HomeMy WebLinkAboutSUB201800077 Correspondence Final Plat 2018-08-31 *IWO *401
Christopher Perez
From: Christopher Perez
Sent: Friday,August 31, 2018 10:16 AM
To: 'Nena H'
Cc: Chris Kean; Scott Collins; Matthew Wentland
Subject: RE: Briarwood phase 8 site plan amendment
---- 'AA,—GvvV���""_ s
1776
Ok, looks good. Now please send in that roa• amendm }�
ia,-.14- ,,,,h4- - --- arr*
From: Nena H<ulcwww@ernbargmail.com> / /Gvt �,/� ��f`�J ,L�
Sent: Friday,August 31, 2018 10:15 AM
gtie�t5 `�-` `�'� l `
To:Christopher Perez<cperez@albemarle.org> �'914N /�--- A/ft ohs'^'-�.,�l-w/.
Cc:Chris Kean<chris.kean@lincolnsurveying.com>, ollins<scott olli�. gineering.com>; Matthew Wentlan
<mwentland@albemarle.org> !�- fi4e
� �}�����Subject: Re: Briarwood phase 8 site plan amendment P) - 0 4 57/1,0-z.:74—
Thanks,
Thanks, Chris. 0/°-'1, r C7 bo rl: //
J1 ew
Nena Harrell
434-975-3334
Sent from my iPhone
On Aug 31, 2018, at 9:58 AM, Christopher Perez <cperez@albemarle.org>wrote:
Chris Kean,
1.The title needs to be revised to correctly reference Parcel X as Parcel Y.That's what page 3 labels this
segment, Parcel Y.
2.The title sheet and sheet 2 correctly modified the lot name to 128; however, page 3 still labels the
new lot as 108A. Revise.
Once those two little things are corrected,this plat will be ready too.
Then all we need is a road plan amendment and we can approve these docs.
From:Chris Kean<chris.kean@lincolnsurveying.com>
Sent: Friday,August 31, 2018 9:30 AM
To: Nena Harrell<ulcwww@embarqmail.com>
Cc:Christopher Perez<cperez@albemarle.org>; Scott Collins<scott@collins-engineering.com>;
Matthew Wentland<mwentlandPalbemarle.org>
Subject: Re: Briarwood phase 8 site plan amendment
Chris P. & Nena:
1
Christopher Perez
From: Christopher Perez
Sent: Friday, August 31, 2018 9:58 AM
To: 'Chris Kean'; Nena Harrell
Cc: Scott Collins; Matthew Wentland
Subject: RE: Briarwood phase 8 site plan amendment
Chris Kean,
1.The title needs to be revised to correctly reference Parcel X as Parcel Y.That's what page 3 labels this segment, Parcel
Y.
2.The title sheet and sheet 2 correctly modified the lot name to 128; however, page 3 still labels the new lot as 108A.
Revise.
Once those two little things are corrected,this plat will be ready too.
Then all we need is a road plan amendment and we can approve these docs.
From:Chris Kean<chris.kean@lincolnsurveying.com>
Sent: Friday,August 31, 2018 9:30 AM
To: Nena Harrell<ulcwww@embargmail.com>
Cc:Christopher Perez<cperez@albemarle.org>; Scott Collins<scott@collins-engineering.com>; Matthew Wentland
<mwentland@albemarle.org>
Subject: Re: Briarwood phase 8 site plan amendment
Chris P. & Nena:
Please find an updated final plat for lot 128 attached. We have included the temp cul de sac & revised
the lot # to 128. Let me know if you have any questions or need additional information.
Chris
Christopher B. Kean, LS
Vice President
Lincoln Surveying
632 Berkmar Circle
Charlottesville, Va. 22901
434-974-1417 (0)
434-960-2942 (C)
434-974-1776 (F)
1
Christopher Perez
From: Chris Kean <chris.kean@lincolnsurveying.com>
Sent: Friday, August 31, 2018 9:30 AM
To: Nena Harrell
Cc: Christopher Perez; Scott Collins; Matthew Wentland
Subject: Re: Briarwood phase 8 site plan amendment
Attachments: 110006801_SU B-128_18243.pdf
Chris P. & Nena:
Please find an updated final plat for lot 128 attached. We have included the temp cul de sac & revised
the lot #to 128. Let me know if you have any questions or need additional information.
Chris
Christopher B. Kean, LS
Vice President
Lincoln Surveying
632 Berkmar Circle
Charlottesville, Va. 22901
434-974-1417 (0)
434-960-2942 (C)
434-974-1776 (F)
L I N o 1c L N Innovation. Integrity, Vision.
SURVEYING
On Thu, Aug 30, 2018 at 8:48 AM,Nena H <ulcwww@embargmail.com>wrote:
Thanks, Chris. This has taken forever. That's why I forgot about supplement to declaration. I believe all
comments except showing temp turn around have been addressed. Please confirm that comments are addressed
& I will get revised with temp turn around. I would really appreciate getting this done so anything you can do
to expedite(before we forget again :) would be great. Assume Matt will figure bond amount. Can he go ahead
& get that piece done?
Scott, can you get info to Chris Kean?
Nena Harrell
434-975-3334
1
4000
Sent from my iPhone
On Aug 30, 2018, at 8:01 AM, Christopher Perez <cperez@albemarle.org> wrote:
Nena,
Thanks for reminding me about the plat for this SUB2018-77. I just pulled it, the last time we
reviewed it was back in May, no wonder it slipped my mind, May seems like a year ago.
So now that we have the minor amendment ready for approval, the plat needs to be revised to
address all previous comments,revised to depict the temporary turn around, and then
resubmitted for final review. I'll send it out for everyone to review.
Also, an amended road plan is going to be needed to depict/provide that temporary turn around.
It'll needed to be bonded prior to the final plat approval.
That should shore it all up.
Christopher P.Perez 1 Senior Planner
Department of Community Development 1County of Albemarle,Virginia
401 McIntire Road 1 Charlottesville,VA 22902
434.296.5832 ext.3443
From: Nena Harrell <ulcwww@embargmail.com>
Sent: Tuesday, August 28, 2018 4:25 PM
To: Christopher Perez <cperez@albemarle.org>
Cc: 'Scott Collins'<scott@collins-engineering.com>
Subject: RE: Briarwood phase 8 site plan amendment
Thanks, Chris. I understood Scott had already clarified parking. Also, we have submitted the
final plat—Sub201800077? I understood the site plan amendment was the final thing other than
perhaps the supplement to the declaration that accompanies the plat. Pretty sure we submitted
the plat in March or April.
Scott—please weigh in.
Nena Harrell
United Land Corporation
Vice President
PO Box 5548
2
Charlottesville, VA 22905
434-975-3334 Fax 434-975-0267
From: Christopher Perez [mailto:cperez@albemarle.org]
Sent: Tuesday, August 28, 2018 3:12 PM
To: Nena Harrell <ulcwww@embargmail.com>
Subject: RE: Briarwood phase 8 site plan amendment
Nena,
The site plan had one outstanding comment/question remaining from planning: "Question for
you on my review. Shouldn't your revised parking calcs truly just depict 128 units...?
As that is currently all the units that are approved w/this minor amendment. If you revise it to
135 it makes it appear like you are already at 135 units as we move forward: "
Aside from this clarification on a typographical error, you are correct, the site plan is ready for
approval. Be aware this is merely a site plan to build the extra townhome. To subdivide it we
need to go through the same process as always to subdivide, a subdivision plat for County
review needs to be applied for and submitted.
Christopher P. Perez 1 Senior Planner
Department of Community Development 1County of Albemarle,Virginia
401 McIntire Road 1 Charlottesville,VA 22902
434.296.5832 ext. 3443
From: Nena Harrell <ulcwww@embargmail.com>
Sent: Tuesday, August 28, 2018 2:48 PM
To: Christopher Perez <cperez@albemarle.org>
Subject: Briarwood phase 8 site plan amendment
Chris,
Hope you are well. Scott tell me the site plan amendment for Elmtree Ct adding lot 108A is
ready. Can you give me process to finish up and get plat signed?
Thanks,
3
400
Nena Harrell
United Land Corporation
Vice President
PO Box 5548
Charlottesville, VA 22905
434-975-3334 Fax 434-975-0267
4
44.
`r/ `wr
Christopher Perez
From: Christopher Perez
Sent: Thursday, August 30, 2018 10:15 AM
To: 'Nena H'
Cc: Scott Collins; Matthew Wentland;Chris Kean
Subject: RE: Briarwood phase 8 site plan amendment
Nena,
f
I reviewed the revised plat you sent over. All planning comments have been addressed, except the numbering of-
the new lot. It needs to be revised to be lot 128 to match the site plan. Additionally, the temp turn around needs
to be depicted.
Also, submit that road plan amendment asap so we can approve the plat. ,
Christopher P.Perez I Senior Planner
Department of Community Development I County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: Nena H<ulcwww@embarqmail.com>
Sent:Thursday,August 30,2018 8:49 AM
To: Christopher Perez<cperez@albemarle.org>
Cc:Scott Collins<scott@callins-engineering.com>; Matthew Wentland<mwentland@albemarle.org>;Chris Kean
<chris.kean@lincolnsurveying.com>
Subject: Re: Briarwood phase 8 site plan amendment
Thanks, Chris.This has taken forever.That's why I forgot about supplement to declaration. I believe all comments except
showing temp turn around have been addressed. Please confirm that comments are addressed & I will get revised with
temp turn around. I would really appreciate getting this done so anything you can do to expedite(before we forget
again :)would be great.Assume Matt will figure bond amount. Can he go ahead &get that piece done?
Scott, can you get info to Chris Kean?
Nena Harrell
434-975-3334
Sent from my iPhone
On Aug 30, 2018,at 8:01 AM,Christopher Perez<cperez@albemarle.org>wrote:
Nena,
Thanks for reminding me about the plat for this SUB2018-77. I just pulled it, the last time we
reviewed it was back in May, no wonder it slipped my mind, May seems like a year ago.
So now that we have the minor amendment ready for approval, the plat needs to be revised to
address all previous comments, revised to depict the temporary turn around, and then
resubmitted for final review. I'll send it out for everyone to review.
1
'kale ,410•0
Christopher Perez
From: Christopher Perez
Sent: Thursday,August 30, 2018 8:02 AM
To: 'Nena Harrell'
Cc: 'Scott Collins'; Matthew Wentland
Subject: RE: Briarwood phase 8 site plan amendment
Nena,
Thanks for reminding me about the plat for this SUB2018-77. I just pulled it, the last time we reviewed it was
back in May, no wonder it slipped my mind, May seems like a year ago.
So now that we have the minor amendment ready for approval, the plat needs to be revised to address all
previous comments, revised to depict the temporary turn around, and then resubmitted for final review. I'll send
it out for everyone to review.
Also, an amended road plan is going to be needed to depict/provide that temporary turn around. It'll needed to
be bonded prior to the final plat approval.
That should shore it all up.
Christopher P.Perez I Senior Planner
Department of Community Development I County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: Nena Harrell<ulcwww@embargmail.corn>
Sent:Tuesday,August 28, W18 4:25 PM
To:Christopher Perez<cperez@albemarle.org>
• Cc: 'Scott Collins'<scott@collins-engineering.com>
Subject: RE: Briarwood phase 8 site plan amendment
Thanks, Chris. I understood Scott had already clarified parking. Also,we have submitted the final plat—Sub201800077?
I understood the site plan amendment was the final thing other than perhaps the supplement to the declaration that
accompanies the plat. Pretty sure we submitted the plat in March or April.
Scott—please weigh in.
Nena Harrell
United Land Corporation
Vice President
PO Box 5548
Charlottesville,VA 22905
434-975-3334 Fax 434-975-0267
From:Christopher Perez [mailto:cperez@albemarle.org]
Sent:Tuesday,August 28, 2018 3:12 PM
1
itOf
To: Nena Harrell<ulcwww@embarcimail.com>
Subject: RE: Briarwood phase 8 site plan amendment
Nena,
The site plan had one outstanding comment/question remaining from planning: "Question for you on my review.
Shouldn't your revised parking calcs truly just depict 128 units...?
As that is currently all the units that are approved w/this minor amendment. If you revise it to 135 it makes it
appear like you are already at 135 units as we move forward: "
Aside from this clarification on a typographical error, you are correct, the site plan is ready for approval. Be
aware this is merely a site plan to build the extra townhome. To subdivide it we need to go through the same
process as always to subdivide, a subdivision plat for County review needs to be applied for and submitted.
Christopher P.Perez I Senior Planner
Department of Community Development I County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: Nena Harrell<ulcwww@embargmail.com>
Sent:Tuesday,August 28,2018 2:48 PM
To:Christopher Perez<cperez@albemarle.org>
Subject: Briarwood phase 8 site plan amendment
Chris,
Hope you are well. Scott tell me the site plan amendment for Elmtree Ct adding lot 108A is ready. Can you give me
process to finish up and get plat signed?
Thanks,
Nena Harrell
United Land Corporation
Vice President
PO Box 5548
Charlottesville,VA 22905
434-975-3334 Fax 434-975-0267
2
'‘11111e '110101
Christopher Perez
From: Christopher Perez
Sent: Wednesday, May 23, 2018 11:03 AM
To: 'ckean2378@gmail.com'
Cc: Nena Harrell
Subject: SUB201800077 Briarwood - Phase 8 - Final Plat
Attachments: CD1 SUB201800077 Briarwood - Phase 8 - Final Plat 5-23-18.pdf
Mr. Kean,
SUB201800077 Briarwood- Phase 8- Final Plat
Attached are County review comments. VDOT comments (if any) are pending and shall be provided soon.
Christopher P.Perez I Senior Planner
Department of Community Development I County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
1
Iry
Nor
Christopher Perez
To: Richard Nelson
Subject: RE: SUB2018-77 Briarwood Phase 8 - Final Subdivision Plat
From: Richard Nelson <rnelson@serviceauthority.org>
Sent: Monday, May 14, 2018 4:51 PM
To: Christopher Perez<cperez@albemarle.org>
Subject: RE: SUB2018-77 Briarwood Phase 8- Final Subdivision Plat
Sorry Chris,
d Phase 8 - Final Subdivision Plat for
Thanks,
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434)977-4511
From: Christopher Perez [mailto:cperez@albemarle.org]
Sent: Monday, May 14, 2018 2:00 PM
To: Richard Nelson <rnelson@serviceauthority.org>
Subject: RE: SUB2018-77 Briarwood Phase 8- Final Subdivision Plat
Does this mean, prior to final plat approval you will need to have an inspection completed and signed off? If so what
does the applicant need to do to get this moving with ACSA?
From: Richard Nelson <rnelson@serviceauthoritv.org>
Sent: Monday, May 14, 2018 1:47 PM
To: Christopher Perez<cperez@albemarle.org>
Subject: SUB2018-77 Briarwood Phase 8- Final Subdivision Plat
Chris,
aminitts for SUB2018-77 Briarwood Phase $ -Final Subdivallaur
A will need to inspect water and sewer services for newly created 141111
Thanks,
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
1
•
Charlottesville, Virginia 22911
(434)977-4511
4 e
2
traswo
Christopher Perez
From: Richard Nelson <rnelson@serviceauthority.org>
Sent: Tuesday, May 22, 2018 9:50 AM
To: Christopher Perez
Subject: RE: SUB-2017-155 Rivanna Village - Final Plat
Chris,
The sewer has been installed. We are still waiting on as-builts.
Thanks,
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434)977-4511
From:Christopher Perez [mailto:cperez@albemarle.org]
Sent: Friday, May 18, 2018 11:43 AM
To: Richard Nelson <rnelson@serviceauthority.org>
Subject: RE:SUB-2017-155 Rivanna Village- Final Plat
Richard,
When you provide me your comments please speak to the following item:
Connection of the East Rivanna Volunteer Fire Department to the ACSA sewer system must be completed prior
to any development that would compromise the existing septic system (see Drainfield Easement, Sheets 7& 8 of
13).
Has the sanitary sewer been installed and the drainfield vacated?
Christopher P.Perez I Senior Planner
Department of Community Development I County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: Richard Nelson <rnelson@serviceauthoritv.org>
Sent: Monday, May 14, 2018 1:50 PM
To: Christopher Perez<cperez@albemarle.org>
Subject:SUB-2017-155 Rivanna Village- Final Plat
Chris,
ACSA is waiting on as-builts to confirm easement locations.
Thanks,
1
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434)977-4511
2
Se
4111104 ./
COUNTY OF ALBEMARLE
c Department Community Development
._ Planning Services Division
Y{r�+Ills:
�#1" 401 McIntire Road North Wing•Charlottesville,Virginia 22902-4596
i' * Phone: (434)296-5823 •Fax: (434)972-4035
Transmittal
From: Christopher Perez Date: 04/25/18
To: 0 u.nctss; -Engineering Jib , 0 \•C ( / id. — 4{6* 4,,,,,.„-„(
OMichael Dellinger- InspectionsN, 0
OAdam Moore-VDOT 0
OElise Kiewra- GDS !iA 0
OShawn Maddox-Fire and Rescue ev,,,,,,,4-) 0
JOB#/FILE NAME: , 't,(R 9.0/,f 77 Srarwoo1 se-Y — -A o f .s--, ! ts m pia.
We are sending you the following items: ®Attached or ❑ Under separate cover
❑ Copy of Letter ❑ Prints ❑ Plans
❑ Plats ❑ Specifications ❑ Other
#of Date Description
Copies
1 fmal plat
These are transmitted as checked below:
® For review and comments ® For approval ❑ Other
Remarks:
Comments are due in City View or email by: 05/15/18 Signature: Christopher Perez