Loading...
HomeMy WebLinkAboutSUB201700140 Review Comments Road Plan and Comps. 2018-09-07Short Review Comments Report for: SUB201700140 SubApplication Type: OLD TRAIL VILLAGE BLOCK 22--ROAD PLANS New Private Use Road Plan Date Completed:09/12/2018 Reviewer:Emily Cox CDD Engineering Review Status:See Recommendations Reviews Comments:- sent to Ana 9/12/18 Division: Date Completed:11/15/2017 Reviewer:Emily Cox CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:10/09/2017 Reviewer:Megan Nedostup CDD Planning Review Status:Requested Changes Reviews Comments:1. Sidewalk/planting strip and sidewalk on one side of the street exceptions have been requested. At this time planning staff cannot support these requests. Road plans should not be approved until these exceptions have been granted, or the requirements have been met. 2. Sidewalks and street trees should be bonded with the road plans. 3. Street tree species and size should be stated on the plans for bonding purposes. Division: Date Completed: Reviewer:Adam Moore VDOT Review Status:Pending Reviews Comments: Division: Date Completed: Reviewer:Jeremy Lynn ACSA Review Status:Pending Reviews Comments: Division: Date Completed:09/23/2017 Reviewer:Robbie Gilmer Fire Rescue Review Status:No Objection Reviews Comments:Based on plans dated 9/13/17. No comments or objections. Division: Date Completed:09/22/2017 Reviewer:Elise Kiewra CDD GIS Review Status:Requested Changes Reviews Comments:The applicant should use the correct spelling for "Addle Hill Road" showing "Addle Hill" as 2 words. Also due to the amount of times the word "Stone" has been used to begin road names (22 times) we cannot approve another road name using "Stone" to begin a road name. The same reasoning would eliminate "Broadwick Street" from the approved road name list. "Broad" has been used 8 times to begin a road name. Also "Waverly Road" is not acceptable because there is already an existing "Waverly Drive". The applicant should contact this office with a list of three (3) additional road names for each of the above names for approval. "Astell Street" is an acceptable road name. see uploaded letter in CV- Elise 10/3/17 Division: Page:1 of 3 County of Albemarle Printed On:September 13, 2018 see uploaded letter in CV- Elise 10/3/17 Date Completed:02/09/2018 Reviewer:Emily Cox CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:01/30/2018 Reviewer:Megan Nedostup CDD Planning Review Status:Requested Changes Reviews Comments:1. Sidewalk/planting strip and sidewalk on one side of the street exceptions have been requested. At this time planning staff cannot support these requests. In addition to these request, a variation from the ZMA application plan is required to make this change. Road plans should not be approved until these exceptions have been granted, or the requirements have been met. Division: Date Completed: Reviewer:Willis Bedsaul VDOT Review Status:Pending Reviews Comments: Division: Date Completed: Reviewer:Richard Nelson ACSA Review Status:Pending Reviews Comments:Road and Utility Plan is currently under water and sewer review. Division: Date Completed:02/08/2018 Reviewer:Shawn Maddox Fire Rescue Review Status:No Objection Reviews Comments:No comments or objections. SNM Division: Date Completed:01/25/2018 Reviewer:Elise Kiewra CDD E911 Review Status:Requested Changes Reviews Comments:see uploaded letter, per site plan dated 9/11/17 Division: Date Completed:03/23/2018 Reviewer:David James CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:03/26/2018 Reviewer:Megan Nedostup CDD Planning Review Status:Requested Changes Reviews Comments:1. Sidewalk/planting strip and sidewalk on one side of the street exceptions have been requested. David Benish is reviewing the requests and will be scheduling them for BOS approval. Road plans should not be approved until these exceptions have been granted. Division: Date Completed:03/06/2018 Reviewer:Willis Bedsaul VDOT Review Status:No Objection Reviews Comments: Division: Date Completed: Reviewer:Richard Nelson ACSA Review Status:Pending Road and Utility Plan is currently under water and sewer review. Division: Page:2 of 3 County of Albemarle Printed On:September 13, 2018 Reviews Comments:Road and Utility Plan is currently under water and sewer review. Date Completed:02/28/2018 Reviewer:Shawn Maddox Fire Rescue Review Status:No Objection Reviews Comments:Fire Rescue has no objections. SNM Division: Date Completed:03/01/2018 Reviewer:Elise Kiewra CDD GIS Review Status:No Objection Reviews Comments:per site plan dated 1/17/18 Division: Date Completed:06/13/2018 Reviewer:Emily Cox CDD Engineering Review Status:Requested Changes Reviews Comments: Division: Date Completed:06/04/2018 Reviewer:Megan Nedostup CDD Engineering Review Status:No Objection Reviews Comments: Division: Date Completed: Reviewer:Adam Moore VDOT Review Status:Pending Reviews Comments: Division: Date Completed: Reviewer:Jeremy Lynn ACSA Review Status:Pending Reviews Comments: Division: Date Completed:05/25/2018 Reviewer:Shawn Maddox Fire Rescue Review Status:No Objection Reviews Comments:Fire Rescue has no objections. SNM Division: Date Completed:05/31/2018 Reviewer:Elise Kiewra CDD GIS Review Status:No Objection Reviews Comments:per site plan dated 5/23/18 Division: Date Completed:07/03/2018 Reviewer:Emily Cox CDD Engineering Review Status:See Recommendations Reviews Comments:- Approval pending approval of WPO201700071 Amendment 1. - Also pending ACSA approval letter. Division: Date Completed:09/07/2018 Reviewer:Emily Cox CDD Engineering Review Status:Approved Reviews Comments: Division: Page:3 of 3 County of Albemarle Printed On:September 13, 2018 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage plan review Project title: Old Trail Village Block 22 — Road Plans Project file number: SUB201700140 Plan preparer: Roudabush, Gale & Associates Owner or rep.: March Mountain Properties LLC Date Received: Sept 25, 2017 Jan 18, 2018 (Rev. 1) Feb 20, 2018 (Rev. 2) Date of comments: Nov 15, 2017 Feb 9, 2018 (Rev. l) March 23, 2018 (Rev. 2) Reviewer(s): Emily Cox (Rev. l ) David James (Rev.2) [bledbetter@roudabush. com] [dave@oldtrailvillage. com] [dj ames@albemarl e. org] Engineering has reviewed your plans and has the following comments: 1. WPO Plan must be approved before road plan can be approved. Rev. 1: Comment not addressed. 2. Fee paid appears to have been $430. This should have been $720 since it was the first submission of this set of road plans. Please provide the difference ($290). Rev. 1: Application and fee was NOT paid for this submission. With each road plan submission, there should be another application and fee. Rev. 2: Check with intake, followup with Jennifer. 3. Update the TMP on the cover sheet. Rev. 1: Comment addressed. 4. Label all existing streets including their ROW and DB & PG #'s. Rev. 1: Comment not addressed. Rev. 2: Addressed. 5. Lnsure roau pian matches site plan and WPO plan. Rev. 1: Comment still valid. Rev. 2: Comment still valid. 6. As commented on the WPO plan, remove road and lot from the buffer. Also, the grading for SWM can only occur in the landward 50 ft of the buffer. Rev. 1: Comment mostly addressed, however the 660 contour was still outside of the landward 50' of the buffer near the SWM facility. Rev. 2: Addressed. 7. Remove contour lines that are going through proposed houses. Rev. 1: Comment addressed. 8. Provide storm pipe capacity/velocity calculations, not just inlet calculations. Rev. 1: Provide the velocity in the pipes. Rev. 2: Acknowledged. Please submit the calculations. I didn't receive a hardcopy. 9. Provide design showing the proposed roadway pavement section can handle the proposed traffic. Rev. 1: Applicant stated that pavement design to be submitted separately. Please provide. Rev. 2: Acknowledged. Show pavement section. Engineering Review Comments Page 2 of 3 10. Show all pavement markings (stop bars, etc.) and signs (speed limit). Rev. 1: Stop bars should be provided at every stop sign. Rev. 2: Addressed. 11. Ensure all ADA requirement are met. Placement of CG -12's should match VDOT's requirements. Rev. 1: Ensure the ADA ramps match the site plan comments. Add CG -12's on Golf Drive to cross Addle Hill Rd. Rev. 2: Addressed. 12. VDOT entrance permit will be required for Golf Drive. Rev. 1: Comment still valid. Rev. 2: Comment still valid. 13. Min. K value for sag vertical curve with design speed of 25 MPH is 26. There are 2 sag curves proposed in this plan with K values less than 26. Please explain or revise. Rev. 1: Comment addressed. 14. RPS' I • P11-1— chnw the WPO plan # where referenced on Sheet 9. Rev. 2: Addressed. 15. Rev. 1: Provide detail for the end road markers. Rev. 2: Addressed. 16. Rev. 2: Make sure sheets are aligned properly. Sheets 12, 14, 19 were upside down. 17. Rev. 2: Include County's General Notes for Private Roads. 18. Rev. 2: Show sight distance easements for those outside of the street ROW. Sight distance must be free of any visibility obstructions (i.e trees, structures). 19. Rev. 2: The minimum ROW (or easement width) is 30' (Design Standards Manual). 20. Rev. 2: Sidewalks used with roll-top curbing shall be 7 inches thick (VDOT RDM B(1) -4.G). Show detail, Buffer Space W= 5 ft.� 3 ft min. 6 ft m1n. w/trees i 3 ft min. Plant 11ne i 7 In. min. next to roll top curb 4 In tyin. elsewhere i i lconpomea sueyraeel • D p D 11 t the uMify space Is paved. constructlon shall be on compacted subgrode and tte th+ckness shall match that of the sldewolk. rcwever. the area will not be considered port of the minlmum width required for sldewalk. rf trees are planted In paved pedestrlon areas, they shall be planted In tree wells that Include r, plonting grote.opproved by the Distrld Administrator's Designee. However. the width of .,. dewalk passing the tree well shall be at least 4 feet In width FIGURE 6 — DETAIL BACK OF CURBS 21. Rev. 2: In general, provide callouts to ref, details sheet (Recommended, not required). 22. Rev. 2: Sheet 8 — Show the 678' contour for lot 34. 23. Rev. 2: Sheet 9 — The 668' contour should tie into the wall near the biofilter. 24. Rev. 2: Sheet 15 — a. Show design speed for each road. b. Provide cut/fill volume balances for the road sections. 25. Rev. 2: Provide CD -1,2 at sag location where Avondale Ln & Astell St intersect. 26. Rev. 2: Lots 18 & 34, the driveway needs to be 18' min. on sides as well. 27. Rev. 2: Show retaining wall TW & BW elevations at each turn or bend. Show wall (max) height. Engineering Review Comments Page 3 of 3 28. Rev. 2: Provide transitioning detail (20' minimum) for roll-top curbing in front of any inlets. 29. Provide driveway entrance details where roll-top curb is being proposed for all driveways. Refer to page B(1)-28 http://www.extranet.vdot.state.va.us/locdes/Electronic Pubs/2005%20RDM/AppendB%281%29.pdf Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforms.asp?department--cdengno File: SUB201700140 Review Comments Road Plan and Comps. 3-2018.docx COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage plan review Project title: Old Trail Village Block 22 — Road Plans Project file number: SUB201700140 Plan preparer: Roudabush, Gale & Associates [bledbetter@roudabush.com] Owner or rep.: March Mountain Properties LLC [dave@oldtrailvillage.com] Date Received: 25 Sept 2017 Rev. 1 Received: 18 Jan 2018 Date of comments: 15 Nov 2017 Rev. 1 Comments: 09 Feb 2018 Bill, We have reviewed the above referenced plans and have the following comments: Engineering (Emily Cox) 1. WPO Plan must be approved before road plan can be approved. Rev. 1: Comment not addressed. 2. Fee paid appears to have been $430. This should have been $720 since it was the first submission of this set of road plans. Please provide the difference ($290). Rev. 1: Application and fee was NOT paid for this submission. With each road plan submission, there should be another application and fee. 3. Update the TMP on the cover sheet. Rev. 1: Comment addressed. 4. Label all existing streets including their ROW and DB & PG #'s. Rev. I: Comment not addressed. 5. Ensure road plan matches site plan and WPO plan. Rev. 1: Comment still valid. 6. As commented on the WPO plan, remove road and lot from the buffer. Also, the grading for SWM can only occur in the landward 50 $ of the buffer. Rev. 1: Comment mostly addressed, however the 660 contour was still outside of the landward 50' of the buffer near the SWM facility. 7. Remove contour lines that are going through proposed houses. Rev. 1: Comment addressed. 8. Provide storm pipe capacity/velocity calculations, not just inlet calculations. Rev. 1: Provide the velocity in the pipes. 9. Provide design showing the proposed roadway pavement section can handle the proposed traffic. Rev. 1: Applicant stated that pavement design to be submitted separately. Please provide. 10. Show all pavement markings (stop bars, etc.) and signs (speed limit). Rev. 1: Stop bars should be provided at every stop sign. 11. Ensure all ADA requirements are met. Placement of CG -12's should match VDOT's requirements. Rev. 1: Ensure the ADA ramps match the site plan comments. Add CG -12's on Golf Drive to cross Addle Hill Rd. 12. VDOT entrance permit will be required for Golf Drive. Rev. 1: Comment still valid. 13. Min. K value for sag vertical curve with design speed of 25 MPH is 26. There are 2 sag curves proposed in this plan with K values less than 26. Please explain or revise. Rev. 1: Comment Engineering Review Comments Page 2 of 3 addressed. 14. Rev. 1: Please show the WPO plan # where referenced on Sheet 9. 15. Rev. 1: Provide detail for the end road markers. Planning (Megan Yaniglos) 1. Sidewalk/planting strip and sidewalk on one side of the street exceptions have been requested. At this time, planning staff cannot support these requests. Road plans should not be approved until these exceptions have been granted, or the requirements have been met. Rev. 1: Comment not addressed. 2. Sidewalks and street trees should be bonded with the road plans. Rev. 1: Comment addressed. 3. Street tree species and size should be stated on the plans for bonding purposes. Rev. 1: Comment addressed. VDOT (Adam Moore) 1. See attached comment letter dated 10/13/17. Rev. 1: See attached comment letter dated 02/07/2018. Fire Rescue (Shawn Maddox) 1. No objection. Rev. 1: No Objection. ACSA (Jeremy Lynn) 1. Still under review. Did not receive comments yet. Rev. 1: Still under review. GIS (Elisa Kiewra) 1. See attached comment letter dated 10/03/17. Rev. 1: See attached comment letter dated 01/25/2018. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Engineering Review Comments Page 3 of 3 Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforms.asp?department--cdengno If you have any questions or concerns, please contact me either by email (ecox@albemarle.org) or by phone at 434-296-5832 ext. 3565. Sincerely, Emily Cox, P.E. Civil Engineer II Stephen C. Brich, P.E. Commissioner COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 Orange Road Culpeper Virginia 22701 February 7, 2018 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Emily Cox, P.E. Re: Old Trail Village Block 22 — Road Plan SUB -2017-00410 Review #2 Dear Ms. Cox: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Roudabush, Gale, & Associates, revised 17 January 2018, and offers the following comments: 1. The provided turn lane warrant analysis could not be followed. How was the advancing volume of 90 vehicles per day calculated? The warrant analysis is based on the peak (VPD) and requires advancing and opposing volumes, and the percent left turns, which is the number of left turns during the peak hour divided by the advancing volume during the peak hour. Both a.m. and p.m. peak hours should be analyzed. Provided clear calculations and/or assumptions used. 2. Please confirm that the design speed of Golf Drive is 25 mph and not 30 mph. If it is 30 mph, the entrance will require a further intersection sight distance. Please provide two copies of the revised plan along with a comment response letter. If further information is desired, please contact Justin DeeI at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. Moore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING APPLICATION# TMP: County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 PLAN REVIEW COMMENTS - E911 SUB201700140 055E0 -01-00-000A1 DATE: 1/25/2018 FROM: Elise Kiewra ekiewra@albemarle.org Geographic Data Services (GDS) www.albemarle.org/ads (434) 296-5832 ext. 3030 The following road names will need to be changed: LORD ALBEMARLE STREET CARLTON GARDENS WAY The following road names are acceptable: ASTELL STREET HEDWORTH STREET LORD ALBEMARLE STREET and CARLTON GARDENS WAY will need to be changed as they exceed 16 characters and spaces. Per Part I, Section 4-c of the County's Road Naming and Property Numbering Manual (page 7 of PDF). "A road name shall not exceed more than sixteen (16) characters including spaces and the designator's abbreviation." We recommend providing three (3) candidate names for each road to our office for review, in case your first choices are not acceptable. A PDF version of the Ordinance and Manual can be found here: https://www.albemarle.org/upload/images/Forms Center/Departments/Geographic Data Service s/Forms/Road Naming and Property Numbering Ordinance and Manual.pdf Please consult the County's Road Name Index to check your road names prior to submittal. The Index can be found here: http://www.albemarle.org/albemarle/upload/images/webapps/roads/ Parcel and mapping information can be found here: http://gisweb.albemarle.org/ Reminder• The developer should contact the Crozet Post Office to determine a location for a cluster box unit (CBU). The Crozet Post Office is no longer able to provide curbside delivery. For questions concerning this, contact Keith Smarte, the Crozet Postmaster, at 823-9847. APPLICATION# TMP: County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 PLAN REVIEW COMMENTS - E911 SUB201700140 055E0 -01-00-000A1 DATE: 1/25/2018 FROM: Elise Kiewra ekiewra@albemarle.org Geographic Data Services (GDS) www.albemarle.org/ads (434) 296-5832 ext. 3030 The following road names will need to be changed: LORD ALBEMARLE STREET CARLTON GARDENS WAY The following road names are acceptable: ASTELL STREET HEDWORTH STREET LORD ALBEMARLE STREET and CARLTON GARDENS WAY will need to be changed as they exceed 16 characters and spaces. Per Part I, Section 4-c of the County's Road Naming and Property Numbering Manual (page 7 of PDF). "A road name shall not exceed more than sixteen (16) characters including spaces and the designator's abbreviation." We recommend providing three (3) candidate names for each road to our office for review, in case your first choices are not acceptable. A PDF version of the Ordinance and Manual can be found here: https://www.albemarle.org/upload/images/Forms Center/Departments/Geographic Data Service s/Forms/Road Naming and Property Numbering Ordinance and Manual.pdf Please consult the County's Road Name Index to check your road names prior to submittal. The Index can be found here: http://www.albemarle.org/albemarle/upload/images/webapps/roads/ Parcel and mapping information can be found here: http://gisweb.albemarle.org/ Reminder• The developer should contact the Crozet Post Office to determine a location for a cluster box unit (CBU). The Crozet Post Office is no longer able to provide curbside delivery. For questions concerning this, contact Keith Smarte, the Crozet Postmaster, at 823-9847. 11 County of Albemarle Department of Community Development`_ 401 McIntire Road, North Wing Charlottesville, Virginia 22902 PLAN REVIEW COMMENTS - E911 APPLICATION#: SUB201700140 TMP: 055E0 -01-00-000A1 DATE: 10/3/2017 FROM: Elise Kiewra ekiewra@albemarle.orq Geographic Data Services (GDS) www.albemarle.ora/ads (434) 296-5832 ext. 3030 The following road names will need to be changed: STONELEIGH PLACE WAVERLY ROAD BROADWICK STREET Note: ADDLEHILL ROAD is incorrectly shows as one word, please correct to "ADDLE HILL ROAD" The following road names are acceptable: ASTELL STREET WAVERLY ROAD will need to be changed per the ordinance below as a WAVERLY DRIVE already exists. Per Part I, Section 4-a of the County's Road Naming and Property Numbering Manual (page 6 of PDF): "A proposed road name which duplicates an existing or reserved road name in Albemarle County or the City of Charlottesville shall not be approved. An exception may be made for cul-de-sacs which have the same name as the road from which they originate (example: "Amberfield Court" which originates from "Amberfield Drive")." STONELEIGH PLACE and BROADWICK STREET will need to be changed per the ordinance below. Per Part I, Section 4-i of the County's Road Naming and Property Numbering Manual (page 7 of PDF). "No proposed road name shall be approved which begins with a word that appears as the first word in five or more official road names." 1. STONE AND BROAD are the first word in over 5 road names in the County. We recommend providing three (3) candidate names for each road to our office for review, in case your first choices are not acceptable. A PDF version of the Ordinance and Manual can be found here: https://www.albemarle.org/upload/images/Forms Center/Departments/Geographic Data Service s/Forms/Road Naming and Property Numbering Ordinance and Manual.pdf Please consult the County's Road Name Index to check your road names prior to submittal. The Index can be found here: http://www.albemarle.org/albemarle/upload/images/webapps/roads/ Parcel and mapping information can be found here: http://gisweb.albemarle.org/ Reminder• The developer should contact the Crozet Post Office to determine a location for a cluster box unit (CBU). The Crozet Post Office is no longer able to provide curbside delivery. For questions concerning this, contact Keith Smarte, the Crozet Postmaster, at 823-9847. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage plan review Project title: Old Trail Village Block 22 – Road Plans Project file number: SUB201700140 Plan preparer: Roudabush, Gale & Associates [bledbetter@roudabush.com] Owner or rep.: March Mountain Properties LLC [dave@oldtrailvillage.com] Date Received: 25 Sept 2017 Date of comments: 15 Nov 2017 Bill, We have reviewed the above referenced plans and have the following comments: Engineering (Emily Cox) 1. WPO Plan must be approved before road plan can be approved. 2. Fee paid appears to have been $430. This should have been $720 since it was the first submission of this set of road plans. Please provide the difference ($290). 3. Update the TMP on the cover sheet. 4. Label all existing streets including their ROW and DB & PG #’s. 5. Ensure road plan matches site plan and WPO plan. 6. As commented on the WPO plan, remove road and lot from the buffer. Also, the grading for SWM can only occur in the landward 50 ft of the buffer. 7. Remove contour lines that are going through proposed houses. 8. Provide storm pipe capacity/velocity calculations, not just inlet calculations. 9. Provide design showing the proposed roadway pavement section can handle the proposed traffic. 10. Show all pavement markings (stop bars, etc.) and signs (speed limit). 11. Ensure all ADA requirements are met. Placement of CG-12’s should match VDOT’s requirements. 12. VDOT entrance permit will be required for Golf Drive. 13. Min. K value for sag vertical curve with design speed of 25 MPH is 26. There are 2 sag curves proposed in this plan with K values less than 26. Please explain or revise. Planning (Megan Yaniglos) 1. Sidewalk/planting strip and sidewalk on one side of the street exceptions have been requested. At this time, planning staff cannot support these requests. Road plans should not be approved until these exceptions have been granted, or the requirements have been met. 2. Sidewalks and street trees should be bonded with the road plans. 3. Street tree species and size should be stated on the plans for bonding purposes. VDOT (Adam Moore) 1. See attached comment letter dated 10/13/17. Fire Rescue (Robbie Gilmer) 1. No objection. Engineering Review Comments Page 2 of 2 ACSA (Jeremy Lynn) 1. Still under review. Did not receive comments yet. GIS (Elisa Kiewra) 1. See attached comment letter dated 10/03/17. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County’s Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County’s Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre-construction conference. Applicants will need to complete the request for a pre-construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre-construction conference will be scheduled with the County inspector. At the pre-construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforms.asp?department=cdengwpo If you have any questions or concerns, please contact me either by email (ecox@albemarle.org) or by phone at 434-296-5832 ext. 3565. Sincerely, Emily Cox, P.E. Civil Engineer II