HomeMy WebLinkAboutWPO201700071 Calculations WPO VSMP 2018-04-06 PHONE(434)977-0205
FAX(434)296-5220
INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
A PROFESSIONAL CORPORATION
LAND SURVEYING Serving Vi ginia Since 1956
ENGINEERING 914 MONTICELLO ROAD
LAND PLANNING
CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEDBETTER,L.S. BRIAN D.JAMISON.L.S.
JIM L.TAGGART,P.E. DAVID A.JORDAN,L.S.
DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S.
AMMY M.GEORGE,L.A.
STORMWATER MANAGEMENT CALCULATIONS
FOR:
OLD TRAIL VILLAGE BLOCK 22
PROJECT LOCATION:
WEST OFF OF ROUTE 250,
NEIGHBORING THE WEST OF OLD TRAIL DRIVE,
ADJACENT TO GOLF DRIVE
TMP 55E-01-22-0
PREPARED FOR:
MARCH MOUNTAIN PROPETIES LLC
CONTACT: DAVE BROCKMAN
1005 HEATHERCROFT CIRCLE, SUITE 100
CROZET, VA 22932
PREPARED BY:
JEREMY L. FOX
ROUDABUSH, GALE & ASSOCIATES, INC.
914 MONTECELLO RD
CHARLOTTESVILLE, VA 22902
DATE :
OCTOBER 3, 2017
REVISED :
MARCH 5, 2018 ' PPROVEL
by the Albemarle Goy.,
`,omrnunity DevelopmentDeryAn;'
Date
pile 'd.0k.100k1
PHONE(434)977-0205
FAX(434)296-5220
It� INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
A PROFESSIONAL CORPORATION
LAND SURVEYING Serving Virginia Since 1956
ENGINEERING 914 MONTICELLO ROAD
LAND PLANNING
CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEDBETTER,L.S. BRIAN D.JAMISON.L.S.
JIM L.TAGGART.P.E. DAVID A.JORDAN,L.S.
DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S.
AMMY M.GEORGE,L.A.
TABLE OF CONTENTS
SECTION 1— ABSTRACT & CONCLUSION
SECTION 2— TEMPORARY SEDIMENT BASIN DESIGN & CALCULATIONS
SECTION 3— BIORETENTION CALCULATIONS
SECTION 4— EXTENDED DETENTION CALCULATIONS
PHONE(434)977-0205
�o, FAX(434)296-5220
INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
A PROFESSIONAL CORPORATION
LAND SURVEYING Serving Virginia Since 1956
ENGINEERING 914 MONTICELLO ROAD
LAND PLANNING
CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEDBETTER.L,.S. BRIAN D.JAMISON.L.S.
JIM L.TAGGART,P.E. DAVID A.JORDAN,L.S.
DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S.
AMMY M.GEORGE,L.A.
ABSTRACT :
This report illustrates that the proposed stormwater treatment facility for the
development of block 22 in Old Trail Village is in compliance with the overall intention
of the approved stormwater management master plan (WP0201600009) . The master plan for Old
Trail Village was adopted under the VSMP part IIC stormwater regulations, which in turn
grandfathered Old Trail development two additional cycles of permit compliance under
these regulations. The intended purpose of the approved stormwater master plan in Old
Trail Village was to be able to utilize a surplus of stormwater treatment in areas where
site restrictions showed minimal, and in turn, compensate for deficits where site
restrictions showed abundant. The stormwater treatment facility in this proposed location
envisioned a bioretention facility with a targeted drainage area of 5.82 acres and a
minimum required drainage area of 4.38 acres. Water quality requirements have been met
for the specifics of this block development based on the approved master plan, and
documents/calculations can be found in subsequent pages of this packet. Water quantity
requirements have been met by the containment of the 10 year storm event within the
proposed facilities in this block.
CONCLUSION:
The conclusions of this analysis are as follows:
• Old Trail Village stormwater master tracking currently has an approved running
compliance of 1.40 +/- surplus of treatment.
• Due to site restrictions within this block development, an actual drainage area of
4.15 acres was determined after analyzing realistic drainage conditions for the
developed site.
• Since the 4.15 acres cannot meet the minimum estimated required drainage area of
4.38 acres, a deficit of 0.23 acres will be subtracted to the latest approved
running compliance.
• Water quality and quantity requirements are met under VSMP part IIC regulations.
PHONE(434)977-0205
FAX(434)296-5220
INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
A PROFESSIONAL CORPORATION
LAND SURVEYING Serving Virginia Since 1956
ENGINEERING 914 MONTICELLO ROAD
LAND PUNNING
CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEDBETTER.L.S. BRIAN D.JAMISON.L.S.
JIM L.TAGGART,P.E. DAVID A.JORDAN,L.S.
DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS.L.S.
AMMY M.GEORGE,L.A.
TEMPORARY SEDIMENT BASIN
PRE-DEVELOPMENT CONDITIONS
Runoff Hydrograph: TR-55 Tabular Hydrograph Method
2YR STORM EVENT
Input Data:
Rainfall Distribution Type: Type II
Rainfall Depth: 3.68 in
Base Flow: 0.000 cfs
Ia/P Interpolation: On
Subarea Downstream Area CN Tc Tt
Name Subareas (acre) (min) (min)
DA-Sed Basin 4.71 61 12.5 10.00
Computed Results:
Peak Discharge (Qp) : 2.990 cfs
Time to Peak: 12.20 hrs
Runoff Volume: 0.14 acre-ft
10YR STORM EVENT
Input Data:
Rainfall Distribution Type: Type II
Rainfall Depth: 5.57 in
Base Flow: 0.000 cfs
Ia/P Interpolation: On
Subarea Downstream Area CN Tc Tt
Name Subareas (acre) (min) (min)
DA-Sed Basin 4.71 61 12.5 10.00
Computed Results:
Peak Discharge (Qp) : 9.301 cfs
Time to Peak: 12.20 hrs
Runoff Volume: 0.40 acre-ft
PHONE(434)977-0205
FAX(434)296-5220
INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
A PROFESSIONAL CORPORATION
LAND SURVEYING Serving Virginia Since 1956
ENGINEERING 914 MONTICELLO ROAD
LAND PLANNING
CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEDBETTER,L.S. BRIAN D.JAMISON.L.S.
JIM L.TAGGART.P.E. DAVID A.JORDAN,L.S.
DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS.L.S.
AMMY M.GEORGE,L.A.
25YR STORM EVENT
Input Data:
Rainfall Distribution Type: Type II
Rainfall Depth: 6.84 in
Base Flow: 0.000 cfs
Ia/P Interpolation: On
Subarea Downstream Area CN Tc Tt
Name Subareas (acre) (min) (min)
DA-Sed Basin 4.71 61 12.5 10.00
Computed Results:
Peak Discharge (Qp) : 14.379 cfs
Time to Peak: 12.20 hrs
Runoff Volume: 0.61 acre-ft
POST-DEVELOPMENT CONDITIONS
Runoff Hydrograph: TR-55 Tabular Hydrograph Method
2YR STORM EVENT
Input Data:
Rainfall Distribution Type: Type II
Rainfall Depth: 3.68 in
Base Flow: 0.000 cfs
Ia/P Interpolation: On
Subarea Downstream Area CN Tc Tt
Name Subareas (acre) (min) (min)
DA-Sed Basin 4.71 86 8.90 6.00
Computed Results:
Peak Discharge (Qp) : 14.790 cfs
Time to Peak: 12.10 hrs
Runoff Volume: 1.46 acre-f
10YR STORM EVENT
Input Data:
Rainfall Distribution Type: Type II
Rainfall Depth: 5.57 in
Base Flow: 0.000 cfs
Ia/P Interpolation: On
Subarea Downstream Area CN Tc Tt
Name Subareas (acre) (min) (min)
DA-Sed Basin 4.71 86 8.90 6.00
Computed Results:
Peak Discharge (Qp) : 26.210 cfs
Time to Peak: 12.10 hrs
Runoff Volume: 2.59 acre-ft
PHONE(434)977-0205
• FAX(434)296-5220
Elk INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
LAND sURVEYIxG A PROFESSIONAL CORPORATION
Serving Virginia Since 1956
ENGINEERING
LAND PLANNING 914 MONTICELLO ROAD
CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEDBETTER,L.S. BRIAN D.JAMISON.L.S.
JIM L.TAGGART,P.E. DAVID A.JORDAN,L.S.
DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S.
AMMY M.GEORGE,L.A.
25YR STORM EVENT
Input Data:
Rainfall Distribution Type: Type II
Rainfall Depth: 6.84 in
Base Flow: 0.000 cfs
Ia/P Interpolation: On
Subarea Downstream Area CN Tc Tt
Name Subareas (acre) (min) (min)
DA-Sed Basin 4.71 86 8.90 6.00
Computed Results:
Peak Discharge (Qp) : 34.130 cfs
Time to Peak: 12.10 hrs
Runoff Volume: 1.16 acre-ft
PHONE(434)977-0205
lit; FAX(434)296-5220
INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
A PROFESSIONAL CORPORATION
LAND SURVEYING Serving Virginia Since 1956
ENGINEERING 914 MONTICELLO ROAD
LAND PLANNING
CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEDBETTER,L.S. BRIAN D.JAMISON,L.S.
JIM L.TAGGART,P.E. DAVID A.JORDAN,L.S.
DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S.
AMMY M.GEORGE,L.A.
SEDIMENT BASIN ROUTED CONDITIONS
Reservoir Routing: Storage Indication Method
2YR STORM EVENT
Results:
Inflow Peak Flow: 14.79 cfs
Inflow Peak Time: 12.10 hr
Routed Peak Flow: 5.28 cfs
Routed Peak Time: 12.30 hr
Maximum Pond Storage: 0.3021 acre-feet
Maximum Pond Elevation: 665.14 ft
10YR STORM EVENT
Results:
Inflow Peak Flow: 26.21 cfs
Inflow Peak Time: 12.10 hr
Routed Peak Flow: 21.96 cfs
Routed Peak Time: 12.20 hr
Maximum Pond Storage: 0.3823 acre-feet
Maximum Pond Elevation: 665.60 ft
25YR STORM EVENT
Results:
Inflow Peak Flow: 34.13 cfs
Inflow Peak Time: 12.10 hr
Routed Peak Flow: 28.20 cfs
Routed Peak Time: 12.10 hr
Maximum Pond Storage: 0.3836 acre-feet
Maximum Pond Elevation: 665.74 ft
PHONE(434)977-0205
Pc* FAX(434)296-5220
INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
A PROFESSIONAL CORPORATION
LAND SURVEYING Serving Virginia Since 1956
ENGINEERING 914 MONTICELLO ROAD
LAND PLANNING
CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEDBETTER.L.S. BRIAN D.JAMISON.L.S.
JIM L.TAGGART.P.E. DAVID A.JORDAN,L.S.
DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S.
AMMY M.GEORGE,L.A.
SEDIMENT BASIN DESIGN PARAMETERS (SAME AS BMP CONVERSION)
Multiple Outlet Design
Outflow
Total Discharge: 100.7192 cfs
Max Water Surface Elevation: 666.50 ft (TOP OF DAM)
Tailwater Elevation: 640.00 ft
Detention Base Elevation: 0.00 ft
Outlet #1: RISER, Drop Pipe
Riser Top Elev: 665.00 ft
Riser Base Elev: 661.50 ft
Riser Diameter: 48.00 in
Orifice Coefficient: 0.60
Weir Coefficient: 3.33
Culvert Length: 35.00 ft
Culvert Diameter: 24.00 in
Culvert Invert In: 660.75 ft
Culvert Friction Coefficient: 0.01
Culvert Entrance Loss Coefficient: 0.10
Discharge: 33.31 cfs
Outlet #2: SPILLWAY, Weir
Shape: Rectangular with Contracted End
Crest Length: 20.00 ft
Invert Elevation: 666.00 ft
Coefficient: 3.33
Number of Openings: 1
Discharge: 65.93 cfs
Velocity: 3.30 ft/s
Outlet #3: 01, Orifice
Shape: Circular
Diameter: 5.00 in
Invert Elevation: 661.75 ft
Coefficient: 0.60
Number of Openings: 1
Discharge: 1.47 cfs
Velocity: 10.81 ft/s
Stage-Storage Report Sediment Basin
316 CY WET REQUIRED/347 CY DRY REQUIRED @ 664.60
288 CY WET PROVIDED/320 CY DRY PROVIDED @ 665.95
Elev(Ft) Storage(CF) Storage(CY) Storage(Acre-Ft) Area(SF) Area(Acre)
661.500 0.000 0.000 0.000 110.809 0.003
662.000 73.851 2.735 0.002 186.577 0.004
663.000 701.120 25.967 0.016 4318.771 0.099
664.000 5519.739 204.435 0.127 5328.853 0.122
666.000 18335.586 679.096 0.421 7525.504 0.173
668.000 35781.128 1325.227 0.821 9952.567 0.228
670.000 58320.985 2160.036 1.339 12616.211 0.290
PHONE(434)977-0205
FAX(434)296-5220
INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
A PROFESSIONAL CORPORATION
LAND SURVEYING Serving Virginia Since 1956
ENGINEERING 914 MONTICELLO ROAD
LAND PLANNING
CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEDBETTER,L.S. BRIAN D.JAMISON.L.S.
JIM L.TAGGART,P.E. DAVID A.JORDAN,L.S.
DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S.
AMMY M.GEORGE,L.A.
BIORETENTION
POST-DEVELOPMENT CONDITIONS
Runoff Hydrograph: TR-55 Tabular Hydrograph Method
1YR STORM EVENT
Input Data:
Rainfall Distribution Type: Type II
Rainfall Depth: 3.04 in
Base Flow: 0.000 cfs
Ia/P Interpolation: On
Subarea Downstream Area CN Tc Tt
Name Subareas (acre) (min) (min)
BIO 4.15 86 8.90 6.00
Computed Results:
Peak Discharge (Qp) : 26.211 cfs
Time to Peak: 12.10 hrs
Runoff Volume: 0.86 acre-ft
2YR STORM EVENT
Input Data:
Rainfall Distribution Type: Type II
Rainfall Depth: 3.68 in
Base Flow: 0.000 cfs
Ia/P Interpolation: On
Subarea Downstream Area CN Tc Tt
Name Subareas (acre) (min) (min)
BIO 4.15 86 8.90 6.00
Computed Results:
Peak Discharge (Qp) : 14.791 cfs
Time to Peak: 12.10 hrs
Runoff Volume: 0.49 acre-ft
PHONE(434)977-0205
1,1 11 FAX(434)296-5220
°g! INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
A PROFESSIONAL CORPORATION
LAND SURVEYING Serving Virginia Since 1956
ENGINEERING 914 MONTICELLO ROAD
LAND PLANNING
CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEDBETTER.L.S. BRIAN D.JAMISON.L.S.
JIM L.TAGGART,P.E. DAVID A.JORDAN,L.S.
DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S.
AMMY M.GEORGE.L.A.
10YR STORM EVENT
Input Data:
Rainfall Distribution Type: Type II
Rainfall Depth: 5.57 in
Base Flow: 0.000 cfs
Ia/P Interpolation: On
Subarea Downstream Area CN Tc Tt
Name Subareas (acre) (min) (min)
BIO 4.15 86 8.90 6.00
Computed Results:
Peak Discharge (Qp) : 26.211 cfs
Time to Peak: 12.10 hrs
Runoff Volume: 0.86 acre-ft
100YR STORM EVENT
Input Data:
Rainfall Distribution Type: Type II
Rainfall Depth: 9.14 in
Base Flow: 0.000 cfs
Ia/P Interpolation: On
Subarea Downstream Area CN Tc Tt
Name Subareas (acre) (min) (min)
BIO 4.15 86 8.90 6.00
Computed Results:
Peak Discharge (Qp) : 48.728 cfs
Time to Peak: 12.10 hrs
Runoff Volume: 1.61 acre-ft
PHONE(434)977-0205
FAX(434)296-5220
INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
A PROFESSIONAL CORPORATION
LAND SURVEYING Serving Virginia Since 1956
ENGINEERING 914 MONTICELLO ROAD
LAND PLANNING
CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEDBETTER,L.S. BRIAN D.JAMISON.L.S.
JIM L.TAGGART,P.E. DAVID A.JORDAN,L.S.
DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S.
AMMY M.GEORGE,L.A.
BIORETENTION ROUTED CONDITIONS
Reservoir Routing: Storage Indication Method
2YR STORM EVENT
Results:
Inflow Peak Flow: 14.79 cfs
Inflow Peak Time: 12.10 hr
Routed Peak Flow: 2.37 cfs
Routed Peak Time: 12.40 hr
Maximum Pond Storage: 0.4931 acre-feet
Maximum Pond Elevation: 666.00 ft
10YR STORM EVENT
Results:
Inflow Peak Flow: 26.21 cfs
Inflow Peak Time: 12.10 hr
Routed Peak Flow: 3.20 cfs
Routed Peak Time: 12.50 hr
Maximum Pond Storage: 0.6818 acre-feet
Maximum Pond Elevation: 666.00 ft
100YR STORM EVENT
Results:
Inflow Peak Flow: 48.73 cfs
Inflow Peak Time: 12.10 hr
Routed Peak Flow: 4.97 cfs
Routed Peak Time: 12.60 hr
Maximum Pond Storage: 1.0542 acre-feet
Maximum Pond Elevation: 666.00 ft
PHONE(434)977-0205
FAX(434)296-5220
°m INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
A PROFESSIONAL CORPORATION
LAND SURVEYING Serving Virginia Since 1956
ENGINEERING 914 MONTICELLO ROAD
LAND PLANNING CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEDBETTER,L.S. BRIAN D.JAMISON.L.S.
JIM L.TAGGART.P.E. DAVID A.JORDAN,L.S.
DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S.
AMMY M.GEORGE,L.A.
BIORETENTION DESIGN PARAMETERS
Multiple Outlet Design
Outflow
Total Discharge: 2.5045 cfs
Max Water Surface Elevation: 666.00 ft
Tailwater Elevation: 661.50 ft
Detention Base Elevation: 0.00 ft
Outlet #1: BIO EXFILTRATE, Exfiltration
Area Type: Pond Wetted Area
Exfiltration Velocity: 1.50 in/hr
Invert Elevation: 662.00 ft
Exfiltration Discharge: 0.00 cfs
Outlet #2: BIO STANDPIPE, Drop Pipe
Riser Top Elev: 666.00 ft
Riser Base Elev: 662.00 ft
Riser Diameter: 18.00 in
Orifice Coefficient: 0.60
Weir Coefficient: 3.33
Culvert Length: 30.00 ft
Culvert Diameter: 6.00 in
Culvert Invert In: 661.75 ft
Culvert Friction Coefficient: 0.01
Culvert Entrance Loss Coefficient: 0.10
Discharge: 0.56 cfs
Outlet #3: BIO ORIFICE, Orifice
Shape: Circular
Diameter: 6.00 in
Invert Elevation: 662.00 ft
Coefficient: 0.60
Number of Openings: 1
Discharge: 1.95 cfs
Velocity: 9.92 ft/s
Stage-Storage Report Bioretention
Elev(Ft) Storage(CF) Storage(CY) Storage(Acre-Ft) Area(SF) Area(Acre)
661.000 0.000 0.000 0.000 3036.579 0.070
662.000 3161.564 117.095 0.073 3289.649 0.076
663.000 6580.046 243.705 0.151 3549.700 0.081
664.000 10261.729 380.064 0.236 3814.832 0.088
665.000 14212.895 526.404 0.326 4087.158 0.094
666.000 18439.829 682.957 0.423 4365.688 0.100
666.000 18439.829 682.957 0.423 4650.413 0.107
PHONE(434)977-0205
FAX(434)296-5220
`°al INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
A PROFESSIONAL CORPORATION
LAND SURVEYING Serving Virginia Since 1956
ENGINEERING 914 MONTICELLO ROAD
LAND PLANNING
CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEDBETTER.L.S. BRIAN D.JAMISON.L.S.
JIM L.TAGGART,P.E. DAVID A.JORDAN,L.S.
DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S.
AMMY M.GEORGE,L.A.
EXTENDED DETENTION
POST-DEVELOPMENT CONDITIONS
Runoff Hydrograph: TR-55 Tabular Hydrograph Method
2YR STORM EVENT
SEE ROUTED CONDITIONS FOR PEAK DISCHARGE FROM BIOFILTER
10YR STORM EVENT
SEE ROUTED CONDITIONS FOR PEAK DISCHARGE FROM BIOFILTER
100YR STORM EVENT
SEE ROUTED CONDITIONS FOR PEAK DISCHARGE FROM BIOFILTER
EXTENDED DETENTION ROUTED CONDITIONS
Reservoir Routing: Storage Indication Method
2YR STORM EVENT
Results:
Inflow Peak Flow: 2.37 cfs
Inflow Peak Time: 12.40 hr
Routed Peak Flow: 2.57 cfs
Routed Peak Time: 12.40 hr
Maximum Pond Storage: 0.0464 acre-feet
Maximum Pond Elevation: 664.89 ft
10YR STORM EVENT
Results:
Inflow Peak Flow: 3.20 cfs
Inflow Peak Time: 12.60 hr
Routed Peak Flow: 3.32 cfs
Routed Peak Time: 12.30 hr
Maximum Pond Storage: 0.0481 acre-feet
Maximum Pond Elevation: 664.95 ft
100YR STORM EVENT
Results:
Inflow Peak Flow: 4.97 cfs
Inflow Peak Time: 12.70 hr
Routed Peak Flow: 4.97 cfs
Routed Peak Time: 12.70 hr
Maximum Pond Storage: 0.0532 acre-feet
Maximum Pond Elevation: 665.11 ft
PHONE(434)977-0205
NFAX(434)296-5220
;`; INFO@ROUDABUSH.COM
ROUDABUSH, GALE &ASSOCIATES, INC.
A PROFESSIONAL CORPORATION
LAND SURVEYING Serving Virginia Since 1956
ENGINEERING 914 MONTICELLO ROAD
LAND PLANNING
CHARLOTTESVILLE,VIRGINIA
22902
WILLIAM J.LEI/BETTER.L.S. BRIAN D.JAMISON.L.S.
JIM L.TAGGART,P.E. DAVID A.JORDAN,L.S.
DAVID M.ROBINSON,P.E. KRISTOPHER C.WINTERS,L.S.
AMMY M.GEORGE,L.A.
EXTENDED DETENTION DESIGN PARAMETERS
Multiple Outlet Design
Outflow
Total Discharge: 100.7192 cfs
Max Water Surface Elevation: 666.50 ft
Tailwater Elevation: 640.00 ft
Detention Base Elevation: 0.00 ft
Outlet #1: RISER, Drop Pipe
Riser Top Elev: 665.00 ft
Riser Base Elev: 661.50 ft
Riser Diameter: 48.00 in
Orifice Coefficient: 0.60
Weir Coefficient: 3.33
Culvert Length: 45.00 ft
Culvert Diameter: 24.00 in
Culvert Invert In: 660.75 ft
Culvert Friction Coefficient: 0.01
Culvert Entrance Loss Coefficient: 0.10
Discharge: 33.31 cfs
Outlet #2: SPILLWAY, Weir
Shape: Rectangular with Contracted End
Crest Length: 20.00 ft
Invert Elevation: 666.00 ft
Coefficient: 3.33
Number of Openings: 1
Discharge: 65.93 cfs
Velocity: 3.30 ft/s
Outlet #3: 01, Orifice
Shape: Circular
Diameter: 5.00 in
Invert Elevation: 661.75 ft
Coefficient: 0.60
Number of Openings: 1
Discharge: 1.47 cfs
Velocity: 10.81 ft/s
Stage-Storage Report Extended Detention
Elev(Ft) Storage(CF) Storage(CY) Storage(Acre-Ft) Area(SF) A;rea(:Acre)
661.500 0.000 0.000 0.000 49.904 0.001
662.000 55.783 2.066 0.001 186.577 0.004 ,
664.000 850.596 31.504 0.020 754.705 '0.01
666.000 3482.473 128.980 0.080 1949.009 0.045
668.000 8871.719 328.582 0.204 3472.167 0.080
670.000 17531.665 649.321 0.402 5217.504 `q . D.1:20
Z CC
n -oa
o M t1
L Planned It a A v
toID fl
p. O — —
Po. '+
:11:
,nQa o a s f o �
e m o
3, .. o o N v
o
w <
m o oIIIIIIIIIIIIIIII
c �_ 3 A
2 �
, o :m08'
0 0 0 o D r
1,1:
�
`° a - r t+ c i1
' w v o v v v o o
3 m 2 Z Z Z Z Z N a
T
�_ O O O O o 0 0 w
O < p x x x x x x °
° ` w oo H D D D D D D D
N
m
3
iD
o m
-,, O
a 0 3
m
a n R z � � m a A m F
CD CO m w'
a a d w v £ u
O \ Di d °'9 (D n
3 O F. RD O co
ry ' N O °' 6 O A it
p > >OKkK N .2 ti. O A m ,3aA mw c o ° a a m
» f F = :4; ?d o m n =
-. ° 0 •4o N A P „ s 3 O 3
3 F < a, ' F. o3k0
v o. M ti 5 V w F 3 ' o- m
O D ^. o
o' v
3 a, °f D3' m 3
2 a S N N p O N
a a— '• 3 m 3 O O a ° °1•
N ^ '.C ' O C to st ' 9
m' i''
io 3 0 i
£ '° m
1111'° � 3 a 3 o f °' . aE1r
bC .gOD 3
E. .. m o H
p w a 8
IIIIII .. a = = 0
c » N m = m m
n a m VII
'�1 111111 ^ ^� A- O
C %p
3 m
0
E ,o
_ a' c n o D
1111 a
'm � 3 � c
a <
3 : 3
iD
3
c
3
F
o -(1)''
a
,oY p O O
00
P. t`'-,
".'2
a� '00 0 o o ^a
a m c aIIIIIIIIIIIIIIII
D m a vO o~ N
p
r. �0vFvv33
O0 2 0 00 0
F
I 0 0 0 o v Or' v v
o Om 8
0 8
0m Om 8
0 OO NO FOOi
ON N_ Z rn 2 Z; 'j ; ; '; • •
2 o O
�9
D
mo 0 0 0 0 0 00W -o
n a �D D DD D aD m m m
.o v a v v =0 0
0 0 0 0 0 0 ~ r r p
m n < < o 0 o m
a a a a a m m m m
3
N pD
O
A A
N
N c c c c
m n a n
d N N N
T.' oO 2 0 0
c 3 m b,, N o+
A W W
3 ''':77
0 A A m
v
a
a v v
Z
m °0 T
m o a' m m c
3
0 3 3 3 ,v,
m m m
v 0 0 0
Om
Oo W W W 3
p O W n n
o F °. a a 3•
Z
W T N Z
D O •O -, O
H
O O N CDD N
a
§ � »
3 .9m 'm m
m
'» w m A .i.0 0 0 0
F F F F
o 0
9 9
0 1,1 O O 0
0 0 $0
o g
o o 8