Loading...
HomeMy WebLinkAboutWPO201300033 Bond WPO VSMP 2017-06-16 Internal Use Qnit ! / /&y-f Date Received: / X c - S/9 c*AL� 7 L� Paid. 'J � Received by: /4 �� ��d1111t('l�lsw r Intake: Forward to'vtanagenhentAnalyst t41 eV1 &111°14-("4/A VOD froi,,iN0A Q L.) Of 7-f..; BOND INSPECTION REQUEST APPROVED PLAN #WPO-2013-00033 PROJECT NAME: PEABODY SCHOOL (As listed on the approved plan) This is to request that an inspection be performed by the County. Where fees are assessed,a fee is required for each inspection. Please check the inspections requested. VSMP/VESCP Erosion Control,Stormwater Management and/or Mitigation per Water Protection Ordinance section 17-207& 208 $250 0 Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435 and 14-438; $269 0 Water& Sewer per Subdivision Ordinance section 14-435 $269 ❑ Site Development Performance bond(Incomplete Site Work& Landscape Maintenance) $301 TOTAL FEES $250 Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development,401 Mclntire Road,North Wing,Charlottesville, VA 22902,Attention: Management Analyst-Phone 434-296-5832; Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings, inspection reports,and completion processes through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and county's published procedures. A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is complete. The revised estimate should be sent to; EMAIL: cob. or 1 a.,ct, e %Jho( " S'(A0in.oc OR REGULAR MAIL ADDRESS: /.2 3 2 J j-v 46-(9r-/1 Chits-44'14.u., VA 2z9b . iLk Signature of Owner/Developer Ch 04' Print Name Date Revised 7/15/2014,7120/2015,11/3/2015 Ana Kilmer From: Ana Kilmer Sent: Monday, August 05, 2013 3:15 PM To: 'Renee Henslee'; Kenny Thacker; Ray Lilly Cc: Esther Grace; Max Greene Subject: Peabody School -wpo-2013-00033 The$74,570 water protection performance bond has been posted and approved (erosion$39,070;stormwater $35,500). The permit and first year inspection fee has been paid. The stormwater agreement has been approved by the county. Stormwater agreement will be recorded this week. Please contact Ray Lilly to determine if you can set up your pre-construction meeting. Thank you Ana D. Kilmer Management Analyst County of Albemarle Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer@albemarle.org 1 ' Ana Kilmer From: Ana Kilmer Sent: Monday, August 05, 2013 3:15 PM To: 'Renee Henslee'; Kenny Thacker; Ray Lilly Cc: Esther Grace; Max Greene Subject: Peabody School-wpo-2013-00033 The$74,570 water protection performance bond has been posted and approved (erosion$39,070; stormwater $35,500). The permit and first year inspection fee has been paid. The stormwater agreement has been approved by the county. Stormwater agreement will be recorded this week. Please contact Ray Lilly to determine if you can set up your pre-construction meeting. Thank you Ana D. Kilmer Management Analyst County of Albemarle Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmerPalbemarle.org 1 Peabody School WPO file number:WPO201300033 Erosion and Sediment Control Bond Estimate Item Item t4 Unit Unit Cost Cost Number Anstelledl ctabloation(PS,TS) 2.3 acres $5,000.00 $11,400.00 sift fence(SF) 800.0 ft 05.00 $4,000.00 safety fence(SAF) 400.0 ft 35.00 $2,000.00 diversion(DO,FD,RWD) 400 ft $13.00 $5,200.00 1 temporary sediment trap(ST or CIP) Method for volume height of dam at toe 2 ft cut at dam 2 ft (tenth)0(total wilt height of dam at face 2 ft out at high side 2 ft assume face at 2: length of darn 50 ft length of cut 50 ft total width=3&Roe top width 2 ft %With of cut 5 ft average height=( (comp.fiN vol) 44.4 cy (cut vol) 48.1 cy $13.00 length of spillway 10 ft (cy est) 63.0 width of spillway 3 ft (spillway stone tons) 3.33333 $50.00 $985.19 1 temporary sediment trap(ST or CIP) Method for volume height of dam at toe 1 ft out at dam 1 ft (tenth)x(total widt height of dam at face 1 ft cut at high side 2 ft assume face at 2. length of dam 60 ft length of cut 60 ft total width=3x(toe top width 2 ft width of cut 5 ft average height=( (comp.fiN Vol) 15.6 cy (cut vol) 36.7 cy $13.00 length of spillway 10 ft (cy est) 41.9 width of spillway 1 ft (spihway stone tons) 1.11111 $50.00 $599.63 silt fence inlet protection(IP) 7 $100.00 $700.00 stone inlet protection(IP) 0 $200.00 $0.00 outlet protection(OP) length 0 ft width 0 ft 3 $0.00 $0.00 channel(SCC,matted) length 0 ft width 0 ft $0.00 check dam depth in channel 0 ft channel width 0 ft 1 $0.00 $000 construction entrance(CE) 1 $2,000.00 $2,000.00 wash rack 1 $2,000.00 32,000.00 paved construction entrance 0 33,50000 $0.00 rip-rap,placed depth 0 ft length 0.0 ft Width 0.0 (tons) 0 360.00 $0.00 survey and layout(price per Of mi.) acres 1 traps and basins 2 $1,500.00 mobtl¢etion stream crossing(computed independently) $500.00 cost sum $30,884.81 • proj mgmt $4,632.72 contingency $3,551.75 Total $39,070 7/12/2013 wee{ Peabody School WPO file number:WPO201300033 Stormwater Management Plan Bond Estimate Item Item Number Na Unit ji nst n t Css3 Cost liabst) site clearing permanent diversion or ditch 0 fl 01300 $0.00 standard manhole frame top(rot inlet) 0 es $500.00 saw manhoe structure(per ft.rise) 0 ft $450.00 $0.00 pipe,rep.cmp(15 to 48') 0.0 in d 0 ES-1,2 0 EC-1 0.0 ft $000 $0.00 aggregate base or drainage stone 1.0 in d 50.0 ft L 8.0 ft W 35.0 ton 335.1)0 $1225.00 1 mein height of dam et toe 0 ft cut at dam 0 ft height 04 dem at face 0 ft cut at high aide 0 ft length of dam 250 0 length of cut 0 ft top width 0 ft width of cut 0 ft (cony.MI vol) 0.0 cy (cut vol) 0.0 ey $1300 length of epdMay 0 ft (cy est) 0.0 width of speMay 0 ft (spilMay stone tons) 0 (Price of base) $0 050.00 50.00 banal collars 0 baffle length 0 ft $000 trees shrubs 2 ea $150.00 $300.00 seedlings 35 on $50.00 $1,750.00 underdram(LF) 0 es $5.00 7500 biofitter toil mix(Cr 75 fl $5.00 0375.00 37 cy 538.00 $1,406.00 trash rack/anti vortex devices Oft $1.500.00 $0.00 maintenance access road(LF) 240 ft $50.00 $12,000.00 rprrsP.Placed depth 0 ft length 0.0 ft width 0.0 (tons) 0 survey and Myatt(price per 0.1 mi.) acres 1 basins 2 00.00 .medication $100.00 medication $500.00 as-built tlrsawgs leer feciay) 1 ea $2.000.00 32,000.00 materiels testing(per facility) 1 ea $2,000.00 $2.000.00 compaction testing(per dam) 1 es $5.00000 05,00000 manufactured facilities(attach manufacturer's or contractor's price as a base) __..._....... ___. oast wan 028,05656 .00 Prof mgmt $4.208.40 contingency $3.226.44 Total $35,500 7/122013 Internal Use Only / I Jl Date Received: / 1 ! Fee Paid: ( egr*:-%�of AI C 6 r=1t Received by: { `s - , Intake: Forward to Management Analyst ®�� + INIIIIir; .) ) 4 frl$GISItP (7 Ld Cf. s;.. ti(,a�. f i5 1 - ,.a ✓ Ir J • BOND ESTIMATE REQUEST ' ,i APPROVED PROJECT PLAN TITLE: (Title on the approve plan from which the estimate will be prepared.) 1-'4 oc{y ScIi / All parcels in the project, including any off-site work if easements are not provided,and current owners. Use a separate sheet if more owners are required. Owner and tax map information must be correct, and plans must be approved prior to bond estimates being prepared. (vt V TAX MAPs/PARCELs: '71'44/- /5 OWNER'S NAM C• I\ C " ✓ W SIGNATURE: _ A im date:l0/ ZV/( TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: The requested estimates are; . 1 Erosion& Sediment Control per Water Protection Ordinance section 17-207 igr Stormwater Management per Water Protection Ordinance section 17-306 ❑ Subdivision (roads,drainage, etc.)per Subdivision Ordinance section 14-435; & Water& Sewer per Subdivision Ordinance section 14-435; $250 fee required The estimate must be sent to the owner. Please provide contact information. EMAIL: I Ns c( Ca C.r0SS l'.'(;GCt;S v• - C ow\ AND .� ce- ( ccit t'4 5'-..�? t n ee V i')i •(CM OR REGULAR MAIL ADDRESS fr 1 )kid ') , n;--At'' .I, f g�� s--0:.," , ? ix 4 ) x i ' ' P ,t4 t..,,ice° 1 4 k p/d,,,, a_,_ ,,,,,. r4, 6.0„.? __---0,_ ,, /k5 .; ,/ 6 &1) c� ( ,, tot V - _.. iaekti 1 S Revised 11/1/2011 , 1/43) pLej)..,2s1_ 0_,E)-4—(_/1 /1"-\,) 1 (i)