Loading...
HomeMy WebLinkAboutSDP201800054 Review Comments Initial Site Plan 2018-08-20County of Albemarle Department of Community Development Memorandum To: Cameron Langille From: Emily Cox Date: 20 Aug 2018 Subject: Brookhill —Block 8B - ISP (SDP201800054) The initial site plan for Brookhill —Block 8B has been reviewed by Engineering. The following comments will need to be addressed before approval: 1. WPO Plan must be approved before final site plan can be approved. 2. Road Plan must be approved before final site plan can be approved. Road plan must include all roads encompassed by this site plan. There appears to be a road between sections 4A & 8A as well as through 8A. 3. VDOT approval is necessary before final site plan can be approved. 4. The minimum ROW (or easement width) is 30' per the Design Standards Manual. VDOT subdivision street design guide —Appendix b, section B-4-B-3-d states that the pavement width can be reduced to 22ft, but the right -of --way must still be 30 feet. 5. Ensure all critical slopes, buffers, etc. are shown as approved on ZMA 2015-007 on all applicable sheets. 6. Ensure the accurate FEMA 100 year floodplain is shown. The ZMA appeared to show the 500 year. Also, Note 4 states there is not floodplain, however there is floodplain shown on the plans. 7. Show how the proposed impacts to the steep slopes and Greenway compare to the approved ZMA. 8. On sheet 4, an approved VSMP plan is referenced. Provide the approved plan #and facilitiy ID's that are proposed to be modified or removed. 9. Show all proposed parking space dimensions (at each parking area). 10. Show top and bottom elevations of proposed retaining walls. Note that per COD, Page 23, the maximum height is six feet. 11. Please label contour elevations. 12. 2:1 Slopes should be avoided wherever possible. The 2:1 slopes behind lots 1-15 are not desirable. 13. Water quality and quantity requirements will be fully evaluated with the VSMP Plan submission. Please note that all concentrated outfalls must be analyzed to comply with state requirements. Also, water quality summary table for overall Brookhill Development must be provided.