Loading...
HomeMy WebLinkAboutWPO201300033 Bond Estimates Bond Estimate 2013-07-12Peabody School WPO file number: WP0201300033 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed site clearing permanent diversion or ditch 0 ft $13.00 $0.00 standard manhole frame top (not inlet) 0 ea $500.00 $0.00 manhole structure (per ft. rise) 0 ft $450.00 $0.00 pipe, mig, mp(15 to 48') 0.0 in 0ES -1,2 0EC -1 0.0 ft $0.00 $0.00 aggregate base or drainage stone 1.0 in d 50.0 ft L 8.0 ft w 35.0 ton $35.00 $1,225.00 1 basin height of dam at toe 0 ft cuf at dam 0 ft height of dam at face 0 ft cut at high side 0 ft length of dam 260 ft length of cut 0 ft top width 0 ft width of cut 0 ft (comp. fill voil 0.0 cy (cut vol) 0.0 cy $13.00 length of spillway 0 ft (by set) 0.0 width of spillway 0 ft (spillway some tons) 0 $50.00 $0.00 (price of base) $0 barrel collars 0 baffle length 0 ft $0.00 Vass 2 as $150.00 $300.00 shrubs 35 as $50.00 $1,750.00 seedlings 0 as $5.00 $0.00 underdrain (LF) 75 ft $5.00 $375.00 Witter soil mix (C1) 37 cy $38.00 $1,406.00 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 maintenance access mad (Li 240 ft $50.00 $12,000.00 np -rap, placed depth 0 ft length 0.0 ft width 0.0 (tans) 0 $60.00 $0.00 umey and layout (price per 0.1 mi.) acres 1 basins 2 $1,500.00 mobilization $500.00 as -built drawings (per facility) 1 as $2,000.00 $2,000.00 materials testing (per facility) 1 ea $2,000.00 $2,000.00 compaction testing (per dam) 1 as $5,000.00 $5,000.00 manufactured facilities (attach manufacturer s or contractors price as a base cost sum $28,056.00 prof mgmt $4,208.40 contingency $3,226.44 Total $35,500 7/12/2013 Peabody School WPO file number: WP0201300033 Erosion and Sediment Control Bond Estimate Item Item Number stablization (PS, TS) cut at dam sill fence (SF) 2 ft safety fence (SAF) 2 ft diversion (DD, FD, RWD) length of cut 1 temporary sediment trap (ST or CIP) 2 ft width of cut height of dam at toe 44.4 cy height of dam at face 48.1 cy length of dam (cy est) top width 3 ft (Comp. fill vol) 3.33333 length of spillway cut at dam width of spillway 1 temporary sediment trap (ST or CIP) cut at high side 2 ft height of dam at toe length of cut height of dam at face 2 ft length of dam 5 ft top width (cut Vol) (Comp. fill vol) loft length of spillway 41.9 width of spillway silt fence inlet protection (IP) 1.11111 stone inlet protection (IP) width outlet protection (OP) length channel (SCC, matted) length check dam depth in channel construction entrance (CE) 0 ft ash rack 0.0 ft paved construction entrance (tons) rip-rap, placed depth traps and basins width survey and layout (price per 0.1 mi.) acres mobilization stream crossing (computed independently) 2 f cut at dam 2 f 2 ft cut at high side 2 ft 50 ft length of cut 50 ft 2 ft width of cut 5 ft 44.4 cy (cut Vol) 48.1 cy loft (cy est) 63.0 3 ft (spillway stone tons) 3.33333 1 ft cut at dam 1 ft 1 ft cut at high side 2 ft 60 ft length of cut 60 ft 2 ft width of cut 5 ft 15.6 cy (cut Vol) 36.7 cy loft (cy est) 41.9 1 ft (spillway stone tons) 1.11111 0 ft width 0 ft 0 ft width 0 ft 0 ft channel width 0 ft 0 ft length 0.0 ft 0.0 (tons) 0 1 traps and basins 2 No. Unit Unit Cost Cost $700.00 (installed) $0.00 2.3 acres $5,000.00 $11,400.00 800.0 ft $5.00 $4,000.00 400.0 ft $5.00 $2,000.00 400 ft $13.00 $5,200.00 $13.00 $50.00 $985.19 I= $50.00 $599.63 7 $100.00 $700.00 0 $200.00 $0.00 3 $0.00 $0.00 $0.00 1 $0.00 $0.00 1 $2,000.00 $2,000.00 1 $2,000.00 $2,000.00 0 $3,500.00 $0.00 f $1,500.00 $500.00 cost sum $30,884.81 prof mgmt $4,fi32.72 contingency $3,551.75 Total $39,070 Method for volume (tenth) x(total widl assume face at 2: total width = 3x(tot average height = ( Method for volume gamh) x(total widl assume face at 2: total width = 3x(tot average height = ( 7/12/2013