Loading...
HomeMy WebLinkAboutWPO201500078 Preconstruction Form WPO VSMP 2018-08-06 • 1 Request for Pre-construction Meeting and Grading Permit ® ice from Albemarle County ��RGIN�A \/4R I O Approved Plan Number: WPO- 7_015 ON)?gj Approved Plan Name: pp N ortrN ��^ITE /*DD T 54-2/1/-(E. 5 �. 7r1 ovi PM07154723 (Plans must be approved prior to a pre-construction meeting.) Bond approved date: 21b/I3 (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: Print Name: AL R. O H Lr �EquE17 State Certification Number: 144 Q 5 b I Address ZLf1Ij OLD 1 ?LA-0 City (LW LurraiJtu 1` State VA Zip 720163 Daytime Phone(1-31) 9 68 - 52H E-mail fkll/0. lL0'FILUc.-M. ^e ff & . CCS Primary Contractor: Print Name I-Ai c 2_ C :,r,Ds-rink Y).-S (O4P 1-1 Address 2H43 b ni_o f 1\..J City ( 2SLOTT V1 l State VA Zip 22%3 Daytime Phone 0-1-6t-i) 2.56-—0022 E-mail ?.ReIN s3 t01- . Cc34\ Permit Issuance and First Year Maintenance Fees: (Request inusi include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 1 and less than 5 $594.00 $748.00 •• - than 50 —$790.0u 50 and less than 100 $1,342.00 100 and more $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14,Revised: 8/29/14 Page 1 of 3 ti , Person(s) to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email cf hEi7 f TrF3 .s Nz.6 cCdzswge-DIc ;aa `1 cDrro The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit Issued Date By who? 7/1/14,Revised: 8/29/14 Page 2 of 3 t V } Fee Received RECEIVED Received Date AUG 0 9 2010 §ifil COMMUNITY Received By DEVELOPMENT rYV�.