Loading...
HomeMy WebLinkAboutSUB201500140 Calculations Road Plan and Comps. 2017-05-03 _ �� COLLINS *�;,�,� • . �t" B00 E JEFFERSON CHARLOTTESVILLE VA 22902 434 293 3719 434 293 3719 www_collins-engineering_corn Lor Date: 5-3-17 Project: Avinity Phase II Road Acceptance/Bond Reduction—Private Roads Project#: SUB2015-00140 Please allow this document accompanied by the following attachments serve as our formal document submission to Albemarle County for the inspection and reduction of the existing road bonds for the above referenced project. Included in this submission is the following documentation: 1. Road and Drainage Asbuilt plans - Road Asbuilt plans include the following documentation: a. Horizontal alignment—provided on the asbuilt plans, Sheet 2—spot shots have been provided ever 25' along the centerline of the roadway. b. Vertical alignment—provided on the asbuilt plans, Sheet 3 —vertical elevations have been added to the plan along the roadway section and compared to the existing centerline elevations c. Edge of Pavement—the edge of the pavement, curb and gutter, and sidewalks have been added to the plans. Any sidewalk or curbing missing in the field has been noted on the asbuilt plan. d. Culverts, Pipes and Drainage Structures—All drainage structures, culverts/pipe size, material, inlets and end treatments have been shown and labeled on the asbuilt plan sheets, sheet 2. The alignment, invert elevations, and pipe slopes have been added to the plans and the pipe designs have been verified. e. Ditch Lines—Not applicable to this project f. Drainage Easements—drainage easements have been added to the asbuilt plan, with deed book and page references added to the easement labels on the plan. The recorded subdivision plat has been included in section 3 of this packet. g. Guardrails—Not applicable to this project. No guardrails are needed. h. Right of Way and associated easements—The right of way, sight distance easements, and slope easements, and other recorded easements have been added to the asbuilt plans, Sheet 2. The recorded subdivision plat in section 3 of this packet also reflects these easements. i. Pavement Designs - The updated pavement designs have been added to the asbuilt plans, based on the soils testing information. Section 2 of this report includes the soils testing for the roadways and the asphalt pavement verification. j. Street Trees—the asbuilt plans show the locations of the street trees. The locations and number of street trees have been compared to the original approved road plans to verify that the required street trees have been installed. k. Signs—the asbuilt plans show the location of the signs or any missing 401101 signs from the project. Page 1 of 10 2. Soil/Material Testing Reports: a. Stone and Asphalt Testing Reports b. CBR Testing Reports c. Soils Testing Report—Roadway and lots 3. Recorded Subdivision Plat—copy of the recorded subdivision plat for the development and phase of construction 4. Engineer's Certification Report—An engineering certification has been provided for the project. The certification indicates those items completed with the project, and the items that have not yet been completed or that are deficient at the time of the inspection 5. Street Sign Maintenance Agreement—Not included, the standard VDOT street signs have been provided on this project. 6. Certificate of Completion—Not included with this packet. All of the improvements for the project have not yet been completed at this time. 7. Pipe Inspection Report: Video pipe and certified inspection report for the storm sewer pipes 8. Original Bond Estimate—Copy of the County bond estimate for the Road and Drainage subdivision bond stow, Page 2 of 10 n m 2 A A F ; $ A `s)°, "x 4 k �O g 2 a I^^ $ m aS ( x 0- m, i " 2 6 i i i i 8 a =x z $ c 2^ my, �> m, m 2 n O y L a m n 0 A 2 A A C p oA n i g �� v w A ',-.1 'o 4-3m 1 c pt 6t a~ �e�l _W12 �tii o: a ee.ga..eena pq o0,M, Np n ""W in4 a= e $ e �' nA_ n� NiA '''P O P pt O eS + bm�^tx a a rn g N� rQja A ca mt C L'j NA_° a N O � j0 jV ;p '^ '''P y 1 v:^ ' �o�Q m a s�i � N $M rg "7� c�^ $a $aAm8 VAsmr ii m '8m2- 1 Ki : > a ,2 yR `$ AIn o t a m mm vaoA2m , � �oi. N .per n faolaN<m^ ° g�i �; g z� F m > � oz"$i=A2 2 c �6 =o�c .>n !!!1il x 4 a,Tvg yi,`A ,A, " , v C; y$ ' 0$aP A� "r �x� a 5, i ° ,'a �$ y 4, t E,-,- 2 'y�"$Q ,yn0 , Q 2Ln2 n$mt0 I moo n,>Rgm R ,,1460it'$> 2 2 n°, m LA; A; $ H P �C 'n$ '^ n i i ~i a 8Na a i;Ox +nt m, ra " nP ^+ y �{' �i >RA a y y �-t mA c' m � A^^2$ yan, a az° {,y{�,,am zpppl3, E y� � pp �n 5,. oma ��> � O A V < mm mt-1` A n°0� � n p AV�I wiC0i > m V n $88 $ i "; �� 'n. ary�y ax2 a v$ m^S� � � i > � � $n ° mA �^ ma ���' m ..e>mmim,5,AA m, 2z 2 ,� x y A > �� x y A � N � N,�I` vA $A a a a s^'�m, y$ g� . Nd "'= e� 'yam ;� s $ ti� �$ i�,7. o=,n yc vi �mA PA. aAa Axa ?F o u � omz°, v o �Aa a s g g g aR "O. 6t � �ry 8 �m� om� $ ogoimO>a� gA oA� o°� �� $ N NO e $o � °s ° �' $ $ RP g ^i^an o' ya,o^O ml�pApa� omaT �^ �: �A�= ��c "� x m°si oa° po A " v 7 $ Y S� m Ah 2n, o iA A$, a N 4iX 2 a2 O 2 zz. m i>� .m o a �x �� $n°2x >>.ey tm n z� s4 4 w z ? zy n� z ''7' + �_ �82 a F 7� a +° um 73 m Ir qm �� n O° $ n i 1 x i g o "q I m=PO 10m, ;2 n , .. $ 8;,0 0 yni ago t"'''' RV JE7• i g " 2 $ b�-o y� �N�eJt, g t ..i '- Ra 2i o +' ° 1.1 o i yo rg 2S y> Wim' i a s y rale 0 N�,� n o `"�w,60„, y ° $2 a ? ° i m yF N A n>�i 3:'^ w o=Pi=4.1gDA m a F-- ;, ° 2 O z A R• >O �'• m1 A N y'OF R $ i 2 to y0 p A > A �b2 rj 2C= 2 m1j F,nn�Am� ?5 Sla O ° na nn P g P- d n 12 ".R,,R aF QAnR a g-§cny s a n gg a $t P4 a ii mm• N t 8 i 0 &IV° n ten' z., mica F .m n $ A v4 P4 $ 2 o + �� g 2 N >i rq �" >An"~niO2 a q. o - 'A $ -x ,, 'D ° 0e n§?' cony ��""' g> ... , ,.j't $ na `a A a nn N ti $xF $ A io°VAyy,,z°x4a >n �i ppo m, R 2a i , b z>cq ;a ^M$$ nanCa;a°28 nn > cr > w pnp H 7N y p �y yN j06 �ro FrAnA y> 4, A > i F g§ o o &'oi rya- t.w. c�-- Z, Aa °'A o $a o o lTJ gin Qi y0� n ,0, RPE ;'^m ct,°.,ynt$ !ii m ° 2a ° A V Y . c 8�..m a n °mn o T n m ,c $ x n ,n i D --------- o 3 o A c C� N 0 C OD3$ rn _ r cr,m0 z o no vrrn s I�_ lili • 1{ ' nX >wg A y . 74 O v. 7 � � � ��� 1�� 9�__ �`s' 1111 ..• 1 11 1I I ,•1 ,..ai 1 ea '�1 I 111 I-I-- '�'1 . L// 1 A T I 1 -111110;0,00,10010017 u �i➢hc�� �'d0S9 �-- - gia o m 3 0 ie�sr+ � _ ._ _ 1 , �- Z �M� w� � ill I of 1 - - z rn A `'tinm O tfi —1 wm--3 v 1 I 1� ) � ) I—+ (nn J v (nm rn T mks limo II, 1. r �� +� ( 2 _ g a~3 1 I F' I ' \ I J t W =IC: a 1 1 ' XI > n o t f -' I ' 1 — I 1--1 1 F� \'� �� 1 —- - i r 4 �I \ z T. n I " 1"�" 1 1 I ' r D O 1 I' $ o ra� , 1 - �`� -&io Dz 4„. l m z m I in f cI I " .!i-'I ,,��m G7 j al w �� z 1 } 111 -9 V C,r y m�oz� wmz rn I �. S JO 0, i �z AD NCZ I 4-1 /� mD' aNO 'n -__.r�� 1\17 / i;' /\n — r > \ • �� cm ��� �, f Q i.-,1 4 Aon Nx -L - � \.0 Y / 111 (( I Doi y .4.---;-----' kQ '1- \� )( z m �s ,A�o ZomZ A Z 2,='ly! Cl m D 9,U D L m ti m w o(� m m $ , a 6 ' r A " A W N t+ C �x ApAg ml 3 a w i A y ai $ h F [ __Q+,, hio a b A m z I I , g % o x $ F )i!u 1 r q� A JJ sr ® # 1 I r . Z v_ eXrFN d ff m I O 1 I c. > .o o n H r-�e�� f ss < 4 m Z ( 10 po O 7. b m .e A g �, A ' 2 0 Z P . r IH ^m to O y A m II y ��¢{" igg Io Z y t 4 s A > N oa q� o6 c�poc % 2 `z' s < Q 0 00 3 "' 1 2 ovs, dN, 2 $ 2 IC x 2 g A INA Ola g � m m r� R A y Y �o i 1 O OOit NAp, $ Z = Phi 1 0 REVISIONS all COLLINS ENGINEERING DATE REVISION DESCRIPTION 'L r 4 6/15/17 INITIAL SUBMITTAL .?� c 1 c, 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 "A r' PROJECT o NJ o AVINITY PHASE II ROAD AS-BUILT PLAN �� z ��r z W SHEET TITLE COVER SHEET - FR �rxt� Dna oss Dote^doamonte o e m - o n' J u.NG and moy no:c p-d whCo or n pont Dna Ono not ee used ton o,y purpose xnatsoever,'nclusv5,but of I'm'ted to con t ucton,kidding and/or constructor stakng wjthout the express w its^cons t of COLLINS ENGINEERING. I _ _______ __-- ___ _______ -- _ ________-- -111•0,-----0-------------ii- -- Iii t • yy� 1, - __...mgaiiiiiiiiiiiiiiiiiirliiiiiiil ____-- • � . c ` sa � Ak • Z F. w w N o�y r, .- , . f ' •.: A '–_ sals' ■ 1mm-mcI / l'-'),-...11.1.......4 . ` X � n � --1-,-..„- ZnZ ' I l , iZ � m�\ '-k_ ' i,_ ZOmOZvi O- Z Z 11110 \ f- -I QUI-r_-1-4 — _ w 1 A r O O Z O 9v.O N ��1 I r o z m m 7 \ -4 \ \\\ ,_ V ,' , ,'" N.---, '''' \ CO 8 \ -, 0 I 't `° M f /•A sem. i IIS ` ,, I I � ��� '�..—— '� 0. 1 tri'►' 11,„ T. -al y AVININ LAN to m z N • � ` l33 PRIV TE RTW) J J — ► /I 2= x _ �� - i ,� \VII U I • ZX N ops a$ / ' i i'2','',, p , ,I • N� _ r EA I �� o Ill (O O=y nN _ IP N• w I1 (til r I r I O 11` ) Ill `'Est tido 9 m '—II Iger_, 0 \ ro r.O O_ o _, �•,l-, _ ' � z ,.,\ • --I �' N ' 1114111R rnCI l .r?.'''�oi 1 F I� 8 '0,,, r-I ,.11,,-, __,,_ 01\ ',SI •p:11\1\ 6,,,, . , AI ` l� / I _\ . • �P III J r A A m ', — I I / 1 'I t. • !d� ,�� N0 I �1I I Iv l I I. .. _ a O 1w ;D C CI �� �t — '-- 1l. Im —� I a Q Tl , Sn ' I 1 RW ' rci o • 1--- _�* ONSr N \ I i!...,1 , a. .1 1 FIO FK m Es; �K N V I z 01 1 a co I\ "' ' I 1 DZ I- I .' r I m� y mo $ N= –T .`�_ Ai 1 El E? .I O I r ;z . L gm i .11:-Ili cNn 01 y ii(5-:91NI_ — m ����.�-�- P N 1 7 AA,py o _ r- 4 log ! /:� r — .. – �� r �/)y X A - :O / f�. r ,? r� , \�.. T — N N" I tis3 r_61 ii N. \ 1 , ,, , 1 , _,_ ,, __,_ \ ,. \ __ , ‘ , di I, w 0 / o / (I/ 1111111 ,--.-(•, rl zd \ r I cAD ___ — _ _ r l I m -44• r (°'O D 1, W r _ I F_ 11 � o � ;I_I a �II 1 r ' oO IIj -II a> r 0 0 1 � 7-1---- I� 1 r. _- -,'I w 0 I REVISIONS ® COLLINS ENGINEERING DATE REVISION DESCRIPTION ,fid �� 6/15/17 INITIAL SUBMITTAL 2 A 200 GARRETT STREET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434.293.3719 P x PROJECT N a o w AVINITY PHASE II ROAD AS—BUILT PLAN �I ����. W SHEET TITLE UTILITY PLAN These plans one associated documents ore the exclusive property of c .-_[RING and may not be .,Hole or In part and andl not be used dor any purpose J NNW PO N91 w ti P3 N 9, w N K1 rn N a 7k w N • n2. w N � w n � � � N o Oac)Gcak AaA to"-1.0141.0 003A ��' n 2 I co to c)0 CD0pp 00 co Da 20ASD npl p0 o2.CmA A pot c) -IS 0 1,V)VIA ,Ct) Pr-Q22,,.2 ma=n"irrr-y0Almirzomn Amo toj 0c� co�0.k-0,inrr--`0.k2ro rV,.11EVAA~O �Aa2nyCrinyAry`ttoOCOA ,_ y 2AC0Sr0oy222)0SrO0°A°D2.Oi~0,1 mOOyi2,. es rnr r2. IAr ry1!lr n2j � mOnA �m� m=yam y0 rOOm D r� D mAa r ��myt 02. z1„.„ 1!...,,201.?a y1i• h ~'1AA�TA2.°�$O N.N. zi Q. 0 r 00..1.2. Ot�i AWo m p y To -102 O Op2�A� klp 2 O ',QS200P.mA if �0 moo npoQt2il• C� Z�xmmo� mercy oiomM�mm ay2 1,°AC)0)2m mac".. 2 ~ oy� c cn2�Ao• 2z�A 03x007 vvi tyila 2 m ° O rn Onmm 022 y poi 2 AZ� �tn"N10� mm 2�2n2 PA;2C y Dm m�AD 1.,N."..,„ ° •032.037 r- 0,.,..oy o� �on2. A2.ym A c)A0030 000 zacn� `�xi0 mAnz en 0 nA,A A01. n° 2 NIT/ �y �nAOoV, ODAO py A2yy220�1 to0� nj� par.-I Oy2m ml'Iw�AtD r pa2yO�py01+1p �N'D m mm "'j Dc) 22 -� A m Ata^-I- m 2 00 AC A• A k�AApm rA y A noyA�1V mr ora2D� prying � .2(x0"17. ptA pAln 200301 �111m ��Ny -- iy .too op O 2Ar2.r A t O p!"2. 0 rrn C y 00 rm a n vlp 2.np�AC p�22 mno CUAOA, 2000mm tA� •A ren 0-<(0 �pnryA y2m0 y mA--I --C2 2 22yy2A n� OA r y m tnU p Fmr2 in, I o••0 p a SA -0 SOA mUyi 2rD mo<) I 2A c co,- VI tnn-.G co p 12x0 0.,x,..000 Am x20,00 Arri rrip 2.Ary pto �m� 008 '"Mny 2Aa Aiy2, 0ommnn0Anta0n"A1 iA�p ° a2c� o'a z A°A�co a� o O 2�rm22 P,;)y en?). �O�yi, y A Ai 1.2^x10.21. ..azyn02 m?O i,2A0 nmDAr00r-rn� 2p mm A ° r ~ A0A-li p2 2 1.A A OpAn A�On vi pAmmm�A m� oy 03x..0 D� VI"I� ymAOn"pAjOp�� A s�Ovpi 2 O� rt°j O�� m 03x03 C)?...e D2 t y 203 "{ 0320. I ooQoIeiJ!J A2 �rN. 1)100 2 L Al2*1A^2i -GSjZr.:30 l C (0410!1".7 0Oa QArp=yiOm1� AA0 o �0 2.A"Ai"Ai �a~ 0 0 PH 2tn A trop to p 2 070n tDC A a m p "� Omy to 2 m�1 m Oy A mpO 2 m Dm r to0 O O O yOrm A A D m m Op c1. 14 yp "1022my 03yDAiotip �7 mm r en a° my � 2p x1)00 m m",yr- to o� -oA Dtny �2 ' m ^10.x07 D D2A yA"1) "H t�D 2 yi 2t~) mp�Iryr m00 2p ) t ',2 ry KA I. 032 0r A O pr 2mt mAmi� l V7ptamy , p A• OFFty� O O 00 00.00 Apt= r rp�14�m H z r m mi A rA"PIyip .^Ac 2A2A^�2� O �mo0r�om 0oy 21,-Ij2 A 0-10 m 01�I*2yprA m� 2y � 2 �aa2 �ymOC A mAtD00p b ID tin Ip'7A Nr 032 02 �� yn0 0 AAp21,,Pp 2 2.02. Atnt Ata0 A-1 022° y A2 1 Appr VI 02C�S -1 pnAAmL/C:I �°��l F a° t �O , "� D t to 2.0000 O o 2 n-pC m tn-< A2 �p yt�oy~ygyIp r1. o Z oi. AonA to 0 ° -12' ,1Ar2 m a A� A °A m ° o� AAV, A - 03 H 2.00,3 yi0�12A 2pO2 0 2 1.1 m22a X22 m�yz onArDg ° �° �yVm m 142..7 n2oA 2 2 t2oo A 2 2 m A 10720037 14m��p rot prn "1 A 2 20c) pA D`� c �,1�,Dn"-I�S A Io mm2 O Oco O� Ayamaj-I On to O C y$o A p r D ^1 A A m n DAO 2r A n A0vl (a m Ay 03003 2 p r r2� mC At A i1.0 0 1)D m 0 =000 A1�*1 in 0pl rnCin' mi 2y1�i1 2yy m m2oAr�p 2 i A pc.„0,.n- 13 It,o i ° Ono2t° -1 yim�� 0 2 203 oA D0�2oC ;0.030 "�mi�A 2m� ? m°a�m2 p a 22.°"r7 2 pn�yi 1x'10 n A , Amy �2N a p, o1) 2r . 0"1,01 2p y moo Q�C A 2pp 02.0 tD m em 2S 2 Orn r p m O A mS�n m 0220 p S ~2� 203 m n°OC m S 1.y ° �21C .�O m� O y �' 103712 m 2 n-1nn:< O 0 o .'11�A oLm `li t a °P.2 ° mm�A Ao .- 1. n AO " cnjam ~ y� ° t°il -OocmD mcnj� "103 a 2 Ortrn t°+1 F y,m'� I�,C pAS 0 S CO ° tD Ornrrn Om 203 (-O Z.12 my j 200 1,2j AL') 1.D 2 2 01.403.0.0 SpC A tiA y2 22W D yQ mi -<a i r-1 to An r1. AA "10 O y AO2.y nya -"LE r 0t x1~71 m "01 2�On °� n 2 1,0rn) °A C) -.- x00 -NO �~ A �y A1, co 2 A°2D. ,yp 2 tmil em,O^1A-11 Oy O UA -I m O CDC r- S c4 Ompr D I e my mcn?.w !v "2 Ort am -1 yx y O0 I. a Lo 03-(2,1 m� = to Vl 1`07x02 t2.° o' p <> I� m 2<o tV1 1) A A 22. y A A p0 1!010 2. n 2."1-10 pp p� p II; HF V+ 0) �. 1 4 4 r,, 000 rn03. r- z>comm. C = e .J p r2 pp1.zr,mD f -< p1. VIA C G)2. H n flU ay 2 p p 00203 y'C oD vlcl o�:m� >`; yyp Aa m zp 17, ° 20 0O O °viAyn AO 25,'03 03 103 m 1)p O "1ri p A A yC 2 �v p2 '<A'� aim .o O A D� A� y N 2r O A co-n s I- x �� a� ��� of 2.i.• eyy O p� p p y0 r 0 ommv,o� 2� 00si p 11) mo A a m p����z2 m= AA o�vN� -.07. = pNn C n Dn D p riy 2 t-1p2vnt� 14In-Wry, nn;0321.;C Onr) o y+D,2- 0 rAj, 'I�i D00 U OA n A� -I m 1n r1) -I -, pmt o2 n 26,2'' 2mn',28-mi�t�'n`' 1.i mm W� D N�o�n ^ �,yGo 0t Cm A Sc) 1)FF A to yi O p 0• 0A A ono m� oAa yr,no=o AV,i cion oo I °0100 02 A p On pm r A 2 m m pe r I. 20 �o `r' 71nm� W x�1n v1) --I ; '1� 2 �y� o~ Av1 2 1.y my i I. p 22 0 03~ to y �m Ap�+7 �IUH T03r1) o2rr2003r�.,m� m1.c N.m00`^03 Anm DZov,o n1o� <ti2�0 � ��1 ; $ 4/ Z YA•�'. p< a mA� v7 n 'I •, 0.022 2.o- �G)-r �\ 1 � D<_. < < y2. x__: - Az 0 22%o 22( 22 o2',ai��m I ',;\' l; r- Dy A8 TAS oin -z z p1 m aon� n o o; smvr'- :'�.. po 1)T mm o -1'... 0 A-4o r�r1 00 203 •:•. D N y v1) n \ � Y7 '',`el �z Stix z pz � p.. l!1 ,222(1 0.,0, 6-,. -,06,•--,i,..4-1V1in '%�,>; �.• II qA �p RI n°3 '2f, to '1. m 1.x72 WyC In'�AAA \ \�. z2. O • S ^I o :•, p m 1.z m v '^c 5 -1 Z7 EG ELEV mN2m c `^ n n,gi � '2, � O ��'7 ° °� zs nm 0 'Fr Z FG ELEV 9 ocG" ^ V ° �o D t 'Y• o- z2. o z ° < �- m I„,::, �nti^� v mit Atenin v� (� 'r`(\�t�� �o '- in " %Cp�Ny Oa D �T3 -iN m D- m �2 rm0 r'11,. ,1 R 'a., !m;�"O $ rY� e e 3 oD �v i czmm 1)G c nrl' n mvZ _ o 032 on A 0W 0natn O/3. 2 o m ,E,,I; vz y r r v O 581.0 _.m 1)A 02 t•+^1 no 200 \ : 'x ;a n,zn y a<N <a a o o nn o p8 -581,88- Nn U onm��mY•,• r <O am `"�z is a o a DZ 0 577.66 v .� - o 2 an 2 o1) y2. v L);,2P �Z G r z ZD _ a:; BVCS:-75+37.50 1)b ri a tr r ac z2 Z oomz 32 z -0 m q.1 T 590.3 G E BVCE: 578.91r._SS T u,., VII ,r- z z o z,G7 n- n 5 x 8 500.32 « ti rvw 1)r v> uD, 5 Ar c n < m I 578,76 n..^y1)`~ F4 i):01 mi 2 00 m� g m 7 030 ..,,,..,-,- 4.2 02.cu-F> K1 1D Dm Oczi �Nm `^ Z m J <a' D- I I v.0 G z2. zo 2.o mmI Sj f m O z °52 ,DO V:+' -N 1.6\I m m-��, 1)A ro a + -- !EVCS: 111E 02.50. °iQm� o m a\ Oyn O Z ••:' rn OD O o SBS.1B.-/.V NO 2 +o Z EVCE: 581.15 ' o o o a AO ; oo • 2 z z G v O 580.8D V > , 'o oav_. i �z " mvz. Z C *6 n - m r, z 4 __ A SS:a.o g> 0 rF t" el m a O vDi !! /SVCS: 11+37.50 m ,y.y • o " o u. r ..7r- E z -< > -1 = m D I- + 584,1 BVCE: 582.76.1.!m<D_m>.-- r. ° v " 22 2, 2 64 a O p r, 8 864,4- i1 EVCS: 11+62.50 00303+15_, � C m r`0' y m '61 „ m Z 5 N EVCE: 583.72 o 0,b1.i ,,,- i-- V',r > n N [i z,0 z z s m ^ O m 68b.37 0 � WoYa. Pc)-; Z e w 1) r D a x Z Z A D m n O 8 585 4 - ..y. l9: W ~Ia m a z ^ ;2 O D O ti b m T 58412 < OIC ng oh z1) o 0 00 = Z 00 m c Si \o Y,m� m Dy ti yD O G7 AO Ll T r a n N -I O p F p o o r Z- n m C< r O > a N nM I`'2o o.o. 030 Z y1) n O m 8 Y...__-.. 030 11-'y .0 y TT '� umi y O Oo -1 GJ 11103 m D In J O �w O O O O 2� D D N J J W Co ro P m� s,� ' m 2.2 Om m m N CO O U O U m� N c ',.1 C yyy��� is %.4 m ',li1 Ie. Q EG ELEV fA FG ELEV c LL 4 / o GR rg Ln CO Um �Lli . R I' O m u o o o o p 12. . a• 1 o 0 m ` + - Z xi + 563.0 m W w 0 A " m !a o'1 < o [p Ln o a ti I e b ti ifs y allo } �� m m o hi I ,e:. r',On a ye:. ba ,y`,, W i .'1 ')Zi E rl% ?- g 1 D p 8 562.48 I ^, A. A c z. • o 1 �.� r Iv a l'1q¢J ,r1 \ g BVCS: 10+ 5.00 v15 F F -Z7 9 BVCE 551.95 '‘,,-,2,v-t 0 I,8 a x� H o \ m m>m O rr u 1�, 55 1 1)p ", C = + 562.7 DON GRADE 0.FRO .SIR D 01 20 �- A �� N 562.23 _ \ £ INTERSruINGE1P=r,% XJ .o •• Id/ i / ��i a D2 N O N''+sem � i ▪ c° T. *i§ m m ' > f , `'" z EVCS: 10+75.00 a ,off+ • II b Sr i - , I 0 EVCE 5.3.98 g;0-, ��, x Z + 555.5 o • w S i!'l �� 8 366.4 i p ` __ m • �$ a Iu- 566.24 �� or r-- I BVCS 11 5i m �, I�' • / �n ` - +42.50 -o • r�� '�!/ o + 580.2 -m--0.m..._..0 ? �` \ EVCE 5721 <7c. -u7i.� m �./ '�I r 37}46- '+ m T?' D m / ;�6, D 8 57+.2.8 °= ':1,, p \ a;c Fi V \ 30Ln ' • �� n,-,,, 2.r C m Do o __. .` , $o •EYCVCE1177.50 573.78 OJa.80� c^ z2. pyyc rn v m o 4.- • g LV -' .. .b + 584.0 m F A51� m 6,,,t' S, Eibi "'' z S o" O 5- "33 a 575.45 ; e \ a m �'. v '"� z s CJ a 5757 m �. BVCS: 12+14.48 s '^ 2(00 ,;,_ Ia.�i u H __ r � y BVCE: 6.52 T N e� C9" -9 C" -. .....m m \ 55 `. - `. - ro 586.7 • \ rx� � • i- r. 8 LA r o + 678.66 ... >m a r" r. 8 575.28 \P.:.. +�• U INTERTION VINITY LANE o .S:',1& r-o 07STA. 12+90.8 ; ELEV. 570.84 9 48896 5EVC9Ym +cx ppUI acr/ 1y I .. . .. .. . . ........ . .... ........... U O U cooic oI c REVISIONS __ _ ® COLLINS ENGINEERING DATEREVISIONDESCRIPTION ��d OAµ^ 6/15/17 INITIAL SUBMITTAL ., 0 . o 200 GARRETT ET,SUITE K - CHARLOTTESVILLE,VA 22902 - 434293.3719 - ="-- PROJECT z N �- y w 1 z AVINITY PHASE II ROAD AS-BUILT PLAN -„,,, � c qt'1 r o kV141`' P SHEET TITLE ROAD PROFILES, NOTES & DETAILS AND CROSS SECTIONS These plans and associated documents ore the exclusive property of COLLINS ENGINEERING and may not be reproduced in whole o - ,,+l, ,,.,e.. ..i y y e whatsoever,inclusive,but not limited to construction,bidding,and/or construction stolen,without the express written consent o -.IN Q EG ELEV c< FG ELEV z 8 wW N m NN 0,,g10,,g1.--, - N>OLi 1 il �F�d Q 574.1 $ 570.41 • r -' ¢ I _ � 1 z t 4 571.8 • 0 576.20 it -. m m u N 87.1 ''- ,M - - b . $ 578.81 I F-1 575.3 Oze,�$F`m P g i'. 0 578.74 1HP Cn2 ►l Y\ 0 9, 'L N 7,U, A k N �•z , O � i 578.9 _ •i- $ E o���n������� �� nianagc�ao�o��vx0 C7 0 560.73 - ° �2°mo�o�oz)i'3zi�on��AF�n°nm�°" D ` � °�yn��ynacac mi2oon� z� m I 4 o�xoa ', 4',• �,iiait2ov),i;n V"):9, z sig m2m�Nv),Pcmn�m�o Fm c�Amaynin�n��z � 577.1 I / �tt - Na 2V)5522 --)1. 1�r � a-6e-'79. ��)a o 581.22 ssH m6 ; _. 220-Wz a �soa° °y 2^�z�mvm� A �a yo s'2 ��i 6 me �� noo a m ,,,i� PAIN a o , m�n x�o c c�eo93-0o m N°'n �m 8 n nm .,=2(!),, . 2m2 o2a U '1�v' ,2?O ;`" n'n vti_m m i�vt�" owzo )aF °zc h--- am)N z� °�mna m�000 � a�zom JI o cn='n o N'-m °a a) )a i")z n m n A i;r'{," 'n';' ,., __._-- -_. - t I ---.._- �om� omo omnpn aya�oz�AssA�mn!� y ...lo IN N y1a 0� 2055 gRli 20 �ryAWry00�,-m p,,r°,1 O a 2;3g. r �y l' Aon o nt 'n 2 2 rr-12g p -9m6=� ',Anp sIg i' o i Ano2cjzA) „°,�m \ ° 'nln'n N a0 " p � "� 9 ,9 m. g. ,- 8 Fri S EG ELEV FG ELEV E N 01 N N U U 01N O N O N O ''I, W = N G x v _ 585 6 O<G A O� N 580.88--- MH:MH6 I:27: $ __- - -_._STA 1196 31 - 8 N '" ,--3 = RIM.58649-5790a R §1E,14 n 0 nCO INV IN.57$.25-70 MH7 5)4 5d w m.,n o z .i n I INV IN.574.25 TO MH8 6 5 4. �' -a~~ +m m ,N Y „ t9y 589.6 " I 5 9 _-__.....: - { INV OUT-674F5-20541,16-52812 n, FG ELEV A p�- rn p e 000,ok o•, r EG ELEV m$$'wro-: m U1 N p 8 O 1-. MH:MHB 6 $� STA D 83.32 RN Iii o IN x I r 579.5 fa •' _NIMOUT�572�OTO MH8574.90- N 7 Cs7 H� _.__ -_ --_GIS-- __... i < 577.04 g° o O O O C A x y 3.7 co. OD O 'Vi, 0 O 'moi, 0 m 0 580.4 - '�>N 0 `G 580.36 O 0'�i > 7. ima °m 347' 7,RCp f.:I § a 4:" 7 D s,,j, lt EG ELEV FG ELEV N N N N.__ W W _ _ J V mo I_mN._ . f___ N p 6 EG ELEV O_ _ x A oFG ELEV yid x _ " x i---', mu . zr E 4E S 1 yg en . �a � x �� ocZ moY 5807 • S 571.12000� N8 $sz'- ®Mil'88 '. citt i 5654 584 2 m$ 56533 (� , I• 00ONNA~OZ~A ' • l $ 519 i-' l , lif oyv.) 7' 563.2 � :MIR _ � ;o° = �� __ �44k ,.....1 1..N 563.77 r v 5 0 _._._..-...._.. • El$ 578553 tAll5631 572.1 _to g _ ► _ t�z ; SECTION 2 SOILS TESTING REPORTS Page 4 of 10 GRAIN SIZE DISTRIBUTION REPORT 100 - - -- 90 ' , , , 1 1 1 80 ' i 1 r 70 . . . . 1 1 11 r4 1 1 1 Ili 60 . Z i L. ' 50 ' Z I w I I, Ce 40 i I 1 W^ . . 1 1 1 a I I 30 I I I I i. 20 I I'. . 10 100 10 1 0.1 0.01 0.001 GRAIN SIZE(mm) %GRAVEL %SAND %SILT/CLAY 38.1 27.4 34.5 SIEVE PERCENT SPEC PASS? Soil Description . SIZE FINER PERCENT (X=NO) Brown,clayey GRAVEL . 11/2 in 92.3 1 in 85.9 Atterberp Limits 3/4 in 81.2 LL= 38 PL= 22 PI= 16 1/2 in 73.4 3/8 in 69.4 #4 61.9 Coefficients #8 54.5 D85= 24.103 13e0= 3.973 D50= 1.317 #10 52.9 Dm= D15= D10= #16 49.2 Cu= Cc= #30 45.4 #40 43.9 #50 42.3 Classification #100 38.8 USCS= GC AASHTO= A-2-6 #200 34.5 Remarks Moisture Content= 11.1 % Specific Gravity= Lab No.: 2538 Date: 7/28/14 Location: Avinity Place Elev/Depth: - SINCE Client: Avon Property LLC 4411.00 r8c° Froehling and Project: Avinity Phases II, III &IV ® Robertson, Inc. Location: Albemarle County 1°°1 Project No.: 71 R3054 I SINCE FROEHLING & ROBERTSON, INC. .: Engineering • Environmental • Geotechnical r$,R 6181 Rockfish Gap Turnpike xt Crozet,Virginia 22932-3330 I USA 1891 T 434.823.5154 I F 434.823.4764 California Bearing Ratio (AASHTO T 193) Client: Avon Property LLC Record#: 71R3054 Project: Avinity Phases II, Ill&IV F&R Lab No.: 2538 , Location: Avinity Place Test Date: 28-Jul-14 (` l Unsoaked CBR ❑ Soaked CBR n Compaction method: VTM-1;Surcharge weight-10 lbs Sampling Depth: 0 to 1.5 feet Compactive effort: 5 Layers with 45 blows per layer 700 600 _ 500 ,1 0. 0 400 VI a c clin 300 • (1) * I' N 200 100 0 0.000 0.100 0.200 0.300 0.400 0.500 Penetration(inches) is CBR @ 0.1 in.penetration: 15.7 Proctor Max.Dry Density(pcf): 129.1 Swell(%): 1.37% Proctor Opt. Moisture Content(%): 11.7 Dry Density Before Soak(pcf): 123.6 Liquid Limit: 38 Moisture Content Before Soak(%): 11.7% Plasticity Index: 16 . %Compaction Before Soak: 95.7% %Retained No.4 Sieve 38.1 Dry Density After Soak(pcf): 121.9 %Passing No.200 Sieve: 34.5 Moisture Content After Soak,Top in.(%): 16.4% Visual Description: Brown,clayey GRAVEL %Compaction After Soak: 94.4% Resiliency Factor: 2.0 USCS Classification: GC AASHTO Classification: A-2-6{1} Tested By: • RK Reviewed By: Froehling and Robertson,Inc. I. F SINCE FROEHLING Sc ROBERTSON, INC. R Engineering• Environmental • Geotechnical Si 6181 Rockfish Gap Turnpike Crozet,Virginia 22932-3330 I USA 1881 T 434.823.5154 I F 434.823.4764 California Bearing Ratio (AASHTO T 193) Client: Avon Property LLC Record#: 71R3054 Project: Avinity Phases II,Ill&IV F&R Lab No.: 2538 Location: Avinity Place Test Date: 28-Jul-14 Unsoaked CBR Soaked CBR I I Compaction method: VTM-1;Surcharge weight-10 lbs Sample Depth: 0 to 1.5 feet Compactive effort: 5 Layers with 45 blows per layer • 1200 1100 1000 • 900 • .n 800 a c 700 a 600 N 500 400 300 200 100 0 0.000 0.100 0.200 0.300 0.400 0.500 Penetration(inches) CBR @ 0.1 in.penetration: 47.1 Proctor Max.Dry Density(pcf): 129.1 Swell(%): N/A Proctor Opt. Moisture Content(%): 11.7 Dry Density Before Soak(pcf): 123.7 Liquid Limit: 38 Moisture Content Before Soak(%): 11.7 Plasticity Index: 16 %Compaction Before Soak: 95.8% %Retained No.4 Sieve 38.1 Dry Density After Soak(pcf): N/A %Passing No.200 Sieve: 34.5 Moisture Content After Soak,Top in.(%): N/A Visual Description: Brown,clayey GRAVEL %Compaction After Soak: N/A Resiliency Factor: 2.0 USCS Classification: GC AASHTO Classification: A-2-6{1} tol'•"' Tested By: RK Reviewed By: Froehling and Robertson, Inc. 1 MOISTURE DENSITY RELATIONSHIP For Curve No.§limiso 131 130 ' . _ _ I 129 - o o. >: _ Ik IO /------- _ _ 128 - 1 _ 1 127 - - , r./ 'e 126 9 10 11 12 13 14 15 IR Water content, % jr Test specification: VTM-1,Std.VTM correction 1 AASHTO T 224-01 Oversize Corr.Applied to Each Test Point :Elev/ Classification Nat. % % Sp.G. LL PI Depth USCS AASHTO Moist. #4 No.200 GC A-2-6 11.1 38 16 38.1 34.5 a) fi = ROCK CORRECTED TEST RESULTS UNCORRECTED MATERIAL DESCRIPTION R E Maximum dry density= 129.1 pcf 113.7 pcf Brown,clayey GRAVEL • Optimum moisture= 11.7% 17.6% c c Project No. 71R3054 Client: Avon Property LLC Remarks: cu w Project: Avinity Phases II,III&IV > Date: 7/18/14 . o Location:Avinity Place Sample Number:2538 *11rr "' FROEHLING & ROBERTSON, INC. co Figure GRAIN SIZE DISTRIBUTION REPORT C 100 -- Silo 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 90 1 1 1 1 1 1 1 cl 1 1 1 1 1 1 1 1 80 ' 1 1 1 1 1 � 70 rt 1 Z 60 I L. z 50 w CL 40 , I w . P. I 30 I I I I I I I 20 i t • 10 1 , 0 . . . . . . 100 10 1 0.1 0.01 0.001 GRAIN SIZE(mm) %GRAVEL %SAND %SILT/CLAY 9.4 26.0 64.6 SIEVE PERCENT SPEC PASS? Soil Description SIZE FINER PERCENT (X=NO) Brown, sandy SILT with little gravel 1 1/2 in 99.9 1 in 98.8 Atterbero Limits 3/4 in 97.9 LL= 40 PL= 29 Pl= 11 1/2 in 96.4 3/8 in 94.8 #4 90.6 Coefficients #8 84.9 D85= 2.387 D6o= Dso= #10 83.7 D,= D15= D10= #16 80.8 Cu= Cc #30 78.0 #40 76.8 #50 75.5 Classification #100 71.3 USCS= ML AASHTO= A-6 #200 64.6 Remarks Moisture Content= 23.1 % Specific Gravity= Lab No.: 2539 Date: 7/28/14 Location: Avinity Lane Elev/Depth: _ SINCE Client: Avon Property LLC • Sire F8C° Froehling and Project: Avinity Phases II, III & IV Robertson, Inc. Location: Albemarle County 1881® Project No.: 71R3054 SINCE FROEHLING & ROBERTSON, INC. Engineering •• Environmental •• Geotechnical $C 6181 Rockfish Gap Turnpike �✓ Crozet,Virginia 22932-3330 I USA 1881 T 434.823.5154 I F 434.823.4764 California Bearing Ratio (AASHTO T 193) Client: Avon Property LLC Record#: 71R3054 Project: Avinity Phases II,III&IV F&R Lab No.: 2539 Location: Avinity Lane Test Date: 28-Jul-14 • Unsoaked CBR X Soaked CBR n Compaction method: VTM-1;Surcharge weight-10 lbs Sample Depth: 0 to 1.5 feet Compactive effort: 5 Layers with 45 blows per layer 700 � 600 • 500 a c 400 o. 300 200 100 0 0.000 0.100 0.200 0.300 0.400 0.500 Penetration(inches) CBR @ 0.1 in.penetration: 25.2 Proctor Max.Dry Density(pcf): 100.0 Swell(%): N/A Proctor Opt.Moisture Content(%): 24.8 Dry Density Before Soak(pcf): 101.3 Liquid Limit: 40 Moisture Content Before Soak(%): 24.9 Plasticity Index: 11 %Compaction Before Soak: 101.3% %Retained No.4 Sieve 9.4 Dry Density After Soak(pcf): N/A %Passing No.200 Sieve: 64.6 Moisture Content After Soak,Top in.(%): N/A Visual Description: Brown,sandy SILT with little gravel %Compaction After Soak: N/A Resiliency Factor: 2.0 USCS Classification: ML AASHTO Classification: A-6{6} Soar' Tested By: RK Reviewed By:. Froehling and Robertson,Inc. SINCE FROEHLINGl & ROBERTSON, INC.raiR f'a Engineering • Environmental • Geotechnical 6181 Rockfish Gap Turnpike Crozet,Virginia 22932-3330 I USA 1881 T 434.823.5154 I F 434.823.4764 California Bearing Ratio (AASHTO T 193) Client: Avon Property LLC Record#: 71R3054 Project: Avinity Phases II,Ill&IV F&R Lab No.: 2539 Location: Avinity Lane Test Date: 28-Jul-14 Unsoaked CBR Soaked CBR X Compaction method: VTM-1;Surcharge weight-10 lbs Sampling Depth: 0 to 1.5 feet Compactive effort: 5 Layers with 45 blows per layer 700 f" • 600 500 y a 0 400 c - 300 Sae Vf 200 100 It 0 0.000 0.100 0.200 0.300 0.400 0.500 Penetration(inches) CBR @ 0.1 in.penetration: 17.8 Proctor Max.Dry Density(pcf): 100.0 Swell(%): 0.89% Proctor Opt.Moisture Content(%): 24.8 Dry Density Before Soak(pcf): 101.3 Liquid Limit: 40 Moisture Content Before Soak(%): 24.9% Plasticity Index: 11 %Compaction Before Soak: 101.3% %Retained No.4 Sieve 9.4 Dry Density After Soak(pcf): 100.4 %Passing No.200 Sieve: 64.6 Moisture Content After Soak,Top in. (%): 29.0% Visual Description: Brown,sandy SILT with little gravel %Compaction After Soak: 100.4% Resiliency Factor: 2.0 USCS Classification: ML AASHTO Classification: A-6{6} %s Tested By: RK Reviewed By: Froehling and Robertson,Inc. MOISTURE DENSITY RELATIONSHIP For Curve No. 2539 104.3 103.8 • 103.3 U Q. • y • N .D 102.8 - 102.3 • Shoe 101.8 21 22 23 24 25 26 27 Water content, % Test specification: VTM-1,Std.VTM correction AASHTO T 224-01 Oversize Corr.Applied to Each Test Point Elev/ Classification Nat. %> %< Depth USCS AASHTO Moist. Sp.G. LL PI #4 No.200 ML A-6 23.1 40 11 9.4 64.6 ROCK CORRECTED TEST RESULTS UNCORRECTED MATERIAL DESCRIPTION > I IT Maximum dry density= 103.9 pcf 100.0 pcf Brown,sandy SILT with little gravel •y Optimum moisture=22.8 % 24.8 %co m Project No. 71R3054 Client: Avon Property LLC Remarks: y Project: Avinity Phases H,III&IV Q>Q Date: 7/18/14 o Location:AvinityLane Sample Number: 2539 FROEHLING & ROBERTSON, INC. Figure fk J + SINCE FROEHLING Sc ROBERTSON, INC. Engineering Stability Since 1881 f'8R 6181 Rockfish Gap Turnpike Crozet,Virginia 22932-3330 T 434.823.5154 I F 434.823.4764 1881 F&R Record Number 71R3054 May 9th,2016 Mr.Alan Taylor Avon Properties, LLC Alan.taylor@redlightmanagement.com Re: Avinity-Pavement Coring Albemarle County,Virginia Dear Mr.Taylor: The purpose of this letter is to provide you with the results of the sampling performed by F&R on the existing pavements within the roadways of Avinity. Samples were collected using wet coring methods at spot-check locations spaced approximately 300 feet apart along each roadway. Upon extraction of the sample the subbase stone thickness was measured and cored holes were then repaired with asphalt cold patch. The samples were then transported to F&R's laboratory for measurement. A summary of F&R's findings are provided within the following table. Measured Base Measured Surface Measured Subbase lOaare Core Designation Location Asphalt Thickness Asphalt Thickness Stone Thickness (in) (in) (in) Avinity Place; south 1 cul de sac roadway 3.0 3.1 6.2 Avinity Place; north 2 cul de sac roadway 2.1 2.9 6.5 3 Avinity Place; Sta. 2.1 2.9 7.0 11+25 4 Avinity Loop; Sta. 2.9 2.9 6.0 18+50 Avinity Loop; Sta. 5 20+50 2.7 3.0 6.2 6 Avinity Loop; Sta. 3.1 2.8 6.5 22+50 7 Avinity Court; Sta. 2.1 2.6 6.4 11+25 8 Avinity Loop; Sta. 2.0 2.3 7.0 11+00 9 Avinity Loop; Sta. 2.0 3.2 13+00 6.4 10 Avinity Loop; Sta. 2.3 3.0 16+00 6.5 11 Avinity Drive 2.0 3.0 6.1 Corporate HQ: 3015 Dumbarton Road Richmond,Virginia 23228 T 804.264.2701 F 804.264.1202 www.fandr.com VIRGINIA• NORTH CAROLINA• SOUTH CAROLINA• MARYLAND• DISTRICT OF COLUMBIA A Minority-Owned Business 1 . %II + + . 1 ' t I o 4c,a rack*ratMocri4mOlon ___ , 46mAO.I., , ELS iOG.orrIn ..„ 4•,.., ,,.,.*o v.„,... t 7/1:: oil=rimatn. ' ty,,,,, r,..V,..0.,"?:7•A.-4,--: .14,,,,,,,.........-, .- , / CALL ELFANNTAir•VOA. i / --"* "---•..?-' • " 4'''.:;.4,04w.a7,..4.4 Wrie4,. ,,,. /' / • , VCRS'S r10.0 MIA ,AWAY mow 11.06 OEVELCOMENr. , ' •MrAM1C A NCH POO / i A -./L• • = i-Ty r-- --_ ., --.-, 4cir.i.;s, „*. kit& ....------ -- , AMMO/AM, ' lb, ' - ,, '1-ka , I , - --' ' • . 1 ,71 . . . --.41 1 - (01k,,,. k1.::,,,f '- I '- ir -- 01,- 'it - '!'-. t 11 -c••..,,1,/e, .4,1'1 ‘Liiv--,-"".7. '„„.,-' , e / '-_.•,,,,,,,..1-0 P., .:..,i 411W4„ZiVilarig44F,74,103,-,1•,-',..- ; =',r0r4T—. .., '1...-- ., .A‘ 0 . ,..', ...„,...-.bilie./....-- •,-._ .. ' ._.,_---'.••"r".-- ',„_%--.--•-:-.7 .2,....-........di .Jr/ieWgillitiritibir, 7•."`•-....e•,, ,411i --%t ,`.,..---"", #•-r-,,,iii.,-Viiiig"' ,,,,,Sr. - • -.•V c-4 - .*-`-t...',.. _ .0,, „''..?'-','",' "--1" ..---.4.-..- "-4" I.'.'''' " +V ,k,..,. .......,,,v._,,_ •• , • *--:. • '4. ----...„,'\,N• -• 0.-.*:,• 1 I..' ----,--t.----.....•-•,•:.:- ,-,-....e.- 1 , • 4.- t matt - N , . t .4"- FL /..,',.;.-.'""...7 ."‘ V V011.t. . ` ..,I, ../.'' ..1.'• ' •• :-., il ,,..' \`.„7.-• if .r.a-. ,10" \ ,, , . " , 4---- Th• , li a \ '-', _.-----,......- c-i..,..44 •,•-' ...• '..'.• , , ,,. ir# , t, , ., . , .,.,., --, I _ ,... ,... ...., ,....,.... ,,, . . - L. ,,- 1. z ‘ - ' . .....i., f \ ;A ,.., (..- I, . ..,...* „..., i.,,,t . ,,,, .... ,,,,,Ifi, '7 •''''' 1 _i,- t„g-,„____,Ak 01,1!..104.--....,,,„;- --!-", ;./,ik,.,- - - - ''••• -,, ,.‘----, \----,,_ .,- .. . 'A ao. ',11 ,,"tir• ' .'• -....."„•;4,,,t.,........7.!... .--.." 1 .. .„. _ ......,N.- ..-.....:.......-_-,,,, ..-•-• ,,,,, <'....--- -•^ - -.. .. ''''''•''''' -. ..-i4:..-.- -.,-1111111 - I ‘. ' N.• - s ' 7., ,. i _ \ , 1 , \ , 1 1 I t7 / 1 I 'i l•t4."' '''''i 1 7AUSI , , ___,,,..o.,,...,lmiim......__ - ,...., ,--• , , ,__,,, il i ti• i , , , \ \\...s.'ly,,,--'..-- . `i: t 11 .. *1----,--t- ,, ,, - „,-.1-2,;z. -, ,,.-- ,ormiZOtg"'"" ---`--: .„‘- „ • I r , ,-, 1 ... 1 'lkig =".**''' _ ‹- \ will ,--=-1.4 :: i., ...a.-.....--- / ' 1 '‘‘ ‘,.\\,, ‘‘. -.atz,,, --\.' \-,low.• IN w 0 . , 1..0 \\\, ). - -•-• .,t." 's "- wi "' 4Wiligrialf .• '";" .. • - -...- , ,, 1 i • 0 \ , ' ••,, - --t2 - ., • - ',...1. .....\ ' 1%....... . X" - 1 I , -,, Alltit*- ile 'Irvolli_ - ... — ___ / Y \ , 1,....i. E,‘,,,,,. Ns-. , ,, .rimpatav r , • / IA.. Atorr. •Pril a • — .... 11 ' - OIC- , in row,iimili,-.11,Jr.ii--41.414i •IN,;111, .7.'4 - - , kt.... I „ - -- -- oho 1 N C c c c c c c c c c c c c p C CD a) a) a) a) a) m 0 a) a) a) a) a) )a U U U U U U U U U U U U U •V C_ C_ C_ C_ C_ C_ C_ C_ C_ C C_ C_ C_ N Z >g >g >g >g >2 �2 >g >g 52 52 �2 >2 >2 CD L - - - .- - CO V N N N ) N N N N N d N N N Illisaf ex Y Y Y Y Y Y Y Y Y -V ` Y 1 CO l0 t0 (0 CO t0 cc CO CO CO f0 (0 CO a) a a a a a 0.. a 0.. a a a a a 5 6 ca GO U N N N N N N N N N N N N N f0 co co co co co co co co co co co co co 7 Z M M M M M M M M M M co co co m (VCO CO CO CO CO CO CO Co CO CO CO Co CO Co M M C') M M co co co co co co co co c @ � N 0 N C QU = a) > ccc C N vim) uJ a' a. CO N > a) L a) CA M V 11 •• a CO X .�s (1) C a^ CU OQco CO• •- 2 Eo\ O O N OUO n '°.CnO O N CO 8 0.O U O O U OO CC •c O CO c O v E a . -VC) OnOOMOMMrn a) a) a) E al O C> > a a) U) co Cn Q 0 G O O CA O O) OM N N N N N N N M V) CA O) CA a) O) 0) O) av r cD CD a; m a> m a; m � m 0 MC) aaNcC 0 0 0 0 N 0 oc 0N N N 0 I- d v- Y Y Y . Y . .) . Y Y Y . y ILO U U U U U U U U U U U U U U) co c0 cc CO CO CO CO CO CO CO co co co co co co co co co co co m co co m co ti C f`0 V=c.co co r N. h co ,-- Co co ,- to N l6 y O CO O OD N O O O O6 M C') ~ co d c 0.U) Co U) in In U) it; to In to U) U) In U U u) N cG m J N 6 J N < ),a1 V V V V V V V V 7 V V V V Cn d > k.... t3 N_j N 7 N_j N_j N 7 N 0 N 7 N 7 N 7 N 7 N 7 N 7 a) a) IR CO f t a) 2 m p a@ am am am am am am am am a1O )> am a@ w N a ' OLo GN a> a> a> a> a> a> a> a> a> a> a> a> a> C a CD(f) O df—c.co. M C') M M M M M M M M M Cl co N N CV C^ a C ` U y 0 C a) 1.0 N x Of Ci N0 � CD� c.0o a) a) aa) a) a) aaa) aamO toQ w y cc H N cc cc N N cc N VcO co cO cc C O w CS m Co Co Co Co Co Co CO CO Co Co m CO �� CO an G .E >, >, >, >. >, >, >, >, >, >,y w N w CO ++ c d m 'c 'c 'c 'c 'c 'c 'c 'c 'c 'c c 'c c 'c .cc E > > > > > > > > > >.', > '' >.: ">w'' co �w Q O Q O Q U) Q O Q Cn a O Qin Q O Q O Q O Q O ¢ O Q 0 ix N. O N to h O N Cn O n O. O- d OC >.+ >.+ 5,1- >.+ >.+ >.+ 5,-1- >.+ >,+ >,U) 5,(0 >,U) >.U) f0 O CO cc es,- CO,- CON CON CON COM CO CO CO CO ▪ 3‘- 3,- 3,- 3‘- 3,- 3v- 3,- 3,- 3� 3-c 3-c 3-c 3� 7 • V V • V • V V • 7 • V 7 • V 7'C V a V a p 055 co 055 Ow Ow co Ow co Ow as aco s Oca w OZ pZ pM Op MN J a X a CC N a' a) a' a) W N a a) CC a) CC . a' . CC ' Y CY ' Y X ww • wnrd UN- U .w Cw CO CO CO .-, CO N . CCO co . C ._ cc .' CUa) w ccva) F CO CL 0)CL U)LL OD CL 0)a U)CL OD EL 0)CL OD CL OD_1 -cc NCO Cn to u) Cn U) Cn O 0 0 0 v) 0 T N w V d- V st d- " a v H G N N N N N N N N N N N N N_ ? Y x 0 0 0 O 0 0 0 0 0 0 0 O O i., a m 0t E lL OZS .i 8"h d rt E +F u HNW ,i N_c N (0 d ,- N C') cn CO N. Co O ° �- .- .- CO 2 V COUa ~ 0 (NI / a m 2 2 a /k � k — E \ (0 = . � 2k } x \ 77 I.- cog w « o u -J 03 0 0 i § 0 -J1.11 k / k % § CD -0 CO CD -0 E a . CL § § J _k § 2 \ & m � dk $ \ CO ,c0) - ■ 20 § r2 D § 0 0 (i) k � 5a2 o c C , aa cp as E 5 •gs �2 � & 2 k \ } ) ■ k *41 / ! ®5k$ § (Ni §)}§ / 7 l7E ! oE Field Observation Form 6-8-16-DFR Various Report Date:6/9/2016 Crozet Office anent: Project: 6181 Rockfish Gap Turnpike Croom,VA22932 Poon Properties,LLC 71R3054 Phone:434-823-5154 455 Second Street SE Xinity Phases 11,111,and IV Fax 434-823-4764 Charlottesville,VA22902 Paon Street Blended Charlottesville,VA 22902 Date: 06/08/2016 Location: Site-Roadway Category: Soils/Earthwork Location Details: Avinity Loop Connector;far east end of site and west of SWM Pond Coverage: Subgrade Observation Type: Inspection Frequency: Periodic Weather: clear Air Temp.(deg.F): 70 FSR Personnel: Quirk,Brendan,Technician Description of Work Completed Work Completed: Road Subgrade Inspection Observations: F&R was onsite as requested to observe the subgrade conditions of the roadway prior to placement of asphalt pavement. Road subgrades consisted of compacted 21A subbase stone which were found to be well compacted. NG density testing was performed to verify compaction of the subbase stone. In addition,F&R performed spot-check stone thickness measurements. All locations exceeded the project design minimums of 5 inches.Approximate measurement locations and recorded thicknesses are as follows. *Sta. 10+50—>6.5" Sta. 11+50—>7" Sta. 12+50—>7" Shoe Determination: As Specified Page 1 of 1 SINCE 1881 rte, SOIL FIELD DENSITY SUMMARY SHEET Project: Avinity Phases II, Ill, IV Date:10-22-15 Client: Avon Property LLC Project No.:71R3054 Field Field Field Test Test Elev./ Percent of Maximum Proctor No. Location Depth Moisture Dry Dry Density Test No. Content Density Type Subbase Stone (ft) (%) (pcf) Act. Spec. 1 Avinity Place-Sta. 11+00 SG 3.7 150.1 98.8 95.0 NG 21A-rh 2 Avinity Place-Sta. 11+50 SG 3.4 149.5 98.4 95.0 NG 21A-rh 3 Avinity Place-Sta. 12+25 SG 3.2 150.2 98.8 95.0 NG 21A-rh 4 Avinity Place-Sta. 13+00 SG 3.1 151.7 99.8 95.0 NG 21A-rh 5 Avinity Lane-north spotcheck SG 3.7 149.6 98.4 95.0 NG 21A-rh 6 Avinity Lane-south spotcheck SG 3.2 149.2 98.2 95.0 NG 21A-rh 7 8 9 10 11 F&R also performed spot-check measurements of the subbase stone thicnkess adjacent to the NG test 12 locations. All areas met or exceeded the minimum 13 thickness requirement of 8 inches. 14 15 16 17 18 Proctor Max. Dry Optimum Soil Lab Test Type Remarks: Key: No. Density Moisture(%) Class. SC -Sand Cone (pcf) (ASTM D1556) 21A-rh 152.0 5.2 21A STD. Please note the above tests represent NG -Nuclear Gauge spot tests only at the locations noted (ASTM D2922&D3017) above. Full time visual observations of DC -Drive Cylinder placement should not be inferred. (ASTM D2937) STD -Standard Proctor (ASTM D698) Froehling&Robertson,Inc. MOD-Modified Proctor Skive Technician: R. Khaterzai (ASTM D1557) Form No. 117(revised 4/1/07) Detail Activity10-19-15-DFR f&R Report Date: 10/20/2015 rpcc« no.ealc e«.INC.. &« ... ayS:.a, Crozet Office Client: Project: 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 455 Second Street SE Avinity Phases 11,111,and IV Phone:434-823-5154 Charlottesville,VA 22902 Avon Street Extended Fax:434-823-4764 Charlottesville,VA 22902 Activity Activity Date: 10/19/2015 Location: Site-Roadway Type: Observation Location Details: Roadway N/NE of and parallel to Avinity Drive;see drawing for location Category: Earthwork Weather: cloudy cold Coverage: Proof Roll Temperature: 40 Technician: Dean, Emily Description of Work Completed Determination: As Specified Description: Observed proofroll of subgrade with a loaded dump truck prior to stone placement.All subgrade materials were found firm,stable,and suitable for stone placement. Subgrade Description: firm,stable Proof Roll Equipment Used: Loaded Tandem Axle Dump Truck Proofroll Observations: Subgrade was stable with no movement observed. '°01a/ Page 1 of 1 -....-_,. . . GIVIA ,.. o 0 7.2 0 typit, ( : E- & g Knit vir ti/OVE 03.1.V0 SIN3WWCID YKIV le wino II3d SNY11 CBSI/011 61LE.E *ton: '4 i ITYLLIWINIS TILLINI PT/KrZ . Slow E lip NO114E0530 NOISIA311 aLVO 0 N O3 SNOISIA311 . . \ # , ,,,, \ _Li\ \4 , \ \ \ •A , / . , ,\ p ,1, ,., „1 0 „ t , \ \ ,' LIJ • \\\\ 3',ivx , !, !____.--I !, , It 1 i ! ) x • . \\` / • ,! ! , \ r----\ I, \ , 1 \ ., • ---' !! I / VI.333 \\\' / '' '0 iLl Ill ••/-LT 3 1\ 4 ,,.,, ,t \ L----' 1 \ t_3 ..\:. rv" / !!!' ' I •' \ ? \ r------! 1! ! L__---------I, \ . ,________________„/ , A , '• '\!. / „ ,,• ,\ \ 1 !, \ —•,....- =....,• . . •-•---' ! . 0 ILI i \ \\ '//e r ',, '' ' '------ „\ --i':. \ \ '7.7-----741L-\.' 1\ \--.1:: --"--'-'------il -*----- r ' . ' it - --`5 ' .. — -.1--- - ,. 1';,..\\, ''t ”'.., '''uls '`.ft, -' :2"---........7 ."•-7-7" . '-'-'-- .n. ''. . . I i I i :' , ;-.1 7L."--- - , . Itr.,4, --'--T„.---.7,....tm,TT,. .0.1 `ct ?, \ ' -4-..-4„ 11.1 t_ '' ' '131.m. ., \ 1 \ .7 \ It '', ,......r. ....„.. ._..........1..V.ii.T.ia--- . 'd ',,.,\, -- ---------7: • '•,' iii-:-.,, ...lar, talirditilltrall.-3111" '‘ .,=--";- trY , 1.101441-,., ....., , ,,,, g,\''\,.' \ i , ‘m , so , - ,- ,--7-, ,,•, 0, .1 ...t-4, -t - ,„pa-- -- ,- i / ,--; . ..-t. 410 ., , ..,' '. i' /;-...,, ,,, '_-4.!. .. r11.,4 II 111154 u.1 CI M „VI i CL '\ 1\ '''''''''TOO _.--- 3.3...''''''t - ' /!". /'* ''.--3. ' ' % n .‘,“ ',71 '3,1••--3' 0. 3. ‘t'„ 1.10 e---,,f-3 ,.-"-...-.' , .7...., - : 'L-L-1 --'r,,, , (', ',\---'"-%‘ 1 / ._,,,..____ .• '-', ,H, I-- i \ ,.It , Imrk..,,. r,, ,':,. ., , A& . %,. N., . 41-• ••'-.....,•••....... , , I ' •II N ' C,,,,,, .L‘ .„:"..;".,:':,-. ''.', .',;.1..?..1C 111—Art,,,,Aki',......„„,,,,,t ''4,1 / r • ( ,--- ,...- ------.; .. - 3.,egz._ miiiiiiiiiiiiiMmimm6• -.' • VI '4, i I I i / . ., -,-,..--,:r.,-.,..,.,..4...,-_7._-_7_,••••••••-•!--7..-7.7_,..7_, '•.... ',4\t, O. I ' ' ,1 - ., 41141EILIV VOIR--,-r4,1:111 s-T.: ",...„..„ ',.. U ' .'-'-* ---- ,1.1:2111.II .. , . ,-,; 6.1,,,.-In li , 1 ' A it /i/ ' , 4 j --,- -h-----.7-:-:". ..,L----C--- - --1'r-'-‘.------\-----7f,:.1-• \• v "I.____ -:." , ,..,.-•---%71-- , --.._-_---r-,---....`„, 7„ .. -'---- -7---mmE--,•,,rE I ! -,..k ,,l, 1___,---7,----jir ,,,, r -; \ , -- - ou,:. , • , . ',...--_-_-_-='0, , . i " ` -----L - 1 - ,,c__,,__-,__ -•-,,,.,,,,-----•,,• , ',,, ., ,\ , . .' i . --,,,,-; , ,:, ,, -Jr .0.--r ' ' :>---&'• ' ,i\ --,c. ••. '.:, ,:i„\ • -// , \ .„ 1 . , \ . . -------T1 4 .• 1 i •, k\ 2" MEW III ..., ,- i y ' ,- / A---. ..LI. . /-- . , % /441 ' . iliS'n:::: 1„ -.,..---...ce.... ,_1 *i‘, . .. „,...-. • , VI dm - z .....- .i., .*, 't.,, 40 MOP .„./ • I• , ip La 0 M ' \, , CI) 0 a /;, ' / — „! i • ! I ! . , ! , ! • 1 MP • 4 ',\11, • I , '1 _-L-----,--A 1 ------- 1 1 .I I I I • I 1 ...1 i'•.. I, 1 - • I i / / 1 , , : : ,>,. : , , IMP , , , I \Y-- -2-------- , r . , . ,, 7 ' ” ' . -- 4 . , i \ , , , ____ _____-_:_i_r_--- l .) 'Stir •• x i / ., / , , ' \ k , i' / ••--,ci • 0= . , / ' ', : 'L / „," 4t 2 ili ,,, s •.,' ' , > • 0/ , GI 0 0 r• 1 *--.. .. —, -------1 .,______ , \ , __i \ r I -b.. g , y - ' I ' 4/ 1 • , • Detail Activity10-19-15-DFR f&R Report Date: 10/20/2015 Crozet Office Client: Project: Show 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 455 Second Street SE Avinity Phases 11,111,and IV Phone:434-823-5154 Charlottesville,VA 22902 Avon Street Extended Fax:434-823-4764 Charlottesville,VA 22902 Activity Activity Date: 10/19/2015 Location: Site-Roadway Type: Observation Location Details: Roadway N/NE of and parallel to Avinity Drive;see drawing for location Category: Earthwork Weather: cloudy cold Coverage: Proof Roll Temperature: 40 Technician: Dean, Emily Description of Work Completed Determination: As Specified Description: Observed proofroll of subgrade with a loaded dump truck prior to stone placement.All subgrade materials were found firm,stable,and suitable for stone placement. Subgrade Description: firm,stable Proof Roll Equipment Used: Loaded Tandem Axle Dump Truck Proofroll Observations: Subgrade was stable with no movement observed. Sire Sole Page 1 of 1 f&RActivity Detail 9-21-15-DFR Report Date:10/8/2015 Crozet Office Client: Project: �Ir+ 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 455 Second Street SE Avinity Phases 11,111,and IV Phone:434-823-5154 Charlottesville,VA 22902 Avon Street Extended Fax:434-823-4764 Charlottesville,VA 22902 Activity Activity Date: 09/21/2015 Location: Jobsite Type: Observation Weather: Rain Category: General Temperature: 69 Coverage: Site Observations Technician: Brown, Ka-Tari Description of Work Completed Determination: As Specified Description: F&R was on site as scheduled but contractor cancelled due to inclement weather. F&R technician requested the contractor call into the office to re-schedule the concrete placement. %1r/ Page 1 of 1 • f&R Detail Activity 7-2-14.DFR Report Date:7/17/2014 Crozet Office Client: Project: iklawt 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 07/02/2014 Location: Site- Roadway Type: Observation Weather: clear Category: Earthwork Temperature: 80 Coverage: Sample Pick-Up Technician: Hargis Anthony N Description of Work Completed Determination: As Specified Description: Obtained material for 2 CBRs from Avinity Ln. and Avinity PI. �l✓ Page 1 of 1 • r&RDetail Activity 7-1-14.DFR ra Report Date:7/1/2014 Fn0/tt"WAaOJ.b Wtt JI1 Crozet Office Client: Project: 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 07/01/2014 Location: Utility Trench-Sanitary Sewer Type: Observation Location Details: Backfill of sewer laterals Category: General Weather: clear Coverage: Site Observations Temperature: 80 Technician: Quirk Brendan L Description of Work Completed Determination: As Specified Description: F&R observed the backfill materials over the sewer laterals extending between stations 11+00 to 13+00 along Avinity Place. Due to the rocky content of the fill materials, nuke gauge compaction testing was note performed. Backfilled materials over sewer laterals was evaluated visually and found to be satisfactory. utility backfill was considered to be firm and stable, and exhibited adequate bearing for future development. 1 Stile Page 1 of 1 Detail Activity 6-13-14.DFR f&R Report Date:6/25/2014 Crozet Office Client: Project: 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 06/13/2014 Location: Utility Trench Type: Observation Location Details: MH#46 and connecting conduit Category: General Weather: cloudy Coverage: Site Observations Temperature: 80 Technician: Quirk Brendan L Description of Work Completed Determination: As Specified Description: F&R was onsite as requested to identify and quantify bedrock materials excavated by Linco during construction of site utilities. Due to the irregular arrangement of the in-situ materials,the dimensions and estimated quantities should be considered approximate. *4'x4'x 1'= 16cf=0.6cy *4'x 6'x 1' =24cf=0.9 cy *8'x 8'x 1'= 64cf=2.4 cy An approximate total of 3.9 cubic yards of rock was removed during trench excavation. Sire Page 1 of 1 • f&RActivity Detail 6-12-14.DFR Report Date:6/25/2014 �Onu'KSaY:.b W.u:YI Crozet Office Client: Project: 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 06/12/2014 Location: Utility Trench Type: Observation Location Details: MH#42 and connecting conduit Category: General Weather: cloudy Coverage: Site Observations Temperature: 80 Technician: Quirk Brendan L Description of Work Completed Determination: As Specified Description: F&R was onsite as requested to identify and quantify bedrock materials excavated by Linco during construction of site utilities. Due to the irregular arrangement of the in-situ materials, the dimensions and estimated quantities should be considered approximate. *8'x 2'x 2' = 32cf= 1.2cy *4'x8'x 1' =32cf= 1.2cy An approximate total of 2.4 cubic yards of rock was removed during trench excavation. Page 1 of 1 f&R Detail Activity 6-10-14.DFR Report Date:6/25/2014 Crozet Office Client: Project: 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-51541 Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 06/10/2014 Location: Site- Roadway Type: Observation Location Details: Avinity Place Road Way Category: Earthwork Weather: Partly cloudy Coverage: Proof Roll Temperature: 83 Technician: Yeago Jacob A Description of Work Completed Determination: As Specified Description: On site to check sewer line backfill on Avinity Place. Trench has been backfilled up to subgrade levels, and F&R observed a proof roll with articulating dumptruck to evaluated the condition of the subgrade materials. Fill materials within the roadway appeared to be firm and stable as little to no pumping or rutting was noted. Subgrade Description: firm and stable Proof Roll Equipment Used: Loaded Articulated Dump Truck Proofroll Observations: Subgrade was stable with no movement observed. Site Page 1 of 1 f&A Detail Activity 6-9-14.DFR K Report Date:6/25/2014 St ari .au Crozet Office Client: Project: Slime 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 06/09/2014 Location: Utility Trench Type: Observation Location Details: Water laterals extending perpendicular Category: General to Avinity Place Coverage: Site Observations Weather: clear Technician: Vest Lee M Temperature: 80 Description of Work Completed Determination: As Specified Description: F&R was onsite as requested to identify and quantify bedrock materials excavated by Linco during construction of site utilities. Due to the irregular arrangement of the in-situ materials, the dimensions and estimated quantities should be considered approximate. *4'x6'x 10'=240cf=8.9 cy *4'x6'x 10'=240cf=8.9 cy *4'x4'x 10'= 160cf=5.9cy An approximate total of 23.7 cubic yards of rock was removed during trench excavation. Soso Page 1 of 1 • Detail Activity 6-6-14.DFR &R Report Date:6/6/2014 �n^•o ruri .ui Crozet Office Client: Project: Sir/ 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 06/06/2014 Location: Utility Trench-Sanitary Sewer Type: Observation Location Details: Sewer trench between MH#5-MH#6 Category: General Weather: clear Coverage: Site Observations Temperature: 80 Technician: Quirk Brendan L Description of Work Completed Determination: As Specified Description: F&R was onsite as requested by Linco to observe the bedrock materials encountered during excavation of the sewer trench between existing MH#5 and new MH#6. The quantities provided below are in addition to F&R's previous reports. Due to the irregular nature of the in-situ bedrock materials and trench dimensions, the quantities provided below should be considered approximate. *20'x8'x 12'= 1,920 cf= 71.1 cy *50'x6'x 1'= 300cf= 11.1 cy *8'x 8'x 1' =64 cf=2.4 cy An approximate total of 84.6 cubic yards of bedrock materials were removed to complete the S,, trench between the above mentioned structures and to set MH#6 Page 1 of 1 f&R Detail Activity 6-3-14.DFR Report Date:6/3/2014 Crozet Office Client: Project: f410,, 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 06/03/2014 Location: Utility Trench-Sanitary Sewer Type: Observation Weather: clear Category: General Temperature: 85 Coverage: Site Observations Technician: Quirk Brendan L Description of Work Completed Determination: As Specified Description: F&R was onsite at the request of Linco to observe and quantify bedrock materials encountered in the utility trench extending west of existing MH#5. While onsite F&R observed in-situ bedrock materials starting at approximately 25 feet west of MH#5 and extending 83 feet towards Avon Street. Bedrock materials were identified through visual assessment, observing scrapping with the excavator bucket,and/or striking with a geologist hammer. Due to the irregularity of the bedrock surface the following dimensions should be considered approximate. 83'x 8'x 6'= 3,984 cf= 147.5 cy of rock material was removed from the above mentioned trench. Sari Sire Page 1 of 1 Detail Activity 5-30-14.DFR f&R Report Date:6/3/2014 Fn0/n"WLaIJb Wu.8 Crozet Office Client: Project: 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 05/30/2014 Location: Utility Trench-Sanitary Sewer Type: Observation Weather: clear Category: General Temperature: 80 Coverage: Site Observations Technician: Quirk Brendan L Description of Work Completed Determination: As Specified Description: F&R was onsite at the request of Linco to observe and quantify bedrock materials encountered in the utility trench extending west of existing MH #5. While onsite F&R observed a bedrock pinnacle starting approximately 10 feet west of MH #5. Bedrock materials were identified through visual assessment, observing scrapping with the excavator bucket, and/or striking with a geologist hammer. Due to the irregularity of the bedrock surface the following dimensions should be considered approximate. 8'x 8'x 6' =384 cf= 14.2 cy of rock material was removed from the above mentioned trench Shiro Page 1 of 1 f&R Detail Activity 5-19-14.DFR Report Date:5/19/2014 Crozet Office Client: Project: S,; 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 05/19/2014 Location: Site-Other Type: Observation Location Details: Residential Lot#15, and Avinity Place Category: General Road Coverage: Site Observations Weather: clear Temperature: 75 Technician: Quirk Brendan L Description of Work Completed Determination: As Specified Description: F&R was onsite as requested by Linco to observe a quantify bedrock materials excavated from Residential Lots 15 thru 18, and site roadway"Avinity Place"(between lots 15 thru 18). F&R has performed spot-check evaluations in coordination with Linco over the past week to record portions of bedrock materials encountered during site grading. The dimensions provided below were recorded in the field to document the amount of rock removed; however, due to the irregular nature of the rock,the following quantities are considered approximate. Dimensions are given in feet. * Lot#15(pinnacle near final subgrade levels)--4 x 6 x 2=46 c.f. = 1.78 c.y. *Avinity Place, spot 1 -- 18 x 15 x 4= 1080 c.f. =40 c.y. *Avinity Place, spot 2--6 x 7 x 4.5= 189 c.f. =7 c.y. *Avinity Place, spot 3-- 24 x 9 x 7= 1512 c.f. = 56 c.y. *Avinity Place, spot 4--7 x 3 x 3= 63 c.f. =2.33 c.y. *Avinity Place, spot 5-- 13 x 10 x 2.5=325 c.f. = 12.04 c.y. An approximately total of 119.15 cubic yards of bedrock materials were excavated at the Avinity project site between 5-13-14 thru 5-19-14. In addition, a collection of boulders compiled from materials removed during the initial excavation of lots#15 thru#18 has been stockpiled in the middle of the site. Based on visual assessments and approximate measurements, it appears that the mass of boulders consists of approximately 66 cubic yards of rock. Page 1 of 1 Detail Activity5-12-14.DFR Report Date:5/12/2014 Crozet Office Client: Project: %r+ 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 05/12/2014 Location: Building Pad Type: Observation Location Details: Lots#16&#17 Category: General Weather: clear Coverage: Site Observations Temperature: 75 Technician: Quirk Brendan L Description of Work Completed Determination: As Specified Description: F&R was onsite as scheduled to observe bedrock materials within Lots#16 and#17. Lot#16 is currently at the approximately final subgrade level except for a hard bedrock pinnacle measuring approximately 10ft x 6ft x 5.5ft(12.2 c.y.). Lot#17 is approximately 3.5 ft above the finished subgrade levels and the lot appears to consist primarily of bedrock materials. Linco is currently hoe ramming the current subgrade in order to excavate the materials. Based on visual assessments of the exposed sides of the lot and exposed surface the remainder of bedrock materials scheduled for removal are estimated to be 24ft x 37ft x 3.5ft(115 c.y.). Slime Page 1 of 1 f&RActivity Detail 5-9-14.DFR Report Date:5/12/2014 ErOnerwq mai,"Wm ISI1 Crozet Office Client: Project: Sloe 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 05/09/2014 Location: Building Pad Type: Observation Location Details: Residential Lot#18 Category: General Weather: clear Coverage: Site Observations Temperature: 75 Technician: Quirk Brendan L Description of Work Completed Determination: As Specified Description: F&R was onsite as schedule to observe bedrock materials being excavated from the base of residential lot#18. Bedrock materials were evaluated visually, observing the excavator rip at the rock, and by striking using a geologist hammer. Bedrock materials were found to be competent and hard. At the base of the lot approximately 14 ft x 24 ft x 3.5 ft (43 c.y.)of bedrock materials were removed to reached planned subgrade levels. I addition, F&R observed the subgrade condition of residential lots#1 thru#8. Lots were found to be at the approximate final subgrade levels and considered to be satisfactory. Subgrade materials observed to be firm and stable, and exhibited adequate bearing. iorre Sore Page 1 of 1 f&A Detail Activity 5-6-14.DFR K Report Date:5/6/2014 Crozet Office Client: Project: 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 05/06/2014 Location: Building Pad Type: Observation Location Details: Lots#1 thru#10 Category: Earthwork Weather: clear Coverage: Fill Monitoring Temperature: 70 Technician: Quirk Brendan L Description of Work Completed Determination: As Specified Location: Lots#1 thru#10 Description: Placement and compaction of fill materials within lot#1 thru#10 was found to be satisfactory. Fill lifts were considered firm and stable, and exhibited adequate bearing. Lots#9&#10 have been filled up to finished subgrade levels, while lots#1 thru#8 vary between 8"to 1.5 ft from finished subgrade levels. While grading within lots#7&#8, soils containing organics(i.e. top soil materials)were encountered. Linco removed organic laden soils and backfilled with controlled and compacted fill. Undercut dimensions were approximately 40'x 30'x 3'deep. Approximate Lift Thickness-inches: 8 Compaction Equipment Used: Sheepsfoot Roller Vibration Used: No Soil Density Tests Performed: No Page 1 of 1 Detail Activity 5-5-14.DFR f&R Report Date:5/6/2014 Crozet Office Client: Project: foisoi 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 05/05/2014 Location: Building Pad Type: Observation Location Details: Residential Lots#1 thru#5 Category: General Weather: clear Coverage: Site Observations Temperature: 60 Technician: Quirk Brendan L Description of Work Completed Determination: As Specified Description: F&R observed the subgrade condition at the above mentioned lots approximately 2 feet below finished subgrade levels. Existing subgrades were found to be firm and stable, and considered ready for the placement of additional structural fill. Onsite materials were spread and compacted using a sheeps foot dozer. Placement and compaction efforts were found to be satisfactory. Lots appear to be within 1 to 1.5 feet of finished subgrade levels. 4ki./ 1�rr►' Page 1 of 1 f&AActivity Detail 4-28-14.DFR K Report Date:5/8/2014 Crozet Office Client: Project: 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 04/28/2014 Location: Building Pad Type: Observation Weather: clear Category: General Temperature: 75 Coverage: Site Observations Technician: Quirk Brendan L Description of Work Completed Determination: As Specified Description: F&R was onsite as scheduled to observe the placement and compaction of fill materials within residential lot#1 thru#10. Onsite fill materials were spread and compacted with a sheeps foot 815 dozer. Placement and compaction of fill was found to be satisfactory. Subgrade were considered to be firm and stable, and exhibited adequate bearing. Sive Page 1 of 1 f&izActivity Detail 4-25-14.DFR Report Date:4/25/2014 brpneempS..zySarce 11,1 Crozet Office Client: Project: ,, 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 04/25/2014 Location: Building Pad Type: Observation Location Details: Residential lots#1 through#5 Category: Earthwork Weather: cloudy Coverage: Bearing Grade Observation Temperature: 60 Technician: Quirk Brendan L Description of Work Completed Determination: As Specified Description: F&R was onsite as schedule by Linco to observed the subgrade conditions prior to the placement of new fill materials within proposed residential lots#1 through#5. Subgrades were evaluated visually and found to be firm and stable, and ready for the placement of structural fill. While onsite F&R observed the first lift of fill which consist of onsite rock and soils mixed to create a well grades rock-dirt combination material (RDC). The fill was spread evenly into an approximate y 12 inch loose lift and compacted with a sheeps-foot roller. compaction of the first lift was observed and considered to be satisfactory. placement of the next lift was postponed due to incoming rainy weather. Geotechnical Reports Available: No Specified Minimum Bearing Capacity: 2,000 psf Page 1 of 1 Detail Activity4-23-14.DFR &K Report Date:4/25/2014 Crozet Office Client: Project: teiliai 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 321 E Main Street Avinity Phases 11,111,and IV Phone:443-823-5154 I Fax:443-823-4764 Charlottesville,VA 22902 Avon Street Extended Charlottesville,VA 22902 Activity Activity Date: 04/23/2014 Location: Building Pad Type: Observation Location Details: Residential Lots-11 thru 14 Category: Earthwork Weather: clear Coverage: Proof Roll Temperature: 65 Technician: Quirk Brendan L Description of Work Completed Determination: As Specified Description: F&R observed the subgrade condition of residential lots 11 through 14, and proceeded to observe the placement and compaction of fill materials. Subgrade and fill lifts were found to be firm and stable, and exhibited adequate bearing. The lots were graded to the approximate finished subgrade levels and considered ready for the next phase of construction. Subgrade Description: Firm and Stable Proof Roll Equipment Used: Loded Single Axle Dump Truck Proofroll Observations: Subgrade was stable with no movement observed. `1.r Page 1 of 1 SINCF F&• Iflfll ASPHALT FIELD DENSITY SUMMARY SHEET Project: Avinity Date: 04/04/16 Client: Avont Properties, LLC Project No.: 71R-3054 Field Field Field Test Test Elev./ Percent of Maximum Proctor Moisture Wet Test No. Location Depth No. Content Density Dry Density Type Upper Phase-Surface (ft) (%) (pcf) Act. Spec. 1 Avinity Place- Sta. 10+50 AG 141.8 92.7 92 NG SM 2 Avinity Place- Sta. 11+50 AG 142.4 93.1 92 NG SM 3 Avinity Place- Sta. 12+50 AG 143.1 93.5 92 NG SM 4 Avinity Place- Sta. 13+00 AG 142.5 93.1 92 NG SM 5 Avinity Lane-North Spotcheck AG 146.7 95.9 92 NG SM 6 Avinity Lane-North Spotcheck AG 144.0 94.1 92 NG SM 7 Avinity Lane-Soutth Spotcheck AG 149.1 97.5 92 NG SM 8 Avinity Lane-South Spotcheck AG 148.5 97.1 92 NG SM 9 10 11 12 13 14 15 16 17 18 Proctor Max.Wet Specific Soil Lab Test Type Remarks: Key: No. Density Gravity Class. SC -Sand Cone (ocf) (ASTM D1556) NG -Nuclear Gauge (ASTM D2922&03017) SM 153.0 2.452 ASP Please note the above tests represent spot tests only at the locations noted DC -Drive Cylinder above. Full time visual observations of (ASTM D2937) placement should not be inferred. STD -Standard Proctor (ASTM D698) MOD-Modified Proctor (ASTM D1557) Froehling&Robertson,Inc. Forrr No. 117(revised 4/1/07) Technician: B Quirk F&R 2-29-16 thru 3-16-16 2-29-16 thru 3-16-16 irmerorp."Sinre 1891 Crozet Office Client: Project: Nilo, 6181 Rockfish Gap Turnpike Avon Properties,LLC 71R3054 Crozet,VA 22932 455 Second Street SE Avinity Phases 11,111,and IV Phone:434-823-5154 Charlottesville,VA 22902 Avon Street Extended Fax:434-823-4764 Charlottesville,VA 22902 Title Description Field Observation Form 2-29-16-DFR Soil Nuclear Gauge 3-1-16-soils Field Observation Form 3-4-16-DFR Field Observation Form 3-7-16-DFR Field Observation Form 3-8-16-DFR Field Observation Form 3-9-16-DFR Soil Nuclear Gauge 3-16-16-soils • '111Irrr Page 1 of 8 Field Observation Form 2-19-16-DFR I Various Report Date:2/22/2016 Crozet Office aient: Project: 6181 Rockfish Gap Turnpike Niro Crozet,VA22932 Aon Properties,LLC 71R3054 Phone:434-823-5154 455 Second Street SE AinityPhases 11,111,and IV Fax 434-823-4764 Charlottesville,VA 22902 Aon Street Extended Charlottesville,VA 22902 Date: 02/19/2016 Location: Site-Storm Sewer Category. Soils/Earthwork Location Details: Amendment#2 Coverage: Test Pits Type: Observation Frequency. Mather: cloudy Air Temp.(deg.F): 40 F&R Personnel: Quirk,Brendan,Staff Engineer Description of Work Completed Work Completed: F&R was onsite as scheduled to observe the excavation of test pits by Contour in order to evaluate the condition of the fill materials placed over the existing stormwater pipes within the proposed roadways. Excavations were performed over structures set within Avinity Loop at the far west end of the site. Excavated fill materials were found to be very moist to wet and contained some debris and little organics. In addition,we noted that the gravel around the top of the pipe did not meet the 6 inch thickness indicated on the typical detail drawing provided by Controur. F&R recommends that the fill materials overlaying the stormwater structures located within the roadway be removed and replaced with controlled,compacted fills. These materials should be free of debris/organics,and compacted within at least 95%dry maximum density as determined by standard proctor. We note that the maturity of Avinity Loop appeared to be firm and stable,and should be further evaluated with a proofroll at a later date. Any unstable subgrades should be addressed prior to the placement of subbase stone. Discrepancy Recorded?: No Page 1 of 1 Field Observation Form 2-29-16-DFR rsiz Various Report Date:3/21/2016 CrOZet Office mart: Project: 6181 Rockfish Gap Turnpike SONO Crozet,VA22932 Aon Properties,LLC 71 R3054 Phone:434-823-5154 455 Second Street SE A AnityPhases 11,111,and IV Fax 434-823-4764 Charlottesville,VA22902 Aon Street Extended Charlottesville,VA22902 Date: 02/29/2016 Location: Site-Roadway Category: Soils/Earthwork Location Details: Avinity Loop-Station 7+50 to 9+00 Coverage: Subgrade Observation Type: Inspection Frequency. Periodic Weather: clear Air Temp.(deg.F): 50 F&R Personnel: Quirk, Brendan,Staff Engineer Description of Work Completed Work Completed: F&R was onsite as requested by Contour Construction to observe the placement and compaction of new fill materials for the building up of Avinity Loop between the stations of 7+50 and 9+00. Residual soils were being cut from the hillside to the west of the roadway cutoff shown on the Amendment No.2 drawings. While onsite F&R observed the placement of fill up to approximately 3-5 feet below finished road subgrade levels. Fill placement procedures and compaction efforts were found to be satisfactory. Compacted subgrades were evaluated by observing proofrolls performed with a fully loaded rock truck. Subgrades were considered to be firm and stable,as little to no pumping or rutting was observed when subjected to the traffic loading. In addition,F&R observed the placement of backfill materials over the stormwater pipe beginning at MH #4 and extending approximately 60 feet north. Due to the depth of the trench,backfill operations were evaluated visually. Backfill materials were spread with a backhoe bucket and compacted with a remote pad-foot trench compactor. Fill placement procedures and coaction efforts were considered to be lar' satisfactory. ‘ilrn' Page 2 of 8 C Soil Nuclear Gauge Client: Project: 3-1-16-soils Avon Properties,LLC 71R3054 _ �-w ^• - Report Date:3/21/2016 455 Second Street SE Avinity Phases 11,111,and IV Crozet office Test Method:ASTM D 6938 Charlottesville,VA 22902 Avon Street Extended 6181 Rockfish Gap Turnpike Charlottesville,VA 22902 Crozet,VA 22932 Phone:434-823-5154 1 Fac:434-823-4764 Test Results Optimum Maximum In Place In Place Probe Min/Max Optimum Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp. Moisture Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Tolerance(%) Remark 1 3/1/16 2703 MH 30.0 89.0 30.3 89.0 6 100 95/105 -2/2 Test Information Gauge Test# Test Location Elevation Reference Make/Model/SN Field Technician 1 Utility Trench-Storm Sewer:North area storm drainage line 0.0 Troxler 3430 36332 Hoskin,Jeffrey Remarks Comments Related Tests Tests are'Direct Transmission"(Method A)unless probe depth is noted as"Backscatter". Gauge calibration data on file with the testing agency. Test# Related Test# Test Type Page 3 of 8 S NCF F&• IPPI SOIL FIELD DENSITY SUMMARY SHEET Project: Avinity Phases II, Ill, IV Date:3-3-16 Client: Avon Property LLC Project No.:71R3054 Field Field Field Test Test Elev./ Percent of Maximum Proctor Moisture Dry Test No. Location Depth Content Density Dry Density Type No. Waterline backfill (ft) (%) (pcf) Act. Spec. 1 Avinity Loop; Approx.Sta.22+50 -1 6.3 139.6 95.6 95.0 NG 21A-Is 2 Avinity Loop; Approx.Sta.23+00 -1 6.9 140.2 96.0 95.0 NG 21A-Is 3 Avinity Loop; Approx.Sta.22+75 SG 5.6 139.0 95.2 95.0 NG 21A-Is 4 Avinity Loop; Approx.Sta.23+15 SG 6.8 140.6 96.3 95.0 NG 21A-Is 5 6 7 8 9 11✓ 10 11 12 13 14 15 16 17 18 Proctor Max. Dry Optimum Soil Lab Test Type Remarks: Key: No. Density Moisture(%) Class. SC -Sand Cone (pcf) (ASTM D1556) 21A-rh 152.0 5.2 21A STD. Please note the above tests represent NG -Nuclear Gauge spot tests only at the locations noted (ASTM D2922&D3017) 21A-Is 146.0 6.0 21A STD. above. Full time visual observations of DC -Drive Cylinder placement should not be inferred. (ASTM D2937) STD -Standard Proctor (ASTM D698) Froehling&Robertson,Inc. MOD-Modified Proctor Technician: B. Quirk (ASTM D1557) Form No. 117(revised 4/1/07) F&R Field Observation Form16-DFR Various Repot Date:3/21/2016 Crozet Office Client: Project: 6181 Rockfish Gap Turnpike Crozet,VA22932 Aron Properties,LLC 71 R3054 Phone:434-823-5154 455 Second Street SE PrinityPhases 11,111,and IV Fax 434-823-4764 Charlottesville,VA22902 Peon Street Edended Charlottesville,VA22902 Date: 03/04/2016 Location: Site-Roadway Category: Soils/Earthwork Location Details: Extension of Avinity Loop into next phase Coverage: Subgrade Observation Type: Inspection Frequency: Wleather: cloudy Air Temp.(deg.F): 50 FMR Personnel: Quirk,Brendan,Technician Description of Work Completed Work Completed: F&R was onsite to perform a proofroll evaluation of the road subgrades between the stations 9+50 and 7+00 of Avinity Loop which extends into the project's next phase. The roadway extension has been brought up to approximately-2ft below finished subgrade levels. Subgrades were evaluated using a fully loaded rock truck and little to no pumping or rutting was observed. Subgrades were found to be firm and stable,and exhibited adequate bearing. F&R will return next week to observe the remaining fill placement as scheduled by Contour. %Ik✓ Page 4 of 8 C Field Observation Form 3-7-16-DFR 1 Various Report Date:3/21/2016 Crozet Office Client: Project: 6181 Rockfish Gap Turnpike err Crozet,VA22932 Poon Properties,LLC 71R3054 Phone:434-823-5154 455 Second Street SE PyinityPhases 11,111,and IV Fax 434-823-4764 Charlottesville,VA22902 Peon Street&tended Charlottesville,VA22902 Date: 03/07/2016 Location: Site-Roadway Category: Soils/Earthwork Location Details: Avinity Loop connector at far east side of site Coverage: Subgrade Observation Type: Inspection Frequency: Weather: cloudy Ar Temp.(deg.F): 55 F&R Personnel: Quirk, Brendan,Technician Description of Work Completed Work Completed: F&R was onsite to the placement of new controlled fill materials over the storm sewer,waterline,and sidewalk subgrades within the connecting section of Avinity Loop. Existing fill materials were removed which contained organic debris and/or consisted of a high moisture content. New backfill consisted of the onsite borrow materials being cut from the hillside located to the east of this project phase. Fill placement procedures and compaction efforts were observed to be satisfactory. `r/ Page 5 of 8 • • SINCF r8' 1991 SOIL FIELD DENSITY SUMMARY SHEET Project: Avinity Phases II, Ill, IV Date:3-7-16 Client: Avon Property LLC Project No.:71R3054 Field Field Field Test Test Elev./ Percent of Maximum Proctor Moisture Dry Test No. Location Depth Content Density Dry Density Type No. Avinity Loop Connector (ft) (%) (pcf) Act. Spec. 1 Sidewalk subgrade-Approx.Sta. 12+00 -1 28.2 87.6 98.4 95.0 NG 2703 2 Storm sewer trench-just north of structure 12 -1 27.9 88.9 99.9 95.0 NG 2703 3 Sidewalk subgrade-Approx.Sta. 11+50 SG 29.1 87.5 98.3 95.0 NG 2703 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Proctor Max. Dry Optimum Soil Lab Test Type Remarks: Key: No. Density Moisture(%) Class. SC -Sand Cone (pcf) (ASTM D1556) 21A-rh 152.0 5.2 21A STD. Please note the above tests represent NG -Nuclear Gauge spot tests only at the locations noted (ASTM D2922&D3017) 21A-Is 146.0 6.0 21A STD. above. Full time visual observations of DC -Drive Cylinder 2703 89.0 30.0 MH placement should not be inferred. (ASTM D2937) STD -Standard Proctor (ASTM D698) Froehling&Robertson,Inc. MOD-Modified Proctor Technician: B. Quirk (ASTM D1557) Form No. 117(revised 4/1/07) C Field Observation Form 3-8-16-DFR 1 Report Date:3/21/2016 Various Crozet Office Client Project: 140000, 6181 Rockfish Gap Turnpike Crozet,VA22932 Aron Properties,LLC 71 R3054 Phone:434-823-5154 455 Second Street SE Paoinity Phases 11,111,and IV Fax 434-823-4764 CharlottesHlle,VA22902 Pion Street Extended Charlottesville,VA22902 Date: 03/08/2016 Location: Site-Roadway Category. Soils/Earthwork Location Details: Avinity Loop connector and extension into next phase Coverage: Subgrade Observation Type: Inspection Frequency Periodic Mather: clear Air Temp.(deg.F): 70 F&R Personnel: Quirk,Brendan,Technician Description of Work Completed Work Completed: F&R was onsite to observe the earthwork operations performed by Contour which included the placement of new fill materials within the proposed roadways. Fill materials consisted of onsite stockpiled materials from east of the existing detention basin.Fill materials were spread with a dozer and compacted with a vibratory pad-foot roller.Compaction and subgrade stability was evaluated by performing a proofroll using a fully loaded rock truck.Subgrades were noted to be firm and stable,as little to no pumping or rutting was observed.Road subgrades were brought up to within approximately 1ft below finished subgrade levels. Itbiev *gird Page 6 of 8 Field Observation Form 3-9.16-DFR 1 Various Report Date:3/21/2016 Crozet Office aient: Project: 6181 Rockfish Gap Turnpike likkoof Crozet VA22932 Aon Properties,LLC 71R3054 Phone:434-823-5154 455 Second Street SE A,inityPhases 11,111,and IV Fax 434-823-4764 Charlottesville,VA22902 Avon Street Exdended Charlottesville,VA 22902 Date: 03/09/2016 Location: Site-Roadway Category. Soils/Earthwork Location Details: Avinity Loop connector and extension into next phase Coverage: Subgrade Observation Type: Inspection Frequency. Periodic Weather: clear Air Temp.(deg.F): 75 F&R Personnel: Quirk, Brendan,Technician Description of Work Completed Work Completed: F&R was onsite to observe the earthwork operations performed by Contour which included the placement of new fill materials within the proposed roadways.Fill materials consisted of onsite stockpiled materials from east of the existing detention basin.Fill materials were spread with a dozer and compacted with a vibratory pad-foot roller.Compaction and subgrade stability was evaluated by performing a proofroll using a fully loaded rock truck.Subgrades were noted to be firm and stable,as little to no pumping or rutting was observed.Road subgrades were brought up to the approximate finished subgrade levels and are considered ready for the placement of subbase gravels. Nliee Page 7 of 8 Soil Nuclear Gauge Client: Project: CI'---- 3-16-16-soils Avon Properties,LLC 71R3054 ^ Report Date:3/21/2016 455 Second Street SE Avinity Phases 11,111,and IV Crozet Office Test Method:ASTM D 6938 Charlottesville,VA 22902 Avon Street Extended 6181 Rockfish Gap Turnpike Charlottesville,VA 22902 Crozet,VA 22932 Prone.434-823-5154 I Fax:434-823-4764 Test Results Optimum Maximum In Place In Place Probe Min/Max Optimum Retest Test Soil Moisture Dry Density Moisture Dry Density Depth Percent Comp. Moisture Test# Of Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (in) Compaction (%) Tolerance(%) Remark 3 3/10/16 2703 MH 30.0 89.0 37.7 84.9 8 95 95/105 -3/3 4 3/10/16 2703 MH 30.0 89.0 37.5 85.7 8 96 95/105 -3/3 5 3/16/16 2703 MH 30.0 89.0 35.6 87.0 6 98 95/105 -3/3 Test Information Gauge Test# Test Location Elevation Reference Make/Model/SN Field Technician 3 Site-Embankment:See attachment -3.0 Ft.below subgrade Troxler 3440 18920 McLaughlin,Jesse L 4 Site-Embankment:See attachment -3.0 Ft.below subgrade Troxler 3440 18920 McLaughlin,Jesse L 5 Storm Water Pond:Dam core North of pond -6.0 Below finish grade. Troxler 3430 36329 Boxier,William Remarks Comments Related Tests Tests are"Direct Transmission"(Method A)unless probe depth is noted as"Backscatter". Gauge calibration data on file with the testing agency. Test# Related Test# Test Type Sabi Page 8 of 8 err' r�rr✓ SECTION 3 RECORDED SUBDIVISION PLAT Page 5 of 10 SECTION 4 ENGINEER'S CERTIFICATION REPORT Page 6 of 10 SECTION 5 STREET SIGN MAINTENANCE AGREEMENT Page 7 of 10 SECTION 6 CERTIFICATE OF COMPLETION Page 8 of 10 SECTION 7 DRAINAGE PIPES INSPECTION REPORT Page 9 of 10 A\lxv\A-1 c J\ Ol\,.l\Std,ti C.Anckd, 4-15`)`\‘11 IA `` ?D$ - C C\1J I v�.s�xc o,,,, fi(/i ,_9-04-vir.. ,S.es\e.vv. k till) i 0, _ --- Report Pipe Manhole Pipe Project Date Location Length Size Link ID Numbers 9 c - 21399AVINITYCONDOS 211112013 AVINITY 58 To 56 26.1 56.1 L-.___ 12:14 LOOP MB ��" w /11/2013 AVINITY 125 SLssio 21399AVINITYCONDOS 12:23 LOOP 56 To 54 200.7 MB 2111/2013 AVINITY 81.1 - 21399AVINITYCONDOS ( 12:34 LOOP 54 To 52 130 MB 2/11/2013 AVINITY 65.8 scion: - 21399AVINITYCONDOS 52 To 50 75.7 12:41 LOOP MB c---,_.... - 21399AVINITYCONDOS 11112013: AVINITY 64 To 54 40.1 56.2 12:55 LOOP MB 5 View /11/2013 AVINITY 58.4 Session - 21399AVINITYCONDOS 13:02 LOOP 62 To 52 39.5 MB F - 21399AVINITYCONDOS 111/2013 AVINITY 60 To 50 37.8 64.0 ___.,_ 13:12 LOOP MB View Session: - 21399AVINITYCONDOS /11/2013 AVINITY 88 To 90 33.3 99'8 8 14:01 DRIVE MB /1112013 AVINITY , 100 - 21399AVINITYCONDOS 14 09 DRIVE 90 To 44A 47.3 MB U" /11/2013 AVINITY 89.3 Session: - 21399AVINITYCONDOS 44A To 28 179.7 10 14:17 DRIVE MB /11/2013 AVINITY . 77.2 -r_ - 21399AVINITYCONDOS 14:48 LOOP 30 To 28 33.4 MB Vind /11/2013 AVINITY 74.5 Session: - 21399AVINITYCONDOS 28 To 26 74.5 12 14:55 LOOP MB - 21399AVINITYCONDOS /11/2013 AVINITY62To 24 27.7 62.5 15:12 LOOP X16 8 , a View - 21399AVINITYC ,DOS 2/11/2013 AVINITY 24 To 22 75.4 70.0 Session: 15:13 LOOP MB 1.1 ,..L. _ . _ - _ 2/11/2013 AVINITY 117 - 21399AVINITYCONDOS 22 To 20 196.7 MB , 15:32 LOOP 10., View 2/11/2013 2/11/2013 AVINITY 49.7 Session - 21399AVINITYCONDOS 20 To 18 34.5 15:42 LOOP MB 16 2/11/2013 AVIN1TY5 4,6. ' - - 21399AVINITYCONDOS 18 To 16 26 15:58 LOOP MB view 2/11/2013 AVINITY 54.1 Session. - 21399AVINITYCONDOS 16 To 14 71.1 16:04 LOOP MB 18 i - 21399AVINITYCONDOS /11/2013 AviNrry 62.614 To 12 87.8 16-10 LOOP MB View /11/2013 AVINITY 53.9 Session: - 21399AVINITYCONDOS 1634 LOOP 20B To 20 34.6 MB 2/11/2013 AVINITY 33.4 ) - 21399AVINITYCONDOS 34 To 14 43.1 . . 16:43 LOOP MB , 7 2/11/2013 AVINITY 56.8 Session: - 21399AVINITYCONDOS 32 To 12 33.3 16:44 LOOP MB mwipposmono......,—......... — • , , . ' - 21605 AVINITY MINOR ' 2/22/2016 AVINITY I AMENDENT # 1 14:14 PLACE 46 To 40 32.6 _ „,_ ._ , .,. ... .... . , View - 21605 AVINITY MINOR : 2/22/2016 AVINITY 94 34.5 Session. 40 To 38 AMENDENT# 1 14:32 PLACE MB 24 i-- :'"1"--- ''s---2 • 6 ' ..... AMENDENT # 1 14:46 PLACE 38 To 36 29, MB i View - 21605 AVINITY MINOR : 2/22/2016 AVINITY 128 Session. . 36 To 26 29 1 26AMENDENT# 1 15:02 PLACE MB , ..... - - - 21605 AVINITY MINOR , 2/22/2016 AVINITY 16.. -- --.ir48 To 36 34.1 AMENDENT# 1 15:19 PLACF ' , - V. - 21605 AVINITY MINOR : 2/22/2016 AVINITY Session: 20 To 16 49.9 1r\8AB3 AMENDENT # 2 16:19 LOOP 28 : - - 21605 AVINITY MINOR : 2/22/2016 AVINITY 18 3 AMENDENT#2 16:36 LOOP •,' 13Th 16 33.3 IMB 1 , View , - 21605 AVINITY MINOR : 2/22/2016 AVINITY Session. 12AB To 16 76.1 19.0 AMENDENT# 2 16:50 LOOP MB '4.w. 30 - 21605 AVINITY MINOR . 2/23/2016 AVINITY OUTFALL 7 20.4 AMENDENT#2 14:56 LOOP To 50AB MB 1 v 1 View - 21605 AVINITY MINOR : 2/23/2016 AVINITY OUTFALL 14.8 Session: 110.4 32 AMENDENT# 2 15:48 LOOP To 4 MB - 21605 AVINITY MINOR : 2/23/2016 AVINITY 2 To 9.27 AMEN DENT # 2 16:20 LOOP OUTFALL 23 1 MB View - 21605 AVINITY MINOR : 2/25/2016 AVINITY 15.9 Session: AMENDENT # 2 07:42 LOOP 16 To 12 51.5 MB 34 - 21605 AVINITY MINOR : 2125/2016 AVIN1TY 6.58 AMENDENT 2 07:49 LOOP 12 To 2 26.6 MB VIc.b"; - 21605 AVINITY MINOR : 2/25/2016 AVINITY 1 To 10.9 Session: AMENDENT # 2 08:14 LOOP OUTFALL 58 MB 36 €- ' 5/5/2016 AVINITY 79.4 44 To 44A 30.9 21605AVINITYMINORPOSTTV 11.21 LOOP MB View 5/5/2016 AVINITY 234 Session: 4 To 2 111.9 38- 21605AVINITYMINORPOSTTV 10:39 LOOP MB t 5/5/2016 AVINITY 119 21605AVINITYMINORPOSTTV 10:38 LOOP 50A8 To 4 98.5 MB ..• VIL: u' Sessio<< 5/5/2016 AVINITY 72.8 �., 21605AVINITYMINORPOSTTV 09:40 LOOP 8 To 4 52 MB 5/5/2016 AVINITY 80.4 21605AVINITYMINORPOSTTV 0939 LOOP 10 To 8 38 1 MB I Total: 2525.3 2.33 GB Contac Tri State Utilities 757-366-9505 Address ,,,, ((It/4'1) 2111 Smith Avenue Chesapeake Virginia , VA l 23320 Website http://www.tristateutilities.com/ Project Information Surveyor Name ROGER KEETON Certificate Number U-611-12948 Truck Number 40 Owner AVON PROPERTIES Customer AVON PROPERTIES LLC LLC Drainage Area Job Number 21505 Pipe Segment Date 2/22/2016 14:14 Reference Street AVINITY PLACE City COUNT RLE COUNTY Comments Manhole Upstream MH 46 Rim to Invert(U) 6.9 Grade to Invert(U) Rim to Grade (U) Downstream MH 40 Rim to Invert(D) 6.6 Grade to Invert (D) Rim to Grade (D) Sewer Use Stormwater Direction of Survey Downstream Pipe Height (Diameter) 15 Width 15 Shape Circular Material Other Lining Method Pipe Joint Length Tape Measured 32 Length Surveyed 32.6 Length Year Laid Year Renewed Misc Flow Control Not Controlled Media Label Digital Purpose Post Rehabilitation Sewer Category SW Survey Pre-Cleaning Jetting Date Cleaned 2/22/2016 14:10 Weather Dry Location Code Light Highway Additional Info Location Details AVINITY PLACE Reverse Setup ID Sheet(Group) Number Imperial Units (US) True Completed Yes Count Groups Number of Taps 0 Number of Roots 0 Num Cracks / 0 Number of Broken / 0 Fractures Holes/ Collapse Number of Deposits 0 Number of 0 Capped/Abd Taps I Created with the °' �f1 report generator Back Project: 21605 i- JINITY MINOR : AMEN. ENT # 1 Ems,'' Date: 2/22/2016 2:14:00 PM Pipe Segment Reference: .I Street: AVINITY PLACE Upstream MH: 46 n,r,t_��rare Length Surveyed: 32.6 Downstream MH: 40%we Pacp Quick Overall Rating: 0000 Direction of Survey: Downstream Height (Diameter): 15 Material: Other �ev+rr Street: AVINITY PLACE ID Number: 46 (0.0)AMH - Manhole Remark: 46 (0.0) MWL -Water Level (32.6) ACB - Catch Basin Remark: 40..... Total Distance: 32.6 • ID Number: 40 Created with the report generator Back S Cont, Tri State Utilities 757-366-9505 Skip( ik Address 2111 Smith Avenue Chesapeake Virginia , VA 11((itilti)): 23320 Website http://www.tristateutilities.com/ Project Information Surveyor Name ROGER KEETON Certificate Number U-611-12948 Truck Number 40 Owner AVON PROPERTIES Customer AVON PROPERTIES LLC LLC Drainage Area Job Number 21505 Pipe Segment Date 2/22/2016 14:32 Reference Street AVINITY PLACE City ALBEMARLE COUNTY Comments Manhole Upstream MH 40 Rim to Invert (U) 6.6 Grade to Invert (U) Rim to Grade (U) Downstream MH 38 Rim to Invert(D) 6.2 Grade to Invert(D) Rim to Grade (D) Sewer Use Stormwater Direction of Survey Downstream Pipe Height (Diameter) 15 Width 15 Shape Circular Material Other Lining Method Pipe Joint Length Tape Measured 94 Length Surveyed 94 Length Year Laid Year Renewed Misc Flow Control Not Controlled Media Label Digital Purpose Post Rehabilitation Sewer Category SW Survey Pre-Cleaning Jetting Date Cleaned 2/22/2016 14:32 Weather Dry Location Code Light Highway Additional Info Location Details AVINITY PLACE Reverse Setup ID Sheet(Group) Number Imperial Units (US) True Completed Yes Count Groups Number of Taps 0 Number of Roots 0 Num Cracks I0 Number of Broken I 0 Fractures Holes/ Collapse Number of Deposits 0 Number of 0 Capped/Abd Taps Created with the ° illi report generator Back Project: 21605 . .VINITY MINOR : AMP'. SENT # 1 _____ Date: 2/22/2016 2:32:00 PM Pipe Segment Reference: Street: AVINITY PLACE Upstream MH: 40 r�U{ f4j, Length Surveyed: 94 Downstream MH: 38 Average Sor Pacp Quick Overall Rating: 0000 Direction of Survey: Downstream 11,-„vy Height(Diameter): 15 Material: Other Street: AVINITY PLACE rf' ID Number: 40 (0.0)ACB - Catch Basin Remark: 40. (0.0) MWL - Water Level (94.0) AMH - Manhole Remark: 38 • • Total Distance: 94 ID Number: 38 Created with the kir'' report generator Back Conti Tri State Utilities 757-366-9505 P V Address i e 2111 Smith Avenue / Chesapeake Virginia , VA / e 23320 Website http://www.tristateutilities.com/ Project Information Surveyor Name ROGER KEETON Certificate Number U-611-12948 Truck Number 40 Owner AVON PROPERTIES Customer AVON PROPERTIES LLC LLC Drainage Area Job Number 21505 Pipe Segment Date 2/22/2016 14:46 Reference ALBEMARLE Street AVINITY PLACE City COUNTY Comments Manhole Upstream MH 38 Rim to Invert(U) 6.2 Grade to Invert (U) Rim to Grade (U) Downstream MH 36 Rim to Invert(D) 6.2 Grade to Invert (D) Rim to Grade (D) Sewer Use Stormwater Direction of Survey Downstream Pipe Height(Diameter) 15 Width 15 Shape Circular Material Other Lining Method Pipe Joint Length Tape Measured 32 Length Surveyed 29.6 Length Year Laid Year Renewed Misc Flow Control Not Controlled Media Label Digital Purpose Post Rehabilitation Sewer Category SW Survey Pre-Cleaning Jetting Date Cleaned 2/22/2016 14:46 Weather Dry Location Code Light Highway Additional Info Location Details AVINITY PLACE Reverse Setup ID Sheet (Group) Number Imperial Units (US) True Completed Yes Count Groups Number of Taps 0 Number of Roots 0 Num Cracks/ Number of Broken / Fractures 0 Holes/Collapse 0 Number of Deposits 0 Number of 0 CappedlAbd Taps Sive ;: r,., Created with the � report generator Back Project: 21605 .°-.VINITY MINOR : AMEI\_JENT # 1 Date: 2/22/2016 2:46:00 PM Pipe Segment Reference: L c3r,1 Street: AVINITY PLACE Upstream MH: 38 NA,,:� r +e Length Surveyed: 29.6 Downstream MH: 36 Average Pacp Quick Overall Rating: 0000 Direction of Survey: Downstream Heavy Height(Diameter): 15 Material: Other {iYV�-tr Street: AVINITY PLACE ID Number: 38 (0.0) AMH - Manhole Remark: 38 (0.0) MWL- Water Level (29.6) ACB - Catch Basin Remark: 36 Total Distance: 29.6 ID Number: 36 Created with the report generator Back Saw Conta Tri State Utilities 757-366-9505 Address 2111 Smith Avenue ))) Chesapeake Virginia , VA i(1iP) 23320 Website http://vvww.tristateutilities.com/ Project Information Surveyor Name ROGER KEETON Certificate Number U-611-12948 Truck Number 40 Owner AVON PROPERTIES Customer AVON PROPERTIES LLC LLC Drainage Area Job Number 21505 Pipe Segment Date 2/22/2016 15:02 Reference Street AVINITY PLACE City ALBEMARLE COUNTY Comments Manhole Upstream MH 36 Rim to Invert(U) 6.2 Grade to Invert (U) Rim to Grade (U) Downstream MH 26 Rim to Invert(D) 9.8 Grade to Invert(D) Rim to Grade (D) Sewer Use Stormwater Direction of Survey Downstream Sr, Pipe Height (Diameter) 15 Width 15 Shape Circular Material Other Lining Method Pipe Joint Length Tape Measured 31 Length Surveyed 29.1 Length Year Laid Year Renewed Misc Flow Control Not Controlled Media Label Digital Purpose Post Rehabilitation Sewer Category SW Survey Pre-Cleaning Jetting Date Cleaned 2/22/2016 14:58 Weather Dry Location Code Light Highway Additional Info Location Details AVINITY PLACE Reverse Setup ID Sheet(Group) Number Imperial Units US) True Completed Yes Count Groups Number of Taps 0 Number of Roots 0 Num Cracks/ 0 Number of Broken / 0 Fractures Holes/ Collapse Number of Deposits 0 Number of 0 Capped/Abd Taps Sloe Created with the � �� Ora report generator Back Project: 21605 a-.JINITY MINOR : AMERJENT # 1 ElMall Date: 2/22/2016 3:02:00 PM Pipe Segment Reference: L c,f,t Street: AVINITY PLACE Upstream MH: 36 t.o,Jd r•rdt Length Surveyed: 29.1 Downstream MH: 26 Average, Pacp Quick Overall Rating: 0000 Direction of Survey: Downstream Neavy Height (Diameter): 15 Material: Other �,, Street: AVINITY PLACE ID Number: 36 (0.0) ACB - Catch Basin Remark: 36 ..... (0.0) MWL - Water Level (29.1) ACB - Catch Basin Remark: 26 Total Distance: 29.1 ID Number: 26 Created with the = " report generator Back Conta Tri State Utilities 757-366-9505 Address 4146,. y 2111 Smith Avenue Chesapeake Virginia , VA r, �J r �, 23320 Website http://www.tristateutilities.com/ Project Information Surveyor Name ROGER KEETON Certificate Number U-611-12948 Truck Number 40 Owner AVON PROPERTIES Customer AVON PROPERTIES LLC LLC Drainage Area Job Number 21505 Pipe Segment Date 2/22/2016 15:19 Reference Street AVINITY PLACE City ALBEMARLE COUNTY Comments Manhole Upstream MH 48 Rim to Invert(U) 7.2 Grade to Invert (U) Rim to Grade (U) Downstream MH 36 Rim to Invert(D) 6.2 Grade to Invert (D) Rim to Grade (D) Sewer Use Stormwater Direction of Surve Downstream Pipe Shoe Height(Diameter) 15 Width 15 Shape Circular Material Other Lining Method Pipe Joint Length Tape Measured 37 Length Surveyed 34.1 Length Year Laid Year Renewed Misc Flow Control Not Controlled Media Label Digital Purpose Post Rehabilitation Sewer Category SW Survey Pre-Cleaning Jetting Date Cleaned 2/22/2016 15:20 Weather Dry Location Code Light Highway Additional Info Location Details 2078 AVINITY PLACE Reverse Setup ID Sheet(Group) Number Imperial Units (US) True Com•leted Yes Count Groups Number of Taps 0 Number of Roots 0 Num Cracks 10 Number of Broken / 0 Fractures Holes I Collapse Number of Deposits 0 Number of 0 CappedlAbd Taps Created with the � � � report generator Back Project: 21605 M IINITY MINOR : AMEN_JENT # 1 EMT131;11 Date: 2/22/2016 3:19:00 PM Pipe Segment Reference: t,, Street: AVINITY PLACE Upstream MH: 48 Mudercie Length Surveyed: 34.1 Downstream MH: 36 Aveve Pacp Quick Overall Rating: 0000 Direction of Survey: Downstream H€-avy. Height (Diameter): 15 Material: Other SF,vrc Street: AVINITY PLACE ID Number: 48 (0.0) ACB - Catch Basin Remark: 48 -- (0.0) MWL - Water Level (34.1) ACB - Catch Basin Remark: 36• -• Total Distance: 34.1 t ID Number: 36 Created with the a �:! SECTION 8 ORIGINAL BOND ESTIMATE Page 10 of 10