Loading...
HomeMy WebLinkAboutWPO201700071 Checklist Minor Amendment 2018-08-28 fi Old T rail V`�llage SStorniwater Management Master PlanReference Checklist (Draft—To be Provided at Design,Submittal) Plan Number: Plan Name: WP0201700071 OLD TRAIL VILLAGE BLOCK 22 SWM&EC PLAN Legend:I-Complete Inc.-Incomplete N/A- Not Applicable Item Plan - PreparerNotes Reviewer Reviewer Co ents Pre r Underdrains included on all ‘/ biofilters. Maximum ponding depth of 6"on all biofilters Safety/Aquatic bench provided ✓ on the two retention basins Steep slopes are not implicitly approved in the 00 master plan— Impacts steep slopes? Floodplain impacts are not implicitly approved in the Nd master plan— Encroachment into Floodplain? Wetland impacts are not implicitly approved in the master plan— N Impacts to Jurisdictional Features? Stream Buffer impacts for SWM BMPs,BMP access,and Greenway trails within landward 5o'are approved with MP Stream buffer yet) impact(Yes/No?) If so,stream buffer impact y� mitigation is included? Outfall protection V included in design Media specification ✓ provided in design(biofilters) Emergency v spillway provided. Forebay or pretreatment V provided. High flow bypass included for individual bioretention cells with greater than 3 acres of direct drainage? Connectivity between facility outfall and existing downstream channel provided. A 10'wide vehicle access graded at less than 20%, V unless paved or graveled provided Necessary lot adjustments 1,1 A provided— reference site plan Design storm(2- year and 10-year) attenuation to predevelopment ✓ flow levels provided per BMP outfall? Water Quality Compliance Tracking See WQ Compliance Tracking Ledger- Is there sufficient running compliance capture surplus (prior approved V plans+plans submitted under this review) across the project for the development to remain in compliance?