Loading...
HomeMy WebLinkAboutWPO201300033 Bond Release 2018-07-09COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: PLAN/PERMIT NO. DATE: 2h This project has been satisfactorily completed and the erosion control performance bond may be released at this time if all re -inspection and annual maintenance fees invoiced have been paid. Erosion Control Inspector Community Development Department All fees invoiced on the above project have been colt ted. Director of Community Development / ount r 047 19 Date DEQ Termination Date 4 7 / 3 //' ; w, -— Cc: Ana Kilmer Revised 10/16/2017 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 STORMWATER MANAGEMENT PERFORMANCE BOND RELEASE PROJECT NAME: PLAN/PERMITNo.: 0 Q Q Z-0 t3 - 0() 3?1 DATE: This project has been satisfactorily completed and the stormwater management performance bond may be released at this time if all re -inspection and annual maintenance fees invoiced have been paid. Date As -built plan was approved by Engineering Division: 15117 or N/A DEQ Termination Date -7 % 49 o — cA Engineering Reviewer/Inspector /47'vd A` v,,,o --rA'it as '*7t"o X_q L_oc Community Development Department All fees invoiced on the above project have been collected.� / Director of Community Development / ounty Engineer Date Cc: Ana Kilmer Revised: 07/03/2018 } 1 ���,ACNia Z MANAGEMENT PERFORMANCE BOND RELEASE 3 Y1 -1 3 • - �Ati S� ',© G (� KOJECT NAME: . ,--4/0al �L7% / a /;74,1) y PLAN/PERMIT NO. -V — 240 S—QDo79 DATE: 6-4 T, zS 203 REp1Aef-d by P aa-1.4 i -Zot 3—aoo 3 3 \\ This proj- has been dailtstegkerthiginagifakileiand the storpw.ate'r management performance bond may be releas-d at this time if all erosion control inspection feecivoiced have been paid. Erg ion Co. rol Inspector 1 ire °L. ...: • Accounting Department All erosion control inspection fees invoiced on the above project have been collected. Chief Accountant Date Cc: Ana Kilmer I:IDEPTICommunlly DevelopmenBFormslInspeclionsISTORMWATER PERFORMANCE BOND RELEASE REVISED 3 8 2010.doc , .)o ca Pho7c) Obi 410 k ' i