HomeMy WebLinkAboutWPO200400057 Agreement - SWM Maintenance 2004-08-03THIS AGREEMENT, made and entered into this 3 day of August , 20 04, by
and between Deep Acres, LLC hereinafter called the
(Insert Full Name of Owner)
"Landowner", and the Board of Supervisors of Albemarle County, Virginia, hereinafter called the
it County"
WITNESSETH, that
WHEREAS, the Landowner is the owner of certain real property described as
42 - 70C, 70D; 43 - 16C, 16D; 59 - 1A, 1C as recorded by deed in the land records of Albemarle
(Albemarle County Tax Map/Parcel Identification Number)
County, Virginia, Deed Book 2773 Page 571, 632 , hereinafter called the "Property".
WHEREAS, the Landowner is proceeding to build on and develop the property; and
WHEREAS, the Site Plan/Subdivision Plan known as Old Ballard Farm
(Name of Plan/Development)
hereinafter called the 'Plan", which is expressly made a part hereof, as approved or to be approved by the
County, provides for detention of stormwater within the confines of the property; and
WHEREAS, the County and the Landowner, its successors and assigns, including any
homeowners association, agree that the health, safety, and welfare of the residents of Albemarle County,
Virginia, require that on-site stormwater management/BMP facilities be constructed and maintained on
the Property; and
WHEREAS, the County requires that on-site stormwater management/BMP facilities as shown on
the Plan be constructed and adequately maintained by the Landowner, its successors and assigns,
including any homeowners association.
NOW, THEREFORE, inconsideration of the foregoing premises, the mutual covenants contained
herein, and the following terms and conditions, the parties hereto agree as follows:
The on-site stormwater management/BMP facilities shall be constructed by the Landowner, its
successors and assigns, in accordance with the plans and specifications identified in the Plan.
2. The Landowner, its successors and assigns, including any homeowners association, shall
adequately maintain the stormwater management/BMP facilities. This includes. all pipes and channels
built to convey stormwater to the facility, as well as all structures, improvements, and vegetation provided
to control the quantity and quality of the stormwater_ Adequate maintenance is herein defined as good
working condition so that these facilities are performing their design functions_ The Annual Inspection
Report form dated 6/2/92 (or latest date form available) is to be used to establish what good working
condition is acceptable to the County. .
-1-
Prepared by County of Albemarle Department of Eneineeaing & Public Work Interim Manual, Appendices, Page A-1
3. The Landowner, its successors and assigns, shall inspect the stormwater management/BMP
facility and submit an inspection report annually. The purpose of the inspection is to assure safe and
proper functioning of the facilities. The inspection shall cover the entire facilities, berms, outlet structure,
pond areas, access roads, etc. Deficiencies shall be noted in the inspection report.
4. The Landowner, its successors and assigns, hereby grant permission to the County, its
authorized agents and employees, to enter upon the Property and to inspect the stormwater
management/BW facilities whenever the County deems necessary. The purpose of inspection is to
follow-up on reported deficiencies and/or to respond to citizen complaints. The County shall provide the
Landowner, its successors and assigns, copies of the inspection findings and a directive to commence with
the repairs if necessary.
5. In the event the Landowner, its successors and assigns, fails to maintain the stormwater
management/BIv1P facilities in good working condition acceptable to the County, the County may enter
upon the Property and take whatever steps necessary to correct deficiencies identified in the inspection
report and to charge the costs of such repairs to the Landowner, its successors and assigns. This provision
shall not be construed to allow the County to erect any structure of permanent nature on the land of the
Landowner outside of the easement for the stormwater management/BMP facilities. It is expressly
understood and agreed that the County is under no obligation to routinely maintain or repair said facilities,
and in no event shall this Agreement be construed to impose any such obligation on the County.
6. The Landowner, its successors and assigns, will perform the work necessary to keep these
facilities in good working order as appropriate. In the event a maintenance schedule for the stormwater
management/BW facilities (including sediment removal) is. outlined on the approved plans, the schedule
will be followed.
7. In the event the County pursuant to this Agreement, performs work of any nature, or expends
any funds in performance of said work for labor, use of equipment, supplies, materials, and the like, the
Landowner, its successors and assigns, shall reimburse the County upon demand, within thirty (30) days
of receipt thereof for all actual costs incurred by the County hereunder.
S. This Agreement imposes no liability of any kind whatsoever on the County and the Landowner
agrees to hold the County harmless from any liability in the event the stormwater management/BMP
facilities fail to operate properly.
9. This Agreement shall be recorded among the land records of Albemarle County, Virginia, and
shall constitute a covenant running with the land, and shall be binding on the Landowner, its
administrators, executors, assigns, heirs and any other successors in interests, including any homeowners
association.
-2-
Prepared by County of Albemarle Department of Engineering & Public Works Interim Manual Appendices, Page A-2
WITNESS the following signatures and seals:
Company/Corpora rship Name e (Seal)
By: Deep Acres, LLC
_ Michael Gaffney
(Type Name)
Manager
(Type Title)
STATE OF
COUNTY OF �( �
The foregoing Agreement was acknowledged before me this 4 day of ,
200. by
My Commission Expires
M
STATE OF
COUNTY OF
NOTARY PUBLIC
COUNTY OF ALBEMARLE, VIRGINIA
(Type Name)
(Type Title)
The foregoing Agreement was acknowledged before me this day of
20_, by
My Commission Expires:
Approved as to Form:
County Attorney
Date
NOTARY PUBLIC
-3-
Prepared by Countv of Albemarle Department of Engineering & Public works Interim Manual, Appendices, Page A-3