HomeMy WebLinkAboutSDP201800039 Review Comments Initial Site Plan 2018-07-02COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 July 2, 2018 Justin Shimp, P.E. Shimp Engineering 201 E. Main Street, Suite 201 Charlottesville, VA 22902 iustina.shimn-eneinerrine.com RE: SDP201800039 Pantops Corner — Initial Site Plan Dear Mr. Shimp: The Site Review Committee has reviewed the development proposal referenced above. Initial comments from the following divisions of the Department of Community Development and other agencies, as applicable, are attached: Albemarle County Planning Services (Planner) Albemarle County Engineering Services (Engineer) (attached) Albemarle County Information Services (E911) (attached) Albemarle County Building Inspections (attached) Albemarle County Architectural Review Board (attached) Albemarle County Department of Fire Rescue (attached) Albemarle County Service Authority (attached) Virginia Department of Transportation Thomas Jefferson Health District (attached) Comments reflect information available at the time the development proposal was reviewed, and should not be considered final. However, the Site Review Committee has attempted to identify all issues that will be required to be resolved prior to Final Site Plan approval. Prior to initial site plan approval a resubmittal of the plan is required. The applicant shall request the project be deferred to allow required revisions. Please contact me at your earliest convenience if you have questions or require additional information. Sincerely, Ltt Cameron Langille Senior Planner Albemarle County Planning Services (Planner) — Cameron Langille, blan ig lle(c-r�,albemarle.org — Required changes: Prior to initial site plan approval, at a minimum, comments 1-5 shall be addressed in a resubmittal. The agent must take action on the initial site plan by Friday July 20, 2018 unless a deferral is requested by the applicant. ARB staff has confirmed that the ARB is expecting a resubmittal to address specific comments (Planning comment #4 below, and ARB comments attached.) Staff highly recommends requesting a deferral in order to allow ample time for revisions and review of the required changes. 1. [32.4.2.1 (f)] The mailing notification fee of $215.00 has not been paid. The fee must be paid prior to Friday, July 20' in order for the initial site plan to be approved. 2. [General Comment] The $100.00 review fee for the Department of Fire & Rescue has not been paid. The fee must be paid prior to Friday, July 20' in order for the initial site plan to be approved. 3. [30.7.4] The site plan shows disturbances to areas of Preserved Steep Slopes that are not permitted. This includes the northeast corner of the hotel parking area and dumpster, retaining wall, and portions of the Pantops Corner Way road entrance onto Route 20. Please revise the site plan so that these features do not encroach into the Preserved Steep Slopes. a. See Engineering comment #2 below for additional details. 4. [ARB] Please see the attached ARB comment letter for items that must be addressed prior to initial site plan approval. The following items must be addressed in a re -submittal: a. Clearly show all utilities and easements on the utility and landscape plans. Provide required planting free of utilities and easements. A separate diagram of the frontage planting that details the utility lines and their easements in varying colors would help clarify the feasibility of the proposed planting. b. Provide large shade trees, 3%2" caliper at planting, 35' on center, along the Rt. 20 side of the site within the bounds of the property. Intersperse ornamentals among the shade trees. c. Provide views (preferably perspectives and site sections) along Rt. 20 to clarify the visibility of the hotel from the street. d. Consider alternate site layout and building footprint to orient the hotel towards Rt. 20 to meet the EC guidelines. 5. [Fire & Rescue] Please see attached comments from Shawn Maddox. Please revise the plans so that Fire & Rescue comments #3 and #4 are satisfactorily addressed. 6. [32.5.1 (c)] Please show all existing utility easements on the drawings. Include a label or call out for each easement stating whether the easement is public or private, the owner of record and the recorded instrument number, and easement width where existing easements are visible on the plans. 7. [32.5.2 (a) and 4.20 (a)] Please amend the building setback notes on Sheet 1 as follows: a. Minimum front setback = 10 feet from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside of the right-of-way. b. Maximum front setback = 30 feet from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside of the right-of-way. c. Side/Rear minimum = primary structure shall be constructed and separated in accordance with the current edition of the Building Code. No maximum side or rear setback. 8. [32.5.2 (a) and 4.20 (a)] Please state the required off-street parking and loading setbacks on Sheet 1. a. Minimum off-street parking/loading front setback = 10 feet from any public street right-of-way. b. Minimum off-street parking/loading setback side and rear setbacks = no off-street parking or loading space shall be located closer than 20 feet to the district boundary. 9. [32.5.2 (a)] Please show all minimum and maximum setback lines of the final site plan site layout drawings. The setbacks should be shown in accordance with Section 4.20 of the Zoning Ordinance. a. The front setbacks for the hotel should be measured from the right-of-way line along Pantops Corner Way. It does not appear to meet the maximum 30' front setback currently. 10. [32.5.2 (a)] There is currently a boundary line adjustment plat under review for these parcels. Please show and label all existing parcel boundaries with dimensions on the final site plan, and update the deed book and page number of the recorded instrument on the plans and the site data table on Sheet 1. Include the revised acreage on Sheet 1. 11. [32.5.2 (a)] Please add the full Action Letter, Proffer Statement, and associated exhibits approved with ZMA2013-02 to the final site plan drawings. These documents are attached to the SRC comment letter. a. Under "Zoning" On Sheet 1, please remove the words "Application Plan" and state "Proffers dated November 26, 2013" next to ZMA2013-02. b. State the ZMA approval date by the Board of Supervisors, December 11, 2013. 12. [32.5.2 (a)] Please state that TMP 78-58G1 lies within the FH Flood Hazard Overlay District on Sheet 1 under "Zoning." 13. [32.5.2 (a)] Please state that portions of TMP 78-58G1 lie within the Managed and Preserved Steep Slopes Overlay District under "Zoning" on Sheet 1. a. Please state that portions of TMP 78-5A and 78-5B lie within the Managed Steep Slopes Overlay District under "Zoning" on Sheet 1. 14. [32.5.2 (b)] Please state the gross square footage of each proposed structure, and proposed acreage of each use on the final site plan. 15. [4.12.4 (a)] The retail parking required is 35 spaces. The number of parking spaces in a parking area may not exceed the number of spaces required by this section by more than twenty (20) percent. 35 required spaces x .2 = 7 additional parking spaces allowed. a. [4.12.5] The total number of parking spaces provided on the parcel where the retail building will be located cannot exceed 42 spaces without approval of a waiver from the Zoning Administrator. Please see Section 18-4.12.2 (c) and 18-14.12.2 (d) for information regarding waiver requests and information that must be submitted. Otherwise, please removed some parking from the retail parcel to comply with the Ordinance. 16. [32.5.2 (h)] Please show the boundaries of the FH Flood Hazard Overlay District on TMP 78-58G1 where visible on the plans. Provide a label and include this feature in the legend. 17. 132.5.2 (b)] No loading spaces are shown on the site plan. One loading space is required for the commercial building, and additional loading spaces must be provided on the hotel parcel in accordance with Section 18- 4.12.13. a. Loading spaces must meet the design standards specified in Section 18-4.12.18 of the Zoning Ordinance. 18. [32.5.2 (b)] No dumpsters are shown near the proposed retail building. In accordance with Section 18-4.12.13 (e), at least one dumpster must be provided on the retail parcel. 19. [4.12.19 and 32.7.9.7 (a)(3)] Please provide a profile view detail with dimensions and materials of the dumpster pad enclosure to verify compliance with the screening requirements contained in the Zoning Ordinance. Please note that fences or other constructed screening measures must be a minimum of six feet (6') in height, as specified in 32.7.9.7 (e). 20. [32.7.3 (b)] Please show the locations of all proposed mechanical equipment and utility hardware. Please provide information so that the agent can verify they will be screened from public view. 21. [32.5.2 (n)] Pedestrian crosswalks and accessible ramps must be provided at all locations within the site where ramps connect sidewalks on opposite sides of vehicular travel ways and streets. a. Please label the dimensions and surface materials in compliance with the County's design standards. 22. 132.5.2 (k)] Please label all existing and proposed sewer and drainage easements by type and include a size/width measurement. For existing easements, state the deed book and page of the recorded instrument. 23. [32.5.2 (1)] Please label all existing and proposed utility easements by type and include a size/width measurement. For existing easements, state the deed book and page of the recorded instrument. 24. [32.5.2 (n)] Please state the proposed surface materials for all parking lots, travel ways, walkways, etc. in a label on the site plan drawings. 25. [32.5.2 (n)] Please state the height of all proposed fences and retaining walls in the labels used on the drawings. Profile view details of all proposed fences, retaining walls, and constructed screening measures will be required with the final site plan. Each will need to show the types of materials used and dimensions. 26. [32.5.2 (e)] Please provide more details about the existing landscape features as described in Section 18- 32.7.9.4(c). a. The Albemarle County Conservation Plan Checklist and Chapter 3.38 of the Virginia Erosion and Sediment Control handbook. The Conservation Plan Checklist will need to be signed by the owners and provided as an exhibit on the final site plan. 27. [32.7.2.31 Please show the proposed sidewalks along Route 250 tying to the existing sidewalks on adjoining parcels/in the Route 250 right of way. The sidewalks are not shown connecting to the adjacent property lines. a. Please clarify whether the proposed sidewalk along Route 20 will connect to the existing sidewalk north and south of the development that is currently within the Route 20 right of way/on private properties. 28. [32.7.2.31 Please provide sidewalks along both sides of Pantops Corner Way and Road B. 29. [32.7.2.2 (f)] Please clarify whether any bicycle lanes are proposed along Road B and Pantops Corner Way. 30. [32.7.9] The landscape schedules do not include a column that states the canopy coverage area per plant species. The canopy area for each species can be found on the Albemarle County Recommended Plants List and Albemarle County Plants Canopy Calculations tables. PDFs of these documents can be accessed through the Department of Community Development webpage: LINK. a. [32.7.9.61 Staff cannot verify if the provided trees meet the minimum 5% canopy required for the parking lot without the canopy figures shown on the drawings. b. [32.7.9.81 Staff cannot verify if the provided trees meet the minimum 10% canopy required for the development without the canopy figures shown on the drawings. 31. [32.7.9.71 Please see ARB comments for landscaping screening requirements that must be addressed prior to final site plan approval. Additional screening comments may be added by Planning during final site plan review. 32. [32.7.9.91 Please add a note to the Landscape plans stating "All landscaping shall be installed by the first planting season following the issuance of the first certificate of occupancy within the development." 33. [32.7.9.91 Please add a note to the Landscape plans stating "All landscaping and screening shall be maintained in a healthy condition by the current owner or a property owners' association, and replaced when necessary. Replacement material shall comply with the final site plan approved landscape plan." 34. [32.7.8 and 4.17] The final site plan lighting plan must meet the minimum requirements of Section 4.17 of the Zoning Ordinance. a. [4.17.4] Please provide a luminaire schedule stating the quantity of each outdoor luminaire proposed, the model number, the fixture type, wattage emission, etc. b. [4.17.4 (a)] Please provide documentation from the manufacturer that all proposed outdoor luminaries exceeding 3,000 lumens are full -cutoff fixtures. c. Please state the pole height of all outdoor luminaires. d. [4.17.4 (b)] Please show foot-candle measurements within the development and along all existing and proposed street right of ways and property boundaries. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half (1/2) foot candle. e. Please add a note to the lighting plan which states "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half footcandle." 35. [32.6.2 (d) and Chapter 14] Please submit an easement plat and application to the County that shows all new easements proposed by the site plan. This includes all new drainage, stormwater, public access easements, etc. The easement plat must be reviewed, approved, and recorded prior to approval of the final site plan. 36. [ZMA201300002,14-234 (E),14-317, and 14-422 (C)] As part of the easement plat application, a public access easement will need to be platted over the Pantops Corner Way and Road B private street right-of-ways. A private street maintenance agreement will need to be approved by the County Attorney and recorded with the easement plat. As required by Proffer #1 of ZMA2013-02, an access easement shall be provided subject to an agreement between the respective property owners to share the cost of maintenance and construction for shared portions of the private road. A template for private street maintenance agreement can be found on the CDD website. 37. [ZMA201300002, 32.7.2.2 (a), 14-233 (B)(1)] As required by Proffer #1 of ZMA241300002, a separate "Application for Road Plan Approval" will need to be filed in accordance with Chapter 14 in order to authorize and construct the private streets identified as Pantops Corner Way and Road B. The road plan application must be approved prior to final site plan approval. a. A certificate of occupancy shall not be issued for any buildings on TMP 78-58G1 prior to completion of construction for Pantops Corner Way and Road B private streets. Please see proffer #2 for additional information. 38. [General Comment] Prior to final site plan approval, a WPO plan must be submitted, reviewed, and approved by the Engineering Division. Please see Engineering comments below for additional information. 39. [32.6.2 (h)] Please provide a signature panel with a line for each member of the Site Review Committee. A copy of the SRC signature panel template is attached. Please contact Cameron Langille at the Department of Community Development at blan ig lle(c-r�,albemarle.org or 296- 5832 ext. 3432 for further information. Comments From Other Reviewers: Albemarle County Engineering Services (Engineer) — David James, diames(c-r�,albemarle.org — Requested Changes, see attached. Albemarle County Information Services (E911) — Elise Kiewra, ekiewraggalbemarle.org — Requested Changes, see attached. Albemarle County Building Inspections Michael Dellinger, mdellingergalbemarle.org — Requested Changes, see attached. Albemarle County Planning Services (Architectural Review Board) — Margaret Maliszewski, mmaliszewski&albemarle.org — Required changes prior to initial site plan approval, please see attached letter. Albemarle County Department of Fire Rescue — Shawn Maddox, smaddoxkalbemarle.org — Required changes, please see attached letter and comments #3 and #4 from Fire Rescue. Albemarle County Service Authority — Richard Nelson, rnelsonAserviceauthority.org — No Objection, see attached recommendation. Rivanna Water and Sewer Authority — Victoria Fort, vfort(c�r�,rivanna.org, 434-977-2970, ext. 205 — Initial site plan is still under review by RWSA. Comments or approvals will be forward to the applicant upon receipt. Virginia Department of Transportation — Adam Moore, Adam.Moorekvdot.vir ig nia.gov — Initial site plan is still under review by VDOT. Comments or approvals will be forward to the applicant upon receipt. Thomas Jefferson Health District — Alan Mazurowski, alan.mazurowski@vdh.vir ig nia.gov — Approved, see attached. Review Comments for SDP201800039 11nitial Site Plan Project Name: Pantops Corner - Initial Date Completed: Tuesday, June 19, 2018 Department1DivisionfAgency: Review sus: Reviewer: David James -E CDD Engineering Requested Changes 1- Please submit a WPO plan for review- - You're proposing to disturb areas of preserved slopes at the northern part of the site and at the Rt- 20 entrance- Currently, the proposed parking lot, grading, retaining wall & road entrance are not permitted (18-30-7-4)- 3- A VDOT entrance permit required- 4- Show sight distance lines- 5- Private road standards will have to be met for 'Pantops Corner Way' [184-12-15-d, D M Sect- 7]-, Show profiles, pavement sections & stationing- 6- Show street signs- 7- Provide engineered plans and computations for the retaining }r5,all design for all the }, alls that are next to parking or travelways- Specify all structural components and dimensions of }xall. The following items will be required [DM]: a- Atypical detail- (VDOT standard walls are acceptable) b- Specific details as required for unusual or possibly conflicting areas- An example is where utilities are expected to go through walls or footings- c- Certified computations to support the design (for wall over 5' high)- All soil and bearing assumptions, as well as reinforcement materials and assumed loadings must be included- 8- Provide safety provision(s) for vehicles and pedestrians for walls over 30" high- This is typically a guardrail, wall, or fencing [DM]- 9- Provide stormwater, sanitary, waterline profiles. 10- Show trees outside of drainage easements 11- Show detail of dumpter pad and enclosure- 1- Sheet 2 — a- Show contour elevation labels- b- Show existing ROW lines (Rt- 250 & Rt- 20)- c- Show AADT for roadways- Provide estimated AADT for proposed entrance roads d- Show existing easements, DB1PO- e- Show limits of disturbance- f- Identify items in addition to trees that you are demoing- 13- Sheet 3 — a- Label entrances, curb & gutter with appropriate VDOT designations (CO-, etc-)- b- Label all sidewalk widths- 14- Sheet 4 — a- Show contour elevation labels- b- Label locations of walls maximum height and TWIBW elevations - A Page: County of Albemarle Printed On: 10710312018 Review Comments for SDP201800039 Initial Site Plan Project Name: Pantops Corner - Initial Date Completed: Friday: June 29. 2018 DepartmentfDivisionfAgency: Review Status: Reviewer: Elise Kiewra CDD E911 No Objection e point in the future th any questions_ Page: County of Albemarle Printed On: 10710312018 Review Comments for SDP201800039 Initial Site Plan Project Name: Pantops Corner - Initial Date Completed: Thursday, June 14. 2018 DepartmentfDivisionfAgency: Review Status: Reviewer: Michael Dellinger CDD Inspections Requested Changes Page: County of Albemarle Printed On: 10710312018 Cameron Langille From: Margaret Maliszewski Sent: Monday, July 02, 2018 5:31 PM To: Cameron Langille Subject: Planning Application Review for SDP201800039 Pantops Corner - Initial. The Review for the following application has been completed: Application Number = SDP201800039 Reviewer = Margaret Maliszewski Review Status = Requested Changes Completed Date = 07/02/2018 This email was sent from County View Production. ARB-2018-72: Pantops Corner Hotel Initial Site Plan - Initial Site Development Plan, First review of an architectural design for the hotel (TM/Parcels 078000000005A0, 078000000005130, 078000000005G1) Proposal: To construct a 5-story hotel and a retail building with associated site improvements. Location: On the north side of Richmond Road (Rt. 250 east) across from People Place Motion: Mr. Van Der Werf moved to forward the revised recommendations as outlined below on ARB-2018-72: Pantops Corner Hotel Initial Site Plan - Initial Site Development Plan, First review of an architectural design for the hotel to the Agent for the Site Review Committee. The ARB forward the following recommendations to the Agent for the Site Review Committee: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and recommended conditions of initial plan approval: o Prior to Initial Plan approval the following items shall be resolved to the satisfaction of the ARB: 1. Clearly show all utilities and easements on the utility and landscape plans. Provide required planting free of utilities and easements. A separate diagram of the frontage planting that details the utility lines and their easements in varying colors would help clarify the feasibility of the proposed planting. 2. Provide large shade trees, 3'/2" caliper at planting, 35' on center, along the Rt. 20 side of the site within the bounds of the property. Intersperse ornamentals among the shade trees. 3. Provide views (preferably perspectives and site sections) along Rt. 20 to clarify the visibility of the hotel from the street. 4. Consider alternate site layout and building footprint to orient the hotel towards Rt. 20 to meet the EC guidelines. • Regarding recommendations on the plan as it relates to the guidelines: None. • Regarding conditions to be satisfied prior to issuance of a grading permit: 1. Adjust the proposed grading to eliminate conflicts with wooded area to remain. Show adequate tree protection fencing on the grading, landscaping and erosion and sediment control plans. • Regarding the final site plan submittal: 1. The stepped gables of Option 2 are not appropriate for the EC. 2. Revise the corner towers of Option 1 so that they appear more fully as towers or eliminate them. 3. Revise the EIFS material and detailing of the entrance bay to better reflect the importance of the entrance function. 4. Note on the elevation drawings that the vents at the windows will be colored to match the adjacent wall surface. 5. Refine and simplify the hotel design to establish greater coordination of architectural elements throughout. 6. Clarify the proposed shingle color and note it consistently throughout the drawings. 7. Include the standard window glass note on the drawings and provide specs for review: Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 3001o. 8. Add a dumpster detail to the site plan. Coordinate dumpster screening materials with the building materials. 9. Confirm that mechanical equipment for the hotel will be screened by the roof Note this on the architectural drawings. 10. Show on the plan where Building A mechanical equipment is located. 11. Add the standard mechanical equipment note to the site and architectural drawings: Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 12. Include details in the lighting plan to confirm that the under -canopy light fixtures are full cutoff fixtures that do not produce glare. 13. Update the lighting plan to include information on all proposed building lights. 14. Clearly show all utilities and easements on the utility and landscape plans. Provide required planting free of utilities and easements. A separate diagram of the frontage planting that details the utility lines and easements in varying colors would help clarify the feasibility of the proposed planting. 15. Provide large shade trees, 3'/2" caliper at planting, 35' on center, along the Rt. 20 side of the site. Intersperse ornamentals among the shade trees. 16. Provide medium street trees, spaced 25' on center, parallel to the sidewalks at the hotel and Building A. 17. Coordinate the number of proposed parking spaces noted on the cover sheet with the number noted on the landscape plan and the actual number provided. 18. Add trees west of the hotel building to soften the appearance of the west elevation. 19. Eliminate Note 4 on the landscape plan. Provide additional clarification regarding the timing of EC frontage planting. 20. Terrace retaining walls 6' in height and taller and plant the terraces. 21. Provide top -of -wall and bottom -of -wall elevations for the retaining walls. 22. Adjust the proposed grading to eliminate conflicts with wooded area to remain. Show adequate tree protection fencing on the grading, landscaping and erosion and sediment control plans. Mr. Stoner seconded the motion. The motion carried by a vote of 5:0. In addition, individual ARB members made the following comments on the architectural design of the hotel for the benefit of the applicant's next submittal. These comments were made by individuals; not every comment was necessarily agreed to by all. 1. The architecture of the building should address Rt. 20. 2. What is the purpose of the overhang? 3. The pitched roof add too much to the mass and height of the building. 4. Simplify the architectural design. There is too much going on and the elements don't relate to each other. 5. The framed central bay could be revised to relate more closely to historic architecture of the area. 6. The height of the brick base, which almost divides the building in half, is too high or too low. 7. Both the stepped ends and the tower ends don't relate to the central portion of the building. 8. The windows are uniform. They could be collected into horizontal or vertical elements to improve scale and provide differentiation. 9. Breaking the mass into figural elements could help mitigate scale and address Rt. 20. 10. The range of materials and colors is too complicated, too busy. Simplify the materials palette. 11. The white modernist central bay framed by brick doesn't go with the tower ends. 12. Make the stepback a thing with its own identity. 13. The proposed design does begin to break down the mass for better scale. It is moving in the right direction. This is a reasonable start. 14. The building is designed for a flat, open site surrounded by parking. A different approach is needed for this site. 15. Simplicity and coherence are needed. 16. The hotel design doesn't relate to Building A. 17. The entrance portico is out of place. 18. Consider orienting the hotel better to the new street, step it down at the back and get the entrance portico closer to the new street. Work Session SDP-2018-72: Pantops Corner — Building A The ARB held a work session and made the following recommendations: 1. Develop openings in the elevations that address the Entrance Corridor and the entrance to the development. 2. Unify the scale of the building. 3. Develop elevations so that the scale of the building is increased on the EC. 4. Anticipate that the future pad development will require a connection to Building A in its architectural design. 5. Windows should acknowledge the corner of the site. 6. Make the language of the building consistent throughout the entire building. Review Comments for SDP201800039 Initial Site Plan Project Name: Pantops Corner - Initial Date Completed: Sunday, July 01. 2018 DepartmentlDivisionlAgency: Review Status: Reviewer: Shawn Maddox Fire Rescue Requested Changes 1_ Hydrant spacing appears to exceed the 250' maximum from any point on a street or read frontage to a hydrant_ _ Fire department connections must be shown on the plans_ The FDC must be located within 100' of a hydrant- 3- Buildings with heights exceeding 30' shall have 26' of clear unobstructed travel way along one entire side of the building This travel way shall be a minimum of 15' and a maximum of 30' from the building- 4- Building A shall have an emergency apparatus access turn around- 5- Knox boxes shall be required for all buildings on the site plan_ Please add a note stating this requirement and that the location shall be coordinated with the fire marshals office 6_ Afire flow test will be required prior to final acceptance Page: County of Albemarle Printed On: 107103T2018 Cameron Langille From: Richard Nelson <rnelson@serviceauthority.org> Sent: Monday, June 11, 2018 11:15 AM To: Cameron Langille Subject: SDP201800039 Pantops Corner - Initial Cameron, I recommend approval for SDP201800039 Pantops Corner — Initial with the following conditions: Submit 3 copies to ACSA for water and sewer review. Proposed connection to water on Route 20 side cannot be made at the proposed location. It is a small diameter service line. Connection to water will need to be made going across Route 20. For budgeting purposes, water and sewer connection fees for the 122 room hotel will be approximately $824,000 dollars. This does not include connection fees for Building A. A final quote will be determined once the owner/developer applies for water/sewer. Thanks, Richard Nelson Civil Engineer Albemarle County Service Authority 168 Spotnap Road Charlottesville, Virginia 22911 (434) 977-4511 COMMONWEALTH of VIRGINIA In Cooperation with the Thomas Jefferson Health District ALBEMARLE- CHARLOTTESVILLE State Department of Health FLUVANN COUNTY (STAY IRALMVRA) 1138 Rose Hill Drive GREENE COUNTY ISTANTY(LO LLE) LOVISA COVNTY)LOVISA) Phone (434) 972-6219 P. O. Box 7546 NELSON COUNTY (LOVINGSTON) Fax (434)972-4310 Charlottesville. Virginia 22906 July 2, 2018 Cameron Langille, Senior Planner Albemarle County Community Development 401 McIntire Road Charlottesville, VA 22902 RE: Pantops Corner Initial Site Development Plan SDP2018-39 Mr. Langille: As requested, I've reviewed the Initial Site Development Plan, dated 5/21/18, for the proposed construction referenced above. Since the water and sewer will be provided by public utilities, VDH will have no involvement. Recommendation: Approval Conditions: None If there are any questions or concerns, please give me a call, 434-972-4306. Sincerely, Alan Mazurowski Environmental Health Supervisor Thomas Jefferson Health District alan.mazurowski(c-r�,vdh.vir ig nia. og_v APPROVALS DATE DEPARTMENT OF COMMUNITY DEVELOPMENT PLANNER/ZONING ENGINEER INSPECTIONS ARB DEPARTMENT OF FIRE RESCUE ALBEMARLE COUNTY SERVICE AUTHORITY VIRGINIA DEPARMENT OF TRANSPORTATION HEALTH DEPARTMENT ALBS. U GIN1P COUNTY OF ALBEMARLE Department of Community Development . 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 January 10, 2014 Justin Shimp 201 E. Main Street Charlottesville, VA. 22902 RE: ZMA201300002 Pantops Corner. TAX MAP 78, PARCEL 58G1 Dear Mr. Shimp: Fax (434) 972-4126 On December 11, 2013, the Board of Supervisors approved the above noted ZMA, rezoning the above noted parcel from Residential — R-1 to Highway Commercial — HC in accordance with the attached proffers dated November 26, 2013. Please refer to this document for any future applications and requests on this property. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: • compliance with applicable PROFFERS; • approval of and compliance with a SITE PLAN; and • approval of a ZONING COMPLIANCE CLEARANCE. If you have questions or comments regarding the above -noted action, please do not hesitate to contact Rebecca Ragsdale at 296-5832. Sincerely, n n / VU V. Wayne ilimberg Director of Planning Cc: Wynne, John Leigh & James B Wynne 1688 Holcomb Rock Rd Lynchburg, VA. 24503 Rebecca Ragsdale, Zoning Elise Hackett, GDS Tex Weaver, GDS Original Proffers X Amendment PROFFER STATEMENT ZMA No. 2013-00002 Tax Map and Parcel Number(s): 078000000058G1 Owner(s) of Record: Pantops Corner, L.C. Date of Proffer Signature: November 26th, 2013 2.246 acres to be rezoned from RI -Residential to Highway Commercial (HQ Pantops Corner, L.C., is the owner (the "Owner") of Tax Map and Parcel Number 078000000058E 1 (the "Property") which is the subject of rezoning application ZMA No 2013-00002, for a project known as "Pantops Corner" (the "Project"). Pursuant to Section 33 of the Albemarle County Zoning Ordinance (Chapter 18 of the Albemarle County Code), the Owner hereby voluntarily proffers the conditions listed below which shall be applied to the Property if it is rezoned to the zoning district identified above. These conditions are proffered as a part of the requested rezoning and the Owner acknowledges that the conditions are reasonable. Each signatory signing on behalf of the Owner covenants and warrants that it is an authorized signatory of the Owner for this Proffer Statement. 1. Interconnectivity. Contemporaneously with, and as part of, frontage improvements along Stony Point Road (Rt. 20) required in connection with any subdivision plat or site plan for the Property, the Owner shall construct a private road from Stony Point Road (Rt. 20) across the Property to and across TMP 78-5A to U.S. Route 250, as labeled Road "A" on Exhibit C-l. The location, alignment and design of Road "A" may be adjusted with approval of the County Engineer. The Owner shall record an easement for the private road granting right of public passage over Road "A" which shall be recorded prior to the request for the first Certificate of Occupancy for the Property. An access easement to TMP 78- 6 shall be provided subject to an agreement between the respective owners to share the cost of maintenance and construction for shared portions of Road "A". 2. No Certificate of Occupancy until Road "A" is complete. The Owner shall not request a Certificate of Occupancy for any building on the Property until the private road connection between U.S. Route 250 and Route 20 is completed along with entrance improvements as required by the Virginia Department of Transportation. Construction of Road "A" shall be deemed complete when the County Engineer determines the roadway is safe and convenient for traffic. The location of the private road connections may vary in accordance with entrance guidelines provided by the Virginia Department of Transportation. 3. Route 20 Widening. The Owner shall not request a Certificate of Occupancy for any building on the Property until the Owner has constructed a second north bound lane on Route 20 along the frontage of the Property such that two full north bound lanes are provided on Route 20 from its intersection with U.S. Route 250 to the intersection of Road "A" and Route 20. OWNER B . Michael McGowan Title: Manager Entity: Pantops Corner, L.C. Tax Map and Parcel Number: 078000000058G1 Proffers for MA 2013-00002 Date: 11.1 4113 EXHIBIT SHOWING ZONING MAP AMENDMENT OF TMP 78-58G1 FROM R1 RESIDENTIAL TO HC ZONING SHIMP EXHIBIT C-1 EXISTING ZONING CLASSIFICATION c� C�' pF ALA, �'IRGINZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4176 September 26, 2013 Justin Shimp 201 E. Main Street Charlottesville, VA. 22902 RE: ZMA201300002 — Pantops Corner Tax Map Parcel - 078000000058G1 Dear Mr. Shimp: On September 10, 2013, the Albemarle County Planning Commission, by a vote of 5:2, approved a motion to recommend denial of the above -noted petition to the Board of Supervisors. This recommendation of denial was based on the following unfavorable factors: The proffers need to be substantively and technically revised. Traffic study information is incomplete and the adequate information as requested by VDOT and the County Engineer needs to be submitted to determine impacts of the rezoning and road interconnection to Routes 20, 250 and adjacent properties. To clarify, Road B needs to be a local public road serving not only development traffic but some amount of through traffic. Please be advised that the Albemarle County Board of Supervisors will review this petition and receive public comment at their meeting on November 13, 2013. It is the Board of Supervisor's preference that a public hearing not be advertised until all of the final materials for a zoning application have been received by the County and are available for public review. Therefore any new or additional information regarding your application, including final proffers if applicable, must be submitted to our office at least twenty-three (23) days prior to your scheduled hearing date, which is October 11, 2013. If you should have any questions or comments regarding the above noted action, please do not hesitate to contact me at (434) 296-5832. VIM1 / 25- ' I Claudette Grant Senior Planner Planning Division Cc: Wynne, John Leigh & James B Wynne 1688 Holcomb Rock Rd Lynchburg, VA. 24503