Loading...
HomeMy WebLinkAboutSUB201800076 Approval - Agencies 2018-08-08Megan Nedostup From: Moore, Adam <adam.moore@vdot.virginia.gov> Sent: Wednesday, August 08, 2018 4:34 PM To: Kyle Redinger Cc: Justin Shimp, P.E.; David James; Justin Deel; Keane Rucker; Megan Nedostup Subject: Re: SUB2018-076 Sparrow HIII My comments are resolved. Adam J. Moore, P.E. I Assistant Resident Engineer — Land Use VDOT - Charlottesville Residency 701 VDOT Way I Charlottesville I VA main 434.422.9782 On Wed, Aug 8, 2018 at 3:52 PM, Kyle Redinger <kyle.redinger&gmail.com> wrote: David - we are all good on those does right ? I can sign them and send over first thing in the morning if so. Thanks, Kyle On Wed, Aug 8, 2018 at 3:46 PM Justin Shimp, P.E. <justin(2shimp-en _ ing eerin _g com> wrote: Hello Megan, Per our latest conversation I've attached a revised plat addressing the comments including showing the steep slopes zoning layer, both managed and preserved. To address David's comments: 3. We changed the language of the slope easement to language required by VDOT which does not put the county at risk for maintenance. 4. SWM facility easement on lot 16+17 is now labeled. 5. Note B has been added on the cover page addressing the served by water and sewer comment. To address your comments: 1. An exhibit has been provided as separate attachment showing the layout of each house as it relates to the building site question. 2. Steep slopes are shown. 3. open space calculations are now on the plat as requested. 4. I understand the easements are all approved? 5. Slope easement has been updated. and VDOT: 1. Note added stating that the streets are dedicated to the County for public use (see note 11) 2. Sight distance easements to be kept clear (see note 13) 3. Maintenance note on the slopes added. (see note 12) Would you guys mind taking a quick email review since the comments are pretty limited? IF this looks good we can turn in hard copies that are signed by the owner. Kyle - have you turned in signed copies of the approved easements? those need to be signed by the County Executive. Thanks! Justin Shimp, P.E. 434-953-6116 On Jul 26, 2018, at 9:53 AM, Megan Nedostup <mnedosjW&albemarle.org> wrote: Justin: Attached are planning and engineering comments. I am waiting to hear back from ACSA and VDOT. Thank you, Megan Nedo0up, A/CP (pronounced nuh-DAHST-up) Principal Planner Community Development Department Planning Services ph: 434.296.5832 ext. 3004 <P2_SUB201800076 Sparrow Hill - 7-26-18.pH><E2-Reviewer Comments.pdf> Kyle Redinger kyle.redin egerr&amail.com Phone: 434.409.1929 Fax: 434.293.6929 This email message and any attachments are for the sole use of the intended recipient(s) and contain confidential and/or privileged information. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply email and destroy all copies of the original message and any attachments.