Loading...
HomeMy WebLinkAboutWPO201300033 Correspondence WPO VSMP 2014-08-07 From: Scott Collins [mailto:scott(acollins-engineering.com] Sent:Thursday, August 07, 2014 1:11 PM To: Hunter McCardle Cc: Renee Henslee; Travis Miller(tmiller(a>peabodyschool.orq) Subject: RE: Peabody Amendment This should be able to be completed with a letter of revision. There is a $100 review fee with the application, but it's pretty straight forward. If we submit an exhibit along with the approval letter from VDOT,that should take care of it. Scott From: Hunter McCardle fmailto:hmccardlePwaterstreetstudio.nett Sent:Thursday,August 07,2014 1:09 PM To:Scott Collins Cc: Renee Henslee;Travis Miller(tmiller@peabodvschool.org) Subject: Peabody Amendment Scott, We received a call from the County saying that our construction parking along Southern Parkway is not in compliance with the site plan. We asked VDOT if we could place the stone there after the site plan approval. The County said we would be fined if we don't gain approval for this. Dennis Seale at VDOT sent an email to the County inspector saying that they are fine with the stone there, but the County is now requiring a site plan amendment in order for us to keep it until the end of construction. Our question to you is two-fold: 1) Do you know if this can be handled as a Letter of Revision vs.Site Plan Amendment? 2) Can you do this for us by the end of next week? Please let me know if you have any questions. Thanks, Hunter McCurdle PLA ASIA waterstreet 418 East Main Street Charlottesville VA 22902 434.295.8177 www.waterstreetstudio.net facebook I twitter 2 Jonney Otto From: Hunter McCardle[hmccardle@waterstreetstudio.net] Sent: Tuesday, September 30, 2014 1:48 PM To: Jonney Otto Cc: Travis Miller(tmiller@peabodyschool.org); Renee Henslee; bradbbx@earthlink.net;Vaughn Tomlin (vtomlin@coleman-adams.com) Subject: FW: Peabody Amendment Attachments: Letter_of Revision_Application.pdf; Letter of revision#1.docx; Letter of Revision Exhibit.pdf; 14_07313_VDOT Entrance-rev.pdf Johnny, I understand that the County thinks we are still out of compliance with the construction parking along Southern Parkway. After our last meeting we submitted a L.O.R.to the County to address the issue. The fee has been paid and the attached documents submitted. We should be in compliance. We will be removing the construction parking in the next two weeks. Thank you and please let me know if you have any questions. Thanks, Hunter From: Scott Collins [mailto:scottC0�collins-enaineering.com] Sent: Monday, August 11, 2014 7:38 AM To: Hunter McCardle Cc: Renee Henslee; Travis Miller(tmiller(apeabodyschool.orq); Jenni Pack; Adam Long Subject: RE: Peabody Amendment Hunter- Attached is the application, narrative, and exhibit. All we need is the application signed and the$100 submittal fee and we can submit it. 4 copies of the exhibit gets submitted with the request(11x17)size. If you have any additional VDOT correspondence,that would be good to include as well. Thx. Scott From: Hunter McCardle [mailto:hmccardlePwaterstreetstudio.net] Sent:Thursday,August 07,2014 1:42 PM To:Scott Collins Cc: Renee Henslee;Travis Miller(tmillerc peabodvschool.org) Subject: RE: Peabody Amendment Thanks Scott. I just spoke to Dennis again and the other thing we have asked of him is to approve an egress only drive where the current construction entrance is located. Attached is a quick drawing that he has approved. He just mentioned that if we are getting approval for the construction parking,that we should throw this in the mix to the county as well. I can ask Dennis for both approval letters and will forward them to you. Thanks for your quick response and again, please let me know if you have any questions and what else you need from us. Thanks, Hunter 1