HomeMy WebLinkAboutWPO201800056 Review Comments WPO VSMP 2018-08-14Phone (434) 296-5832 OF Alga. VIRGSry�P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 VSMP Permit plan review Project title: Wawa Project file number: WP0201800056 Plan preparer: Jonathan Q Ritchie Owner or rep.: Mark Fontaine Plan received date: July 16, 2018 Date of comments: Aug 14, 2018 Reviewer: David James Fax (434) 972-4126 [j ritchie@bohlereng. com] [mfontaine@renaudconsulting.net] [dj ames@albemarle.org] County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all of the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Complete items 8 & 12 of the Registration Statement. 2. Insert copy of General Permit coverage when obtained. 3. Provide a PPP exhibit sheet (to be updated in the field). 4. When ready provide (2) copies of updated SWPPP. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Show any proposed clearing/grading activities, paving operations, landscaping operations, E&S controls, staging, stockpile, borrow, fueling, waste disposal, vehicle/equipment washing, concrete washout locations on the PPP. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The Stormwater management plan content requirements can be found in County Code section 17-403. 1. Cover sheet: Add the WPO number to title: WP0201800056; Remove signature block (not needed for WPO); Update Sheet Index. 2. Please include the SWM and Storm computations sheets in the plan set; C-403 to C-503 sheets that were on the site plan. 3. Show existing conditions sheet with existing drainage divides. 4. One or more actions may be required (to be determined): Removal of existing stormwater facility (SWF) on adjacent property may require the adjacent property owner to submit a VSMP plan amendment. The easement for the SWF may need to be vacated. A boundary line adjustment plat may need to be submitted/reviewed/approved prior to VSMP approval. 5. Submit a SWM maintenance agreement (see below). 6. Purchase of nutrient credits required before the VSMP plans can be approved. Please contact Ana Kilmer regarding nutrient credit purchase and required documentation. 7. Show a `SWM facility easement' for the proposed underground detention system. Required width: 10'+(pipe dia. or channel width) + 2'+ 2(depth-5'). Show drainage easement for proposed pipes/channels (outside of ROW) which carries water through site from offsite. {Design Manual, section 6} 8. Submit a Deed of dedication and easement & Plat for the SWM facility (UD system). 9. Provide details on UD system including profile and cross-section showing pipe and manhole openings, orifice and weir locations and dimensions. Show material, lining, bedding, cover details & dimensions. 10. Sheet C503: Show the culvert / orifice & weir locations on the profiles. Show height of the W.S.E. for the design storms. 11. Provide Hydraflow report of the pre/post watershed model schematic, and report of pre/post hydrograph summary. 12. Can you provide computations on how the Q values were obtained on the pre & post development plan (sheets C402 & C403)? There appears to be some discrepancy between the Q values shown on the hydrographs (C404 to C407). 13. Sheet C408 — Show the Energy Balance equation solved for each POI and total site. 14. Use the NOAA Atlas 14 for precipitation/ intensity values for the 1-,2-,10-yr storms (C409) - https://hdsc.nws.noaa.gov/hdsc/pfds/pfds printpage.html?lat=38.1324&lon=- 78.4344&data=depth&units=english&series=pds 15. Provide MH access to UD pipe at STM B-1 location. 16. Provide maintenance requirements for the UD system on the plans. 17. Provide typical section, lining type requirement & design calcs. for the ditch alongside Proffit Road. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Show existing conditions sheet with existing drainage divides. Show all existing easements with deed book references, locations & dims. 2. Show area of existing stormwater facility to be removed (tbr). 3. Show off -site disturbances in an easement. 4. Show existing right-of-way lines and EOP labeled. 5. Note: Contractor can't demo pavement, or grade until E&S perimeter controls are in place (phase 1). 6. Show proposed street name and ROW line. Show portions of sight distance in an easement if outside of ROW. 7. Proposed slopes greater than 3:1 to have low maintenance (not grass) ground cover specified on the plans, which will not require mowing. {Design Manual, section 81 8. The county requires a paved construction entrance. Provide this detail on the details sheet {Design Manual, section 3F}: STONE 70' MIN. CONSTRUCTION ACCESS Y' 5M-2A ASPHALT TUP COURSE 2$ PAVE12AISTINO 2% M'V` 5MiN. 2�A AGGREGATE SASE PROFILE STONE — 70• MIN. CONSTRUCTION ASPHALT pAVVrp ACCESS A WASHf20.C% EC 27 2% PAVEMAVELI ENT Z% 12' MIN! •MUST EXTEND FULL WIDTH �`pOSfTiVE DRAINAGE OF INGR€SS AND EGRESS TO SEDIMENT pPERATION TRAPPING DEVICE PLM �12' MIN. POSITIVE :%I:'•.I -I, 2q Tp sEpla!�,._ // TRAPPING FILTER CLOTH — SECTION A —A A uTitiunun water tap of 1 iwh unlst be installed u�tlr a mutumm� 1 loch ballcock elnRod'T•ahe suppl}ius a wush hose with a diameter of 1.5 vaches for adeclnate constant pressTue Was9i water must he carded away firm the enhnnce to an approved settling — to remove aeduneirt. All sedunent shall be preT tw ,j fivm enteriuz storm drams. ditclres or watercoines, PAVED WASH RACK NO SCA_L 9. Diverting runoff to an existing inlet that is proposed to be raised to final grade will not be allowed. Runoff must go to a sediment trap or similar. 10. Callout the type of IP needed, i.e. for STM EX-02, and provide a detail (ESC HB, Spec 3.07). 11. Show dust control symbols (DC) for phase U. 12. Show temporary seeding symbols (TS) where needed. 13. Show existing vegetation to be saved with (TP) symbols. This must match any landscaping plans. 14. `Gutter buddy' use needs variance approval (let Frank Pohl, County Engineer know). The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforms.asp?department=cdengwpo