Loading...
HomeMy WebLinkAboutARB201800103 Staff Report 2018-08-22ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB-2018-103: Brookhill Blocks 9, 10 and 11 Initial Plan Review Type Initial Site Development Plan Parcel Identification 046000000019134 Location On the east side of Rt. 29, approximately 550' south of Ashwood Blvd. Zoned Neighborhood Model District (NMD)/Entrance Corridor (EC) Owner/Applicant Crocket Corporation/Collins Engineering (Scott Collins) Magisterial District Rivanna Proposal To construct 85 attached townhouses with associated site improvements. Context Blocks 9, 10 and 11 are located in the northwest section of the Brookhill development. Block 9 is adjacent to Rt. 29. Block 10 is to the east of Block 9, and Block 11 is to the southeast. (See Attachment A.) Brookhill Block 4B is to the south. Residential development (Forest Lakes and Montgomery Ridge) is to the north and east. Visibility The residential units of Block 9 will be the most visible from the EC street. Blocks 10 and 11 are not expected to have much visual impact on the EC due to their increasing distance from the street and the topography that falls away to the east. The visibility of Block 9 will be reduced by the landscape buffer that is required along Rt. 29. ARB Meeting Date August 20, 2018 Staff Contact Margaret Maliszewski PROJECT HISTORY DATE APPLICATION RESULT 11/9/2016 ZMA-2015-07 Brookhill rezoning approved. 5/7/2018 ARB 2018-52 Brookhill Block 4B Initial Plan reviewed. 5/29/2018 ARB-2018-53 Brookhill Block 3 Ice Rink Initial Plan reviewed. 8/20/2018 ARB-2018-83 and -102 ARB review of Final Site Plan for Blocks 4A and 4B, and Initial Plan for Block 8B scheduled. ANALYSIS Gray highlight = means the guideline can't be reviewed at initial site plan stage, but recommendations can be provided for final Yellow highlight = means the guideline can only be reviewed for location/configuration at the initial plan stage Regular text = means the guideline can be reviewed at initial plan stage, can be made a condition of initial plan approval, and can be the basis for denial REF GUIDELINE ISSUE RECOMMENDATION Purpose, Compatibility with significant historic sites: 1 The goal of the regulation of the design of development within the Architectural designs have not yet With the final site plan, designated Entrance Corridors is to insure that new development been submitted for review. It is likely submit architectural within the corridors reflects the traditional architecture of the area. that the proposed design will drawings for the Therefore, it is the purpose of ARB review and of these Guidelines, incorporate architectural elements residential units in Block that proposed development within the designated Entrance Corridors derived from traditional residential 9. The architecture of reflect elements of design characteristic of the significant historical buildings, but the overall development Blocks 10 and 11 does landmarks, buildings, and structures of the Charlottesville and will not have a strong traditional not require ARB review Albemarle area, and to promote orderly and attractive development character. The buffer along Rt. 29 will due to anticipated limited within these corridors. Applicants should note that replication of histo ' reduce the visual impact of the visibility. structures is neither required nor desired. development on the street. As such, it will also serve to promote orderly and 2 Visitors to the significant historical sites in the Charlottesville and Albemarle area experience these sites as ensembles of buildings, land, attractive development. and vegetation. In order to accomplish the integration of buildings, land, and vegetation characteristic of these sites, the Guidelines require Maximum building height is identified attention to four primary factors: compatibility with significant historic as 3 stories or 40'. Residential units sites in the area; the character of the Entrance Corridor; site closest to the EC have their rear development and layout; and landscaping. elevations facing the EC. The landscape buffer is expected to 3 New structures and substantial additions to existing structures should respect the traditions of the architecture of historically significant mitigate impacts of these elevations. buildings in the Charlottesville and Albemarle area. Photographs of The ground elevation drops away from historic buildings in the area, as well as drawings of architectural the street moving eastward, effectively features, which provide important examples of this tradition are eliminating the visibility of the contained in Appendix A. residences in Blocks 10 and 11 from the EC. 4 The examples contained in Appendix A should be used as a guide for building design: the standard of compatibility with the area's historic structures is not intended to impose a rigid design solution for new development. Replication of the design of the important historic sites in the area is neither intended nor desired. The Guideline's standard of compatibility can be met through building scale, materials, and forms which may be embodied in architecture which is contemporary as well as traditional. The Guidelines allow individuality in design to accommodate varying tastes as well as special functional requirements. Compatibility with the character of the Entrance Corridor 5 It is also an important objective of the Guidelines to establish a pattern The landscape buffer that is required See landscape of compatible architectural characteristics throughout the Entrance along Rt. 29 will establish a level of recommendations. Corridor in order to achieve unity and coherence. Building designs unity and coherence along the corridor should demonstrate sensitivity to other nearby structures within the for the development. Entrance Corridor. Where a designated corridor is substantially developed, these Guidelines require striking a careful balance between harmonizing new development with the existing character of the corridor and achieving compatibility with the significant historic sites in the area. 9-16 Structure design Architectural designs were not Provide for review included in this submittal. The degree architectural drawings for to which compatibility with local, the residential units in historic precedents is accomplished Block 9 with the Final can be determined when architectural Site Plan. designs are submitted for review. Accessory structures and equipment 17 Accessory structures and equipment should be integrated into the Accessory structures and equipment See landscaping overall plan of development and shall, to the extent possible, be associated with the residences in Block recommendations. ompatible with the building designs used on the site. 9 are expected to be of the variety and scale typically seen in residential 18 The following should be located to eliminate visibility from the Entrance Corridor street. If, after appropriate siting, these features will still have a yards. A substantial buffer along Rt. 29 negative visual impact on the Entrance Corridor street, screening should that includes evergreen plants and a be provided to eliminate visibility. a. Loading areas, b. Service areas, c. mix of trees and shrubs should Refuse areas, d. Storage areas, e. Mechanical equipment, minimize visibility of these items to a f. Above -ground utilities, and g. Chain link fence, barbed wire, razor sufficient degree. wire, and similar security fencing devices. 19 Screening devices should be compatible with the design of the buildings and surrounding natural vegetation and mayAonsist of. a. Walls, b. Plantings, and c. Fencing. 20 Surface runoff structures and detention ponds should be designed to fit In Blocks 9, 10 and 11, no stormwater None. into the natural topography to avoid the need for screening. When management facilities are proposed in visible from the Entrance Corridor street, these features must be fully locations that are expected to be visible integrated into the landscape. They should not have the appearance of from the EC. engineered features. 21 The following note should be added to the site plan and the architectural plan: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." Lighting A note on Sheet 1 states that no Provide in the site plan lighting is proposed. If exterior wall- sufficient details to show mounted fixtures are proposed, that all proposed light sufficient detail is needed in the plan to fixtures meet the show that the fixtures meet the requirements of the requirements of the lighting ordinance. lighting ordinance. Landscaping 7 The requirements of the Guidelines regarding landscaping are intended A landscape plan has been provided, Provide the landscape to reflect the landscaping characteristic of many of the area's but it is not at a workable scale, and no plan at the same scale as significant historic sites which is characterized by large shade trees plant schedule is provided. The plan the rest of the site plan and lawns. Landscaping should promote visual order within the set does not show the full frontage and set. Entrance Corridor and help to integrate buildings into the existing buffer along Rt. 29. environment of the corridor. The Brookhill Code of Development Revise the site plan to show the frontage along 8 rontinuity within the Entrance Corridor should be obtained by planting different types of plant materials that share similar requires a 100'-deep buffer along the Rt. 29 out to the street. [haracteristics. Such common elements allow for more flexibility i4 EC street, composed of a 30' planted [he design of structures because common landscape features will help buffer and a 70' natural undisturbed Revise the site plan to ko harmonize the appearance of development as seen from the street buffer. Most, but not all, of this is show the 30' Rt. 29 Won which the Corridor is centered. shown on the landscape plan. The plan shows trees added into bare areas of buffer outside of the private lots. 32 tandscaping along the frontage of Entrance Corridor streets should include the following: the 70' buffer, and in graded areas of a. Large shade trees should be planted parallel to the Entrance the 30' buffer. Corridor Street. Such trees should be at least 3%2 inches caliper (measured 6 inches above the ground) and should be of a plant speciel The 30' buffer overlaps the 10' rear common to the area. Such trees should be located at least every 35 feed setback of Lots 1-12. The Code of on center. Development (see Attachment B) does b. Flowering ornamental trees of a species common to the area should be not allow this, stating that buffers are interspersed among the trees required by the preceding paragraph. Thq not allowed within any private lot. ornamental trees need not alternate one for one with the large shade trees. They may be planted among the large shade trees in a less regular spacing pattern. c. In situations where appropriate, a three or four board fence or low stone wall, typical of the area, should align the frontage of the Entrance Corridor street. d. An area of sufficient width to accommodate the foregoing plantings and fencing should be reserved parallel to the Entrance Corridor street, and exclusive of road right-of-way and utility easements. 33 Landscaping along interior roads: Sidewalks and street trees are shown None at this time. a. Large trees should be planted parallel to all interior roads. Such along most of the streets. Trees are not trees should be at least 2'/2 inches caliper (measured six inches aboA shown along portions of Stella Lane the ground) and should be of a plant species common to the area. Such and Foxworth Lane that are shown as trees should be located at least every 40 feet on center. future extensions. 34 Landscaping along interior pedestrian ways: a. Medium trees should be planted parallel to all interior pedestrian ways. Such trees should be at least 2%2 inches caliper (measured six inches above the ground) and should be of a species common to the area. Such trees should be located at least every 25 feet on center. 35 Landscaping of parking areas: Some on -street parking is provided None. a. Large trees should align the perimeter of parking areas, located 40 throughout the development. One feet on center. Trees should be planted in the interior of parking areas parking "lot" containing 6 spaces is at the rate of one tree for every 10 parking spaces provided and should proposed at the south end of Flora be evenly distributed throughout the interior of the parking area. Drive. It is not expected to be visible b. Trees required by the preceding paragraph should measure 2A from the EC. inches caliper (measured six inches above the ground); should be evenly spaced; and should be of a species common to the area. Such trees should be planted in planters or medians sufficiently large to maintain the health of the tree and shall be protected by curbing. c. Shrubs should be provided as necessary to minimize the parking area's impact on Entrance Corridor streets. Shrubs should measure 24 inches in height. 36 Landscaping of buildings and other structures: The residences in Block 9 are grouped None. a. Trees or other vegetation should be planted along the front of long in blocks of 2, 4 and 5 units. The 5- buildings as necessary to soften the appearance of exterior walls. The unit block, located on the east side of spacing, size, and type of such trees or vegetation should be Koch Court, measures approximately determined by the length, height, and blankness of such walls. 160' long. The front and rear b. Shrubs should be used to integrate the site, buildings, and other elevations of these units project structures; dumpsters, accessory buildings and structures; "drive thru" forward/back from adjacent units. windows; service areas; and signs. Shrubs should measure at least 24 Street trees provided along Koch inches in height. Court, and trees in the 100' buffer, will help reduce the visibility of all the units in these blocks. With a substantial buffer, additional vegetation would not be required along the elevations. 37 Plant species: Plant species have not been identified. Include a complete plant a. Plant species required should be as approved by the Staff based schedule in the landscape upon but not limited to the Generic Landscape Plan Recommended plan. Species List and Native Plants for Virginia Landscapes (Appendix D). 38 Plant health: The note does not appear on the plan. Add the standard plant The following note should be added to the landscape plan: "All site health note to the plan. plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of theplant." Site Development and layout Development pattern 6 Site development should be sensitive to the existing natural landscape The development exhibits an organized None. and should contribute to the creation of an organized development pattern of roads and sidewalks. The plan. This may be accomplished, to the extent practical, by preserving residences in Block 9 are not exactly the trees and rolling terrain typical of the area; planting new trees parallel to the EC street; they are along streets and pedestrian ways and choosing species that reflect oriented towards Koch Court, a new native forest elements; insuring that any grading will blend into the street between Rt. 29 and Stella Lane, surrounding topography thereby creating a continuous landscape; which travels north/south through the preserving, to the extent practical, existing significant river and stream western end of the development. Stella valleys which may be located on the site and integrating these features Lane is shown connecting to Polo into the design of surrounding development; and limiting the building Grounds Road at the south and mass and height to a scale that does not overpower the natural settings Ashwood Blvd. at the north. of the site, or the Entrance Corridor. Greenways and stream buffers border the north and south perimeters of the 39 The relationship of buildings and other structures to the Entrance Corridor street and to other development within the corridor should be combined blocks. as follows: a. An organized pattern of roads, service lanes, bike paths, and pedestrian walks should guide the layout of the site. b. In general, buildings fronting the Entrance Corridor street should be parallel to the street. Building groupings should be arranged to parallel the Entrance Corridor street. c. Provisions should be made for connections to adjacent pedestrian and vehicular circulation systems. d. Open spaces should be tied into surrounding areas to provide continuity within the Entrance Corridor. e. If significant natural features exist on the site (including creek valleys, steep slopes, significant trees or rock outcroppings), to the extent practical, then such natural features should be reflected in the site layout. If the provisions of Section 32.5.2.n of the Albemarle County Zoning Ordinance apply, then improvements required by that section should be located so as to maximize the use of existing features in screening such improvements from Entrance Corridor streets. f. The placement of structures on the site should respect existing views and vistas on and around the site. Site Grading 40 Site grading should maintain the basic relationship of the site to Significant grading is required to None. surrounding conditions by limiting the use of retaining walls and by develop the property as proposed. shaping the terrain through the use of smooth, rounded land forms that Throughout the plan, grading generally blend with the existing terrain. Steep cut or fill sections are generally has an engineered appearance, unacceptable. Proposed contours on the grading plan shall be rounded including that which is proposed into with a ten foot minimum radius where they meet the adjacent condjA the 30' buffer along the EC. These Final grading should achieve a natural, rather than engineered, areas will be replanted. The replanting appearance. Retaining walls 6 feet in height and taller, when necessary, and the 70' buffer are expected to shall be terraced and planted to blend with the landscape. sufficiently minimize the impacts of the grading on the EC. 41 No grading, trenching, or tunneling should occur within the drip line of Tree protection fencing is not shown Revise the plans to show any trees or other existing features designated for preservation in the final on the plans, but is needed. adequate tree protection Certificate of Appropriateness. Adequate tree protection fencing should fencing. be shown on, and coordinated throughout, the grading, landscaping and erosion and sediment control plans. 42 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and protected on the site prior to any grading activity on the site. This protection should remain in place until completion of the development of the site. 43 Preservation areas should be protected from storage or movement of heavy equipment within this area. 44 Natural drainage patterns (or to the extent required, new drainage In Blocks 9, 10 and 11, no stormwater None. patterns) should be incorporated into the finished site to the extent management facilities are proposed in possible. locations that are expected to be visible from the EC. Staff recommends the following as the primary points of discussion: 1. Anticipated visibility of blocks 9, 10 and 11 2. The need for review of the architectural designs for Blocks 10 and 11 Staff recommends that the ARB forward the following recommendations to the Agent for the Site Review Committee: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and recommended conditions of initial plan approval: o Prior to Initial Plan approval the following items shall be resolved to the satisfaction of the ARB: None. Note that a Certificate of Appropriateness is required prior to final site plan approval. • Regarding recommendations on the plan as it relates to the guidelines: o None. • Regarding conditions to be satisfied prior to issuance of a grading permit: o Revise the plans to show adequate tree protection fencing. • Regarding the final site plan submittal: 1. With the final site plan, submit architectural drawings for the residential units in Block 9 for review. The architecture of Blocks 10 and 11 does not require ARB review due to anticipated limited visibility. 2. Provide in the site plan sufficient details to show that all proposed light fixtures meet the requirements of the lighting ordinance. 3. Provide the landscape plan at the same scale as the rest of the site plan set. 4. Revise the site plan to show the 30' Rt. 29 buffer outside of the private lots. 5. Revise the site plan to show the frontage along Rt. 29 out to the street. 6. Include a complete plant schedule in the landscape plan. 7. Add the standard plant health note to the plan. "All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant." 8. Revise the plans to show adequate tree protection fencing. 0M:3 0 W.1 This report is based on the following submittal items: Sheet # Drawing Name Drawin Date/Revision Date 1 Cover 7/9/18 2 Overall Master Plan 7/9/18 3 Overall Block Plan 7/9/18 4 Existing Conditions 7/9/18 5 Layout Plan 7/9/18 5A Layout Plan 7/9/18 6 Utility Plan 7/9/18 6A Utility Plan 7/9/18 7 Layout & Utility Plan 7/9/18 8 Layout & Utility Plan 7/9/18 9 Grading & Drainage Plan 7/9/18 9A Grading & Drainage Plan 7/9/18 10 Grading & Drainage Plan 7/9/18 11 Grading & Drainage Plan 7/9/18 12 Notes & Details 7/9/18 13 Notes & Details 7/9/18 14 Stormwater Management Plan 7/9/18 15 Landscaping Plan 7/9/18 16 Proffers 7/9/18 16A Proffers 7/9/18 BrookhIll Development nd Use Map B o khm Blocks %!Qand II are located in the northwest c m7 0 the development. ATTACHMENT A 10 2.4.2 Buffers Buffers are part of the Gmenspace Area within Brookhill There are (5) proposed Buffers to be located on the Broolthill property, which are outlined below Each of the but3'ers shall be established at the time of development of the individual block that contains the buffer if the buffers as shown on the Application plan and desenbed below are disturbed during construction (above What is permitted), additional approvals for increases in square footage and/or dwelling units (site/subdivision plans and/or building permits) will not be approved until the buffer is restored or bonded. All buffers shall be measured from the property lines or edges of the public right-nf--way Installation and maintenance of freestanding signage, pedestnan paths, and trails shall be allowable disturbances witlun the buffer areas Disturbances to the Buffer for required site distances for the roadway access }paints as shown on the Application plan and utility connections shall also he allowed In addition, removal and replacement of trees within the buffer shall be allowed if the Director of Community Development determines that the existing tree or trees create a substanttal risk to people or property or the uses are diseased or dying Buffers shall not be located within any private lot, and the buffer shall be owned and maintained by the Homeowners Association Buffer Cltssiflcation Buffer Buffer Width Descri Lion Notes Route 29 100 feet wide Buffer along Route 29 to 1. 30' portion of the buffer may be disturbed for grading Buffer (70' Natural screen development from within the development, and shall be replanied with a Undisturbed Entrance Corridor mixture of deciduous and evergreen shrubs and trees Buffer & 30' to be approved by the Director of Planning Planted I Note See Figure 4 for 2 Buffer shall he reduced to 5G' between the VDOT Reforested additional details on the stormwater management facility and the development Ruffrr) Buffer Any pinion of the 50' buffer that is disturbed shall be replanted with a mixture ofilmiduous and cvcrgrccn sl=hs and trees to be approved by the Director of PIannin Perimeter .30 feet wide Natural undisturbed buffer ] Any portion of the Perimeter Buffer that is not Buffer Huffer blw the development and currently wooded shall be planted and screened wtth a the adjacent Neighborhoods mixture of deciduous and evergreen shrubs and trees Note See Figure 5 & 6 for to be approved by the Director of Planning additional details on the 2 (2) proposed connection points within the perimeter Buffer. buffer -see Application plan For location Palo 30 fmt wide Natural undisturbed buffer I Any portion of the Polo Cyrounds Road Buffer that is Grounds Buffer or replanted/landscaped not currently wooded or that is disturbed during the Rued Buffer buffer between the grading for the devriopi-writ yr roadway dcvelopment and Polo improvements shall be planted and screened with a Grounds Road mixture ofdeciduous andeyergreen shmbs and trees Note See Figure 7 for to be approved by the Daector or Planning additions[ details on the 2 (2) prr9nfed mold connection points within the Polo Buffer Grounds Road buffer - see AppJtcatuxi plan Brookhill 20 feel wide Natural undisturbed buffer 1 Any portion oFdne Brookhill Histone House Buffer Historne Buffer around the and new landscaping that is not currently wooded shall be plaracd/screened House perimeter of the belwiten the deve]opment in accordance with County snorer DHR buffer Buffer Brookhill lot and the Brookhdl lot screening requirements Ashwood Vanable width. Natwal undisturbed buffer r Minimum 10 feet wide buffer between the adjacent Connector Minimum 20 feet or replanlyd evergreen Itxs and the proposed Ashwood connector road Road suffer wide buffer landscaped buffer 2 Replant any portion oFbutfcr that is disturbed from road construction with evergreen trees and shrubs ATTACHMENT B 11