LAWN - COMMERCIAL OR RESIDENTIAL 175-200 LBS. - KENTUCKY 31 OR TURF -TYPE TALL FESCUE 95-100% - IMPROVED PERENNIAL RYE GRASS 0-5% - KENTUCKY BLUEGRASS 0-5% HIGH MAINTENANCE LAWN 200-250 LBS. - KENTUCKY 31 OR TURF -TYPE TALL FESCUE 100% GENERAL SLOPE (3:1 OR LESS) Tall fesclue makes - KENTUCKY 31 FESCUE 128 LBS. - RED TOP GRASS 2 LBS. - SEASONAL NURSE CROP* 20 LBS. LOW -MAINTENANCE SLOPE (STEEPER THAN 3:1) 400 - KENTUCKY 31 FESCUE 108 LBS. - RED TOP GRASS 2 LBS. - SEASONAL NURSE CROP* 20 LBS. - CROWN VETCH** 20 LBS. TOTAL 150 LBS. *USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES AS STATED BELOW: FEBRUARY 16TH THROUGH APRIL 30TH............ ANNUAL RYE MAY 1ST THROUGH AUGUST 15TH ................ FOXTAIL MILLET AUGUST 16TH THROUGH OCTOBER 31 ST ........... ANNUAL RYE NOVEMBER 1ST THROUGH FEBRUARY 15TH ........ANNUAL RYE *** SUBSTITUTE SERICEA LESPEDEZA FOR CROWNVETCH EAST OF FARMVILLE, VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL OTHER PERIODS, USE UNHULLED SERICEA.) IF FLATPEA IS USED IN LIEU OF CROWNVETCH, INCREASE RATE TO 30 LBS./ACRE. ALL LEGUME SEED MUST BE PROPERLY INNOCULATED. WEEPING LOVEGRASS MAY BE ADDED TO ANY SLOPE OR LOW MAINTENANCE MIX DURING WARMER SEEDING PERIODS; ADD 10- 20 LBS./ACRE IN MIXES. PS PERMANENT SEEDING FERTILIZATION AND MAINTENANCE TABLE 24 Maintenance Fertilization for Permanent Seedings Use Soil Test Recommendation or Rates Shown Below Seeding Mixture Formulation Lbs. per Lbs. per Time Mowing AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS (CONT.) Acre 1000 sf DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR SEEDING IS TO BE AT' 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO Tall fesclue makes 10-10-10 500 11.5 Yearly, or as *Not closer than 3" if up 70% or more or 400 9.2 needed fall occasional mowing is of cover.. 30-10-10 MEASURES. LBS/1000SF. INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER 0.. desired. Crownvetch PERMANENT SEEDING SHALL BE APPLIED AT 180 LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY Spring the year Do not mow crownvetch Service �espedeza 0-20-0 400 9.2 following establishment RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE Birdsfooit trefoil REPAIRED IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE and every 4-5 RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND m DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE / CLEANED AND REPAIRED IMMEDIATELY. years thereafter. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE Fairly uniform REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO O LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL Fall the year Not required. not closer stand of Tall 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 0 YEAR OF THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17-204G). following than 4" if occasional Tescue & Service 5-10-10 500 11.5 establish- ment mowing is desired, and lespedeza, or I> and every 4-5 then in fall after seed Birdsfoot Trefoil. J years thereafter. has matured. Weeping 0 Spring the year Not required. not closer Lovegrass & following than 4" if occasional Service Ilespedeza 5-10-10 500 11.5 establishment mowing is desired, and fairly uniiform plant J and every 3-4 fall after sericea has distribution years thereafter. matured. Red & chewings 20-10-10 250 5.8 September, 30 Mow no closer than 2" for red fescue and Ky fescue, Kentucky days later December, May bluegrass; and closer g bluegrass, hard fescue mixture: 2.0-10-10 100 2.3 20 -June -30, if than 3" for fescue. needed. e INLET PROTECTION BLOCK & GRAVEL CURB INLET SEDIMENT FIL TER CURB INLET ZL --- `- WIRE SCREEN RUNOFF OVERFLOW WATER WITH SEDIMENT SEDIMENT IMM GRAVEL FILTER WIRE SCREEN / 2" X 4" WOOD STUD CONCRETE• FILTERED WATER :. IIIIII�II�111111 • •. ''..11=III=III= ��-•:o III=11 11- CURB INLET SPECIAL APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE AN OVERFLOW CAPABILITY IS NECESSARY TO PREVENT EXCESSIVE PONDING IN FRONT OF THE STRUCTURE. * GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE AGGREGATE SOURCE: VA. DSWC PLATE 3.07-5 SEQUENCE OF CONSTRUCTION 1. AFTER OBTAINING ALL REQUIRED PERMITS THE CONTRACTOR SHALL COORDINATE A PRE -CONSTRUCTION MEETING, ALLOWING 72 HOURS FOR ITS COORDINATION. 2. INSTALL CONSTRUCTION ENTRANCE AS SHOWN ON APPROVED PLAN. 2.1. SHOULD THE TEMPORARY CONSTRUCTION ENTRANCE NOT BE MAINTAINED PROPERLY OR AN EXCESSIVE AMOUNT OF SOIL FOUND TRACKED ONTO THE PUBLIC ROADWAY, THEN A PAVED CONSTRUCTION ENTRANCE, WATER TANKER TRUCK WITH TWO (2) PRESSURE WASHERS AND A SETTLING AREA MAY BE REQUIRED BY THE EROSION AND SEDIMENT CONTROL PROGRAM ADMINISTRATOR. 2.2. SILT FENCE SHALL BE INSTALLED ON THE DOWNHILL SIDE OF ALL OPERATIONS. 3. THE CONTRACTOR SHALL COORDINATE INSPECTIONS, AS REQUIRED BY THE COUNTY OF ALBEMARLE. 3.1. THE LAND DISTURBANCE SHALL BE RESTRICTED TO THE LIMITS OF DISTURBANCE l9ND SURNE��� a Uconr CL W g V Ob AS Up I. a� V.cc 0 °tW So �g �z �J y •. O �./Q 4z 9LL co O , W U t/1 (0 go rr to O rz W It U_ r 2 �W (� O Z a 0Uj REVISIONS AUG 1, 2018 DATE JULY 9, 2018 SCALE N/A CONTOUR INTERVAL N/A SHOWN IN THE APPROVED EROSION CONTROL PLANS. 4. DENUDED AREAS SHALL DRAIN TO AN APPROVED EROSION CONTROL MEASURE AT ALL TIMES DURING CONSTRUCTION. V 5. PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS (CONT.) SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO 17. TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT FOR SEEDING IS TO BE AT' 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO LONGER THAN 30 DAY'S. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, ARE TO BE LEFT DORMANT FOR MORE THAN ONE YEAR. OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO 6. LIME, FERTILIZE /AND APPLY TEMPORARY OR PERMANENT SEEDING TO ALL DENUDED CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80 LBS/100SF. AREAS IMMEDIATELY AIFTER ACHIEVING FINAL GRADES. ALTERNATIVES ARE SUBJECT TO BE APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. 7. AFTER SITE IS STABILIZED AND PERMISSION IS OBTAINED FROM THE EROSION 18. PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, CONTROL INSPECTOR, REMOVE SILT FENCING AND OTHER REMAINING EROSION CONTROL AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 90 MEASURES. LBS/1000SF. INCORPORATED INTO THE TOP 4-6 INCHES OF SOIL. FERTILIZER 0.. SHALL BE APPLIED AT 1000 LBS/ACRE AND CONSIST OF A 10-20-10 NUTRIENT MIX, W PERMANENT SEEDING SHALL BE APPLIED AT 180 LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80 LBS/10OSF. ALTERNATIVES ARE SUBJECT TO BE APPROVED BY THE COUNTY EROSION CONTROL INSPECTOR. � 19. MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE D REPAIRED IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND m DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE / CLEANED AND REPAIRED IMMEDIATELY. 20. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO O LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL LTH of INSPECTOR. 21. THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 0 YEAR OF THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17-204G). 22. PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN " NINE (9) MONTHS AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. WILLIAM J. LEDBETTER (WATER PROTECTION ORDINANCE SECTION 17-207B). Lic. No. 1507-B l9ND SURNE��� a Uconr CL W g V Ob AS Up I. a� V.cc 0 °tW So �g �z �J y •. O �./Q 4z 9LL co O , W U t/1 (0 go rr to O rz W It U_ r 2 �W (� O Z a 0Uj REVISIONS AUG 1, 2018 DATE JULY 9, 2018 SCALE N/A CONTOUR INTERVAL N/A FILE NUMBER 8053 SHEET 5 of 5 V W Q J 0.. W V W � Z g z D 0 J 0 m / 0 J O III..m a. Q 0 W a Z m CL I> Q CL J 0 1" 10 J FILE NUMBER 8053 SHEET 5 of 5