Loading...
HomeMy WebLinkAboutSUB201800142 Review Comments Final Plat 2018-09-04County of Albemarle Department of Community Development Memorandum To: Kristopher C. Winters, LS — Roudabush, Gale & Associates, Inc. (kwinterskroudabush.com) Alan Taylor — Avinity Estates, LLC (alan&riverbenddev.com) From: Tim Padalino, AICP — Senior Planner Division: Planning Services Date: September 4, 2018 Subject: Review Comment Letter — SUB-2018-00142 (Avinity Estates — Final Plat) The final subdivision plat referred to above (dated July 12, 2018; received August 14, 2018) has been reviewed by the Planning Services Division of Albemarle County's Department of Community Development (CDD) and other applicable members of the Site Review Committee (SRC). The review comments contained herein are those that have been identified at this time; additional comments may be added or eliminated based on further review. (Each comment is preceded by the applicable reference to the Albemarle County Code.) Any pending review comments will be promptly forwarded upon receipt. The County will approve this final plat when all of the following review comments (below) have been satisfactorily addressed. Please work directly with each reviewer to address and resolve all review comments, as may be applicable. Tentative approvals from each reviewer should be forwarded to the Planner upon receipt. Please contact me if you have questions or requests for assistance, or if you require any clarification or additional information. Sincerely, II Tim Pad ' o, AICP Senior Planner (434)-296-5832 x 3088 tpadalinogalbemarle. org Page 1 of 4 Albemarle County Planning Services (Planner) — Tim Padalino, 1padalino =,albemarle.org — Requested Changes: 1. [14-302(B)-5]: Please revise Note 5 (zoning) on Sheet V1 to include a reference to the Special Exceptions (Variations) approved by the Board of Supervisors (BOS) on 3/7/2018. Rev. Comm. #2 (9/4/2018): Addressed. 2. [14-302(B)-5]: Please revise Note 16 (minimum building setbacks) on Sheet V1 to include a reference to the Special Exceptions (Variations) approved by the Board of Supervisors (BOS) on 3/7/2018. Rev. Comm. #2 (9/4/2018): Addressed. 3. [Application Plan (ZMA-2013-16) and 14-302(A)-141: Please clarify/explain the following discrepancies (below) in the proposed open space areas. If necessary, please also revise the proposed open space areas and update the calculations to address these discrepancies. a. The applicable open space calculations on the ZMA application plan (ZMA-2013-16) show a total open space area of 3.78 acres for "Avinity II" (Avinity Estates). b. The final site plan (SDP-2018-35, dated 7/23/2018) includes an "Open Space" note (Sheet 1) indicating a total open space area of 3.60 acres for Avinity Estates. c. The final site plan (SDP-2018-35, dated 7/23/2018) includes a Layout Plan (Sheets 3 and 3A) which appears to show a total open space area of 3.52 acres on the Avinity Estates project (not counting the 0.12 acres of labeled open space shown on Avinity I, and not counting the 0.38 acres of open space dedicated to Avinity I). d. This preliminary plat (SUB-2018-67) includes an "Area Summary" note (Sheet V1) indicating a total open space area of 3.17 acres. Rev. Comm. #2 (9/4/2018): Not Addressed / Revision Required. The "Area Summary" calculations on Sheet V 1 identifies 3.265 acres of Total Open Space Area for Avinity Estates. This is 0.515-acres less than what the 3.78-acre open space area specified on the approved Application Plan for ZMA201300016; and is 0.02-acres less than what is specified in the Final Site Plan (dated 7/23/2018). Please revise the Area Summary calculations and the associated Open Space designations and depictions to meet the open space requirements established through ZMA201300016. Note: Please also see review comment #4, below, regarding eligible open space uses. Note: Please also see review comment letter (dated 8/22/2018) for Final Site Plan SDP201800035 for separate but related review comments regarding open space requirements. Note: Please note that revisions to open space designations on this final subdivision plat (SUB201800142) may result in the need to make corresponding revisions to the final site plan (SDP201800035). Please ensure final site plan and final plat are revised to be consistent with one another, and consistent with the approved Application Plan for ZMA201300016. 4. [Application Plan (ZMA-2013-16) and 14-302(A)-14] : Please describe the proposed use, ownership, and management of the area labeled "Common Open Space 2," the proposed 0.058-acre common open space comprised of a five (5) foot wide corridor of land between Bergen Street and Montague Street. Rev. Comm. #2 (9/4/2018): Not Addressed / Revision Required. Sheet 3A on the Final Site Plan SDP201800035 (dated 7/23/2018) states that this proposed 0.058-acre "common open space" would be "for utilities to be owned and maintained by the HOA." Per Z.O. Section 3, "common open space" is defined as "An open tract or parcel of land not devoted to residential uses or structures but directly related and adjunct to a cluster development or planned development, as herein provided, and owned and/or controlled by the residents of such development." While it is technically acceptable to designate this 0.058-acre area as a "common open space for utilities to be owned and maintained by the HOA," private utility corridors such as this are not eligible for meeting "open space" requirements, per Z.O. Section 4.7(a) and (b). Therefore, this 0.058-acre area (as proposed) cannot count towards the 25% (total) / 5.69 acres (total) open space requirements for Avinity I and Avinity Estates (combined total) that were established by the approved Application Plan for ZMA201300016. The minimum open space requirements (25% total for Page 2 of 4 Avinity I and Avinity Estates / 5.69-acres total) must be met using other proposed open space designations that comply with Z.O. Section 4.7, and the Open Space Calculation Table on Sheet 3 must be revised (as may be applicable, in accordance with revisions to the proposed open space). Note: Please note that revisions to open space designations on this final subdivision plat (SUB201800142) may result in the need to make corresponding revisions to the final site plan (SDP201800035). Please ensure final site plan and final plat are revised to be consistent with one another, and consistent with the approved Application Plan for ZMA201300016. Note: Please also see review comment letter (dated 812212018) for Final Site Plan SDP201800035 for separate but related review comments regarding open space requirements. 5. [14-302(A)-13] : Please show the location of proposed water and sewer lines on Sheet V 12 (and other sheets, as may be applicable). Rev. Comm. #2 (9/4/2018): Addressed. 6. [14-302(A)-13]: Please show the location of proposed stormwater management facilities on Sheets V9 and V 10 (and other sheets, as may be applicable). Rev. Comm. #2 (9/4/2018): Addressed. 7. [Application Plan (ZMA201300016) and 14-302(A)-4] : Please add a note stating that the required access easement granting access within and through Avinity I all the way to a public right of way (Avon Street) will be (or has been) submitted separately. As noted in the review comments for the final site plan SDP201800035, the required access easement to a public right of way (Avon Street) must be established pjior to approval of final site plan, which must occur prior to County approval of the final subdivision plat. Rev. Comm. #2 (9/4/2018): Not Addressed / Revision Required. Staff acknowledge the note added to Sheet V3. Please further revise Sheet V3 to list the Deed Book and Page Number for the required access easement, after it has been submitted, approved, and recorded. To date, no such application for an access easement plat has been received. 8. [Application Plan (ZMA201300016) 14-302(A)-51: The stormwater management facilities access and maintenance easement plat(s) (and corresponding deed) must be provided to the County for public use. These must be recorded in conjunction with WPO Plan approval, prior to County approval of final site plan, which must occur prior to County approval of the final subdivision plat. (Note: see review comments from CDD-Engineering; pending as of 6/4/2018.) Rev. Comm. #2 (9/4/2018): Not Addressed / Revision Required. Please ensure the plat contains a note that states the "SWM Maintenance & Access Easement[s]" are dedicated to public use. Please provide the Deed Book and Page Number references for these SWM Maintenance and Access Easements, after they have been submitted, approved, and recorded (in conjunction with the WPO Plan approval, prior to County approval of the final site plan, which must occur prior to County approval of the final subdivision plat. 9. [14-302(A)-5] : Public sewer and water easements must be provided to ACSA for public use. These must be established in conjunction with the final plat. (Note: see review comments from ACSA; pending as of 6/4/2018.) Rev. Comm. #2 (9/4/2018): Addressed. Staff acknowledge language in Note 11 on Sheet VI and note on Sheet V 12. 10. [Application Plan (ZMA201300016) and Variation for ZMA-2013-16 and 14-302(A)-5]: Easements for the proposed five (5) foot "landscaping and maintenance easement' along the project boundaries and for the proposed six (6) foot "planting strip" adjacent to the private streets right-of-way are required. These must be established in conjunction with the final plat. Rev. Comm. #2 (9/4/2018): Not Addressed / Revision Required. Neither of these two (2) easements shown on the final site plan SDP201800035 are shown on any of the Easements sheets (Sheet V9 — V 13) on this final subdivision plat (SUB201800142). Page 3 of 4 11. [14-317]: A private street maintenance agreement for the new private streets will need to be reviewed and approved prior to final plat approval. Please use the following template for the maintenance agreement: TEMPLATE. Rev. Comm. #2 (9/4/2018): Not Addressed / Revision Required. To date, no private street maintenance agreement has been received. 12. [14-303 and 14-302(A)-4]: Please provide a reference to the Deed Book and Page Number for the "Variable Width Access Easement" that provides temporary construction access and permanent emergency access from Scottsville Road / Route 20. Note: Sheet 3A on the Final Site Plan SDP201800035 provides the following reference for a "Road Access and Maintenance Agreement" easement: D.B. 795, PG. 437. Albemarle County Engineering Services (Engineer) — Matt Wentland, mwentlandgalbemarle.org — Review comments pending (as of 9/4/2018); all CDD-Engineering comments will be forwarded upon receipt. Albemarle County Building Inspections — Michael Dellinger, mdellingerkalbemarle.org — No Objection (8/22/18). Albemarle County Department of Fire & Rescue — Shawn Maddox, smaddoxkalbemarle.org — Review comments pending (as of 9/4/2018); all Fire & Rescue comments will be forwarded upon receipt. Albemarle County Information Services (E911) — Andrew Walker, awalkerkalbemarle.org — No Objection (8/20/2018). Albemarle County Service Authority (ACSA) — Richard Nelson, rnelsonnserviceauthority.org_— Requested Changes; see attached review comments (9/4/18). Virginia Department of Transportation — Adam Moore, PE, Adam.Moorekvdot.vir ig nia. og_v — Review comments pending (as of 9/4/2018); all VDOT comments will be forwarded upon receipt. Note: VDOT previously indicated No Objection to the Preliminary Plat SUB201800067 (on 5/18/2018); Final Plat was transmitted to VDOT on 8/14/2018. Please contact Tim Padalino at the Department of Community Development at (434)-296-5832 ext. 3088 or tnadalinokalbemarle.org for further information or assistance. Page 4 of 4 Review Comments for SUB201800142 NoSub-ApplicationType S.elected - Project Name: AVINITY ESTATES - FINAL Date Completed: Tuesday, September 04, 2018 Department1DivisionfAgency: Review Status: Reviewer: Richard Nelson � ABSA Requested Changes Below are comments for SUB 0180014- Avinity Estates Final Subdivision Plat: Include 10' 10' easements ar0L111d all fire hydrants_ Include water meter easement for Lot 102_ Include fire hydrant and water meter easement for clubhouse_ Page: County of Albemarle Printed On: 10910412018