Loading...
HomeMy WebLinkAboutSUB201800077 Correspondence Final Plat 2018-08-31 *IWO *401 Christopher Perez From: Christopher Perez Sent: Friday,August 31, 2018 10:16 AM To: 'Nena H' Cc: Chris Kean; Scott Collins; Matthew Wentland Subject: RE: Briarwood phase 8 site plan amendment ---- 'AA,—GvvV���""_ s 1776 Ok, looks good. Now please send in that roa• amendm }� ia,-.14- ,,,,h4- - --- arr* From: Nena H<ulcwww@ernbargmail.com> / /Gvt �,/� ��f`�J ,L� Sent: Friday,August 31, 2018 10:15 AM gtie�t5 `�-` `�'� l ` To:Christopher Perez<cperez@albemarle.org> �'914N /�--- A/ft ohs'^'-�.,�l-w/. Cc:Chris Kean<chris.kean@lincolnsurveying.com>, ollins<scott olli�. gineering.com>; Matthew Wentlan <mwentland@albemarle.org> !�- fi4e � �}�����Subject: Re: Briarwood phase 8 site plan amendment P) - 0 4 57/1,0-z.:74— Thanks, Thanks, Chris. 0/°-'1, r C7 bo rl: // J1 ew Nena Harrell 434-975-3334 Sent from my iPhone On Aug 31, 2018, at 9:58 AM, Christopher Perez <cperez@albemarle.org>wrote: Chris Kean, 1.The title needs to be revised to correctly reference Parcel X as Parcel Y.That's what page 3 labels this segment, Parcel Y. 2.The title sheet and sheet 2 correctly modified the lot name to 128; however, page 3 still labels the new lot as 108A. Revise. Once those two little things are corrected,this plat will be ready too. Then all we need is a road plan amendment and we can approve these docs. From:Chris Kean<chris.kean@lincolnsurveying.com> Sent: Friday,August 31, 2018 9:30 AM To: Nena Harrell<ulcwww@embarqmail.com> Cc:Christopher Perez<cperez@albemarle.org>; Scott Collins<scott@collins-engineering.com>; Matthew Wentland<mwentlandPalbemarle.org> Subject: Re: Briarwood phase 8 site plan amendment Chris P. & Nena: 1 Christopher Perez From: Christopher Perez Sent: Friday, August 31, 2018 9:58 AM To: 'Chris Kean'; Nena Harrell Cc: Scott Collins; Matthew Wentland Subject: RE: Briarwood phase 8 site plan amendment Chris Kean, 1.The title needs to be revised to correctly reference Parcel X as Parcel Y.That's what page 3 labels this segment, Parcel Y. 2.The title sheet and sheet 2 correctly modified the lot name to 128; however, page 3 still labels the new lot as 108A. Revise. Once those two little things are corrected,this plat will be ready too. Then all we need is a road plan amendment and we can approve these docs. From:Chris Kean<chris.kean@lincolnsurveying.com> Sent: Friday,August 31, 2018 9:30 AM To: Nena Harrell<ulcwww@embargmail.com> Cc:Christopher Perez<cperez@albemarle.org>; Scott Collins<scott@collins-engineering.com>; Matthew Wentland <mwentland@albemarle.org> Subject: Re: Briarwood phase 8 site plan amendment Chris P. & Nena: Please find an updated final plat for lot 128 attached. We have included the temp cul de sac & revised the lot # to 128. Let me know if you have any questions or need additional information. Chris Christopher B. Kean, LS Vice President Lincoln Surveying 632 Berkmar Circle Charlottesville, Va. 22901 434-974-1417 (0) 434-960-2942 (C) 434-974-1776 (F) 1 Christopher Perez From: Chris Kean <chris.kean@lincolnsurveying.com> Sent: Friday, August 31, 2018 9:30 AM To: Nena Harrell Cc: Christopher Perez; Scott Collins; Matthew Wentland Subject: Re: Briarwood phase 8 site plan amendment Attachments: 110006801_SU B-128_18243.pdf Chris P. & Nena: Please find an updated final plat for lot 128 attached. We have included the temp cul de sac & revised the lot #to 128. Let me know if you have any questions or need additional information. Chris Christopher B. Kean, LS Vice President Lincoln Surveying 632 Berkmar Circle Charlottesville, Va. 22901 434-974-1417 (0) 434-960-2942 (C) 434-974-1776 (F) L I N o 1c L N Innovation. Integrity, Vision. SURVEYING On Thu, Aug 30, 2018 at 8:48 AM,Nena H <ulcwww@embargmail.com>wrote: Thanks, Chris. This has taken forever. That's why I forgot about supplement to declaration. I believe all comments except showing temp turn around have been addressed. Please confirm that comments are addressed & I will get revised with temp turn around. I would really appreciate getting this done so anything you can do to expedite(before we forget again :) would be great. Assume Matt will figure bond amount. Can he go ahead & get that piece done? Scott, can you get info to Chris Kean? Nena Harrell 434-975-3334 1 4000 Sent from my iPhone On Aug 30, 2018, at 8:01 AM, Christopher Perez <cperez@albemarle.org> wrote: Nena, Thanks for reminding me about the plat for this SUB2018-77. I just pulled it, the last time we reviewed it was back in May, no wonder it slipped my mind, May seems like a year ago. So now that we have the minor amendment ready for approval, the plat needs to be revised to address all previous comments,revised to depict the temporary turn around, and then resubmitted for final review. I'll send it out for everyone to review. Also, an amended road plan is going to be needed to depict/provide that temporary turn around. It'll needed to be bonded prior to the final plat approval. That should shore it all up. Christopher P.Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road 1 Charlottesville,VA 22902 434.296.5832 ext.3443 From: Nena Harrell <ulcwww@embargmail.com> Sent: Tuesday, August 28, 2018 4:25 PM To: Christopher Perez <cperez@albemarle.org> Cc: 'Scott Collins'<scott@collins-engineering.com> Subject: RE: Briarwood phase 8 site plan amendment Thanks, Chris. I understood Scott had already clarified parking. Also, we have submitted the final plat—Sub201800077? I understood the site plan amendment was the final thing other than perhaps the supplement to the declaration that accompanies the plat. Pretty sure we submitted the plat in March or April. Scott—please weigh in. Nena Harrell United Land Corporation Vice President PO Box 5548 2 Charlottesville, VA 22905 434-975-3334 Fax 434-975-0267 From: Christopher Perez [mailto:cperez@albemarle.org] Sent: Tuesday, August 28, 2018 3:12 PM To: Nena Harrell <ulcwww@embargmail.com> Subject: RE: Briarwood phase 8 site plan amendment Nena, The site plan had one outstanding comment/question remaining from planning: "Question for you on my review. Shouldn't your revised parking calcs truly just depict 128 units...? As that is currently all the units that are approved w/this minor amendment. If you revise it to 135 it makes it appear like you are already at 135 units as we move forward: " Aside from this clarification on a typographical error, you are correct, the site plan is ready for approval. Be aware this is merely a site plan to build the extra townhome. To subdivide it we need to go through the same process as always to subdivide, a subdivision plat for County review needs to be applied for and submitted. Christopher P. Perez 1 Senior Planner Department of Community Development 1County of Albemarle,Virginia 401 McIntire Road 1 Charlottesville,VA 22902 434.296.5832 ext. 3443 From: Nena Harrell <ulcwww@embargmail.com> Sent: Tuesday, August 28, 2018 2:48 PM To: Christopher Perez <cperez@albemarle.org> Subject: Briarwood phase 8 site plan amendment Chris, Hope you are well. Scott tell me the site plan amendment for Elmtree Ct adding lot 108A is ready. Can you give me process to finish up and get plat signed? Thanks, 3 400 Nena Harrell United Land Corporation Vice President PO Box 5548 Charlottesville, VA 22905 434-975-3334 Fax 434-975-0267 4 44. `r/ `wr Christopher Perez From: Christopher Perez Sent: Thursday, August 30, 2018 10:15 AM To: 'Nena H' Cc: Scott Collins; Matthew Wentland;Chris Kean Subject: RE: Briarwood phase 8 site plan amendment Nena, f I reviewed the revised plat you sent over. All planning comments have been addressed, except the numbering of- the new lot. It needs to be revised to be lot 128 to match the site plan. Additionally, the temp turn around needs to be depicted. Also, submit that road plan amendment asap so we can approve the plat. , Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Nena H<ulcwww@embarqmail.com> Sent:Thursday,August 30,2018 8:49 AM To: Christopher Perez<cperez@albemarle.org> Cc:Scott Collins<scott@callins-engineering.com>; Matthew Wentland<mwentland@albemarle.org>;Chris Kean <chris.kean@lincolnsurveying.com> Subject: Re: Briarwood phase 8 site plan amendment Thanks, Chris.This has taken forever.That's why I forgot about supplement to declaration. I believe all comments except showing temp turn around have been addressed. Please confirm that comments are addressed & I will get revised with temp turn around. I would really appreciate getting this done so anything you can do to expedite(before we forget again :)would be great.Assume Matt will figure bond amount. Can he go ahead &get that piece done? Scott, can you get info to Chris Kean? Nena Harrell 434-975-3334 Sent from my iPhone On Aug 30, 2018,at 8:01 AM,Christopher Perez<cperez@albemarle.org>wrote: Nena, Thanks for reminding me about the plat for this SUB2018-77. I just pulled it, the last time we reviewed it was back in May, no wonder it slipped my mind, May seems like a year ago. So now that we have the minor amendment ready for approval, the plat needs to be revised to address all previous comments, revised to depict the temporary turn around, and then resubmitted for final review. I'll send it out for everyone to review. 1 'kale ,410•0 Christopher Perez From: Christopher Perez Sent: Thursday,August 30, 2018 8:02 AM To: 'Nena Harrell' Cc: 'Scott Collins'; Matthew Wentland Subject: RE: Briarwood phase 8 site plan amendment Nena, Thanks for reminding me about the plat for this SUB2018-77. I just pulled it, the last time we reviewed it was back in May, no wonder it slipped my mind, May seems like a year ago. So now that we have the minor amendment ready for approval, the plat needs to be revised to address all previous comments, revised to depict the temporary turn around, and then resubmitted for final review. I'll send it out for everyone to review. Also, an amended road plan is going to be needed to depict/provide that temporary turn around. It'll needed to be bonded prior to the final plat approval. That should shore it all up. Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Nena Harrell<ulcwww@embargmail.corn> Sent:Tuesday,August 28, W18 4:25 PM To:Christopher Perez<cperez@albemarle.org> • Cc: 'Scott Collins'<scott@collins-engineering.com> Subject: RE: Briarwood phase 8 site plan amendment Thanks, Chris. I understood Scott had already clarified parking. Also,we have submitted the final plat—Sub201800077? I understood the site plan amendment was the final thing other than perhaps the supplement to the declaration that accompanies the plat. Pretty sure we submitted the plat in March or April. Scott—please weigh in. Nena Harrell United Land Corporation Vice President PO Box 5548 Charlottesville,VA 22905 434-975-3334 Fax 434-975-0267 From:Christopher Perez [mailto:cperez@albemarle.org] Sent:Tuesday,August 28, 2018 3:12 PM 1 itOf To: Nena Harrell<ulcwww@embarcimail.com> Subject: RE: Briarwood phase 8 site plan amendment Nena, The site plan had one outstanding comment/question remaining from planning: "Question for you on my review. Shouldn't your revised parking calcs truly just depict 128 units...? As that is currently all the units that are approved w/this minor amendment. If you revise it to 135 it makes it appear like you are already at 135 units as we move forward: " Aside from this clarification on a typographical error, you are correct, the site plan is ready for approval. Be aware this is merely a site plan to build the extra townhome. To subdivide it we need to go through the same process as always to subdivide, a subdivision plat for County review needs to be applied for and submitted. Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Nena Harrell<ulcwww@embargmail.com> Sent:Tuesday,August 28,2018 2:48 PM To:Christopher Perez<cperez@albemarle.org> Subject: Briarwood phase 8 site plan amendment Chris, Hope you are well. Scott tell me the site plan amendment for Elmtree Ct adding lot 108A is ready. Can you give me process to finish up and get plat signed? Thanks, Nena Harrell United Land Corporation Vice President PO Box 5548 Charlottesville,VA 22905 434-975-3334 Fax 434-975-0267 2 '‘11111e '110101 Christopher Perez From: Christopher Perez Sent: Wednesday, May 23, 2018 11:03 AM To: 'ckean2378@gmail.com' Cc: Nena Harrell Subject: SUB201800077 Briarwood - Phase 8 - Final Plat Attachments: CD1 SUB201800077 Briarwood - Phase 8 - Final Plat 5-23-18.pdf Mr. Kean, SUB201800077 Briarwood- Phase 8- Final Plat Attached are County review comments. VDOT comments (if any) are pending and shall be provided soon. Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 1 Iry Nor Christopher Perez To: Richard Nelson Subject: RE: SUB2018-77 Briarwood Phase 8 - Final Subdivision Plat From: Richard Nelson <rnelson@serviceauthority.org> Sent: Monday, May 14, 2018 4:51 PM To: Christopher Perez<cperez@albemarle.org> Subject: RE: SUB2018-77 Briarwood Phase 8- Final Subdivision Plat Sorry Chris, d Phase 8 - Final Subdivision Plat for Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 From: Christopher Perez [mailto:cperez@albemarle.org] Sent: Monday, May 14, 2018 2:00 PM To: Richard Nelson <rnelson@serviceauthority.org> Subject: RE: SUB2018-77 Briarwood Phase 8- Final Subdivision Plat Does this mean, prior to final plat approval you will need to have an inspection completed and signed off? If so what does the applicant need to do to get this moving with ACSA? From: Richard Nelson <rnelson@serviceauthoritv.org> Sent: Monday, May 14, 2018 1:47 PM To: Christopher Perez<cperez@albemarle.org> Subject: SUB2018-77 Briarwood Phase 8- Final Subdivision Plat Chris, aminitts for SUB2018-77 Briarwood Phase $ -Final Subdivallaur A will need to inspect water and sewer services for newly created 141111 Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road 1 • Charlottesville, Virginia 22911 (434)977-4511 4 e 2 traswo Christopher Perez From: Richard Nelson <rnelson@serviceauthority.org> Sent: Tuesday, May 22, 2018 9:50 AM To: Christopher Perez Subject: RE: SUB-2017-155 Rivanna Village - Final Plat Chris, The sewer has been installed. We are still waiting on as-builts. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 From:Christopher Perez [mailto:cperez@albemarle.org] Sent: Friday, May 18, 2018 11:43 AM To: Richard Nelson <rnelson@serviceauthority.org> Subject: RE:SUB-2017-155 Rivanna Village- Final Plat Richard, When you provide me your comments please speak to the following item: Connection of the East Rivanna Volunteer Fire Department to the ACSA sewer system must be completed prior to any development that would compromise the existing septic system (see Drainfield Easement, Sheets 7& 8 of 13). Has the sanitary sewer been installed and the drainfield vacated? Christopher P.Perez I Senior Planner Department of Community Development I County of Albemarle,Virginia 401 McIntire Road I Charlottesville,VA 22902 434.296.5832 ext.3443 From: Richard Nelson <rnelson@serviceauthoritv.org> Sent: Monday, May 14, 2018 1:50 PM To: Christopher Perez<cperez@albemarle.org> Subject:SUB-2017-155 Rivanna Village- Final Plat Chris, ACSA is waiting on as-builts to confirm easement locations. Thanks, 1 Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434)977-4511 2 Se 4111104 ./ COUNTY OF ALBEMARLE c Department Community Development ._ Planning Services Division Y{r�+Ills: �#1" 401 McIntire Road North Wing•Charlottesville,Virginia 22902-4596 i' * Phone: (434)296-5823 •Fax: (434)972-4035 Transmittal From: Christopher Perez Date: 04/25/18 To: 0 u.nctss; -Engineering Jib , 0 \•C ( / id. — 4{6* 4,,,,,.„-„( OMichael Dellinger- InspectionsN, 0 OAdam Moore-VDOT 0 OElise Kiewra- GDS !iA 0 OShawn Maddox-Fire and Rescue ev,,,,,,,4-) 0 JOB#/FILE NAME: , 't,(R 9.0/,f 77 Srarwoo1 se-Y — -A o f .s--, ! ts m pia. We are sending you the following items: ®Attached or ❑ Under separate cover ❑ Copy of Letter ❑ Prints ❑ Plans ❑ Plats ❑ Specifications ❑ Other #of Date Description Copies 1 fmal plat These are transmitted as checked below: ® For review and comments ® For approval ❑ Other Remarks: Comments are due in City View or email by: 05/15/18 Signature: Christopher Perez