HomeMy WebLinkAboutSDP201600072 Plan - Approved 2018-08-17COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
August 17, 2018
Brian Brewer
Kim ley -Horn
1700 Willow Lawn Dr. Suite 200
Richmond, VA 23230
RE: Letter of Revision #1 — Staybridge Suites Site Development Plan (SDP201600072)
Mr. Brewer,
This letter approves your submitted Letter of Revision request for the above referenced site plan. The
approved changes are reflected in the attached Letter of Revision (from Brian Brewer of Kimley-Horn,
dated June 25, 2018) and the referenced plan sheets on the revised "Final Site Plan for Staybridge
Suites, revision date 08/08118. There are no other changes to SDP201600072 proposed or approved at
this time.
This is the first Letter of Revision for this this site plan. Three (3) Letters of Revision are allowed, after
which all required changes must be submitted in the form of a site plan amendment.
Sincerely,
David Benish
Chief of Planning
Albemarle County Dept. of Community Development
Phone (434) 296-5832, ext. 3251
Attachments:
Letter of Revision from Brian Brewer, dated June 25, 2018
Revised Final Plan sheet, revision date 08/08/18
Kimley»>Horn
June 25, 2018
J.T. Newberry
County of Albemarle, Planning Division
401 McIntire Road
Charlottesville, VA 22902
Re: SDP 2016-00072 — Staybridge Suites
Letter of Revision
Mr. Newberry:
We are requesting a letter of revision (LOR) for a few changes for the Staybridge Suites located at the
northeast corner of Berkmar Drive and Timberwood Boulevard in Charlottesville, Virginia. We originally
received the Site Plan Approval from Albemarle County on January 9, 2018. The following changes are
being proposed to the approved set:
• Pergola shown on Site Plan Sheet CS-101.
• Structures 3 and 6 removed from the proposed stormwater network. Updated network and
calculations shown on Sheets CG-100 to CG-103.
• Heavy Duty pavement section revised to a 2.0" SM-9.5A, 2.0" IM-19, and 6" VDOT Type[, 21A
aggregate base. The original plans called for a 3.0" SM-9.5A, 2.0" IM-19, and 8" VDOT Type 1,
21A aggregate base.
• Sod shown to only be installed in the immediate building area. All other areas are shown as
topsoil and seed.
• Transformer location shown on Utility Plan Sheet CU-101.
• Grading revisions at the main building entrance.
No additional impervious area is proposed. All other site plan components remain unaltered.
Attached with this letter is the LOR Application, the revised plan sets, and the fee check.
Your consideration and approval of this change are greatly appreciated. If you have any questions,
please feel free to contact me at (804) 673-3882 or brian.brewer0kimley-horn.com.
Sincerely,
4.'J"4'
Brian Brewer, P.E.
Project Manager