HomeMy WebLinkAboutWPO201800010 Review Comments WPO VSMP 2018-09-18COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Old Trail Borrow Area Erosion and Sediment Control Plan for Block 32 — Amendment for Mass Grading Project file number: WP0201800010 Plan preparer: Roudabush, Gale and Assoc. Jeremy Foxbfox@roudabush.com] Owner or rep.: March Mountain Properties LLC. [dave@oldtrailvillage.com] Plan received date: 10 Aug 2018 Date of comments: 17 Sept 2018 Reviewers: Geoff Elsie County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The application may be resubmitted for approval if all the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Please provide a copy of the existing SWPPP showing this activity updated in the approved WPO (WP0201600009) paperwork. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. See above comment. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. See above comment. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. Engineering Review Comments Page 2 of 3 1. Update Title to include reference to borrow area which was the original WPO/VSMP application tiltle. 2. Construction Entrance must have water source with meter and minimum 2" hose and nozzle, or tank with 2 power washers onsite. 3. Wire reinforced Silt Fence is recommended along buffer zones. 4. Add note that all slopes greater than 3:1 must be stabilized with Low Maintenance Vegetative Ground Cover Other Than Grass The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; hlt2://www.albemarle.org/del2tforms.asp?department--cdeng3Uo File: E1_vsmp_review projectname.doc Engineering Review Comments Page 3 of 3 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP Permit plan review Project title: Old Trail Borrow Area Erosion and Sediment Control Plan for Block 32 Project file number: WP0201800010 Plan preparer: Roudabush, Gale and Assoc. Jeremy Foxbfox@roudabush.com] Owner or rep.: March Mountain Properties LLC. [dave@oldtrailvillage.com] Plan received date: 26 Jan 2018 5 Mar 2018 — Revision 1 Date of comments: 26 Feb 2018 22 Mar 2018 — Revision 1 Reviewers: Geoff Elsie County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is Approved The rationale is given in the comments below. The application may be resubmitted for approval if all the items below are satisfactorily addressed. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Please provide a copy of the existing SWPPP showing this activity updated in the approved WPO (WP0201600009) paperwork. —Rev. 1 Comment Addressed: Updated Registration Statement provided, please include copy of approved Erosion and Sediment Control Plan for Borrow Area in existing SWPPP for WPO 201600009. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. See above comment. - Rev. 1 Comment Addressed: Updated Registration Statement provided, please include copy of approved Erosion and Sediment Control Plan for Borrow Area in existing SWPPP for WPO 201600009 C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is Approved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. See above comment. - Rev. 1 Comment Addressed: Updated Registration Statement provided, please include copy of approved Erosion and Sediment Control Plan for Borrow Area in existing SWPPP for WPO 201600009 Engineering Review Comments Page 2 of 3 D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is Approved and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Cover Page must have signature from Engineer. — Rev. 1, Comment addressed 2. Construction Entrance must have wash rack and drain to an approved sediment trapping device. - Rev. 1, Comment addressed 3. Extend Construction Road Stabilization to both sides of the Stream Crossing. - Rev. 1, Comment addressed 4. Add Outlet Protection to 24" min. Culvert at Temporary Sediment Basin. - Rev. 1, Comment addressed 5. Consider using Reinforced Silt Fence near Stream Crossing to reduce chance of sediment loss due to damage to installed Silt Fence. - Rev. 1, Comment addressed The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/deptforms.asp?department--cdengno Engineering Review Comments Page 3 of 3 Please provide 2 additional copies of the current plan for final approval and stamp. Any questions please let me know. Geoff Elsie Senior Inspector — Engineering Albemarle County Community Development. File: E1_vsmp_review projectname.doc PHONE(434)977-0205 ,,; FAX(434)296-5220 FAX ROUDABUSH, GALE &ASSOCIATES, INC. A PROFESSIONAL CORPORATION LAND SURVEYING Serving Virginia Since 1956 ENGINEERING 914 MONTICELLO ROAD LAND PLANNING CHARLOTTESVILLE,VIRGINIA 22902 WILLIAM J.LEDBE I I ER.L.S. BRIAN D.JAMISON,L.S. JIM L.TAGGART.RE. DAVID A.JORDAN.L.S. DAVID M.ROBINSON,P.E. KRISfOPHER C.WINTERS.L.S. AMMY M.GEORGE,L.A. March 5,2018 Geoff Elsie, Senior Inspector-Engineering County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville,VA 22902 Regarding: WP0201800010 Old Trail Village Block 32-Borrow Area ESC Plan Mr.Elsie, I have reviewed department comments from February 26,2018 and below are the individual responses according to their department. A. Stormwater Pollution Prevention Plan(SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain(1)a PPP,(2)an ESCP,(3)a SWMP, and(4)any TMDL measures necessary. / 1. Please provide a copy of the existing SWPPP showing this activity updated in the approved WPO (WPO201600009)paperwork. • Copy of updated registration statement(Feb 2018) has been submitted to show area is covered under VPDES permit. The area on the updated registration statement includes block 22 and block 32 in their entirety. B.Pollution Prevention Plan(PPP) The PPP content requirements can be found in County Code section 17-404. 1. See above comment. • Copy of updated registration statement(Feb 2018) has been submitted to show area is covered under VPDES permit. The area on the updated registration statement includes block 22 and block 32 in their entirety. C. Stormwater Management Plan(SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below.The stormwater management plan content requirements can be found in County Code section 17-403. / 1. See above comment. ✓ • Copy of updated registration statement(Feb 2018) has been submitted to show area is covered under VPDES permit. The area on the updated registration statement includes block 22 and block 32 in their entirety. WP0201800010 3/5/2018 1 PHONE(434)977-0205 FAX(434)296-5220 Nome FAX ROUDABUSH, GALE &ASSOCIATES, INC. A PROFESSIONAL CORPORATION LAND SURVEYING Serving Virginia Since 1956 ENGINEERING LAND PLANNING 914 MONTICELLO ROAD CHARLOTTESVILLE,VIRGINIA 22902 WILLIAM J.LEDBEI IER..L.S. BRIAN D.JAMISON,L.S. JIM L. !AWARE.R.E. DAVID A.JORDAN.L.S. DAVID M.ROBINSON.P.F.. KRISTOPIIER C.WINTERS.L.S. AMMY M.GEORGE.L.A. D.Erosion and Sediment Control Plan(ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved,and the reasons are provided in the comments below.The erosion control plan content requirements can be found in County Code section 17-402. 1. Cover Page must have signature from Engineer. • Acknowledged. Signature has been provided with resubmittal as requested. /2. Construction Entrance must have wash rack and drain to an approved sediment trapping device. • Wash rack has been noted on the plan with a sediment drain pit to be graded in as requested. /3. Extend Construction Road Stabilization to both sides of the Stream Crossing. • CRS has been added over the entirety of the haul path as requested. /4. Add Outlet Protection to 24"min. Culvert at Temporary Sediment Basin. • Outlet protection has been added as requested. 15. Consider using Reinforced Silt Fence near Stream Crossing to reduce chance of sediment loss due to damage to installed Silt Fence. • Acknowledged.A note has been added to install super silt fence through the stream crossing portion for additional stability. If you have any questions or comments, please feel free to contact me. Sincerely, (744.4.47 ) Jeremy L. Fox WP0201800010 3/5/2018 2 ROUDABUSH, GALE & ASSOCIATES, INC. A A PROFESSIONAL CORPORATION AA LAND SI-It\I,t vG Serving Virginia Since 1956 EY(;I\f I Iti�l; LAND Pt..>VAIAG I\(,IAI I RI\I,Ifl P\RIMI\ISURVEY DEPARIMIN I Il III P.A\POPS DRIVE,S'1'E:.A 914 MONTICELLO ROAD JIM I JAGGART,P.E. II\RI 01 1LSVI1.I.E,VA22911 CMEARI OI II sVIL 1.VA 22902 WILLIAM J.I.IiDBETT@R,L.S. DONFRANCO.P.E. Plitf\I_t4W)979-8121 NI()\,1 (134)9770205 BRIAN D.JAMISON,LS. DAVID M.ROBINSON,P.F. I V\(4 z4f 979-1681 11\(4;41246-5220 I)N\II) \.JORDAN,L.S. AMMY M.GEORGE.L.A. INFO!t4ROUDABI'SILCOM KRIS"I01 411 R C.V INTERS.L.S. September 24,2018 Geoff Elsie, Senior Inspector-Engineering County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville,VA 22902 RE: WP0201800010-Old Trail Block 32 Borrow Area ESC Plan Dear Geoff, Please find attached two(2)copies of the revised plans dated August 10,2018 last revised September 24, 2018. The plans have been revised to address the comments in accordance with the following: A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain(1)a PPP, (2)an ESCP, (3)a SWMP, and (4)any TMDL measures necessary. 1. Please provide a copy of the existing SWPPP showing this activity updated in the approved WPO(WPO201600009) paperwork. • Copy of the latest registration statement(02/06/18)for the proposed development has been submitted with the revisions.The total disturbed acreage of 136.08 includes the development of Block 32(20.80 acres).An email to Albemarle County Engineering regarding the latest clarification on modification on the permit is attached with this resubmission. J B.Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. See above comment. • Copy of the latest registration statement(02/06/18)for the proposed development has been submitted with the revisions.The total disturbed acreage of 136.08 includes the development of Block 32(20.80 acres).An email to Albemarle County Engineering regarding the latest clarification on modification on the permit is attached with this resubmission. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17-403. I. See above comment. • Copy of the latest registration statement(02/06/18)for the proposed development has been submitted with the revisions.The total disturbed acreage of 136.08 includes the development of Block 32(20.80 acres).An email to Albemarle County Engineering regarding the latest clarification on modification on the permit is attached with this resubmission. D. Erosion and Sediment Control Plan(ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Update Title to include reference to borrow area which was the original WPO/VSMP application title. • Title has been revised to reference original borrow area as requested. I 2. Construction Entrance must have water source with meter and minimum 2"hose and nozzle,or tank with 2 power washers onsite. • A tank with 2 power washers will be provided onsite and has been noted on sheet 3 of 7. 7 3. Wire reinforced Silt Fence is recommended along buffer zones. • Silt fence has been revised to Super Silt Fence for additional buffer protection. 4. Add note that all slopes greater than 3:1 must be stabilized with Low Maintenance Vegetative Ground Cover Other Than Grass • A note stating the above has been added to the plans where 2:1 grades are shown as requested. I We thank you for taking the time to review these plans and trust the above adequately addresses your comments. However, please let me know if you have any questions or require additional information. Thanks, Jeremy L. Fox