HomeMy WebLinkAboutSUB201400185 Bond 2018-09-129//'.�,7/j,
Qeu Received: L Fee Peid: � � A
Received by. L l G . ,
IrAahe: Forward le , 2aaje,aea! AnnLyse
jr
BOND INSPECTION REQUEST
APPROVED PLAN # U6 �Q Qp jgC
PROJECT NAME: f tI�4 — p�� �rtyl5
(As listed on the appra plan)
This is to request that an inspection be performed by the County. Where fees are assessed, a fee is required for
each inspection. Please check the inspections requested.
❑ VSMPNESCP Erosion Control, Stormwater Management and/or Mitigation per
Water Protection Ordinance section 17-207 & 208 $250
0 Subdivision (roads, drainage, etc.) per Subdivision Ordinance section 14-435 and 14438: S269
11 Water & Sewer per Subdivision Ordinance section 14435
$269
❑ Site Development Performance bond (Incomplete Site Work & Landscape Maintenance) $301
TOTAL FEES 5 3 $
Inspections for the purposes of bond reduction or release will require a separate fee for each bond
Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville,
VA 22902, Attention: Management Analyst - Phone 434-296-5832. Fax 434-972-4126. All roads and
stormwater facilities will require construction record drawings, inspection reports. and completion processes
through VDOT or DEQ. Bonds will not be reduced or released without record drawings and inspection
documentation per the state requirements and county's published procedures. A minimum 20% of the original
posting is held until acceptance of all bonded improvements For Site Development Performance bonds, if
landscape installation is part of the bonded incomplete site work, a request for reduction should only be made
once all site work is complete.
The revised estimate should be sent to:
EMAIL: rn C am
OR REGULAR MAIL. ADDRESS: Zap C�t4rr+t .Slti�C _rt
1---11 - —
'- ature of Orvner/Developer
Print lame —�-� --_
Date
Rcused 7415 2014. 7120-2015, 11 3.2015