Loading...
HomeMy WebLinkAboutCTB 6 Yr Plan FY1999-2000 Vol1~ommon w~alth Y(an~p orta t/on Volume One Vlr. qinia ~partm~nt of Han~poytation and th~ Vi~.qinia ~partm~nt of Rail and ~ublic Yran~po~tatton iacal year I ! ! ! ! I I I ! ! I I ! I I I ! I ! FISCAL YEARS 1999- 2000 THRU 2004- 2005 SIX YEAR IMPROVEMENT PROGRAM Interstate, Primary, Urban and Secondary Highway Systems Public Transit, Ports and ^irports Copyright 1999, Commonwealth of Virginia ! ! ! it ! ! ! ! ! ! HOW TO READ THE SIX-YEAR IMPROVEMENT PROGRAM The Six-Year Improvement Program is divided into the nine construction districts that comprise the Virginia Department of Transportation. may be looking at an abbreviated program that covers only your district.) Within each district, the program is divided into four categories: Interstate, Primary, Urban and Secondary Systems. (You The pages in the statewide Six-Year Improvement Program have eight columns, some of which are divided into subcolumns. This text will describe each column and how it functions within the program. ROUTE~ COUNTY/CITY~ TYPE~ LENGTH Generally self-explanatory, this column identifies the route number on which the project is located, the county or city where the road is located, the type of work that will be done on this project, and the length of the project. Projects are listed in numerical order by route number, except for the Urban System. Urban projects are listed alphabetically by city/town. "(PE Only)" means funds to finance only preliminary engineering work have been allocated to date. DESCRIPTION This column gives a location description of the project limits. The route number and the length of the project are known from the previous column. This column gives reference points indicating where the work will take place. ESTIMATED COST (IN THOUSANDS OF DOLLARS) The estimated costs given in this column begin as rough estimates usuallY based on historical data for the area. As work progresses, a better cost estimate can be developed. The estimated costs are updated at critical stages such as the time of the final field inspection, when plans are more defined and estimates can be relied upon to closely compare with the final project costs. To the far left of the ESTIMATED COST column box the letters PE, RW, CN and TO appear with the cost estimates to their right. PE This stands for preliminary engineering. In this phase a preliminary field survey, utility location, environmental/historical studies, road design alternatives, drawings, final field inspections and public hearings will be done. This process can take a few months to several years to complete. A time line showing how long this phase will last for this project can be found on this row in the ACTUAL ALLOCATION and PROJECTED ALLOCATION columns. RW This stands for right of way. This is the portion of the project in which negotiations with property owners take place, payments are made and arrangements with utility companies are finalized, to obtain the land necessary for the project. As with the PE portion, the cost estimates are to the right, followed by the time line for the work in this part of the project. Right of way work will not begin until most of the preliminary engineering steps are complete. CN This means construction. In this phase the project is advertised to prospective contractors for bids. awarded, construction can begin. The cost estimate and time line are shown to the right. Once the bids are opened and a contract TO This is the total of all cost estimates and should represent the final estimated cost of the project. In the lower left-hand comer of the ESTIMATED COST column box there is four-or five-digit number. This is a VDOT internal Program Project Management System number used to track the project. It is referred to as a PPMS number. PREVIOUS FUNDING This column indicates prior allocations given to this project in the years preceding the current Six-Year Improvement Program. ADD'L FUNDING REQUIRED/FUND SOURCE This column shows the total allocation needed to complete fimding of the project, less the mount in PREVIOUS FUNDING. The funding designation is indicated by a letter at the bottom of the box in the column. All designations except "S" indicate that federal funds are to be used for at least a portion of the project. FUNDING SOURCE IDENTIFICATION TABLE APD - Appalachian Development IMG - AD - Defense Access IR BOND - Bond Issue IX BR - Bridge Replacement M BH Bridge Rehabilitation MR CM - Congestion Mitigation & Air Quality NH DEMO- Demonstration S EN Enhancement STP F - Consolidated Primary TB HES - Hazard Elimination TFRA - HPD - TEA-21 High Priority RRP I - Interstate RRS ID - Interstate Discretionary IM - Interstate Maintenance Interstate Maintenance Grade Crossing Interstate 4R Interstate Substitution Urbanized Maintenance Replacement National Highway State Surface Transportation Program Timber Bridge Toll Facilities Revolving Account Rail Highway Protective Devices Rail Highway Grade Separation ACTUAL ALLOCATION The column shows how much money has been allocated to the project for the fiscal year in which the Six-Year Improvement Program was published. It is the current year's allocation. I I I I i I I I I ! I I I ! I I The years shown under the ACTUAL ALLOCATION and PROJECTED ALLOCATIONS header, represent fiscal years beginning July 1 and ending June 30. The horizontal lines found in the year columns depict time lines for the PE, RW, and Construction activities. The placement of the time line within the fiscal year column indicates the start of the activity. Each column represents the 4 quarters of the fiscal year, with the start of each time line encompassing a span of three months. For example, a project activity starting in the second quarter of the fiscal year could be interpreted as beginning in October, November or December. At the bottOm of the ACTUAL ALLOCATION box, there is a long nuinber with dashes and letters. This is the official state project number. This number appears on all documents and correspondence related to the project. In the Urban portion of the Six-Year Improvement'Program, the project number is found in the DESCRIPTION PROJECT NUMBER column. The project number can be broken as follows: Example: (FO)OR(NFO)0340-007-106, PE 104,RW204,C504 (FO)-(NFO) beginning with Fiscal Year 1995-96 new projects showing a prefix in parentheses of"FO" represents federal oversight and "NFO" represents no federal oversight. 0340- means that this project is located on Route 340. A project beginning with U000 is an Urban project and located only in a city. Those projects beginning with a 6, such as 6522, mean the road is an arterial corridor. 007- is a county/city code. 007 is the code for Augusta County. 106- is a section number assigned sequentially along ea6h mute. This number also helps differentiate this project from others on Route 340 in Augusta County. An "S" in place of the first digit represents a safety project, an "F" represents federal oversight in all phases and a "V" represents no federal oversight past the environmental process. PE104- is the preliminary engineering number. Usually this is a 101 number. A 104 number indicates that three other projects relating to this project using the 0340-007-106 number are or have been in existence. RW204- is the right of way number. As with the PE number, this number usually is 201. A 204 number indicates other projects relating to this project have been or are planned to be built. C504- is the construction number and follows the same format as PE and RW above. Other construction letter codes are as follows: P = Paving, G = grading, L = landscaping, B = bridges, M = minimum plan, N = no plan, D = box culvert/drainage structure, FS = flashing signal (railroad crossing), S = sign plan PROJECTED ALLOCATIONS This column has five subcolumns listed by fiscal year. fiscal year, Each column shows the amount of money anticipated to be available for the project for that BALANCE TO COMPLETE This column shows allocations needed in future years, beyond the Six-Year Improvement Program, to complete paying for the project. Adding the BALANCE TO COMPLETE, PROJECTED ALLOCATIONS and ACTUAL/~LLOCATION will equal the amount shown in ADD'L FUNDING REQUIRED/FUND SOURCE column. Secondary roads (generally roads with route numbers 600 and above) are not included in this program. The secondary road program is developed by each county in conjunction with VDOT. Consequently, each county has its own Six-Year Improvement Program for secondary roads. I I ! ! ! ! i TABLE OF CONTENTS VOLUME 1 ! I ! Improvement Program: i I ! I ! I i FOREWORD This program is the Commonwealth Transportation Board's plan for the use of funds anticipated to be available for ports, airports, public transit, and highway construction in the 1999-2000 fiscal year. The Board also uses this Six-Year Program to distribute funds anticipated for the next five fiscal years through 2004-2005. The revenue projections on which this program are based include all funds anticipated, both federal and state, to be available for distribution by the Board as mandated by State statutes for preliminary engineering, right of way, and construction on the InterState, Primary, Urban, and Secondary Systems, as well as funds anticipated to be available for ports, airports, and rail and public transportation. To seek the maximum input from the public, hearings are held yearly in each of the nine construction districts in the Commonwealth. Advice and input are solicited from members of the General Assembly, members of the county boards of superVisors, city council members, other public officials, and the general public. This year hundreds of individuals attended these hearings, and their input into this program is highly significant. The Board's principal objectives in developing this particular update of the program are to complete the financing of projects that are under way or completed, to address the most pressing needs on the Primary and Interstate Systems, to respond to the transportation needs of cities and towns, support public transit, and provide funds from the Commonwealth Transportation Trust Fund to upgrade ports and airports. The Transportation Equity Act for the 21st Century or "TEA-21", signed by the President on June 9, 1998 contained provisions for continuing the Congestion Mitigation and Air Quality Improvement Program (CMAQ), the Regional Surface Transportation Program, the Safety Progrmqa and the Enhancement Program. This federal-aid legislation establishes federal authorizations through 2003, thus providing better planning for future revenues. This will enable Virginia to continue an aggressive construction program. Also included in the new law were numerous high priority projects, of which 42 were identified in Virginia for special funding. In 1989 the Virginia General Assembly enacted House Bill 1836, establishing the Route 58 Corridor Development Program. In addition to annual general fund appropriations to support the program, the General Assembly also authorized the issuance of $600 million in revenue bonds for this purpose. The 1999 General Assembly increased that amount to $704.3 million. 2 I I i I i I i I I I I I I I i i I I i ~IHS-INTERSTATE NHS-NONINTERSTATE PRIMARY SECONDARY TEA-21 HIGH PRIORITY * CTB/STP ~WDE. T~TAL STP REGIONAL TOTAL ENHANCEMENT (+ Statewide) , SAFETY (+ Undistributed) StateWide Summary (In ThOusands of DOllars) Fiscal Years Allocation 215,808! 234,202 41,230[ 31,813 201,557 215,059 161,891 172,978 225,440 241,933 43,918 41,738 27,250 27,751 34,17~ 30,813 204,473 42,311 205,41~} 164,994] 226,4751 53,870 4,000 0 34,813 34,179 56,833 18,531 57,883 18,531 10,133 8,291 55,325 10,133 18,531 10,133 RAIL SAFETY (+ Undistrib.) 8,291 8,291 MASS TRANSIT 111,886 112,258 118,097 1,155,773 TOTAL 1,214,768 1,157,402 * Includes $2',500,000.00 per yea'r for FY00.tl~u FY03 in Special Appropriations. ** Includes undistributed allocations.. 252,990 274,929 20,380 10,700 218,736 229,913 175,989 184,621 245,897 43,918 28,347 34,705 255,716 28,911 34,705 0 0 34,705 34,705 59,131 60,366 18,531 16,681 10,133 10,119 8,291 8,279 123,788 1,240,836 129,305 1,244,245 283,775 8,700 257,264 205,388 281,887 0 29,486 1,466,177 155,134 1,327,945] 1,065,8611 1,477,3481 :.1.83,444 162,542 0 165,302 0 8,000 0 173,302 61,628 351,166 16,970 107,775 10,331 60,982 49,895 8,452 134,236 729,570 1,298,117 7,311,141 3 1999-00 2000-01 2002-03 2003-04 2004-05 TOTAL Air Carrier Airports Air Carrier and Reliever Airports General Aviation Airports Total 6,485 6,683 6,966 7,219 7,516 7,847 42,716 6,485 6,683 6,966 7,219 7,516 7,847 42,716 3,242 3,341 3,482 3,611 3,757 3,924 21,357 16,212 16,707 17,414 18,049 18,789 19,618 106,789 Port Capital Facilities Preservation of Capital Facilities Total 15,663 15,663 15,663 15,663 15,663 15,663 93,978 11,438 12,267 13,468 14,542 15,798 17,208 84,721 27,101 27,930 29,131 30,205 31,461 32,871 178,699 Special Programs Capital Assistance Formula Assistance Total 1,443 1,464 1,527 1,583 1,649. 1,723 9,389 24,049 24,393 25,444 26,382 27,480 28,713 156,461 70,703 71,717 74,805 77,562 80,792 84,415 459,995 96,195 9%574 101,776 105,527 109,921 114,851 625,844 122 , 48 514,672 536,951 556,810 580,105 606,061 3,287,917! 1,514 1,558 1,605 1,652 1,701 8,153t 658,397 686,830 712,195 741,929 775,102 4,207,402! TRANSPORTATION TRUSTFUND I I t ~ 4 STATEWIDE I I i ! I I I I I I ! I I ! I I I York [George P, Coleman) 12.6 Miles Extension; Route 7 near Leesburg · Route 28 Route 44 Route 360 Interchange Interchange CTB/STP Statewide Allocations TEA.21 High Priority Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project wilh Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest TOLL FACILITIES REVOLVING ACCOUNT STATEWIDE 5 ~tomer Service Center TOTAL [1) Nat{onal Highway System Allocations CTB/STP Statewtde Allocations TEA-21 High Priority Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest TOLL FACILITIES REVOLVING ACCOUNT STATEWIDE i I i I i i I I Vehicle Toll Administration Building ~O O3 ~O; 267 - Fourth Lane Interchange Improvements at Toll Booth 14888/15655 14888 I *Includes PE for Wiehle Avenue Interchange Hill Road Ramp to Westbound Duties Toll Road National Highway System Allocations (4) STP Regional Nlooattons CTB/STP Statewide Allocations (5) Federal Demonstration Funds TEA-21 High Priority Funds (6) Cooperative Project wilh Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest NORTHERN VIRGINIA DISTRICT DULLES TOLL ROAD 7 Security b"yst~ a! th~ Dulles Toll Road Collection Equipment at the Hemdon/Uonroe Commuter Parking Lot Western Regional Park and Ride Construction Transit Set-Aside Hunter Mill Road Interchange Improvements 12314 --! ! (Du{les , System Allocations CTS/STP Statewide Alkx~atio~s High Priodty Funds (4) STP Regional Allocations {5) Federal Demonstration FUnds (6) Cooperative Project with Oth~ System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest DULLES TOLL ROAD NORTHERN VIRGINIA DISTRICT ] ] ! I ' ! Set-Aside Express Bus Sewice Pilot Project Transit Set-Aside Transit Set-Aside TOTAL National Highway System Allocations CTB/STP Statewide Nlocations TEA-21 High Priority Funds (4) STP Regional Allocations (5) Federal -Demonstration Funds (6) Cooperative Project with Other System (7) CooPerative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest NORTHERN VIRGINIA DISTRICT DULLES TOLL ROAD 9 for all ' of Bristol, Mendota Trail Park Georgetown Pike Trait Park Sidewalk Project Development of the Cou~onse Square Project National Highway System Allocations CTB/STP Statewide Allocations TEA-21 High Pdority Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) 8ondsflnte~est "OFF THE TOP" THROUGH LEGISLATIVE ACTION 10 STATEWIDE I ! I I I I ! ! I I ! i ] I I I ! I i of Suffolk of the Station n of GRTC Routes Into the Surrounding Counties Route MatChing Federal Funds Naval Base and Airport Counf~es kllocations CTB/STP Statawids Allocations TEA.21 High Priority Funds (4) STP Regional Nlocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (?) Cooperative Project with Other Localities (8] Funded on a Previous Project (9] Bonds/interest "OFF THE TOP" THROUGH LEGISLATIVE ACTION 11 STATEWIDE Technology Implementation of West Virginia Tourist Train Service ~'unding for Study f the TOTAL [ I National Highway System Allocations OTB/STP Statewide Allocations Funds Federal Demonstration Funds (4~) STP Regional Nlecations Cooperative Project with Other System {7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest "OFF THE TOP" THROUGH LEGISLATIVE ACTION STATEWlDE 12 ! ! '! ! - ! ~ommon w~alth Yran~p orta tion ~oard fiscal year ! ! BristolDistrict Bri~tolDi~trict I I ] I I I ! I ! I ] ] I I ! I ! I ! BristOl District (In Thousands of Dollars) Fiscal Years Allocation NHS-INTERSTATE NHS-NONINTERSTATE 13,065 7,277 22,948 PRIMARY URBAN 5,294 SECONDARY 24,437 TEA-21 HIGH PRIORITY* 14,383 CMAQ TOTAL 0 CTB/STP STWDE. TOTAL STP REGIONAL TOTAL 2,150 0 ENHANCEMENT 1,825 SAFETY 1,265 RAIL SAFETY 699 MASS TRANSIT 84~ 12,511 8,690 22,257 5,239 24,327 2,876 0 1,150 16,011 1,333 24~931 5,563 25,996 3,034 250 15,364 1,000 25,419 5,663 26,430 3,034 14,083 1,000 26,970 5,921 27,592 500 14,499 1,000 30,033 6,521 ~0'266 0 85,533 20,30( 152,558 34,201 159,048 0 4,050 0 0 0 0 0 ANNUAL ALLOCATIONS 1,825 ANNUAL ALLOCATIONS 1,265 ANNUAL ALLOCATIONS 699 82,319 848 483,654 I TOTAL ........................... 94,191 77,050I *Includ~s'$11,507,000.00 in Appalachian Highway DevelOpment Funds. ANNUAL ALLOCATIONS 77,118.. i 76'9101 76,0661 RW CN TO East River Mountain Tunnel PE RW CN TO 18923 East River Mountain Tunnel PE RW CN TO 18924 Big Walker Mountain Tunnel RW CN TO 18925 Big Walker Mountain Tunnel PE RW CN TO 18926 Intersection Route 1-77t81 (At Wytheville)- Interse~ou Route 1-77/81 (At Fort PE RW CN TO 51441 (1) National Highway System Nlocations CTB/STP Statewide Allocations Funds (4) STP Regional Allocations (5] Federal Demoosb'ation Funds (6] Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM ! i I 14 BRISTOL DISTRICT I I ! ! I I ! ! I I I I I ! I I ! I I I Structure #2044 SB & CN [0.8 Mile West Route 683) PE RW CN TO Lanes Line - 1,6 km No~ Route 704 (Exit 22) RW CN TO Route 11 (: Tennessee)- State Une 123O6 PE RW CN TO 13886 5.1 km North State Une PE RW CN TO from 4 State Line PE RW CN TO i I I ! (7) CTB/STP Statewlde Allocations ; Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project wla Other System )roject with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM 15 BRISTOL DISTRICT from4 Lanes Interchange Improvements and }to8 ~l- Smyth & Wythe .2 Bristol - 1.1 km South Route 611 PE RW Chi TO PE RW CN TO 14884 PE RW CN TO (0,8 Mile West Route 680) 17745 PE RW CN TO West Route 77 (Wythevi~le) - 1,6 km North Route 77 PE RW CN TO PE RW CN TO I0081-095-F16~PE10 ,RW201, ' ........ , , .......... ! ! t7744 Nal~onal Highway System Allocations t TEA-21 High Priority Funds 4) 5) Funds (8) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM 16 BRISTOL DISTRICT I ' I ! I I I ! I I I I I i I I I I ! I i · j ID stHctwide Adwsoi7 Rad o ~ ~ ~ ~ ~-~ ~1 )ther Localities CTBISTP Statewide Allocations Funds (8) Funded on a Previous Project High Priortly Funds C~opemtive Project with Other System (9) Boeds/Interest INTERSTATE SYSTEM BRISTOL DISTRICT 17 razewell Pave & Light Park and Ride Lot Russell Parallel Lane 19- s: Russell Parallel Russell '(2 to 4 Lanes) I I / , a / 12531278 / / ;c.~--.$.a. _ _ _ . - - ~ / 19- BLUEFIEEDBYPA~S: / PE'" / r ' / / raz~ell 5 2 U les West West Wginia State Line- =arallel ~2 to 4 Lanes)West Virginia Slate Line t / / I ,, , ........ . / / / / _~ / 4.o ~i~ /~ / / APO/S ~ / ~9- 2,3 Miles East / PE ~ / i ~ I " ~ ' / / f~ewell Rus~lt~unty Line- / RWcN / I ~ // // Parallel Lane Ru~ell ~nty 2 to 4 Lanes) Line / TO ~ / / / C~e[e _ .......... ~ ._ ' '~ ..... . . ' _ I / ..... 2.3 Miles (1) Na~onal Highway System AIl~ti~s 1 (2) CTBfSTP S~tewide AIl~s (5) Fed~al Bemons~a~ Funds (3) TEA-21 High P~ority Funds (6) C~eraave Pr~t ~B ~er System (9) Bonds/Interest PRIMARY SYSTEM 18 BRISTOL ,DISTRICT I I I I I i ! I I ! i ! ! I I I I I I I Tazewell Interseclion Improvement Reconstruction of 1,5 Miles (Claypcol Hill) 1126 County Line- PE RW CN TO 18927 'RW CO TO 52221 PE RW CO TO State Line - 4 Lane Roadway r of 1.1 Miles East of Norton 4 Lanes on Limits of Norton. GAP: )1 Miles N,W. NI. 58 (Morgan Avenue)- National Highway System Allocations CTB/STP Statewide Allocations Funds PE RW CN TO 10181 13351 CN 575 RW CN TO 18928 i (5) Federal Demonstration Funds (6) Cooperative Project with O~her System Other Localities (8) Funded on a Previous Project (9) Bonds/interest PRIMARY SYSTEM BRISTOL DISTRICT 19 1.3 Miles Ride Lot t,2 Miles East West St. Paul Corporate Limits St, Paul - Corporate Limits 67O Route 421 at Dot Route 636 (Scott Co.) 5.9kin Interseclion Route 633 PE RW CN TO RW CN TO 15219 PE RW CO TO PE RW CN TO 18929 PE RW CN TO 50305 PE RW CN TO 16031 '~1) National Highway System Allocations CTBISTP Statewide Nlocations TEA-21 High Priority Funds (4) (5) Federal Demons{ration Funds (0) Cooperative Project with Other System Project wiS~ Other Localities (8) Funded on a Previous Project (9) gondsflnterest PRIMARY SYSTEM 2O BRISTOL DISTRICT I I I I '1 I il I Ii I I I I I I I I ! New Loca- a~ 1061) RW ON TO Uttle D.7 Mile East West New Loca- Coebum. Route 72 1.7 Miles COEBURN BYPASS: lanes on Route 72 - Little Route 72. Little Tom Tunnel Route 657 - Route 626 18930 PE RW CN TO 57? PE RW CN TO 12296 PE RW CN TO 884O PE RW CN TO 17748 PE RW CN TO CTB/STP Statewide Allocations i Funds (5) Federal Demonstration Funds (6) Cooperative Project with Olher System with Other Localities (8) Funded on a Previous Project (9) Bonds/interest PRIMARY SYSTEM 21 BRISTOL DISTRICT 3.3 Miles Route 58 - 58 (Jones~lle) Line PE RW CN TO 13341 PE RW CN TO 50304 7f- PE RW CN TO 17749 1,7 Miles South RW 2Lanes 3.0 Miles 2 Lanes 3791 South PE 797 - RW East CN TO 1.9 Miles RW & RW O~ly) 12764 CTB/STP Statewide Nlocattons ) TEA-21 High Priority Funds (4) STP Regional Nioca{ions (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8} Funded on a Previous Project (9} Bonds/interest PRIMARY SYSTEM 22 BRISTOL DISTRICT I I I I ! I I . I I I I I I I i I I I I I West PE Russell County Line - RW 2.0 Miles West CN TO Area 1.4 km 1823 Belween South PE RW CN 2.5 km South of TO Route Conslruct Climbing 1,5kin EB 0.2 km East Intersection Route 1001 t.5 km East Route Powers Lane Route 23 Business CTBISTP Statewide Allocations ~[iofity Funds 14808 RW CN TO 17750 RW CN TO 17751 RW CN TO 17752 PE RW CN TO 17753 (5) Federal Demonstration Funds (§) Cooperative Project with Other System (8] Funded on a Previous Project (91 Bonds/Interest BRISTOL DISTRICT PRIMARY SYSTEM 23 91- Washington Reconstruct Existing 2 Lanes (PE & RW Only) 4,8 km Washington Nidening and _oration Study Grayson Bddge :{eplacement Lanes on qew Location 100 * 2.6 Miles . Wythe Replacement 102 - 0,2 km South Route 734 - Route 11 Tennessee State Line - Route 58 (Wast ~)f Damascus) ~EW 'RIVER: [Str.# 1007) Bridge at Cripple Creek. Route 605 North NEW RIVER: Str,#1028) ~,t N,S, R,R,: Southeast of North Corporate Limits Bluefield - 1,9 km Northwest North Corporate PE RW CN TO 26O PE RW CN TO 13503 PE RW CN TO ~932 PE RW CN TO 8378 PE RW CN TO 18933 PE RW CN TO I' I ',1] National Highway System Allocations CTBtSTP Statewide Allocations TEA-21 High Priority Funds (4) (5) Federal Demonslration Funds (6) Cooperative Project with Other System Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 24 BRISTOL DISTRICT I 1 I I I i I I I I I -! I I I ! I I I 11 and Improvements and Correctional Site State Line - Mile West ~onte 809 (Harman 1.3 Miles East of ~outh Route 83 Mile East of South Route 83 PE RW CN TO PE RW CN ~ TO 17754 RW 3158 RW CN TO 233 RW CN TO Royal Cily) - ~oute 83/460 Intamectio~ PE RW CN TO 13505 Slatewide Allocations High Priority Funds . / I .. Includes $1,000 Sham by Town of Grundy ..... J J~a~ve Pr~e~ ~ ~rps of En~in~m ' Est. Mci. VDOT's ~u~ ~ a Non-Federal S~nsor ($) Cooperative Project wl~ Othe System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 25 BRISTOL DISTRICT SCL Grundy ~outh mute 615 PE RW CN TO 3,1 KB North NCL Grundy 17755 PE RW CN TO :L1 KB North RW Umils Greedy - CN kB West TO 6O9 3,SkB Buchanan State Une - Existing Route 460 RW Junction) CN Route 609 TO 18233 Mile WCL Richlands RW CO TO Lanes Route 806 RW I....... * Federal Appalachian Development Funds .................. National Highway SysteB Allocations CTBISTP Statewide Nlecations TEA-21 High Priority Funds (4) (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bondsflnterest PRIMARY SYSTEM 26 BRISTOL DISTRICT I PE RW CN TO Inia State Line - Route 23 RW CN TO 14810 (1) ~ (1) ~ ~i~ (1) ~t~ (1) fl) (1) ~ '~ ~ (3) ~ (3) (3) (3) {2) ~FqrCorridorAnalysi~,,T, hmughC, oridorSElection ,,, AccmalofFundsTowardCons~ucUon ...... IDistfictwide Advance Funding Barrier (1) (1) ~! (1) ~ Signs CTBISTP Statewide Allocations High Pdmity Funds (5) Federal Demonstration Funds (8) CoOperaUve Project with Oth~ System (8) Funded on a Previous Projecl (9) Bonds/Interest PRIMARY SYSTEM 27 BRISTOL DISTRICT Dis~clwide F~imary Matching Funds Required DISTRICT SUMMARY ;TATEWIDE ALLOCATIONS NATIONAL HIGHWAY SYSTEM ALLOCATIONS TEA-21 TEA-21 HIGH PRIORITY ALLOCATIONS ENHANCEMENT) (I) National Highway System Allocations ~ Project with Other Localities CTB/STP Statewide Allocations (5) (8) Funded on a Previous Project TEA-21 High Pdority Funds (6) Cooperative Project wilh Other System (9) Bonds/Interest PRIMARY SYSTEM 28 BRISTOL DISTRICT I I ! I I I ! 1 I ! I I I I I ! I I I (tMInivan) STATEWIDE ALLOCATIONS: CTB/STP Statewlde Allocations TEA-21 High Priority Funds (4),~ (5) Federal Bemonslratk)n Funds (6) CooperalJve Project wilh Other System (8} Funded on a Previous Project (9] Bonds/Interest PUBLIC TRANSPORTATION - CTBISTP STATEWIDE BRISTOL DISTRICT 29 National Recreation Area 5RW CN TO 71 t 9978 HIGH PRIORITY ALLOCATIONS National Highway System Allocations (4) STP Regional AlloCations CTBtSTP Statewide Allocations (5) Federal Demonstration Funds (8) Funded on a Previous Project TEA-21 High Priority Funds (6) Cooperative Project with Other.System (9) Bonds/Interest SECONDARY - TEA-2'! HIGH PRIORITY PROJECTS 3O BRISTOL DISTRICT I I i I I i I ! I I I I ! I ! ' I ! I CN 50533 Garden Hole ama of . RW Interstate CN Park TO ~ ~.~ RW CN ! PE RW CN TO PE RW ) CH TO House PE RW CN TO Sta~on CTB/STP Statewide AIIocallons High PriOry Funds 451 Federal DemonstratiOn (6) Cooperative Project with Other System Other Localities (8) Funded on a Previous Project (9) Bonds/Interest ENHANCEMENT - TEA-21 HIGH PRIORITY PROJECTS BRISTOL DISTRICT 31 Mountain Music Interpretive Center CN TO 50563 HIGH PRIORITY ALLOCATIONS t National Highway System Allocations i CTB/STP Statewide Allocations l TEA~21 High Priority Funds (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest ENHANCEMENT - TEA-2'I HIGH PRIORITY PROJECTS 32 BRISTOL DISTRICT '! ! I I I :1 I I ! ' ! ] ! I i ! ! I I I Norlh of R~itro~d Av9 (NFO) 0011-140-t04, 9931 Stone Gap 19th Street 2 Intersection Improvements Lane '. L~ne Includes Signals and Gates at Southern Railroad UOOO-IOl-V03, PEt01, ~OVer Powe~R~er UOOO-tOl-V04, PEI01, Fork Powell Rive~ Bridge & Aoproaches River U0O0-143-V(]6, PEI01 15786 14623 17638 ICon~,ruction Comp[e. ,:e ....... I ......... Allocations Funds (5) Includes CTS/STP Statewide Nlocatkms (6) Includes TEA-21 High Priorily Funds (7) r and Contract Administration by Municipality Minor Construction Project by Municipality (101 Cooperative Project with Other System URBAN SYSTEM BRISTOL DISTRICT 33 Lane U000-143-t07, RW201, CS0t Z Lane U000-143-108, RW201, CSOL Mile 5 Lane Mile Lane ,Ortveto (NFO}U000.102-10~, 1-81 PEIO1, 1t Lane U000-102-107, PE101, RW201, RW202, C$01, 3Lane 1) National Highway System Allocatic~s Funds 14621 175O8 COnstruction Comple :e .......... I ..... 16193 (6) Includes TEA.21 High Priorily Funds ' and Contract Administration by Municipality Administration b (9) Minor Construction Project by Municipality (10) Cooperative Project with Other System URBAN SYSTEM 34 BRISTOL DISTRICT ! ! ! I I i i Il I I ! I Bridge and ,~e~roaches 2Lane UOOO-11g-V05, PEI01 SCL 19-106, PEI01 ,PE10t, M over Guest River 146~2 15492 15757 U000-146-V05, PE101 Replacement (NFO) 0460-148-101, PE101, RW201, C501, CTB/STP Statewide Nlocations , Funds 17639 ($) (6) Includes TEA*21 High Rto~tty Funds (?} r and Contra~t Administration by Municipality (g) Minor Conslru~lon Project by Municipality (10) Cooperative project with Other System URBAN SYSTEM BRISTOL DISTRICT 35 Mile 2L~e , C501, No~h of Route 91 PE102, Lane Lane Lane 0016-158.10~, 161460 U000-158-104, PEI0t, ~orton-Wlse Road National Highway System Allocations CTB~TP Statew'~e Allocations TEA-21 High Priority Funds URBAN SYSTEM 9930 18907 9918 17817 (6) Includes TEA.21 High Priority Funds (7) Plans, Right of Way and Contract Administration by MunioipalitV 36 (9) Minor Construction Project by Municipality (10) Cooperative Project w'~h Other System BRISTOL DISTRICT i ! I 'i i ! ! ! ! i ! i ! I I ! ! 8L Ext. 2 Laneon RW e Rd. 2 Lane PEtOt, End of Existinfl Nye Rd, U000-139-t06, PE101, Peppers Fern/ Lithia Road U000-139.107, PE101, 271 12531 15785 BRISTOL DISTRICT TOTALS Highway System Allocations CTB/STP Statewtde Allocations High PP;o~ Funds (5) (6) Includes TEA-21 High RIodty Funds t and Contract Administration by Mun~l~alily (9) Minor Construction Project byMuniclpality (I0) CooperatNe P[oJect with Other System URBAN SYSTEM 37 BRISTOL DISTRICT BRISTOL ,DISTR ,,CT SECONDARY SYSTEM CONSTRUCTION IMPROVEMENT PROGRAM FISCAL YEAR ALLOCATIONS Bla~ 703,772 ,~ 698,007 ~: 746,579~.~ 759.072~:~[ 793~05 :~ 873.854 ~ 4,574,789 Buchanan ~ z,z~p.~v.~ ~ 2.241.0.~2 ~::~ 2~392,786~ 2,433.1()8~:~ 2.537.38()~'.~ ,.776.101 ~ 14.625.899 ,- 174'605, Dickenson }~[ 1,174,201 ~ 1,254,029~ 1.275,223~;~ 1.328,924 ~ 1A51.897 ~}}; 7.658,878 I ~ayson , ' 2,053861 ~ ' ~ ' ~ ?~ ~ ' ~' ' ' ~ ' ' ~:*:' ' :~;.~ 2,033,~32 ~.~:: 2,173,626:~ 2.209,6>6 ~:~ 2.312.046 ~, 2,>49~645 ~ 13,332.166 Lee ~: 2,225,269 ~ ~;~ 2,212,686 ;~ 2,~64.291~ 2,40.~.7~5~;,~ 2,510,64.~ ~,'~ 2.756,965 ~ 14,473,589 Russell }~ 2,610,697 ~:{~ 2.790,2641~ 2,836,652 ~ 2,965,146 ~3~} 3.262.137 ?;~ 17,095,466 Seo~ ~.~:. }~ 2,~ 90,629 ~:~ 2,768~720~?~ 2,814,728~;; 2,943.632 ~;~:~ 3.242.058 x~g 16,973,231 '~:~ ~':~ 1-749,673, ~::~:~ ~ Sm~h g3 1,746,354 ;~;~: 1.866,182i~.~ 1.897.412 ~3~ 1.978778~;~ 2,165,356 ¢:~ 11,403,754 T~ewell ~ 2.284,364 ~ 2,281.690 ¢?;;.¢ .2.438.156~:~ 2.47¢,08~ ~:~; 2,584,521 ~ 2,826,~26~¢~ 14,894,141 W~hin~on ~ :~,0~ 1~240~ p,02..597 ?: 3.2.~ 1.786 ;~ p,285,734 ~:~ 3,427,560 ~¢:~ 3.753,207 ~. 19,753,123 ~:,~ ~.~ 1,725,519 ~;~: 1,842,099 ~ 1,873,p14 :;.~ I,~48.263 ~:~t 2.11T806 ~:-~ 11,224,190 WytheWiSe ;:~ 2,007,2541}717~191 ~ 1,989,757 ~ 2, t27,270~ 2,162.544~ 2.261~5817 2,491,088 }~ ' 13,039,493 Total ~ ~ ~ 24,327,492 ~ 25,995,787 ~ 26,430~260 ~ 27}591}978 ~ ~~ 159,048,719 SECONDARY SYSTEM 38 BRISTOL DISTRICT I ! i ~ommonw~alth Han~po(tat/on ~oa(d 6 C#lp~p~r D~trJct £u~oeper Di~trict CulpePer District (In Thousands of Dollars) Fiscal Years Allocation NHS-INTERSTATE NHS-NONINTERSTATE PRIMARY URBAN SECONDARY TEA-21 HIGH PRIORITY * CMAQ CMAQ TOTAL c't~s I ct~/st~ stwo~, tOTAE STP REGIONAL TOTAL 1,126 1,500 18,713 4,177 17,441 830 1,500 18,409 4,134 17,386 1'2501 0 19,637 19,978 4,140 830 460 430 464 1,500 1,500 1,500 1,500 9,000 21,034 23,337 121,108 4,671 19,727 0 5,146 21,620 0 0 0 1,250 0 0 0 0 0 4,468 4,390 . 18,596 18,906 ""1'~250'i 50 1,2 0 0 500 26,984 113,674 5,000 0~ 500 0 0 0 0 0 0 ENHANCEMENT 1,825 ANNUAL ALLOCATIONS 1,825 SAFETY 1,806 ANNUAL ALLOCATIONS 1,806 RAIL SAFETY 257. ANNUAL ALLOCATIONS 257 ANNUAL ALLOCATIONS 43,5091 46,2031 ..... 46,5621 47,8..62] 52,067 1,254 MASS TRANSIT TOTAL 49,349 * lnclu~les $1,250,000.00 per year for FY00 thru FY0~'"in Special Appropriations. 1,254 285,552 39 Detection Districtwide MM 105 EB MMH3WB (A{ Rest Area 3W) hals Barrier RW CN TO 14656 PE RW CN TO 52338 RW CN TO 15479 t!(1) National Highway System Allocations (2) CTB/STP Statewide Allocations ) TEA-21 High Priority Funds (4) STP Regional Allocations (5) Federal Demonsl~on Funds (6) Cooperative Project with Other System (7) Coopem{ive Project wilh Other Localilies {8) Funded on Previous Project (9) Bonds/Interest INTERSTATE SYSTEM CULPEPER DISTRICT 40 I I ! I I i I I ! I I I I I I ! I I I Variable Message Sign Initiative DISTRICT SUMMARY Highway System Allocations CTBISTP Statewide Allocations h Priority Funds (4) STP ReglonalNIocati0ns 5) Federal Demonstration Funds 6) Cooperative Project wilh Other System (7) CooperaUve Project with Other Localities (8) Funded on PrevioUs Projecl (9) Bonds/Interest CULPEPER DISTRICT INTERSTATE SYSTEM 41 4 Lanes on New Loc~tion Culpeper Parallel Lane (2 to 4 Lanes) (PE Only) 6.7 km Parallel Lane ;ounty Line - West Culpeper and Orange County Une 3range County Une- 6.9 km East Route 29 4.3 Miles East Route 29. 3,3 Miles East Route 29 4.2 Miles East Route 522 1.1 Miles Culpeper Pamllel Lane 2,9 km Nor~ North ~orporate Limits Culpeper 15 & 29 - 3.3 Mile Ninth Route Fauquier 15129 Bypass- Construct 3rd Lane 1,4 Miles North Route I- NBL & SBL ~,5129 Bypass National Highway System Allocations CTB/STP State,',,ide Allocations High Priority Funds RW CN TO RW CN TO 14657 RW CN TO 14658 PE RW CO TO 52339 PE RW CN TO RW CN TO 11044 (4) STP Regional Nlouatio~ (5) Federal Demonstration Funds (6) Cooperative Project with Other System t Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM CULPEPER DISTRICT 42 I I I I I ! i I I I PE Prince William RW Line CN TO Route 68'/- Intersection Improvements Route 687 - 2.4 km 15&29. Route 17 (Opal) 14659 RW 15984 RW TO 15 - RIVER: H. Cocke 15- Bremo Bluff (Sff.# 1987) RIVANNA RIVER: 0,5 km North Rivanna River. 0,6 km South Rivanna River (At Palmyra) 15- Intersection ntersection ;m Non Louisa/ CoL 15977 PE RW CN TO 12768 PE RW CN TO RW CN TO 16536 165~ [1) National Highway System Nlocatioes CTBISTP Statewide Ntocations TEA-21 High Priority Funds (4) STP Regloual Allocations (5) Federal Demonsffation Funds (6) Cooperative Project with Other System Coo eratlvePr~ ect~th L ch p oI ' yn ~,,i' (?) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest CULPEPER DISTRICT PRIMARY SYSTEM 43 15- 0.1 Mile 2.5 Miles 17- vier PE S. Route 614 - RW CN [Str. #1002) TO 17019 SPUR: RW Route 29 Bypass CN TO Route 17 Iht, Route 713 & PE InL Route 55 RW CN TO HARDWARE RIVER: Car~er's Bridge RW 1061) CN ?O Route 53- RW Lanes 1,5 km South CN Route 53 TO 17619 North of RemingtonF RW Prince William CN County Une TO 17977 I(1) National Highway System Allocations (2) CTBtSTP Statewide Allocations (3),TEA-21.,, High Priority Funds {4) STP Regional Allocations (5) Fedem! Demonstration Funds (6) CoopemUve Project with Other System (7) Cooperative Prolect with Other Localities (8) Funded on a Previous Project (g) Bonds/Interest r,i PRIMARY SYSTEM 44 CULPEPER DISTRICT I I I " I ~ 610 (Midland)- 0.7 km East Int. 649 PE RW CN TO 1.4 km from 4 to 6 1.8 Miles Lanes with Cont, Right Turn Lane Each Direclion North Corporate Limits Charlottes* Mile North Rio Road (Route 631) Mite No~lh Rio ;~oad (Route 631)- South FoA Rivanna ~iver I§997 PE RW CN TO 13348 PE RW CN TO Route 643 - D.2 km No~ Route 649 RW CN TO 4.0 km 29- Albemarle Management Greene County Line 3160 PE RW CN TO 17621 RIVER: RW I km S, South CN Fo~k Rivanna River- TO <m N. Route 643 159~8 I CTBtSTP Statewide Allocations t TEA-21 High Priority Funds (4) STP RegiOnal Nlocali0n$ (5) Federal Demonslratlon Funds (6) Cooperative Project with Other System (7) Cooperative Rroject with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest CULPEPER DISTRICT PRIMARY SYSTEM 45 Replace Bridge on Soulhbound Lane Improve Vertical BYPASS: Rou{e) FORK HARDWARE RIVER: km North Route 641 - km Norlh Fauquier Pdnce William (PE Onty) County Une Line * Madison County Management Line and Cha~lottesvi~le RW CN TO 16160 PE RW CN TO PE RW CN 'TO RW CN TO 13492 RW CN TO 181O4 RW CN TO 12782 (1) National Highway System Allocations CTB/STP Statewide Allocations Priority Funds (4) STP Regional Allocations (5) Federal 0emons~ation Funds (6) Cooperative Project wi~ Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM I I I 46 CULPEPER DISTRICT Lane ImproveSight Route 29 NB Approach at Route 97'31 RW CN TO 14662 RW CN TO 1.0Mi~ lusiness- 4 Laneson New Location Route 15- ;oulh Route 29 Bypass NBL PE RW CN TO 1,0 km , Soulhbound Route ~ - Fontaine Avenue RW CN TO Lanes on .ocafion BYPASS 0.9 km West WCL Stanardsville- PE RW CN TO Stanardsville LocaBon 1.6 Miles West West Corporate Limits Stanardsville- 0.6 Mite West West Corporate Umits Stanardsville PE RW CN TO 15247 ',1) National Highway System Nloca~ns CTB/STP Statewide Allocations h Priorily Funds (4) STP 'Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System ~i Cooperative Projebt with Other Localities (8) Funded on a Previous Project (9) Bondsllnterest CULPEPER DISTRICT PRIMARY SYSTEM 47 Lanes on 4-Lane Only) 2.9 km 0,8 km Calming Lock Lane Drive RW 11045 Lock Lane Drive- 33 PE RW CN TO 11046 PE RW CO TO ' TEA-21 3 Lanes with Creek Only) County Line Island PE RW CN TO 18697 Soulh RW East CN TO 16522 RW CN TO 18898 [1) National Highway System Allocations CTB/STP Statewide Allocations i TEA-21 High Priorib/Funds (4) STP Regional Allocations (5) Federal [:)emonsb'ation Funds (6) Cooperative Project with Other System {7) Cooperative Project with Other Localities (8] Funded on a Previous Project (9) Bondsltntemst PRIMARY SYSTEM 48 CULPEPER DISTRICT I I ' I 11 I I ! ' I I I i I ' I '! I 211 - Expand Commuter Parking Lot Lane& PE RW CN TO 52283 :),2 km West Int. Route 522 - ~).3 km East Int. PE RW CN TO 0.4 km Route 652 - 0.4 km South 15982 PE RW CN TO 0.7 km No~ Corporate Limit of Culpeper - 1.3 km North of North Corporate Limit 16419 PE RW CN TO 1.3 km 231 - ~adison I Miles North North Corporate Limits Madison (Route 609 West)-5A Miles 1008) 18899 PE RW CN TO 12777 PE CN TO 18901 Highway System AIIocatiohs CTB/STP Statewide Allocations Priority Funds (4) STP Regional NlocalJons (5) Federal Demonstration Funds (6) Cooperative Project with Other System (?] Cooperative Project with Other Localities (8] Funded on a Previous Project (9) Bonds/Interest CULPEPER DISTRICT PRIMARY SYSTEM 49 0.5 km 0,4 kin 0. t Mile West Int. Route 80g - 0.1 Mile East Int. Route 809 Intersection Route 689 - Route 689 Route 647 (Northgrounds UVA Campus) RW CN TO 17146 PE RW CN TO 17622 RW CN TO 15981 PE RW CN TO 12784 Bddges Beaufifica~on Improvemen~ National Highway System Allocations CTB/STP Statewide Nlocations TEA-21 High Priority Funds (4) STP Regional AIIoca~ns (5) Federal Demonstration Funds {6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 50 CULPEPER DISTRICT I I I I i I i I ! I ' I ! I I I I New nstallations nstaltations Buardmil Pavement Markers Signs Signals Funds Required for Fibe~ Optics Resource Sharing D STRICT SUMMARY CTB/STP STATEWIDE ALLOCATIONS NATIONAL HIGHWAY SYSTEM ALLOCATIONS SPECIAL APPROPRIATION (TEA-21) National Highway System Nlocations CTB/STP Statewide Allocations TEA~21 High Priority Funds {4) STP Regional Nlocations (5) Federal Bemonstration Funds (6) Cooperative PmJec~ with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest CULPEPER DISTRICT PRIMARY SYSTEM 51 RW CN TO (FIC. Bus Purchase (4 Body on Chassis & 6 Vans) RW CN TO 'of Purchase 13 Vans, 2 Mini-Vans & Famboxes Replacement Trolleys RW CN TO PE RW CN TO TOTAL CTBISTP STATEWIDE ALLOCATIONS: PUBLIC TRANSPORTATION - CTBISTP STATEWIDE CULPEPER DISTRICT 52 ' I II " ! Lane Street $i.qnal , PE10I, Barracks Road Road 4 Lane Parkway 4 L.ane 10th St. 3-La Underpass Brid~le Emmett Street PEI01, Route 250 B~3ass U000-104-V02, PE10t, RW201 U000-104-102 Cherry Ave. to Main St, U000-104-V08, PE101, RW201, C501, B605, Bridfle over Norfolk Southern Railroad , PE101, CTB/STP Statewide Allocations High Priority Funds 14643 14644 2529 15487 2525 14645 (5) InClUde~ CTB/STP'Statewide Nlocations (6) Includes Tea.21 High Prlmity Funds ~ Administration by Municipality (9) Minor Construction Project by Municipality (10) Cooperative Project with Olher system CULPEPER DISTRICT URBAN SYSTEM 53 ;)owntown Transit DRPT , PEI01, C501 , PE101, Lane 3229-204-101, PE10t, Bddfle and Approaches Mils , PE101, Funds qequimd for Federal ~ulpeper Rd. , PEt01, (1) National Highway System Nlocations CTB/STP Statewide Atlocat~m Funds Includes National 51414 18967 (6) Includes Tea-21 High Priority Funds t of Way and Contracl Administration by Municipality (9) Minor Construction Pr~ect by Munictpallly (10) Cooperative Projec~ with Other System URBAN SYSTEM CULPEPER DISTRICT 54 Required for Federal Safety Program in , Ave. Garrett St. & 5 Lane knYO.7 M (FO) 7029-156-10~, 2516 ~,PPORTIONMENTS NOT ALLOCATED TOTAL TEA-21 RESTORATION ACT FUNDING Emmett Street CTB/STP Statewide Allocations Funds {5) Includes CTi~/STP SMtewtde Allocations (6) Includes Tea-21 High Priority Funds {7) Plans, Right of Way and Contract Administration by Municipality (9) Minor Construction Project by Municipality (10) Cooperative Projed wilh Other System URBAN SYSTEM CULPEPER DISTRICT 55 CULPEPER DIST~CT SECONDARY SYSTEM CONSTRUCTION IMPROVEMENT PROGRAM FISCAL YEAR ALLOCATIONS ~'*~ 4,894.464 ~ 5,234,852] ~. 5 ~22,067~' ~ ~46 798 ~;;' 6 062 242 ¢,:~ 31 956,088 ...~ 1 184.588 .:; t .269,250, ~ 1,290,283 ..... 1.346.916 1.479.045 ~,, 7 760 028 ~¢~ 838.552 ~} 897,9()2i~5 912.782.;~:: 951.9M ;~;: t,042,463 5~ 5,483,777 Louisa ~ 1.808.061 ~ 1,799,776 '~ 1,925,772 ~ 1.957.946 ~ 2.043}875 (~ 2,243,478 ¢ 11,778,908 Rappahannock ~: 790.294 ~ 791~667 ~ '846,604~ 860,704~ 900}31.7~}} '992}620~ 5,191,205 Total ~ 17,440,~23~ 17,386,006~? 18,596,412~ 18,906,398:~ 19,726~6075 21,619,829~? 113,67~,1'69 SECONDARY SYSTEM 56 CULPEPER DISTRICT '! i I I '1 ....I " II ~"ommon w~alth Yran~p o(ta tJon fJ~ c~l y~ar ' I " ! I I I i i Frededck~bur~ District Frededck~bur~ D~trict i I I i I ! i i ! ! I i I Fredericksburg District (In Thousands of Dollars) Fiscal Years Allocation NHS-INTERSTATE . I6,°871 $,783l 4,165l 3,805l 3,372l 3,486126,638 NHS-NONINTERSTATE ' i 'a4sl .... 14s] a~b[ 'o[ oI ........ o[ PRIMARY ] ..... ~22,749l 23,360] ...... 24,043[ 24,467[ 25,805{ 28,622] 149,046 URBAN ' [ '1,492[ 1,476[ 1,568[ 1,596] ' ' 1,670[ 1,840[ 9,642 SECONDARY' " ] ........ ' 18,477] 18,489] 19,794] 20,124] 20,965] 22~2 ] 120,751 TEA-2~ mGH PmORITY .... [ ~ ~789] ~,089] ~,.~49] ' 1,t49] 0[ '0] ....... ' 4,476 C~A?~O~A~ l' ~441" 4771 '4s71 499l' 4991 4991 " CTB/STP STWDE. TOTAL { 2,800 { 3,850 { 4,500 } 4,500 { 3,500 { 0{ 19 150 s~= ~ ~~ .. I { ! { s~~O.A~O~A~ I 400{ 4001 4001 ~00{ o{ .... 01 ,;700 SA~V I" 0{ ..... A.~UA~'~COCA~OnS { 0 ~ASS ~Sl~ ............ I ~70~ ~".~n~A~OCA~,O~S "' I ~70 · o~nc ..... ~ , '. { - s6,~{ ~ s~zg~ - s6,~s~ -- ~ s~,~40 ss,sU ...... ,,,, s7,~{ *Allocated by Hampton Roads MPO. 57 Caroline IAreas (MP 107 N & S) RW Improve Rest Room 1(37 N & S) CN Capacity & Improve I TO Spotsylvania IRest Area (MP 131 S) RW ' rncrease Restroom 1(38 S) CN & Parking Capacity ] TO ~, improve Lighting I aS- Stafford & IRoute 627- 18pSE53 ~potsylvania IRoute 606 (Thm'nburg) I RW ~oti.-Disl. Access ! CN & ExL of HOV I] TO .anes I :easibility Study J IPE Only) .J . 51473 (NFO)0095-966.10~ PE100 )5 - JNear Intersection PE ~ ' ~tafford IRoute 61o IRW Construct Park J CN , 2335 Construct J CN Interchange J TO ~ ~ ~ ~ ~. (PE Only) J , 3557 / I NH g095-089-FOS, PEt01 (7) 95-Stafford' ,(Phase ,Al Rotlte 6271) ]PE RW ~ ~ ~~1 7 Jil311o~ e~ C(3~) ~i P~~~ded(b3~ ~ounty-- ,$~ ,ill o1, LC8~ i ' 'i ...... interchangeC°nstruct Diamond J CNTo '~ I Cash flh ' (1 ) NaUonal Highway System AllocaUoos (4) STP Regional Allocations (7) Cooperative Project wilh O~her Localities (2) CTB/STP Star.wide Allocations (5) Federal Demonstration Funds (8) Funded on a Previous Project (3) TEA-21 High Priority Funds (6) CeoperalJve P~'oject Wilh Other System (9) Bonds/Interest INTERSTATE SYSTEM 58 FREDERICKSBURG DISTRICT I ' i I r ~. Io" Route 684 I PE Expansion of CN ' ' · ' Commuter Park TO I& ~d~ Lot I I ' ' I I I C~s~ Unde~ay ......... P~- i~t ~t~ ! "~ ~4~ I / ......... [~mplete I Ilnterchange ! I TO Relation of CN Interchan e and TO I{PE ~ly) I 1135~ I NH 1~95~89-F09 PR101 ' ' I 195- IC~an Boul~ard ! PE ~ ~1 .... i I ' ' ICi~ of IExtensio. ! RW ~ ~1 ~ I I IFrede,cksbum i ! CN ~ ~1 / · 195. IV~ C~muter Ride J PE ' ~ ~ I' ' ~ ~ ...... ISlaffo~&Ci~of JLotsatLelandand ! ~W IFrede~cksbarg JCi~ofFr~e~burg ! CO J,[~Ex ansion, of, iv~ ~ar~ aha I i / I I / IRide Lots I 15~ / I. I ...... / " ' ~stric~ide ~avement Ma~ ~(~) N,~on~/Hi~hwaysystem ~l~s ( ) S R~ ~al ~s ' (~) C~peali~ Pr~e~ wi~ ~er L~lilles ~(2) CTB/$TP Stat~ AIl~s (5) F~erM ~~ Funds (8) Fund~ ~ a Pm~s Proj~t (.3) TEA-2~ High Prl~i~ Funds (6) ~em~e Pr~ ~ ~er S~tem (9) B~ds/lnte~t INTERSTATE SYSTEM FREDERICKSBURG DISTRICT 59 New Signs Distdc[~de Sharing Initiative TEA-21 HIGH PRIORITY ALLOCATIONS (1) National Highway System Allocations (2) CTB/STP Statewlde Nlecatlons (3) TEA-21 High Priority Funds {4) STP Regional Allocations (5) Federal Bemonstration Funds (6) Cooperative Project wtih Olher System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM 60 FREDERICKSBURG DISTRICT ! I I I II & Rehabilitation Lane Richmond PamllelLane (2to4Lanes) Lanes) 1.5 Miles BRIDGE RW CN TO ROBERT O, NORRIS BRIDGE (Str.# 1959) 10067 PE RW CN TO 7.7' km North NCL Ktlmarnock - 2.4 km North NCL Kilmamock 14774 RW CN TO 11766 Rte. 3 & 36O- 3,4 Mile North of ~=ast Corporate Limits RW CN TO 15244 Totuskey Creek. Creek PE RW CN TO (3818) 11006 0,1 Mile No~h Realign Curve R~chmond County Line PE RW CN TO 14859 16650 Lc~s~__~on Under ~ lay ..... ' .............. t CTB/STP Statewide Allocations Funds (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM FREDERICKSBURG DISTRICT 61 12 (Rutherford Drive) - Route 626 (Andom Ddve) PE RW CN TO & RW Only) 13564 Route 1112 RW CN TO 1,2 Miles George & Only) Ronte205(OakGrove) 14776 PE RW TO 18~56 Intersection Route 622- 0.1 Mile East Intersection Route 622 RW CO TO 17- (Tappahaoneck) PE RW CN TO Crossover 17- (Str,# 1004) 14738 RW CN TO 14180 ) National Highway System Allocations CTBISTP Statewide Allocations TEA-21 High Priority Funds jConstruction Comple e .................. (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other Syslem (7) ~erative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 62 FREDERICKSBURG DISTRICT I I ! I i I ! i i I ! I I ! I ! I Gloucester between York River RW Enhance Traffic Bridge & Gloucester CN . Operations Courthouse TO ~ 18875 ~ 1 ..... /~t Intersection PE King William Route 360 I~N Conslmct Right Turn Lanes TO ~ ~! 33- At Matlaponi I' yE ~) ~' /~~ ~ ..... ~(,ng William & River Bridge IRW ~ ~ . ~ ~ ~ing and Queen (LORD DELAWARE BR.) & ] CN Replace Bridge Pamunkey River Bridge I TO ~ ~ (6) I ] / (2)~ . ¢2) ~ (2)~i (2) (2) and Approaches (ELTHAM BRIDGE) 18205 ICOOperalive Pre ~ct /)th Richmond Distric~ ., 118206 . / BP/STP l(FO)0033-968-11 ~3,PI il01,PE102iRW201~ OSOt; (FO)0033-966-~02,PE101,RW201,CSI~1 :i3- At (,te,~ectton I PE ~ {lng & Queen Route 643 East of ! RW ~ 33- ~).1M'ile East ! PE , S 3,3,-049-105,PE101,RW201~CS01 ..... I Parallel Lane [Cooks Comer) - ! CN .~ ~. ....... ~,~ (2 to 4 Lanes) 2.8 Miles East J TO ~ ~%~'~ F~oute 227 ] ...... ~ ~,Cooks Corner) - 12140 /{;onstmction Complete ............... / 2.8 M,es 11 474 S i 33 g-V68,PE103,RW ; 0 ,C 02 / (2 to 4 Lanes) 10.3 Mile East ! TO ~ ].6 Miles l(.armony Vdlage) 111768 s ~I~T~ 10033-059-V06,PE 1~,RW203,C505' / (1 ) National.Highway System Altocal~'~s - (4) STP Regional Allocations (7) CooperativeProject wi~h Other Localities ......... [2) CTBISTP Statewide Nlocetiofls (5) Federal Demonstration Funds (8) Funded on a Previous Project [3) TEA-21 High Priority Funds (6) Cooperative Project with Other System (9) Bonds/Interest PRIMARY SYSTEM FREDERICKSBURG DISTRICT 63 Farmers Market PE RW CN TO 198- Ride Lot High School RW CN TO 198- Expand Park & Ride Lot Northumberland & Improve Vertical 52315 RW CN TO 5230O km South PE County RW km North CN Northumberland County TO Line 17347 12788, 17348 Route 3 - PE Route 301 RW CN TO [1) Nationel Highway System Allocatic~s Funds 17787 PE RW CN TO 17788 Routes (4) STP Regional AIIocaUons (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM FREDERICKSBURG DISTRICT 64 ! ! ! ! ! I I I ! i i 2 to 4 Lanes) Lanes on 1.5 Mi. S. of Soulh Intersection HOUSE BYPASS: t .2 km Wasl Po River Lanes on RW CN TO RW CN TO Mile O~ly) 18115 PE HOUSE BYPASS: RW 1.2 km West Po River - CN 1.6 km West Ni River TO PE North Inl RW Route 606 (Snell)- CN Nmlh Int. TO Route 606 (Snell) 16351 PE RW 1.4 Miles East CN Route 3 TO 2295 (Heathsville) - RW 4.8 Mile East Route 201 ON TO 1) National Highway System Allocations CTB/STP Statewide Nlocations Funds 22O6 / / BP/STP j{)208-088-116,PE101,RW201,CS01,B610 ........ j ........ (4) STP RegiOnal AllocatiOns (5) Federal Oemonstration Funds (6) Cooperative Project with Other System (?)Cooperative Project With Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM FREDERICKSBURG DISTRICT 65 Lane Northumberland Left and Right Tum Lanes Miles East Route 201 - West Route 200 Route 698 PE RW CN 1'0 3820 PE RW CN TO 16O25 Stafford 4 Lanes on New Location (PE Only) 34.8 kml 21.6 Mi. Stafford and Spotsylvania WESTERN TRANSPORTATION CORRIDOR: Route 95 - Prince William County Line (NW) Route 1 - Route 3 West (Spotsylvania PE RW CN TO 3159 13600 PE RW CN TO Stafford and Spotsylvania Route 1 - Route t7 12846 PE RW CN TO 3 West Route 1 RW CO TO i) National Highway System Ntocations CTB/STP Statewide Allocations TEA-21 High Priority Funds (4) STP Regional Nlocatious (5) Federal Demonsffatlon Funds (6) CooperaUve Project with Other System (7) Cooperative Project with Other Localities (8} Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 66 FREDERICKSBURG DISTRICT I I ! I ! ! ! ! Glaucesi~, JUp~ivergrosslng PE ~1 I J f -- I I I I i ' "~"' (PE 0nly) I Feasibility S~/ RW ~1 I I / I i ! I I LJlSmc~ae jAavance runalng i~i~,~i~;~i:~,~.(~,~?~j .... j j ~ ' j ..... Ifor Prelimln~ ~ ~ ~ ~ ~ ~ ~~J ~l~ ~ ~ ~' Safety) ~;:~:~ ~ (t) ~ (1) (1) ~q~ )isMc~ide Pav~t Markem ~.]~,~{~ ~{~ ~ ~ ~ .... DistHc~ide Signals ~;~;~:~;~;~[~;~:;:;::~ ~?~;~;~ J JJ ........... (2) CTB/STP Stat~ide Nl~aons (5) FNeBI ~m~s~a~ Fg~ds (8) Fund~ ~ a Prevl~s Pr~ [3) TEA-21 High Priod~ Funds (6) ~aave P~ ~B ~er S~m (9) ~d~lnter~t PRIMARY SYSTEM FREDERICKSBURG DISTRICT 67 Primary Matching Funds Required for Funds Required for DISTRICT SUMMARY OTB/STP STATEWlDE ALLOCATIONS NATIONAL HIGHWAY SYSTEM ALLOCATIONS STP REGIONAL ALLOCATIONS ',1) National Highway System Allocations CTB/STP State,,vide Allecalions Funds (4) STP Regional Nlocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 68 FREDERICKSBURG DISTRICT I ! ! ] I Village Enhancement RW CN TO 16554 REGIONAL ALLOCATIONS National Highway syst~ffiNlocations' (4) STP Regional Nlocatlons CTBISTP Statewide Nlocations (5) Federal Demonstration Funds Funds (6) Cooperative Project with Olher System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest ENHANCEMENT UTILIZING STP REGIONAL FUNDS FREDERICKSBURG DISTRICT 69 Ito be Determined RW ' CO TOTAL STP REGIONAL ALLOCATIONS (SECONDARY) 'j) National Highway System Allocations (4) STP Regional AIIocalions (7) Cooperative Project with Other Localities '(2) CTB/STP Statewide Allocations (5) Federal Demonstration Funds (8) Funded on a Previous Project (3) TEA-21 High P~iorily Funds (6) Cooperative Projecl with Other System (9) Bonds/Interest · SECONDARY UTILIZING STP REGIONAL FUNDS FREDERICKSBURG DISTRICT 70 I I I I . I I ' ! I ' ! on Chassis Bus) PE RW CN TO I'OTAL CTBISTP STATEWIDE ALLOCATIONS: CTBISTP Statewide Nlocatio~s I High Prio~ty Funds (4) STP Regional AIIocalions (5) Federal Demonstration Funds (6) Cooperative Project with O~er System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PUBLIC TRANSPORTATION - CTBISTP STATEWIDE FREDERICKSBURG DISTRICT 71 t.6kmJt.0 M 0003-11 I-t02, C503, to Jefferson Davis Hiflhway (All. Route 1) (NFO) U000.1 t't -103, PE100, PE101, RW20t, 23OO 16556 17974 FREDERICKSBURG DISTRICT TOTALS TOTAL STP/CTB STATEWtDE ALLOCATION National Highway System Allocations CT6/STP Statewide Allocations TEA-21 High Priority Funds {5) Includes OTB/STP Statewide Allocations (6) Includes TEA-21 High Priority Funds (7) Plans, Right of Way and Contract Administration by Municipality (9) Minor Construction Project by Munlclpalily (10) Cooperative Project with Other System URBAN SYSTEM I 72 FREDERICKSBURG DISTRICT I I I I ] I I ! I ! I ! I ! I ! I I ! i I I i FREDERICKSBURG DISTRICT SECONDARY SYSTEM CONSTRUCTION IMPROVEMENT PROGRAM FISCAL YEAR ALLOCATIONS Caroline ' ' 1.403,249 ~ ..~ ........ 51~ 1.401,488 !!:i 1,498,952 ~ 1.524.149 ~;~ 1,588,860(:~ 1,738,354 9,155,051 Essex ~ 725,049 :}i!i! '721,928 ~! 771.979 !:'~i '7841978 ~ '819,263 i~ii 898,881 4,722,079 Gloucester /.707,940 ~? 1,708 223 ii;! . I 832 304 i~!~ 1,862,380 ~}} 1,940,785 ¢~(' 2.122.552 11,174,185 KingGeorge ?~ 948,422 ~ 949,031 (~;~ 1.015,592 :~; 1,032,519 ~ 1,075,692 5~ 1.174,951 6,196¢208 King & Queen ?'~ 776,817 ~ 768.934 :? '822,533 ~ 836,318 ~ '874~892 ~ ~965}332 5,044,826 King William ~ 916,234 ~:?~ 912.806 ;~,: 976,618 ~:~ .992.979 ::~ 1,036,17.~ ;.:. 1.136,454 5,971,263 ...... ' ;~: ~¢:~ 745,011 :)~} 811.840 4,292,350 Lancaster :¢:~ 657,168 ~ 658.820 ~ 70.,,815~ 715,696 ¢¢,~ Mathews ~}} 545,900 ~ 54&571 : 584,211 ~:~ 594,003 ~ 618.695 675.111 3,564,492 Middlesex ;:~ ' ' ~?;'~': 586,966 ~;~.; 627,483 }?}: 638,025 ~{~ 664,762 ~ 726,123 3,830,182  586,822 ~:f~] ~: ~:~ 759,318 ? 863,704 4,557,071 697,944 ~ 698,412 ;:~ 746,737 .5 ~?~ 790,956 ~" 3,657,429 Noahumberland ~::~ ~:;:)598,70~{ ~ ~,~ 608,760 ~ 634,773 Richmond ~ 560,574 ,~ 559,434 ?~ . Spotsylvania ~'~? 4,035,072 ~ 4,041,395 ~} 4,328,797 ~{ 4,400,505 5 4,583,050 ~? 5,003,169 ~ 26,391,987~ Stafford ?~ 3,920,271 ~ 3,938,794 ~:}~4,221,697~ 4,291,189~}~ 4,464,073~{~;} 4,859,822~ 25,695,845] Westmoreland ?~ 995.562 ~: 996,590 .:~-.~.. 1,064,837 ~ 1,082,784 ?~ 1,127,797 ~)?~. 1,230,757~.~.: 6,498,329 Total }~::~18,477,022 ~ 18,489,390 ~ 19,7~4,259 ~ 20,123,604 '~ 20,964,785 ~;~¢..22,902,236 :.~' 120,751;297 FREDERICKSBURG DISTRICT SECONDARY SYSTEM 73 ~"ommon wealth Y(ansp o(ta tlon ~oa~d year ! ! Y Lynchbur~ Di~tric! I I I I I ! I I I ! I I I ! ! I ! I Lynchburg District (In Thousands of Dollars) Fiscal Years Allocation !i 0 0 , 1,000 1,000 1,,000 NHS-INTERSTATE '1,648 1,265 · 1,000 S S-SOmS'T aSTAT PRIMARY 20,9~1 20,6981 22~1221 22,455 23,628 26,199! i36,098] U~AN 10,0331 9,9281 12,358! 64,8171 10,5441 10,733 11,221 132,2111 ~CONDARY 20,317[ 20,2071 21,602] 21,963 22,936 25'1 5,27 C~Q~o~[ ~ o '" 0 o CTB/STP STWDE. TOTAL 6051 1,31 6,88 660 12,770 STP ANNUAL ALLOCATIONS 1,82SI SAFETY '"[ "ANNUAL ALLOCATIONS 112! ~IL SAtiETY ~ 57~] ' ANNUAL ALLOCAtiON~ MASS T~NSIT 1 ..... ANNUAL ALLOCATIONS 1,155 TOTAL 58,5501 54,699~ 63,505 58,164 71,555 ,64,743/ 371,216] projects ~tified by system. 74 Lynchburg - ~/est Virginia RW CN TO 16598 PE RW CN TO DISTRICT SUMMARY 1'EA-21 HIGH PRIORITY ALLOCATIONS (1} National Highway System Allocations CTB/STP Statewide Allocations TEA-21 High PdoHty Funds (4) STP Regional Nl~.,ations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with O{her Localities (8) Funded on a PreviOus Project (9) Bonds/interest INTERSTATE SYSTEM I 75 LYNCHBURG DISTRICT I I I I ! ! ]1 I ! ! ! I I ! ! t ']i I ! ! 15- Lane Lanes on New 4 Lanes on New Memorial Bridge at Bremo Bluff (Sff.# 1987) Route 628 - Route 133 Route 460 - Existing Route 460 LYNCHBURG MADISON ~{EIGHTS BYPASS: N, Existing Route 460 - 0.38 MI. N. N.C.L Lynchburg BYPASS: 0,5 Mile North of North Corporate Lynchburg- Mile Nalh HEIGHTS BYPASS: ~oute 661 RW CN TO 1279O PE RW CN TO 5239O RW CN TO 15843 11812/18195 PE RW CN 'ro 15844 18196 PE RW CN TO 11813 RW CN TO 1912 [. I STP ]6029-005-F22~ PE101~ RW201~ 0501~ B615~ 8616, I~'{i17~ B62{;' D633r 13634, D635 '" · ....... (2) ......... CTB/STP Statewide Nlocations High Priority Funds (4) STP Regional Allocations (5) Federal Bemoostratlon Funds (6) Cooperative Project with Other System (7) Cooperative Project wilh Other Localil]es (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM LYNCHBURG DISTRICT 76 1.3 km Interchange HEIGHTS BYPASS: Route 661 - Route 29 South of Route 711 - 0.5 km East Route 711 RW CN TO 15842 PE RW CN TO 14833 PE RW ON TO I0~85 Route 29 PE RW CN TO 12916 ~685 PE RW CN TO 16599 Route 863 - ROUte 863 PE RW CN TO . (21 ~ , [1) National Highway SYstem Allocations CTB/STP Statewide Allocations l TEA.21 High Priodty Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project wRh Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 77 LYNCHBURG DISTRICT I il I I ! I I t i I I I I ) I I t ! Route 29 Northbound Int. Route 924 - 0,9 Mile South Int. Route 924 - PE RW CN TO 18877152522 RW CN TO II & III Only) Proposed Route 29 Bypass of Charlottesville PE RW CN TO PE RW 1008) ON TO 12792 At Intemec~n PE Route 605 RW CN TO to4 Limi~Danville- [Route 716) RW CN TO 9845 I (1) National Highway System Nlocations CTB/STP Slatewlde Nlocations High P[iority Funds (4) STP Regional Allecations (5} Federal Demonstration Funds (6) Cooperative Project with Other System {7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest PRIMARY SYSTEM LYNCHBURG DISTRICT 78 ,I- O. ly) North Corporate to 4 Limits Danville (Route 719)- Route 863 4LanesonNew 1.g km CONNECTOR: Existing Route 29 Business - West Intemection Route Route 614 - Route 611 2.5 Miles DAVID CREEK: 1.4 Miles West Buckingham Co. Line Str.# 1007) Powhatan County Line - Route 29 [1) National Highway System Allocations CTB/STP Statewide NlocaUous TEA-21 High Pdority Funds PE RW CN TO 17724 PE RW CN TO 13511 RW CN TO 17723 PE RW CN TO 5O510 PE RW CN TO 16O38 PE RW CN TO 17722 lc6~d~r Feasibitty Study ...... Cooperative Project ~ ~th Richmond Dis'~tct (4) STP Regional AIIocaUons (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bouds/interest PRIMARY SYSTEM 79 LYNCHBURG DISTRICT i I I I I I ! I 11 ! ]1 I I I I I I t i Lanes on New 130 - ROUTE 130 0.4 km East Route 29/130. 0.3 km West Route 29 Bypass (Dixie Airport Road) 29/130 - RW CN TO 11914 RW CN TO Int. Rte. 56 InL Rte. 655 (Str.# 1033) 16428 PE RW CN TO Lane 16039 InL Route 709- 0.3kin N. InL Route 709 RW CN TO 5O981 and INTERCHANGE: 0.1 km West Int. Main Skeet- 0.4 km East Route 29/210 RW CN TO 14607 Intemhange. RW CN TO Route 29 Bypass 11913 / System Allocations CTBISTP Statewlde Nlocations TEA-21 High Pdodty Funds I I I (4) STP Regional Allocations {5] Federal Demonstration Funds (6) Cooperative Project with O~her System (7) Cooperative Project with Other Localities (8) Funded on a PrevioUs Project (9) Bonds/interest PRIMARY SYSTEM LYNCHBURG DISTRICT 8O ' of Danville Edward Realign DANIEL MEMORIAL N. Int, 58 (EBL)- Nottoway County Line - 0,8 km West Noltoway Courtly Line 3f [13- East of Int. Route 613 (Str. # 1024) Only) JOHN OVER DAN RIVER: (Str,# 1901) 0,3 km North Route 34 - Route 58 1,2 km E. Rte. 1.8 km E. Rte. 501 , System Allocations CTBISTP Statewide Nlocations High Priority Funds RW CN TO ~6603 PE RW CN TO 16792 PE RW CN TO 14835 PE RW CN TO 18878 RW CN TO PE RW CN TO 18879 (1) (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Boeds/intemst PRIMARY SYSTEM 81 LYNCHBURG DISTRICT I I ! ! I I ! ! t I I I i I I I I I I Intersection RW TO At Bee Drive PE (Future Int. of Enterprise RW Drive Extension) CN TO Lynchburg - 2,4 Miles West East Corporate Limil~ Lynchburg 31 Lynchburg - Only) Only) 0.3 Mi. N. Iht, Rte. 40 0.5 Mi. N. Int. R{e. 633 CTBISTP Stateside Allocations Funds 52247 RW CN TO 14837 RW CN TO 16041 16040 RW CN TO RW CN TO 52248 ,econdary and Revenue Shadng Project Jj (3) ~ (3) ~ (3) ~i~ig~~ (3) ........ ~0..,~ (4) STP Regional Allocations (5) Federal Demonsb'aUon Funds (6) Cooperative Project with Other System (7) Cooperative Project wilh Other Localities (8) Funded on a Previous Project (9) Bonds/interest PRIMARY SYSTEM LYNCHBURG DISTRICT 82 Including 4 O~iy) Intersection Road - Road At Intersection Route 610 AtVolens 0.4 Mi, South Iht. North Int. PE RW CN TO 13515 RW CN TO 17721 forPreliminary BAdges Improvements Guardrall PE RW CN TO 18229 Guardrail Pavement Markers National Highway System Allocations t C?B/STP Statewide Allocations TEA.21 High PriOry Funds (4) STP Regional Allocations (5) Federal Demonslration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest PRIMARY SYSTEM 83 LYNCHBURG DISTRICT State Traffic Operations & Safety (1) Resource Shadng DISTRICT SUMMARY CTBISTP STATEWIDE ALLOCATIONS NATIONAL HIGHWAY SYSTEM ALLOCATIONS TEA-21 HIGH PRIORITY ALLOCATIONS TEA-21 HIGH PRIORITY ALLOCATIONS ~ Allocations CTB/STP Statewide Allocations Funds (4) STP Regional Ntecations (5) Federal Oemonslration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest PRIMARY SYSTEM 84 LYNCHBURG DISTRICT 'of Danville Bus Purchase (2 Medium Duty RW Buses) CN TO ' of Danville PE (2 Body on Chassis RW & 1 Van) CN TO Purchase 2 Medium PE Buty Buses and RW Fareboxes CN TO TOTAL CTBtSTP STATEWtDE ALLOCATIONS: 4 CTS/STP Slalewide Allocations TEA-21 High Priority Funds (4) STP (5) Federal Demons~ratio~ Funds (6) Cooperative Project with Other System (8) Funded ~ a Previous Project (9) Bonds/Interest PUBLIC TRANSPORTATION - CTBISTP STATEWIDE 85 LYNCHBURG DISTRICT i I I I I I I I I ' I I I I I I ! ! I I PE 5RW CN TO 05t7 HIGH PRIORITY ALLOCATIONS National Highway System Allocations CTB/STP Statewide Nlocations Funds (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest TEA-21 HIGH PRIORITY PROJECTS LYNCHBURG DISTRICT 86 , PE101, Roule 2g sand U000-162-V01, PE101, CSOt Bri~e St. 7029-108-F01, PE101, Road) to NCL 8755 8757 Main St. I krn/1.4 M PEIO'I, Kemper Rd. to Route 29 B~ass ,PEI01, 0501 BridgeSt. to U000-108-10g, PEI01, 14614 4681 12521 Nalio~al Highway System Allocations CTB/STP 8latewlde Allocations High Priority Funds {5) Includes CTB/STP Statewlde Allocations (6) Includes TEA-21 High Priority Funds (7) Plans, Right of Way and Contrac~ Administration by Municipality (9) Minor Construction Project by Municipality (10) Cooperative Project with Other Systems URBAN SYSTEM 87 LYNCHBURG DISTRICT I I I I I I I I I I I I ! I ' I 2 Lane U000-108-110, 17740 RequlmdforFedeml 2 ~ne ,PEIO1, 4Lane CLane PEI01 Route$01/Expresswav RW201, C501 Rte. 29 Expressway to Forest Rd. U000-118-V09, PE101, 17815 13534 16604 8759 CTB/STP StatewJde Allocations t TEA.21 High R'iority Funds ($1 I~lcl~e~ TEA-21 High Pr{nd~y Funds ¥ Municipal~ (g) Minor Construction Project by Municipality (10) Cooperative Project with Other Systems URBAN SYSTEM 88 LYNCHBURG DISTRICT Railway Lane l. PE101 IRoute 221) to ,PEI01 Road 166O5 17727 Mile Lane , PE101, C501 From Route 501 to ,.akeslde Drive [Route 221) 52071 , PE101, 52078 ! System Nlocations CTB/STP Statewide Allocations Funds (5) Includes CTB/STP Statewide Allocations (6) Includes TEA.21 High Priority Funds , and Conlracl Admhlstration by Municipality (9) Minor Construction Project by Municipality (10) Cooperative Project with Other Systems URBAN SYSTEM 89 LYNCHBURG DISTRICT I I I I I I I I I I I I I Il ! I 11 ! ! Extension 2 Lane Replace Median Blvd. PEI01. km North Route ~29 3941 , PEt01, 13514 r ALLOCATED STP/CTB STATEWIDE ALLOCATION CTB/STP Statewide Allocations Funds (5} Includes CTB/STP Statewide AIIocatlor~ (6) I~udes TEA.21 High miof~y Funds (7) Plans, RigM of Way and Contrac~ Administration by Muol. cipatity Administration 1 (9) Minor Construction Project by Municipal{ty (t0) Cooperative Project with Other Systems URBAN SYSTEM LYNCHBURG DISTRICT 90 LYNCHBURG DISTRICT SECONDARY SYSTEM CONSTRUCTION IMPROVEMENT PROGRAM FISCAL YEAR ALLOCATIONS [Amherst ~:,.::!'"'i 2,345_ ,_324 :~ii~ ~,.~36.971. ...:=.- 2.497,723. ,..,::,~.: 2.53.._~87. .- 2.650.119. .~.: 2.904,657. . .~. 15,274,181 Appoma~x t,064.959 ~. 1.059.876 ~::"~ ~ , ~ , . . . [~: t,133,282 1.152,291 :~?~ 1,202,93~ ~ 1,.~20,~23~ 6,933,665 Buckingham }~; 1,%8A56 ~4} 1.915,716 ~:/ 2.049.577 ~}:~:~ 2,08.,.5.¢0 :~ 2, t81,422 ~:~:~ 2.410,413 ? 12,579,175 Campbell ?~ 2.598,269. :.:~:~2,606.687 ~ 2.785.252~:~ ..... 2,832.2015:. 2,947,42()~}~ 3,209.820~:~;} 16,979,648 Charlo~e ~?:~ 1,344,601 ~ 1,332, t50 ~:~ 1,424,612 ~ 1,448,465 ~:~ 1,514,808 ~:~ 1,669,779 3:::~ 8,734,416 Cumberland }'~,~ 1,048,231 ~.::¢ 1,036,772 ;¢~ 1,108,472¢ 1,126,912/}, 1,179,470~:: 1,301,971¢:~ 6,801,829 Ualihx t;::'~'~ 2,277,144 .¢:? 2.268.619 }} 2~424,00077 2,464,950:~}}~}2,572,()59¢~:~ 2,819,695~ 14,826,466 Nelson :~.~ 1,785,229 ~ 1,765,511 }¢: 1,888,229 1,919,5527;} 2,009,216 2.218,362'~::?~ 11,586,100 Pittsylvania ~.:~.:~ 4,691.275 4,671 ~282 ~ ~}~ 5,076,235 ~:~ . }~ . ;:} 4,992.745 ¢ 5.298,766 5: 5~811,804 ~,~ 30,542,109 Prince Edward ~ 1.223.569 ? 1,213,661 ?~ 1,297,960 ~ 1.319.612 ::~:~;~ 1.379,517 ~;') 1,518.933 ~)~ 7,953,253 Total ... 20,3~7,060 ~):.~20,207,246 ~ .¢!,601,852 )~ 21}963,196 }(~22,935,729 ~ 25,185,758 ~ 132,210,840 SECONDARY SYSTEM 91 LYNCHBURG DISTRICT I Common w~alth Y(anap o~ta tion 8oa(d f/ s ca/ y~a( ] ! ' ! ! - ! ! I Northern D/strict Northern ~Y~n/~ D/~tr/ct I ! ! I I i I I I i ! ! I ! I ! i I I Northern Virginia District (In Thousands of Dollars) Fiscal Years Allocation NHS-INTERSTATE NHS-NONINTERSTATE PRIMARY URBAN SECONDARY CMAQ TOTAL CTB/STP STWDE. TOTAL STP REGIONAL TOTAL ENHANCEMENT SAFETY RAIL SAFETY MASS TRANSIT 47,367 6,076[ 32,352I 15,628[, , 50,3161 12,900 8,563 9,363 22,740 1,825 2,063 2,390 80,145 58,535 1,095] 31,296! "i5,278l ' 49,962 11,852] 8,063 23,360 211,716[ 65,8821 73,184i 80,2161 82,1011 407,285! 1,500 32,645 16,367 54,114 12,888 12,107 2,663 23,791 2,000 31,993 16,649 54,952 12,888 12,411 4,663 ........ 24,30'5 2,000 33,083 17,490 57,437 12,41 2,035 24,812 ANNUAL ALLOCATIONS ANNUAL ALLOCATIONS ANNUAL ALLOCATIONS ANNUAL ALLOCATIONS 221,957 233,045' 229,484 37,902 19,541 63,458 12,411 25,331 TOTAL 291,728 240,744 *Reductions and/or undistributed balances shown on Primary System. Local MPO to make final determination. ** Includes $1,250,000.00 per year for FY00 thru FY03 in Special Appropriations and $625,000.00 in Ferryboat Discretionary Funds. 12,671 199,271 100,953 330,239 50~951 69,755 26,787 144,339 1,825 2,063 2,390 80,145 1,428,674 92 HOV Miles L~ne Mill Road- 0.8 Mile East Compton Rocky Run Fairfax & Road- t,8 Miles East !asl Route 234 - HOV Lanes 234 & 234 William National Highway System Allocations CTB/STP Statewide Nlocations Funds RW CN TO 13475 11777 PE RW CN TO 18603 RW CN TO 11048 PE RW CN TO 11O49 RW CN TO 13267 13268/13269 PE RW CN TO (4) STP Regional Allocations (5} Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Intereat INTERSTATE SYSTEM 93 NORTHERN VIRGINIA DISTRICT ! I ! ! I ! I I i (Gainesville) RW CN TO PE RW CO TO Lane (Galnesvillel- Route 15 RW CN TO 16001 Improvement at ;28 RW CN TO 11750 PE RW CN TO 16003 Station RW CN TO 13520 (1) National Highway System Allocations CTBISTP Statewide Nlocatlons r Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) C~x~perative P~ject with Other System (7) C~operative Project with Other LOcalities (8) Funded off a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM 94 NORTHERN VIRGINIA DISTRICT Lighting Minor Upgrades Fair[ax and ,of toAdd km ~of to Add Interchange Route 234 Route 495 - District of Road Interchange - 1,1 km E. Telegraph Road Interchange Interchange- City of Nexandria/ DC Corporate Limits Eisenhower Avenue Connector. 0.5 Mile South Eisenhower Avenue Connector ~ Clermont PE RW CN TO 16623 16648 PE RW CN TO RW CN TO 14675 RW 18136 PE RW CN TO 18138 PE RW CN TO / / 1) National Hkjhway System Allocations CTB/STP Statewide AllooaOons High Rioftty Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project wilh Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM 95 NORTHERN VIRGINIA DISTRICT I I I ! i I ! ! I i I i ! I I I .~1 I I Eisonhower Avenue Mile RW CN TO ~ N, Rte, 638 at t Mile North Route 638 (Pohick Road) - 1.6 Miles North Route 611 (Furnace 16354 PE RW CN TO 10407/13763 13649/13836/190 ~ North Route 611 (Furnace Road)- RW CN TO RW CN TO 104O5 RW CN TO RW 18079 i CTB/STP StateWide Nloca~Jons Funds H) STP Regional Allocations (5) Federal Demonsb'atfon Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest INTERSTATE SYSTEM NORTHERN VIRGINIA DISTRICT 96 Bridge P~ince William Pdnce William Line - RW CN TO Route 234 - '1,0 Mile South 193 13382 PE RW CN TO 192 13363 Stafford County Line PE ) RW CN TO 18029 PE RW CN TO 12798 Cr~k - Homer Road of Way at Homer Road interchange Area PE RW CN TO 17154 RW CN TO 12793 [1) National Highway System Nlocations CTBtSTP Statewide Nlocations TEA-2'I High Piiortty Funds (4) STP Regional Nlocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other LocalilJes (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM 97 NORTHERN VIRGINIA DISTRICT 1 I i I I I I I " I I ' '1 I I ' I I ] ' I ] ! ~nterchange Route 644 (North of Springfield) - 0.9 Mile Soulh Route 234 PE RW Cfi TO 13517 RW CN TO 15 TDM & Transit Prince William County Pa~'kway CTB/STP Statewide Allocations Funds RW CN TO 16630 PE RW CN TO 54 PE RW CN TO 17814 RW CH TO (4) STP Regional Nlocetio~s (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Olher Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM 98 NORTHERN VIRGINIA DISTRICT At Northwest Quadrant PE Route 234 and Route 1 RW CN TO 52337 PE RW Sydenstricker Road CN (Route 640) TO Park& 524O2 Incident Management RW rMS CN TO 18004 e 3951495 Local Area Network RW Operations CN ID'S 51001,51002,51316 TO 18O05 PE Marketing & Public RW Affairs CN TO 18OO6 .' 395/495 PE field Mall) RW CN TO 52403 {1) National Highway System Allocations CTB/STP Statewide Allocations TEA.21 High Priority Funds i{~O) CM95~9-F.20, PE!05 '" I ....... (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8} Funded on a Previous Project (9] Bonds/Interest INTERSTATE SYSTEM 99 NORTHERN VIRGINIA DISTRICT I I I I I I i I ! ! I I I I ! ' i ' ! ! '! ! Loisdale Road - Spdn9 Mall Drive RW CN TO 17039 PE Commerce SI, Francouia RW Keene Mill Rd & CN Route 95 NB (South TO III of Beltway) 18516 14677 Express RW of CN 1495 Outer TO Beltway; 1495 Inner Westbound 14678 PE 1-951o 1495 Inner Loop; RW J Express CN TO 1-395/I-95 Southbound & Woedmw Wilson Memorial Bddge 14680 RW CN TO 14682 RW CN TO 17038 12324 OTB/STP Statewide Allocations Fends (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) CooperaUve Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest INTERSTATE SYSTEM NORTHERN VIRGINIA DISTRICT 100 ton Memorial Bridge Each Direction Memorial Bridge Disl~ic[ of of Nex. Route 3951495 Route 66 PE RW CN TO 13898 RW CN lrO 17071 PE RW CN TO 16OO4 PE RW CN TO 16628 PE RW CN TO 12794 12795 PE RW CN TO 12796 CTBtSTP Statewide Aflocal~ons TEA-21 High Priority Funds (4) STP Regional AIIocatio~ (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM 101 NORTHERN VIRGINIA DISTRICT I I I I Access Toll P,o~d RW CN TO 13335 PE RW Legion CN HOV) in Memorial Bridge TO Legion 12797 RW CN TO 16625 CN TO Advanced Traffic Management System 13687 13518/13647 RW CN TO 13519 National Capital Area RW 'Umbrella Study' CN TO 16005 (7) ~ 1) National Highway System Allocations C TBtSTP Statewide Nlocattons High Priority Funds (4) STP Regional Nloca~ons (5) Federal Demonstration Funds (6} Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Pmvtous Project (9) Bonds/Interest INTERSTATE SYSTEM NORTHERN VIRGINIA DISTRICT 102 Improvements New Signs New Signals Guardrail Guardmil Barrier Rumble Strips Highway Advisory Radio Network Sharing Initiative DISTRICT SUMMARY HIGH PRIORITY ALLOCATIONS National Highway System Allocations CTB/STP Statewide Allocations TEA.2'I H~h Pdodty Funds (4) STP Regional Nlocations (5) Federal Demonstration Funds (6) Cooperative Project wi~ Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project {9) Bonds/Interest INTERSTATE SYSTEM 103 NORTHERN VIRGINIA DISTRICT I ! ! I ' ! I ! ~ I ]1 I -I ~ '! I I I ! · ! h of Telegraph Road 0.01 Mi. North Canal Road - Old Stage Coach Road 1.95 km 0.4 Mile South Intersection 3784 0.7 km S. Rte. 610 Rte. 638 1: Curtis Ddve RW CN TO 12g05 PE RW CN TO 12g06 RW CN TO 13521t18102 RW CN TO 14684 RW CN TO RW CN TO 18457 (7) , System Allocations CTBtSTP Statew'~e Allocations Funds (5) Federal Demonstration Funds (6) cooperative Project with Other Syste~ (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM NORTHERN VIRGINIA DISTRICT 104 Stafford County Line PE RW CH TO Limits of Route 253 PE RW CN TO 25.3 km Prince William County Line 15686 PE RW CN TO 18.5 km Lane to 6 Lanes y Line ~II~T~IR~d ~nes 15~5 RW CN TO 14686 PE RW CN TO RW CN TO (o) ~ National Highway System Nlocattons OTB/STP Statewide Allocations i TEA-21 High Priority Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 105 NORTHERN VIRGINIA DISTRICT t ~ I J Including from4 9.3 M'des Bypass RW TO 14685 CN 10 RW CN TO 12366 PE RW CN TO 13527 PURCELLVILLE/ RW BYPASSES CN TO Steding Boulevard. Boulevard 13306f13367 RW CN TO 17668 [Constru~on Comple e . , ,, J ........ , ...... ' .... ,,, , 1 (1) National Highway System Nlocations CTB/STP State, de Nlocat~ons Funds (4} STP (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM NORTHERN VIRGINIA DISTRICT 106 Lana to 6 Lanes Bypass (interim Improvement) Fort Evans Road - km East Cardinal Park ~ve Boulevard Fairfax County Line At Algonktan Parkway 15 - Engr. for Development merits between Bails and Left Bluff Rd. to Whites La~e Ferry Rd.,Left Turn Lane at Rte.740 (Tutts Lane) & PE RW CN TO 13523/13877 PE RW CN TO 13526 RW CN TO PE RW CN TO 17435 RW CN TO 17847 PE RW CN TO I .... (4) ~007~ , - ! (4) National Highway System AllocaUons CTB/STP Statewlde Nlocatious TEA-21 High Priority Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System O~er Localities (8) Funded on a Previous Project (9) Bonds/In{ernst PRIMARY SYSTEM 107 NORTHERN VIRGINIA DISTRICT Improvements (PEOn~x) Road RW 15- PE Loudoun r Road RW Safety CN Improvements TO i- Fe~ Road - Londoun Improvements Loudoun 52329 CN TO RW CN TO RW CN TO 13528 RW CN TO (7) (4) (1) National Highway System Allocations CTGISTP Statewide AllOCations High Priority Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM NORTHERN VIRGINIA DISTRICT 108 At Bamsfield Road Route 606 Route 606 Ilncluding PE for EIddge over Broad Run) ; William Manassas Park- SCL Manassas Park Lanes Fauquier County Line - Drive PE RW CN TO 17669 16626 PE RW CN TO 52458 PE RW CN TO 17848 PE RW CN TO 13524 PE RW CN TO 17984 (4) ~ ~:~i~ National Highway System Nlocalions CTBtSTP Statewide Allocations TEA.21 High Riority Funds (4) STP Regional AJIocations (5) Federal Bemonstration Funds (6) Cooperative Project with Other System Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 109 NORTHERN VIRGINIA DISTRICT 1-495 - Cedarest Road Lanes from4 Lanes Bridge and Interchange 0.2 km West Cedar Lane At Big Rocky Run ,29 Road) (1) National Highway System Allocations ~ Allocations High Priority Funds RW CN H395 PE RW CN TO 1424 RW CN TO 14688 RW CN TO 14869 RW CN TO 13530 RW CN TO (6) Cooperative Project wi~ Othe[ System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 110 NORTHERN VIRGINIA DISTRICT I Approaches TO ~ w,, ~'"~ 14689 , . , ' r nter~ange TO ~{~ ...... ~ ~ ~:~:~ (4) ~OND/ i . ~35~t ............. ~ / STP ~00~'000--V 18. PE 10 ~ ,C501 Cen~eville Road - RW Jdening 0.1 Mile ~s{ CN . :.~'~ ~. ~ ~-. ........ S~ingfell~ Road TO ~ ~{~ ~,~ ~50- ~0,3 Mile West ~" I STP I(FO)~-F33~E~O~,RW20~,CSO~,BSOg, BS~O, B6~ IFaidax Route 657 - RW I ICons~u~on Und~ay I " ' 16~1 I STP I(FO)~5~-02~-F33,(P~101),RW202,C502 ~ "' Ilntem~on CN ........ nt 18859 S ~29-~,~PE101,C~!,,, ILoudoun IRoute 15- RW ~5.9 Miles West CN (1) Na~onal H~hway System AIl~ti~s O) STP Rq~al A~i rative ~oject wl~ ~ L~li~es ~(2) CTB/STP Statewlde Nl~ti~s  (3) TEA-21 Funds (5) F~al ~m~sff~on Funds (8) Fund~ on a Previous Pmj~t High P~ority (6) C~ra~ve ProJ~ with ~her System (9) Bond~lnterest PRIMARY SYSTEM 111 NORTHERN VIRGINIA DISTRICT i ' It I !i I ! il } ,! 120 0.2 Mile to4 Faldax Drive Boulevard North Cadyn Springs ~oad [Mington Blvd.) Bridge - ~ 8onlh of Southern Raitway ~mpany RW CN TO 5233O CN 11051 PE RW CN TO 110,52 RW CN TO 16649 PE RW CN TO RW CN TO 13532 (7) ...... *'inhou~'PE- (~emaining to be funded bi Arlington Couniy) ...... / / National Highway System Allocations CTB/STP Statewide Nlocations ~ Funds (4) STp Regional AIIocalions (5) Federal Demonstration Funds (6) C~perative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 112 NORTHERN VIRGINIA DISTRICT 6 Lane RW 123. Fairfax 0.3 km South Lee Chapel Road Chapel Road - North Davis Drive Drive - South Approaches of Bridge over'Occoquan River 123- Interchange PE RW CN TO 16622 PE RW CN 51135 PE RW CN TO 14691t14692 PE RW CN TO 14693 RW CN TO PE RW CN TO 12918 (9) [I) N~onal Highway System Allocations CTBISTP Statewide Nlocatious t TEA.21 High Pdodly Funds (4) STP Reg (5] Federal Demonstration Funds (6) Cooperative Proja:t with Other System Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 113 NORTHERN VIRGINIA DISTRICT West Lena 1.8 Miles East National Highway System Allocallons High Prior'e/Funds RW CN TO RW CN TO 20514322 PE RW CN TO RW CN TO 3789 PE RW CN TO RW CN TO 11718 (4) STP Regional AllOCations (5) Federal Demonstration Funds (6) Cooperative Project with Olher System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 114 NORTHERN VIRGINIA DISTRICT 9,8 Miles Lighting Lanes on William ~]ound Lane Interstate Route East East- 28 Eastbound Lane Route 66 - Elalls Ford Road BYPASS: d Lane Route 66 - Mile West Existing ~ Ford Road R~est Existing Balls Ford Road - Mile West of Relocated Wellington Mile West of Relocated Wellington FBL Route 28 PE RW CN TO PE RW CN TO RW CN TO 16213 RW CN TO 13O11 RW CN TO 3.4 Mile West EBL ~lokesville Road- 3.9 Mile East EBL 649 - RW CN TO 51241 I(1! National Highway System Allocations ((2!.3) CTB/STP Statewide Allocations TEA-21 High Priority Funds ,,,, (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (g) Bondsllnteres! PRIMARY SYSTEM 115 NORTHERN VIRGINIA DISTRICT - ! Sight of Route 1-95 RW interchange) CN 13525 Road West - PE of Fal~fax RW & CN Lake Drive - TO Pickett Road i7671 PE RW CN 'fO Route 663 * ~taffo~d County Line PE RW CN TO 12910 RW CN TO 13599 3175/3176 RW CN TO 17845 I(NFO) 0236-0294 2(] PE'~G1 ' IAddilional Fu'nding in CMAQ P'r~'r~m in Vol. 2 ! (~) (1) National Highway System Nlecations CTB/STP Statewide NlecatiOns High Pdorily Funds (5) Federal Demonslration Funds (6) Cooperative Project wi~ Other System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM NORTHERN VIRGINIA DISTRICT 116 Smithsonlan Nr and PE Space Museum Access RW & Appurtenandes CN TO 13926 National Nr and PE Space Museum Space Museum for RW CN TO 18699 e- PE District of Columbia Rt/V CN TO (7) PE Western Regional RW Park and Ride Lot CN TO 18862 I J STP / IWMAT^ nterstate and :'= :!::= ': ~ ?. ~/f'.' ~'= ~ ! J Con~ Measures ~ RW I ~o suppo~ 1-6~ CO ~ ~ ,, 16130 TCM0-~A.102,PEI~ AdministerS' by DRPT National Highway System Allocations (4) STP Regional Nlocations CTB/STP Statewide Allocations (5) Federal Demonstration Funds (8) Funded on a Previous Project TEA.21 High Priority Funds (6) Cooperative Project wilh Olher System (9) Bonds/Interest PRIMARY SYSTEM 117 NORTHERN VIRGINIA DISTRICT Traveler Informalion RW 8entle~s. No.em CO and Washington Melro Ama 17272/18208 PE Traffic Signal RW System & Control CO Monitoring TO r Y2K Compliance 13453 12821/12380 RW CN TO 51322 RW CN TO 51394 (2) ~AO~ (5) Federal Demonstration Funds (8) Funded on a Previous Project High Priority Funds (6) Cooper~ve Project with Other System (9) Bonds/Interest PRIMARY SYSTEM NORTHERN VIRGINIA DISTRICT 118 Pavement Markers ~0: Signals Operations and Safety Funds Required Funds Required for ................ Sharing initiative To Be Distributed by ALLOCATIONS SYSTEM ALLOCATIONS NVTDP BONDS & INTEREST 1999 FEDERAL APPROPRIATIONS & TEA-21 FAIRFAX COUNTY PARKWAY: [!) National Highway System Allocations CTB/STP Statewide Allocations ~ Funds ~0~ (4) ~;~3;~3~ (4) ~;:~3~79~ {4) STP Regional (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/interest PRIMARY SYSTEM 119 NORTHERN VIRGINIA DISTRICT t I I } I J J I I ' I ' I ' I I I I ' ! J I ! ' J ! ! ~ & INTEREST TEA-21 HIGH PRIORITY ALLOCATIONS PUBLIC TRANSIT, SECONDARY & ENHANCEMENT) System Nlocatlons t CTB/STP Statewide Allocations I Funds (4) STP Eegional Allocations (6) Cooperative Project wtih Olher System (7) Cooperative Project with Other Localities (g) Bonds PRIMARY SYSTEM NORTHERN VIRGINIA DISTRICT 120 4.4 Miles 1,3 Miles Fairfax County Parkway 2.0 Miles Route 123 Road Franconia/Springfield Parkway at Frontier Drive Route 1 (Richmond Highway) Baron Cameron Avenue- 0,4 Mile South Westbound Lane Route 7 (Sugarland) RW CN TO 2O6 PE RW CN TO 14719 PE RW CN TO 13572 PE RW CN TO 11681 PE RW CN TO t) National Highway System Allocations CTB/STP Statewide Nlocations (3) TEA-21 High Priority Funds (4) STP Regional Allocations (5) Federal Demonsffation Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest SECONDARY SYSTEM 121 NORTHERN VIRGINIA DISTRICT Route 7 - RW Route 7 TO (2) ~:~;~1~663! (2) ~ 15292 PE Route 29- RW 0.2 Mile North CN Route 29 - TO 13452 0.4 Mile Soulh Route 50 - RW 0A Milo Norlh CN Route 50 TO Baron Cameron Avenue 11527 RW CN ?0 11679 Baron Cameron Ave. - RW CN Baron Cameron Avenue TO Rolling Road- Fullerton Road 16627 RW CN TO ..... _C~S_~Iojl. _Comple e ........ Northern Virginia Tmnsp~)rtalion District Proflram ...... ( ) ~i (2) (2) CTBtSTP Stateaide AIIocalions (3) TEA-21 High Priority Funds (4)~ (,5) Federal Demonstration Funds (6) Cooperative Project wtih Other System (8) Funded on a Previous Project (9) Bonds/interest SECONDARY SYSTEM NORTHERN VIRGINIA DISTRICT 122 ;TO FAIRFAX COUNTY PARKWAY: CTB/STP STATEWIDE ALLOCATIONS NATIONAL HIGHWAY SYSTEM ALLOCATIONS ~IVTDP BONDS AND INTEREST /EA-2~ HIGH PRIORITY ALLOCATIONS National Highway System Nlocations CTB/STP Statewide Allocations TEA-21 High Prierit~ Funds (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest Localities SECONDARY SYSTEM 123 NORTHERN VIRGINIA DISTRICT Trail RW CO (4) t Fleet Improvement A~ess Rideshare Program Enhancements RW CO TO Purchase (2) PE RW CO TO RW CO TO Purchase (10) RW CO TO PE RW CO TO 2OO ational Highway System Allocations TBISTP StateWide Nlocations Funds (4) STP Regional Allocations (5) Federal Bemonstralion Funds (6) Cooperative Project with Olher System Other Localities (8) Funded on a Previous Project (9) Bonds/Interest CMAQ UTILIZING STP REGIONAL ALLOCATIONS 124 NORTHERN VIRGINIA DISTRICT Railway Express RW CO TO Spaces RW CO TO Transit Vehicle Storage RW CO TO RW CO TO ALLOCATIONS: National Highway System Nlocations CTB/$TP Stat~lde Nlocations TEA-21 High Pdodty Funds (4) STP Regional Allocations (5) Federal Bemonstration Funds (6) Cooperative Project with Other System Othor Localities (8) Funded on a Previous Project (9) Bonds/Interest CMAQ UTILIZING STP REGIONAL ALLOCATIONS 125 NORTHERN VIRGINIA DISTRICT trail RW CO TO ~; [1) National Highway System Nlocall~s (5(4] CTB/STP Stateside ^li~ons Funds (6) Cooperative Project wi~ Other System (8) Funded on a P~evious Project (9) Bonds/Interest ENHANCEMENT UTILIZING STP REGIONAL ALLOCATIONS 126 NORTHERN VIRGINIA DISTRICT Davis Ford Road RW Bypass CO TO PROPOSED PE RW Bypass- CO Dulles Toll Road TO PE Street RW CO TO Monument Drive PE RW CN TO Parkway and Route 95 524O4 PE RW CN TO TOTAL STP REGIONAL ALLOOATIONS: (4) (~) (4) 4 :1) National Highway System Allocations i CTBISTP Statewlde Allocations Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (g) Bondsflnterest SECONDARY UTILIZING STP REGIONAL ALLOCATIONS 127 NORTHERN VIRGINIA DISTRICT I i I I ! I I I I I i I ! ! I I I ! TDM Program RW CO Transit Store PE Funding RW CO TO RW CO TO PE RW CO TO (4) Enhancemen~ Lake Ridge Nea (Tacketts Mill) RW CO TO RW CO TO 15290 ~ Allocations (4] Allocations (5) Federal Demons~'ation Funds Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest PUBLIC TRANSPORTATION UTILIZING STP REGIONAL ALLOCATIONS 128 NORTHERN VIRGINIA DISTRICT Regional Ridesharing Program Support Yransif, Center Enginee~ng Capacity Expansion PE RW CO TO RW CO TO PE RW CO TO RW CO TO PE RW CO TO PE Metro Station RW Improvements CO TO (1) National Highway System Nlocations CTBISTP Statewide Nlocations ~ Funds I (5} Federal Demonstration Funds t$) Cooperative Project wtlh Other System {8) Funded on a Previous Project (9) Bonds/Interest PUBLIC TRANSPORTATION UTILIZING STP REGIONAL ALLOCATIONS 129 NORTHERN VIRGINIA DISTRICT 0 Z n, improvements RW CO TO TOTAL CTB/STP STATEWIDE ALLOCATIONS: High Pdori~y Funds (5) Federal DemonstralJon Funds (6) Coopm'atlve Project with O~er System (8) Funded on a Previous Project (9) Bonds/interest PUBLIC TRANSPORTATION - STBISTP STATEWIDE NORTHERN VIRGINIA DISTRICT 132 RW CO TO TEA-21 HIGH PRIORI'P(ALLOCATIONS: 1) National Highway System Allocations CTB/STP Statewide Allocations TEA*21 High Pdority Funds (5) Federal Demonslration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest Locnlities PUBLIC TRANSPORTATION - TEA-21 133 NORTHERN VIRGINIA DISTRICT i i ) RW CO TO !~,~ National Highway System Nloc~oes CTBfSTP 8tateWide Allocations ~ Funds (4) STP Regional (5) Federal Oemons~ation Funds (6) Cooperative Project wilh Other System (8) Funded on a Previous Project (g) Bonds/interest PUBLIC TRANSPORTATION - SPECIAL GRANT 134 NORTHERN VIRGINIA DISTRICT Lane Lane km/0.7 M St. , PE101, 1-395 near 30th St, Includes Intersection Street Edeall Road to Dom Pickett Road C501 Eisenhower Ave. to 29 17685 17693 JibE'& RW Provided b f C~'~,' ' " / ......... ,,,, . Lane U000-100-V09, PE101, RW201, 81 Lane I, PEt01, 3951 National Highway System Allocations CTB/STP Statewide Niocations TEA-2! High Priority Funds STP Regional Nlocations (5) Includes National Highway System Funds (6) Includes CTB/STP Statewide Allocations (7) Includes TEA-21 High Priority Funds {8) Includes R, ,e~ional STP Aliocat, ,k?s (~) ~;ans, Right of Wayand Contrac{Administrat~ by munlclpal~ (10) Plans and Contract Administration by Municipality (1 t) Minor Construction Project by Municipality {12), !n ,coniunctio,n,,,with Other System P, ,roject ........... URBAN SYSTEM 135 NORTHERN VIRGINIA DISTRICT Street Rail U000-100-115. PE101. 15961 U000-100-118, Slreet Rail U000-100-119, , PEI01. Street Station 17452 ;easibilit¥ Study [NFO) U000-100-121, Let and {1) N~a! Highway System Allocations CTB/STP Statewide Allocations (3) TEA-21 High Priority Funds (4) STP Refiiorml Allocations 17679 18991 National Highway System t {~)0) Plans and Contract Administration by Municipality (6) Includes CTS/STP Statewide Allocations Plans, Right of Way and Contract Administration by municipality (7) Includes TEA-21 High Priority Funds (11) Mhor CoflstmcUon Project by Municipality {8) In~,,,u,,,d,,,,e.s, ReRi~.al ~T~,,N, locations ..... (!2) In Conjunct,Ion with Other System Prok~ct . URBAN SYSTEM NORTHERN VIRGINIA DISTRICT 136 Lane I Mile Eicenhower Avenue to Duke Street t Lane 5 Lane 1.9 kris/l,2 M , RW201, Eaton Place DO29-151-F03, PEI01, Eaton Place to Lane arid~e 0029-151-t06, Lane between Route 29150 3 Lane Section 0123-151-105, National Highway System Allocations CTB/STP statewide Nlocations Funds 12537 4514 16632 17690 17691 I ___ l* NVluP Bond Func s for Construction I ......... ' ......... {5) Includes National Highway System Funds (6) Includes CTS/SI'P Statewtde Allocations Includes TEA-2! High Priority Funds (9) Plans, Right of Way and Contract Administration by municipality (10) Plans and Contract Administration by Municipality (11) Minor Construction P~'o~ect by Municipality URBAN SYSTEM 137 NORTHERN VIRGINIA DISTRICT I I I I ! I · II Street to Entrance to Pa~nll Lot o~ U000-151.V05, PE101, (NFO) U000,.151-I08, Provided by C ~y ................ J ....... 17684 Lane ,PE101, PE101, to 221 a. tiona!Highway System Allocations (5) Includes National Highway t TS/STP Statewlde Allocations (6) Includes CTi~/GTP Statewlde Nloeatlons , Funds {7) Funds (9) Plans, Right of Way and Contract Adminislration by municipality (10) Plans and Contract Administration by Municipality (11 ) by Municipality URBAN SYSTEM NORTHERN VIRGINIA DISTRICT 138 PEI0t, 195 195 Street , PEt01, Buren Street C501 g Funds 12741 N648 50t00 National Highway System AIk)c, ations CTBtSTP Statewide Altocatlons TEA-21 High Prior'~ Funds (5) Includes National Highway System Funds (6) Indudss CTB/$TP Slatewide Allocations Funds (9) Plans, Right of Way and Contract Administration by municipality (1 O) Plans and Contract Administration by Municipality URBAN SYSTEM 139 NORTHERN VIRGINIA DISTRICT 4 La.e 4 {FO) 0015-253-101, (NFO) 0015-253-102, King St. U000-253-V04, PEI01, U000-253.104. Street U000-253.V08, PEt01. Evans Road (NFO) U000-253.110 Norfolk Southern Railroad Track Relocation, Track (Crew Change) 17~7 STP IPE to be P,.r.,ovided b1 TOwn ..... I IContract A.,dministratinn I~y ?own ,, ' II ,, , i 18992 (1) National Highway System Nlocatio.s (2) CTEISTP Statewide Allocations (3) TEA-21 High Priority Funds 4) STP Re01onal Nlocatiorm (5) Includes National Highwa1 (6) Includes CTS/$TP St~tewide Allocations t7) Includes TEA-2! High Priority Funds 8) Includes ,Regional 8~P Atlo~tions, (9) Plans, Right of Way and Contract Administration by municipality (10) Plans and Contract Administration by Municipality (tl) Minor Construction Project by Muntcipali[y URBAN SYSTEM NORTHERN VIRGINIA DISTRICT 140 ,2 kin/2.6 M Lane Southern Railroad and Interchange of Road 0028.155-t03, (8) 17689 Lane 2000-155-V05, PEI0t, L~eCmAve. PE10t, C501 Road Nokesville Road t4646 (41 ~ , ilane CTB/STP Statewide Nlooations Funds (5) Includes National Highway t (6) Includes CTB/$TP Statewlde Niooations (7) {9) Plans, Right of Way and Contract Administration by munioipafity (t0) Plans and Contract Administration by Municipality {11) Minor Construction Project b URBAN SYSTEM 141 NORTHERN VIRGINIA DISTRICT 2 Lane Lane Lane U000-152-102, PEt01, Drive ,PEI01 U000-153-108, PEI01 OTB/STP Statewide Allocations Funds 18634 50101 HIGH PRIORITY ALLOCATION STP REGIONAL ALLOCATION (5) (6) Includes CTWSTP Slatewide Allocations (9) Plans, Right of Way and Contract Administration by municipal~ (10) Plans and Contract Admlnlslration by Municipality (1 ! J Minor Co~skuction Project by Municipality URBAN SYSTEM NORTHERN VIRGINIA DISTRICT 142 NOVA DISTRICT SECONDARY SYSTEM CONSTRUCTION IMPROVEMENT PROGRAM FISCAL YEAR ALLOCATIONS Xrlin~on - - *~ 9 '~'~ ~ 5,608.948 ~ ...... ~5.5~3 ~ 6,596,889 .~ 34,026,175~ 5,267,~70 ~? 5,14_.798 ~i 5,514,618 ~.~ . ~,: ~,~. 29 169.~.~0 ::.~ 31.705.162 4~:. 32.183,745 33,621~005 )~ 37,126,149 ~ 193,128,039j Faiffax ~1 29.322,647 ;~?: '~ ~'~ ~ Loudoun :¢.}?~ 6,377,730 ~ 6,325.823 :.:~:;: 6,8t2,602 7:~ 0,921,092 :~: 7~237~212} Z987.716¢ 41,662,175 9}348}018 ~:~ ' ' ;'~7' ' ' © ' }~' 10.683.581 '11~747~214¢ 61,422,477 Prince Willim ~. . . ~.:~ ~}~ 9.32~.77.~ :~: 10,081,28.~ 10.238.608 To~I ........ ~ 50,315,765 ~ 49,961,724' ~ -~4,113}665]~ 54,952,393. ............ ~j~ ~ ~}' 63}~'5'7}969~ .... ~ ~... SECONDARY SYSTEM 143 NORTHERN VIRGINIA DISTRICT ! ! I ! i I ~ommonw~altb Hanapo(tation ~oard fiscal ear ! ! · ! Richmond D/strict Richmond D/strict ! ! I I I I ! I ! I I I I ! ! Richmond District (In Thousands of Dollars) Fiscal Years Allocation NHS-INTERSTATE NHS-NONINTERSTATE 42,036 1,990 30,053 42,133 2,190 40,656 2,190 40,282 2,500 32,005 42,892 2,500 43,965 2,500 251,964 13,870 PRIMARY 29,324 31,627 33,523 37,619 194,151 URBAN 18,598 18,249 19,498 19,838 20,810 23,149 120,142 SECONDARY 34,506 34,247 36,771 37,376 39,060 43,048 225,008 &-21 HIGH PRIORITY CMAQ TOTAL CTB/STP STWDE. TOTAL STP REGIONAL.TOTAL ENHANCEMENT SAFETY 5,490 5,794 5,794 2,770 5,482 10,049 1,825 1,631 0 0 3 3,917 4,015 5,482 5,482 5,482 ! 4,000 10,514 10,7401 10,965 ANNUAL ALLOCATIONS ANNUAL ALLOCATIONS ANNUAL ALLOCATIONS ANNUAL ALLOCATIONS RAIL SAFETY 10,323 I 156,449 158,032] ~ 157,765[ 11,526 MASS TRANSIT 0 4,015 22,568 22,566 165,490 151,2721 TOTAL 165,956 *Reductions and/or undistributed balan&&s shown o~ Primary System. Local MPO to make final determination. 0 25,928 11,194 63,785 1,825 1,631 11,526 954,964 144 1,4 km Bridge Route 64 At Oilville Rest 16gE&W) 1.0 km West Hendco Route 295 (Short Pump)- 1.6 km West Lanes Route 623 RW CN TO RW CN TO 18937 RW CN 1'O 14758 RW CN TO Interchange of Richmond RW CN TO 50122 RW CN TO 18938 1) National Highway System Allocations CTB/STP Statewide Allocations ) TEA-21 High Pdofity Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bondstlntemst INTERSTATE SYSTEM 145 RICHMOND DISTRICT I ! I I ' I I RW CN TO 1.0 Mile West Airport Drive - 1,0 Mile East Route 249 1.0 Mile West Airport Drive - 1.0 Mile East Route 295 Mi, 17757 NewKent Pavement RehabilitaUen RW CN TO 52442 RW CN TO 12799 PE 1.0 Mile East Route 249 RW (Including Modification of CN Route 249 Interchange) TO Mile East Route 33 1.0 Mile East 1.0 Mile West Route 155 CTBISTP Statewide Allocations Funds PE RW CN TO 11800 PE RW CN TO 11802 I I (4) STP Regional Nlocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest RICHMOND DISTRICT INTERSTATE SYSTEM 146 Kent Widening Kent PE Route 155- RW 1.0 Mile East Route 33 CN TO RW County Line CN TO 12801 PE Area (MP 213 E & W) RW & W) CN TO 14759 {MP 213 E & W) RW &w) cN TO 18939 of Richmond, RW County Line CN Kent TO Ramp & 16417 RW 52445 ',1) National Highway System Allocations CTB/STP Statewide Nlocations i TEA-21 High Priority Funds (4) STP Regional Allocations (5) Federal Bemonstral~on Funds (6) Cooperative Project with Other System (7) Cooperative Project w~h Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM 147 RICHMOND DISTRICT I I I ! ! ! Scales (Bottoms Bridge PE RW CO TO IMP 32 N & S) Improve Lighting s) Rest Area UP 1 NB) 1 NB) Sewer Line f of National H~ghway System Allocations CTB/STP Statewide AllOCations TEA-21 High Pdority Funds RW~ CN TO 18940 RW CN TO RW CN TO RW CO TO RW CN TO 13804 l , (4) STP Regional Allocations (5) Federal DemonsffaUon Funds (6) Cooperative Project with Olher System {'~) dooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest INTERSTATE SYSTEM RICHMOND DISTRICT 148 ' o! Colonial Interchange Improvement Interchange Improvements C, SX Transportation and CSX Transportation of Richmond Hermitage Road, and Ramp of Richmond National Highway System Allocations CTB/STP Statewide Alloe, ations TEA.21 High Priority Funds PE RW CN 'fO ;~ 18943 PE RW CN TO 14760 PE RW CN 1'O 13794 13795 PE RW CN TO RW CN TO 13796 13799 RW CN TO 13801 (4) STP Regional Atlocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM RICHMOND DISTRICT 149 I I I i I ! ! I I ! I i I Over Bellwoed Road, and Willis Road PE RW CN TO Over Unnamed Road and Falling Creek 1380O PE RW CN TO Henrico Inter~ange 13802 PE RW CN TO of Richmond Maury Sffeel 16559 t398 PE RW CN TO Between Route 1 PE RW CN TO ~ of Richmond Bridges 17780 PE RW CN C501 National Highway'System Allocations Allocations High Priority Funds 17781 STP Regional Allocations I~I Federal Demonstratioa Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest RICHMOND DISTRICT INTERSTATE SYSTEM 150 ' of Richmond Bridges end Upham Brook Run RW CN TO 18944 RW CN 'fO 14762 , of Richmond Accel Lane Between Hermitage RW 13541 of Richmond Mast t,1 km South Maury Street RW CN TO t7762 RW CN TO Route PE RW CN TO 16125 16126 I ! Highway System Allocations High Pflo~ity Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM 151 RICHMOND DISTRICT I I I I ] I I I I i '1 ~ast of Richmond RW CN TO 3.2 km Rou~e 295 Smart Traffic Center 12802 PE RW CN TO 1715 1716 RW CN TO 18945 Districtwide ns 8arriei* Highway System Allocations TEA.21 High Priodty Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Coopemlive Project wlU~ Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM RICHMOND DISTRICT 152 DISTRICT SUMMARY ~" ' i~ ~;~ National Highway System Allocations OTB/STP Statewide AIIocalions ~ Funds (4) STP Regional Nfocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9] Bonds/Interest INTERSTATE SYSTEM RICHMOND DISTRICT 153 I I I I I I I I I i I I I I I I I I Lanes Lanes km North Route 145 (Chester Road)- D.6 km North (Chester [0.4 Mile South Route 620) Ashland Corporate Limits 0,1 km South Sliding Hill Road [Route 623) Route 295 - D.I km South County Une ROANOKE RIVER: 7.2 km South Route 58 [Sff.# 1002) RW CN TO 15988 PE RW CN TO RW CN TO 18946 PE RW CN TO PE RW CN TO 15428 PE RW CN TO 1347 Highway System Nlocations Statewide Allocations Prlodty Funds (4) STP Regional Nlocations (5) Federal Demonstration Funds (B) Cooperative Project with Other System (8) {9) Bonds/Interest PRIMARY SYSTEM RICHMOND DISTRICT 154 Route 608 RW CN TO Coun[y Line (SI~.# 1917) 17763 RW CN TO 17764 Laburnum Avenue. Left 0.3 km East Int. RW CI~ TO 0.7 km t4763 Willson Road - 0.3 km East Int. RW CN TO 15980 Route ,522 PE RW CN TO Route 522 PE RW CN TO ',1) National Highway System Allocations CTB/STP Statewide AIIocalions Funds (4) (4) I~{ Federal Demon~atlon Funds (6) Cooperative Project with Other System Other Localities (8) Funded on a Previous Project {9) Bonds/Interest (4) PRIMARY SYSTEM RICHMOND DISTRICT 155 I i I 10- ~ Direction (PE Only) Lane Route 95 Route 295 - Meadowville Road PE RW CN TO 15979 PE RW CN TO 16521 0.7 Mile North NCL Hopewell - NCL Hopewell (S~r,# 1901) RW CN TO 0.7 M~le Route 609 - km East Route 609 RW CN TO km West Route 641 - 0.4 km West Route 641 16515 PE RW CN TO Funding 13- Sidewalk Route 1001 - Route 1005 & 16516 PE RW CN TO National Highway System Allocations CTBISTP Statewide Allocations TEA.21 High Priority Funds (4) STP Regional Nlocations (5) Federal Demonsb'ation Funds (6) Coopemlive Project with Other System (8) Previous Project (9) Bonds/Interest RICHMOND DISTRICT PRIMARY SYSTEM 1 56 t.5 Ntiles (PE & RW Only) South Intersection Route 722- Route 58 (In Clarks- PE RW CN TO (st~,# lO4O) 11068 PE RW CN TO 18947 Intersections PE RW CN TO PE RW CN TO km East Gordons Lane- km East Dabbs House Road 52446 PE RW CN TO River Bridge (Ellham Bridge) 12805 PE RW CN TO (4) ~!.~ (4) Allocations CTBtSTP S~atewide Allocations I Funds (5) Federal Demonstration Funds (6) Cooperative Project with O{her System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 157 RICHMOND DISTRICT i I ! I I I Amelia Courthouse: Route 360 Business 1003 RW CN TO 0.2km Route 49 - PE RW CN TO 3.6 km lIVER: 1.1 Miles North Route 715 RW CN TO 18949 PE RW CN TO 18950 At tntersu~ion Route 666 PE RW CN TO 18951 At Route 249 RW CN TO 16562 y System Allocations CTBISTP Statewide Nlocatlons High Priority Funds ($) Federal Demonsb'a~ion Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 158 RICHMOND DISTRICT Route 522 (West of Cumberland County Line PE RW CN TO RW CN TO 52447 RW CN TO 18953 PE RW CN TO 18954 s Road RW CN TO r of Richmond 18955 PE RW CN TO 16305 National Highway System Allocations CTBISTP Statewide AIIocalJons TEA-21 High Priority Funds L ~1(NFO)0060'072'114 P'(710~C501 ........ ' .... , ..... (5) Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest (4) PRIMARY SYSTEM 159 RICHMOND DISTRICT I i I I I I ,! I I I I I I I 0.7 km &SB Line City/New Kent County Route 607 RW CN TO 15978 RW CN TO 16517116518 RW CN TO ~21 (2) ~ ¢21 ,, (4) ~ (4) ........ ~;~o;~ 147 - , of Richmond e Rehab. (Str.# 1942) BRIDGE: 17766 PE RW CN TO 1;6 Miles 6 Lanes 6.6 km/4.1 Mi. 150- 16519 RW CN TO 1.5 kml0.9 Mi. East PE RW ~ EBL CN Fluff SL)- TO 8446 (1 ) National Highway System Allocations (2) CTB/STP Statewide Allocations (3) TEA-21 High Pdority Funds , S (6) Coe~ve Project with Other System (8) Funded on a Previous project (9) Bondsflnterest (4) ,,! PRIMARY SYSTEM 160 RICHMOND DISTRICT RW CN Route 64 15989 PE RW CN TO 156- (Str.# 1014) 15976 PE RW CN TO 157- 0.3 km North Nuckois Road Lanes 14767 PE RW CN TO PE RW CN TO Kent Lanes 0.3 km East Rte,613 3- 16565 PE RW CN TO 16564/16566 [1) National Highway System Allocations CTB/SIP Statewide Allocations 1 TEA*21 High Riofity Funds IC~o_ns~n _Cpmp!e.:e . ,,, i I I i (4} (5) Federal Demonstration Funds (8) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest (4) PRIMARY SYSTEM 161 RICHMOND DISTRICT I I I I I I I I I ! I I I I ! i I i i Lanes , Line Lanes and Route 623 Lanes 0,? km County Une- 0.1 km West County Une Route 621 RW CN 'tO 16567 RW CN TO PE RW CN TO 13546 PE RW CN TO 12921 RW CN TO 17070 PE RW CN TO (4) (4) Co~{'ructton ~mple? .... , .... , ,, (4) (4) ~ (4) ~ (4) (4) (4) National Highway System Allocations CTB/STP Statewide Allocations Funds (4) STP Regiona 65) Federal Demonstration Funds ) Cooperative Project with Other System (8) Funded on a Previous Project (g) Bonds/Interest PRIMARY SYSTEM RICHMOND DISTRICT 162 Intersection improvement Goochland Improvements 250 - Improve Sight Distance Hen~coand ~om4 km West 522- 0.2 km East Route 522 Mile West Route 271 Mile West 0.1 Mite West HenricolGoochland County Line (South of Rockvilte). Rockville (Route 622) PE RW CN TO RW CN TO RW CN TO CN RW CN TO 12421 RW CN TO (4) (4) B602 (1) National Highway System AllocalJons (2) CTB/STP Statewide Allocations TE^-21 High PriOry Funds (5) Fedeml Demonstralion Funds (6) Cooperative Project with Other System Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 163 RICHMOND DISTRICT I ! ! ! - Laneson ) COALFIELD ROAD: Centerpointe Pa[kway/ Route754 - 0.2 Mile North  Chestertietd Route 76- ew Location Chesterlield/Powhatan Lanes on New County Line Lanes on New Lanes on New PE RW CN TO 14857 PE RW CN 1'O Route 76- South of Charter Colony Parkway 13548 PE RW CN TO South of Charter Route 60 18085/50661 RW CN TO Route 60 RW CN TO , Line- Lanes on 6-Lane Powhatan/Goochland County Une (James PE RW CN TO CTBISTP Statewide Allocations (4} STP Regional Allocations (5] Federal Demonstration Funds (6) Cooperative Project with Other System /ith Oiher Localities (8) Funded on a Previous Project (9) Bonds/interest PRIMARY SYSTEM 164 RICHMOND DISTRICT · lames River PE RW TO Lanes on Lo~tien 2 Lanes on Location Phase I North of Route 71~I (Includes Ramps at Raute 6 of River Bridge 6 River) RW CN TO 17781/18956 RW CH TO 17782/I~957 RW CN TO 2 Lanes on 6-Lane River)- Route 250 PE RW CN TO 2 Lanes on &Lane Location 13547 PE RW CN TO / (1) National Highway System Allocations CTBISTP Statewide Allocations TEA-21 High Priority Funds (5) Federal Demonstration Funds (6) Cooperative Project with Other System Other Localities (8) Funded off a Previous Project (9) Bonds/Interest PRIMARY SYSTEM RICHMOND DISTRICT 165 I I I I I I I I ! ! " Phase II Lanes on 6-Ln, Route Route 250 Route 250 RW CN TO RW CN TO 13547/15974 Route 250- Lanes on 6-Lane 0,3 km South Route 250 0.5 km Shady Grove Road PE RW CN TO PE RW CN TO RW CN TO 1896O ~nds (5) Federal DemonstraUou Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM RICHMOND DISTRICT 166 0,2 km East Realignment Intersection Route 6201616 Coudhouse Road. 0,1 Mile West Walmsley Boulevard/ Hicks Road 2,0 Miles .... ] ]1.0 km East I~e~terlle~d360 IRoute 288- ~ Lanes West Road PE RW t'O 16568 RW CN TO 11073113368 RW CN TO Lanes Only) 15990 PE RW CN TO Road - East 5OO29 RW CN TO 18961 Road (0,2 Mile West Lee Davis Road to 0.2 Mile East Lee Davis Road) PE RW CN TO 13551 ) National Highway System Allocations CTB/STP Statewide Allocations Funds (1) (4) STP Regional Allocations 5) Federal Dem~stration Funds 6) Cooperalive Project ~lth Other System (8] Funded on a Previous Project (9] Bondsllnteresl Localities PRIMARY SYSTEM RICHMOND DISTRICT 167 i i I I I I I I I I I I Hanover 360- Hanover 4to6 &8 Lanes 4 to 6 Lanes ~dge Replacement Dinwicldie BELL CREEK ROAD RELOCATED: and ~liminafion of 0,2 Mile West Mile East Mile East Nottoway County Line * 22,3 Miles East Nottoway County Une NS RAILROAD; PE RW CN TO 18962 RW CN TO 1776~ CN TO 18963 PE RW CN TO 17959 PE RW CN TO 17169 17091t17168 PE RW CN TO 18964 _ . :*--=(2} (2~ CTBISTP Statewide Allocations h Priority Funds (4) STP (5) Federal Demonstration Funds (6) Cooperative Project with O~her System (8} Funded on a Previous Project (9] Bonds/Interest PRIMARY SYSTEM 168 RICHMOND DISTRICT to Provide Route 629 PE RW CN TO 17759 Route 156- 0,5 km East Route 156 RW CN TO ~ km Bank 17770 PE RW CN TO Direct Airport Access Road Feasibility Study 15989 RW CN TO Plaza 17771 RW 19004 PE RW CN TO (4) ~,~ (4) ......... (4) ',1) National Highway System Allocations C'I'B/STP Statewide Allocations t TEA-21 High Priority Funds (4) STP Regional Niocatione (5) Federal Demoflsffation Funds (6) Cooperative Project with Other System with Other Localities (8) Funded on a Previous Project (9) Bonds/interest PRIMARY SYSTEM RICHMOND DISTRICT 169 I I I I " I Beautifi~tion Improvements Pavement Ma~kers Signals Operations & Safety , Matching Funds Required for Funds Required for Fiber Optic Resource Sha~g Initiative )National Highway System Allocetions t CTB/STP Statewide Allocations Funds (I) (1) {4) STP Regional Allocallons (5) Federal. Demonstration Funds (6) Cooperative Project with Other System (~) (9) Bonds/Interest PRIMARY SYSTEM 170 RICHMOND DISTRICT Transit) DISTRICT SUMMARY CTB/STP STATEWlDE ALLOCATIONS STP REGIONAL ALLOCATIONS NATIONAL HIGHWAY SYSTEM ALLOCATIONS To Be Dislributed (Public Transit) , Nlocations (1) National Highway System Alloca~ons (2) CTB/STP Statewide Allocations (3) TEA-21 High Pdority Funds (4) STP Regional Allocations (5) Federal Demonstratio~t Fueds (6) Cooperative Project wtlh Other System (8) Funded on a Previous Project (9) Bonds/interest PRIMARY SYSTEM RICHMOND DISTRICT 171 I ! ! I ! I ! ! ! I ! I I I Intersection 5o Charles City Turn Lane t55- Turn Lane Intersection Improvement Improvement , of Richmond Trolley Funds 55 PE RW CO TO 12952 RW CO TO 1O477 PE RW CO TO 16O95 PE RW CO TO 17147 PE RW CO TO 17148 RW (4) (4) ~ CTB/STP StatewJde Allocations High Prlodty Funds (5) Federal Demonstration Funds (6) C~operalive Project wilh Other System )thor Localities (8} Funded on a Previous Project (9) Bonds/interest CMAQ UTILIZING STP REGIONAL ALLOCATIONS 172 RICHMOND DISTRICT Inc. PE RW Pollution CO Program TO Enhanced Ozone RW CO TO National Highway System Allocations (4) STP Regional Allocations CTBISTP Statewide Allocations (5) Federal Demonstration Funds TEA-21 High Priority Funds (6) Cooperative Project with Other System (9) Bonds/Interest CMAQ UTILIZING STP REGIONAL ALLOCATIONS RICHMOND DISTRICT 173 I I I · ! ! ! I I South Ridge Drive- RW CO TO (4) Chesterfeld Genlto Road Cou~ouse Nash Road Woodpecker Road Chesterfield Intersection Improvement RW CO TO 1652 RW CO TO PE RW CO TO 7178 RW CO TO 1489 RW CO TO 17184 (4) CTB/STP Statewide AIIocal~ons High Priority Funds (5) Federal Demonstra~on Funds (6) Cooperative Project With Other System (8) Funded on a Previous Project (9) Bonds/Interest Localities SECONDARY UTILIZING STP REGIONAL ALLOCATIONS 174 RICHMOND DISTRICT Lanes Lanes on New Route 360 Salisbury Road RW CO TO 12818 PE RW CO TO 14966 Park Road- Coalfield Road Route 5 RW CO TO 17820 PE RW CO TO Station Sliding Hill Road RW CO TO Lanes Hemico County Une. Route 638 11273 PE RW gO TO 17861 National Highway System Allocations CTBISTP Statewide NlocaUons TEA-2i High Prierity Funds (4) (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Pt~evious Project (9) Bonds/Interest LocaliZes SECONDARY UTILIZING STP REGIONAL ALLOCATIONS 175 RICHMOND DISTRICT I I I I } I I I (CDBG) Road RW CO TO 17389 RW CO TO (4) ~7~ (4) ~ . Hemico Rubberized Track Crossing Hanover County Line -Hen~co Road- BlueJayLane - Henrico Richmond Corporate Umits Additional RW CO TO RW CO TO 18122 RW CO TO 16288 PE RW CO TO 16153 CTB/STP Statewide Allocations I Funds (4) STP Regio~ (5) Federal Demonslration Funds (6) CooperalJve Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest SECONDARY UTILIZING STP REGIONAL ALLOCATIONS RICHMOND DISTRICT 176 - Henrico Hungary Springs Road ~t~p~s Mi~ R~d Hungary Road * Mountain Road Hanover County Line- 1.0 Mile West ~tanover County Une RW CO TO $152 PE RW CO TO RW CO TO E~anlngton Hill RW CO TO 50528 Barrlngton Hill RW CO TO 50525 Saskins Road RW CO TO 50529 (1) Nalio~al Highway System Allocations CTBISTP Statewide Allocations TEA-21 High Pdority Funds (4} STP Regional Allocations (5) Federal Demonslmtton Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest SECONDARY UTILIZING STP REGIONAL ALLOCATIONS 177 RICHMOND DISTRICT · ]1 ]1 Academy RoBd Powhatan Intersection Improvement 603 - Rocky Ford Road Powhntan Intersection Improvement 614 - Mill Road Powhntan Realignment 6i4- Jude's Fern/ Intersection Improvements Improvement 711 - At Route 13 Route 643. Mile North Route 643 Jenot Trail PE RW CO TO 19O54 PE RW CO TO 19O49 PE RW CO TO 17874 RW CO TO PE RW CO TO 19O5O PE RW CO TO (4) (4) ~ National Highway System Nlocalions CTB/STP Statewide Allocations Funds (4) STP Regional NlocaUons (5) Federal Demonstration Funds (6) Cooper~ve Project with Olher System (8) Funded on a Previous Project (g) 8ondsllnterest SECONDARY UTILIZING STP REGIONAL ALLOCATIONS RICHMOND DISTRICT 178 TOTAL STP REGIONAL ALLOCATIONS National Highway System Allocations CTB/STP Statewide Atiocations TEA.21 High P~iority Funds (4) STP Regional Allocations (5) Federal Demonsb'aUon Funds (6) Coopecative Project with Other System (8) Funded on a Previous Project (9) BondsYlnteresl SECONDARY UTILIZING STP REGIONAL ALLOCATIONS 179 RICHMOND DISTRICT ' } I ! ! ! RW CO TO on Broad Slreet between 7th and 8th RW CO 1'O RW CO TO PE RW CO TO TOTAL STP REGIONAL ALLOCATIONS (4) ~1~ (4) I CTBISTP Statewide Nlocations Funds (5) Federal Bemonstmlion Funds (6) Cooperative Project with Other System Project wilh Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PUBLIC TRANSPORTATION UTILIZING STP REGIONAL ALLOCATIONS RICHMOND DISTRICT 180 RW RW CO 1'O PRIORITY ALLOCATIONS National Highway System Allocatic~s CTB/STP Statewide AIIocal~ons TEA.21 High PHo~ity Funds (4) STP Regional AIIocatk)ns (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest PUBLIC TRANSPORTATION - TEA-21 181 RICHMOND DISTRICT ! I I I ! I I ! I Pleasants St. Lane .lkm/1.3 M ~.4 M C501 ~,shcake Rd. 1-166-104, PE102, C502 rntersection improvement J000-166..V10, PE101, Route 54 U000-166-111, PEt01, 8652 8651 17772 17773 (4(t ) National Highway System Allocations (2) CTB/STP Statewide Allocations (3) TEA-21 High Priority Funds ) STP Regional Niocations 10510 ~ Allocations (6) Includes CTB/STP Statewide Allocations (7) Includes TE21 High Priority Funds 18~ Includes STP Regional Altocations , (9) Plans, Right of Way and Contract Administration by Municipality (10) Plans and Contract Administration by Municipality (11) Minor Construction Project by Municipality {12~l~,l~,,coniu,nctior~ w, ith Other System Proiect ............... URBAN SYSTEM RICHMOND DISTRICT 182 , PEI01, C50t [to Fifth Street , PEt0t, Mile Heights Baiter? Place Ave, Lane Heights ;, PEI0t. C501 3ouiovard to 3945 4594 Lane UOOO-lO6-V05, PE102, National Highway System Allocations CTB/STP Statewide Allocations TEA.21 High Priority Funds (5) Includes National Highway System Allocations (6) Includes CT&'STP Statewide Allocations (9) Plans, Right of Way and Contract Administration by Municipality (10) Plans and Contract Administration by Municipality {1 Project by Municipality URBAN SYSTEM RICHMOND DISTRICT 183 I I 't I I I I I ' I I ' I I r Level Mesa Dr. Lane kin/l.1 M ZLana , Street Lane A Miles U000-116-V02. PE101, Mesa Drive U000-116-107 Io Hiflh Avenue (NFO)U000-116-110 Urban Matching Funds Required for Federal Safety Program in 1436 15831 52172 ! ' I 1.7 km/1.1 M B~dgeOver , PEI01, Stmetand Puddledock Road 1423 15956 ',1) National Highway System Allocations CTB/STP Statewide Allocations (3) TEA-21 High Priority Funds t4) STP Regional Allocations (5) Includes National Highway System Allocations (6l Includes CTESTP SMlewlde Allocations {7} Includes TE21 High Prior'n'y Funds (8l Includes STP Regtonal Allocations (9) Rahs, Right of Way and Contract Administration by Municipality {10) Plans and Contract Administration by Municipality (11) Minor Construction Project by Municipality ,, , (121 In Coniunctign with Other System Pro~ect .. URBAN SYSTEM RICHMOND DISTRICT 184 Lanes. Drive (NFO) 0142-123-101, ~ over Norfolk , PE101, PE102, RW201, C501, B601 Interstate 95 13441 Lane ~, Lane 1.3 km/0.8 M (NFO) U000-123q 13, South Crater Read UOOO. t23-1 t4, PEtOt, 15832 15957 Only and Accrue ;un. ds Toward..RW & q.0nstructio~... ! ............ Lane ~, PE101, 16571 Phase I and tt , PEt02, 15142 CTS/STP Statewide Allocations 'Funds (5) Includes National Highway 1 Allocations {6) Includes CT~STP Statewlde Allocations Funds (9) Plans, Right of Way and Contract Administration by Municipality ¢10) Plans and Contract Administration by Municipality {11) Minor Construction Project by Municipality URBAN SYSTEM 185 RICHMOND DISTRICT Decatur Street l km/l.1 M ~5955 atBroadStreet Improvements (NFO] 0001-127410, 16572 Improvements 0001-127-109 System Signal System Phase I & Phase II {NFO] 0001-127-111, C501 e over S0uthem ',PEI01, 16573 17774 3944 15653 CTB/STP 8tatewJde Aliocations (3) TEA-21 High Priority Funds (4) STP Regional Allocations (5} (7) Includes TE21 High Priority Funds .. {8) Includes STP Re~ional Aliocalions (9) Plans, Right of Way and Contract Administration by Municipality (10) Plans and Contract Administration by Municipality (11) Minor Construction Project by Municipality ,I12) In Coniunction with Other system prolect ....... URBAN SYSTEM RICHMOND DISTRICT 186 ito Lanes km/1.9 M {NFO) 0060-127-106, Interchan~le Study Forest Hill Ave. to Broad Street to Westwood Ave. [NFO) 0161-'127-t05. Dixon Drive to Elkhardt Read Lane IFO) 0360-127-12L km/2.t M 14th Street Dock Street INFO} 0360-127-122, National Highway System Allocations CTBtSTP Slatewide Allocations TEA-21 High Priority Funds Allocations URBAN SYSTEM 15834 19001 16574 99:33 16575 15959 16576 (5) Includes National Highway System Allocations (6) Includes CTB/STP Statewide Allocations (7) (9} Plans, Flight of Way and Contract Administration by Municipality {10] Plans and Contract Administration by Municipality (11} ~' Municipality with 187 RICHMOND DISTRICT I I ! ! I ! ! ~ Street Pair Lane .7 Miles Rd. Lane Miles Ist Street Ll000-127-114, RW202, Broad Rock Blvd. to Bells Road LI000-127-114, RW2~, 11770 11810 ~, PE101, Lane ~lulti-Model Center Phase II & III Federal ~Orlve to [NFO) U000.127-t36. OTB/STP Slatewide Allocations (3) TEA-21 High Priority Funds (4) STP Regional Allocations (5) Includes National Highway System Allocations (6) Includes OTB/STP Statewide Allocations (7) Includes TE21 High Priory Funds (8) Includes STP Regional Allocations (9) Plans, Right of Way and Contract Administration by Munictpality (10) Plans and Contract Administration by Municipality (11) Minor Construction Project by Municipality {12} In ,Coniunction with Other System Proiect , , URBAN SYSTEM RICHMOND DISTRICT 188 Lane Lane 4 Lane Point {NFO) U000-127.137, Parkway to 0.2 km West INFO) U000-127.~138, Road INFO) UOOO-;t27-13g, {NFO) U000-127-140, Road n 15th 195 Franklin Street Ramp [NFO) U000-127-143, National Highway System AIIocalions CTB/STP Statewlde Allocations High Priority Funds URBAN SYSTEM 15953 ~5958 15954 14735 16577 (5) Includes National Highway,~ (6] Includes CTB/STP Statewide Allocations (7) Funds (9) Plans, Right of Way and Contract Administration by Municipality {t O) Plans and Contract Administration by Municipality (t 1) Minor Conslruction 189 RICHMOND DISTRICT I LIOOO-1E-148, Schsr INFO) U000-127-147, 2 Mile INFO) U000-127-148, Painting and Forest Hill g5 Ramp to Street (NFOIUO00-127-150, r2l CT~/STP statewlde Afloeations (3) TEA-21 High Priority Funds (4) STP Re~jional Nlocations .......... 17779 17778 17777 17776 18999 19032 Only and ACcrue -unde Towards RW & Construction I , IPE by City (5) Inctudes National Highway (8) Includes OTB/STP StatewJde Allodio~s (7) Includes TE2t High Priority Funds ,, {81 includes, STP Reflional Allocations (9) Plans Right of Way and Contract Administration by Municipality (10) Plans and Contract Administration by Municipality (11) Minor Constmdion Project by Municipality {12) In Coniunction ,w,~th Other System Proiect URBAN SYSTEM RICHMOND DISTRICT 190 Wide Corridor Congestion Analysis Aerial Photography for Wide ,r intersections Street to Road Gordon Avenue lg033 ~2 kin/1.0 M U000-127-156 Roadio Feasibility Study Ro~d to East Jct, Powhite Parkway Feasibility Study 19O35 ~ r -- I I I i I / State Matching Funds National H~hway System Allocations CTB/STP Statewide Allocations TEA-2! High (5) Includes National Highway System Allocations (6) Includes CTBfSTP Statewlde Allocations ~ Includes TE21 High Priority Funds {9) Plans, Right of Way and Contract Administration by Municipality (10) Plans and Co~lmct Administration by Municipality (11} Minor Construction Project by Municipality URBAN SYSTEM 191 RICHMOND DISTRICT ! ! ! ! J I I ! ! I I I I I I ! , Street i-95 Road to Hill h Ave. Urban Matehinfl Funds Required for Federal Pro.qram in Richmond Hi.qh St. to Lane Lane Hill h Ave. Lane U000-301-106, PEt01, C501 Main Street to Route 58 By~ass U000-301-109, PE101, Route 47 to Route 58 U000-301-110, PEI0t 10516 19038 19037 Allocations CTB/STP Staiowide Allocations Funds (5) Includes Nattonal Highway System Allocations (6) Includes CTB/STP Statew'~e Allocations (7) Includes TE21 High Priority Funds (9) Plans, Right of Way and Contract Administration by Municipality (1 O) Plans and Contract Administration by Municipality URBAN SYSTEM RICHMOND DISTRICT 192 STRICT TOTALS National Highway System Allocations CTBtSTP Statewide Allocations Funds Aliccations TOTAL STP/CTB 8TATEWIDE ALLOCATION (5) Includes National Highway System Allocations {6) lndudss CTS/STP Statewide Allocations (7) Includes TE21 High Priority Funds (9) Plans, Right of Way and Contract Administration by Municipality (10) Plans and Contract Administration by Municipality (11) by Municipality, URBAN SYSTEM 193 RICHMOND DISTRICT I I i I ! ! ! ! ! I I 11 ]i I I I I I CHMOND DISTRICT SECONDARY SYSTEM CONSTRUCTION IMPROVEMENT PROGRAM FISCAL YEAR ALLOCATIONS ' , :' - · ': '' -:.'('.2,.::':~:~ Amelia 1,075.438 .ii,, 1,065,364 ii~i!i 1,140.061 ;~:~!: 1.159.053 ? 1.212.238 :'.'i;!'] 1,336.677 iii,il 6,988,831 Brunswick 1.5741tll ~?~:! 1:563,007 :}i:.i 1.6711454:!!!! 116991512;~.ii{ '11775.738i, i!i. ii 1.9531358;;~.!~ 10,237,179 Charles City ,i::ii 499,358 :;i'i. 497 710 ,,:,;:; 5.~2 292 ~:~; 541,262 ? 564,667 ;,.:; 618.998 ;.~. 3,254,288 8,931~633 ~ ~? 8,907,881 ~ 9,639,550~ 9,789,337}:~;) 10,2'15,'108~(:,:~ 11,2,6,126~ Cbsterfield 58,719,637 Oinwiddie 1.812,737 }(~ 1,805,272 t~}~;~ 1,931,415 ¢;~; 1,963,6811';:':; 2.049,515 ~:.~:.~ 2,248,561 }~:? 11,81.1;181 Ooochland :~; 12127.107 }2~' 1,124,569 ;;:~; 1,203,522;1T,~; 12223,618[~? I;2.762157~;::(~: 1,397,802~ 7,352,775 Hanover~ 32516.472 ~ ~.509.4.~5 ,~: >.77,.275 . .~,834.408: .~.999,.~38 .. 4.~86.562 , 23 019,488 Henrico 7.576}7t7 ~ 7,413,621 ~} 7,937,167 (?:~} 8,073,992 };~} 8,479,296 ~:~} 9.463.912 ~ 48,944,7061 Lunenburg ~ 1,~8.997 ~ 1,375,729 [~}'~ 1,471~570 ~ t,496,094[;}~ I}564}903 ~:; 1.725,555 ~ 9,022,848~ 2..~30,486 }~;~: 2 313,358 ~ 2473'614 ;:~ 2514'843t7':} 2628}318:,? *,891 652~?¢ 15 152272i Mecklenburg Newrem ~;} 921}017 ¢~: 917.138 i}~:~:~} 981,370 '~(~ 997,723 },:;;~ 1,041,4095 1,142;687 5 6,001,345 No~oway : 874.321 : 871}761 ~:'?}~ 931}564 ~ 947,280[}~ 988,145 ~}?~ 1}082,474~:~¢ 5,695,545 Powhatan 1,277,4~1. ~:.~} 1,274,845~(:.~} 1,365,6805 1,388.310 ~;;:.~ 1,447}899~{~} l}586}131:;:~'~ 8,340,337~ Prince George 1.600,4.,2 1,607,184 ~ 1.718,153 ~ 1.746~994 ~: 1}817}448 ~};: t~977~753 ¢} 10,467,964 Ts~al 34,506,298. ~" 34,24~,874 ~}~ ~'6~770~688 5 37~376;108 ~; 39,060,180 :~} 43,648~248 ~ 225,008,3~6~ SECONDARY SYSTEM RICHMOND DISTRICT 194 ~"ommon w~alth Yranap o(ta tion 8oa(d fi~ cai -! I I 6 i ! ! ! I Sa/em District Sa/em District J i I ! i ! ! ! I I ! I ! ! I ! I I Salem District (In Thousands of Dollars) Fiscal Years AllocatiOns NHS-INTERSTATE NHS-NONINTERSTATE 23,544 10,045 19,471 13,145 19,735 14,145 21,950 19,031 8,380 23,517 31,6601 32,427 0 0 145,8681 45,715 PRIMARY 21,213 20,580 24,983 27,995 140,238 URBAN 17,821 17,634 18,728 19,063 19,932 21,952 115,130 26,046 26,013 28,271 29,475 27,806 5,041 5,041 0 4,775 SECONDARY TEA-21 HIGH PRIORITY* 32,239 · I I CMAQ TOTAL ] 01 CTB/STP STWDE. TOTAL ! 5,300 0 1,825 0 0 0 0 0 4,775 870 STP REGIONAL TOTAL 169,850 19,632 8,800 9,000 10,000 10,000 0 43,100 MASS TRANSIT ANNUAL ALLOCATIONS 1,825 SAFETY ANNUAL ALLOCATIONS 870 RAIL SAFETY 648 ANNUAL ALLOCATIONS 648 1,923 ANNUAL ALLOCATIONS 114,613 TOTAL 114,010 *Includes projects unidentified by stem. ..... ! 116,405] 113,303 110,418 !116,0501' 1,923 684,799 195 Detection State Line - North Carolina State Line RW CN TO 14822 Roanoke - N~h Carolina State Line PE RW CN TO 16596 CN TO 178O9 77 - PE NB) RW Cons~'ucl Water CN & Sewer Lines TO 81- Botetourt Increase Rest Reon & Parking Capadty i& Improve Lighting JSM~tgomery ~,t Troutville Rest ~rea (MP 158 SB) ~.t Radford Rest Areas N & SB) N&S) 18864 PE RW CN TO 18865 Highway System Ntocations RW CN TO CTBtSTP Statewide Allocations High Pdori~y Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Coopmative Project with Other Localities (8) Funded on a Previous Project (9) Bondsflnterest INTERSTATE SYSTEM 196 SALEM DISTRICT i i I I ! i ! i I I ! Enff. & Exit Sewer, Montgomery and IMontgomery and Interchange 1.0 Mi, from4 I Lanes 1,9 km North 1,9 km North Route 460111 (Route PE RW CN TO 13507 RW CN TO 16389 16317 PE RW CN TO 524,53 17743 RW CN TO PE RW CN TO 52416 PE RW CN TO (3) (3) (3) 16591 , System Nlocallon$ CTB/STP Statewide Nlocations High Priodty Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Conpemtive Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM SALEM DISTRICT 197 IEnd of CD System . I PE ~ : , , I ~ ~ , , Roanoke & 12.0 Mi. N, Exit 150 I RW I I I I i I Botetourt ~(MP 144.3 - 152,5) I I HPD IAcmal of Fund~"t~ard Cons~u~U~ ......... Roanoke INodolk S~em RR I RW I I Bridge land Route 630 I ~epm~mem I I / ' /~s~ioh C~p~ete ............ i iPE~) I p78!2 . _ nH I(nFo)~81-~2-~4,Pe~o~ ...... / 58~. latva,ey~ rom i PE c~ of Roanoke IPhase I ! RW I I , / ~s~ucl I ! CN I I / I ..... 1t65~ ~1- ILib~ Road- 'l PE ~ ' I ~ ........... ! City of R~noke I~proximately I RW I J I Inter~ange I1 6 km N~hwest I CN ! I and CD Roads l~rshberger Road ! TO i ',1) Na~al HighWay S~lem AIl~ons (4) STP Rqi~at ~1~ (7) ~mUve Pr~ect ~ ~er L~liaes ',2) C~/STP Slat~ide AIl~6ons (5) F~eral ~m~sEaaon Funds (8) Fund~ ~ a P~vious Proj~ ',3) TEA-21 H~h Pd~i~ Funds (6) ~era6ve P~ wl~ ~ S~lem (9) Bond~nlerest INTERSTATE SYSTEM 198 SALEM DISTRICT I I I ! ! ! I I ! ! ! ] I ! ! ! I ! ! Shadflg Initiative Guardrail Guardrail Rumble Strips Variable Message Sign Highway Advisory Radio Netwod~ DISTRICT SUMMARY TEA-21 HIGH PRIORITY ALLOCATIONS CTB/STP Statewlde NIocations High Priority Funds (4) STP Regional AIIocatiofl'S (5) Federal Demonstration Funds (6) Cooperative Project with Othe~ System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest INTERSTATE SYSTEM SALEM DISTRICT 199 57 - RW ~ km North CN 57 TO ~ Intersection Route 612 Ci~/of Radford Pulaski County Southwest Virginia Memorial Bridge at 24* Bedford Parallel Lane (PE Only) Franklin 2 to 4 Lanes Route 791 - Route 746 km East Iht, Route 220 - km East Int. Route t22 Straighten Curves Distance km South Route 868 - km South Route 801 National Highway System Allocations CTB/STP Stateside Allocations Priority Funds 17697 PE RW CN TO 17698 PE RW CN TO 18422 PE RW CN TO 12812 PE RW CN TO 11080 PE RW CN TO 16654 (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bondsflnterest PRIMARY SYSTEM 200 SALEM DISTRICT I ! I I , I ' i i I ! ! ! I ! I ! I i I I 1,2 km North of PE RW CN TO 1.2kin New East Comorate Umits Pulaski - Widen from'2 to 4 Route 1-81 Lanes 16112 PE RW CN TO Ulle - 5.6 Miles North Dublin RW CN TO 686111062 (S~.#1018) RW CN TO 114 - 18866 RW 50030/50561 Ch~sUansburg RW CN TO 18867 '" I* $250,00~ ~und~l fi'( m Ma.!qte~.a. nce Fun( s .. CTBtSTP State~kle Nlocations ' Funds (6) Cooperative Project with Other System Other Locelil~es (8) Funded on a Previous Project (9) Bonds/interest PRIMARY SYSTEM SALEM DISTRICT 201 Botetourt IRoute 43 (At North RW 2 Lanes on New lend Eagle Rock CN Location on 4-Lane JRelocation)- TO Right of Way IO,4 km North I(PE O~ly)- IRoute 696 I 11.3km I ,35os ,[ ........ I S/STP 16220'01'J'"{~)~'J,l~101 ............ ! ....... 1220- 12.7'kin Son{h PE 12 Lanes on New 11.9 km No'th CN ILocation on 4-Lane IRoute 722 TO ~. I 4.Skin I' 11314 . I .I ST!~.....]~220:011-11t,(PE101),RW202,CS02,B6.23,~§..24 " I ...... IHenry JStato Line- RW ID~elop ~ J0.3 Mile No~ CN 12 to 4 Lan~ INo~ Carolina TO I 0.3Mile ] 11~1 .. I ...... . ~ S- 16220~4-117~PE101.RW201~C~l {7) .......... / ....... IHen~ IRouto 902 RW Ilnterse~on IRel~on- CN Ilmprovements 10.3 ~ U~ TO .,~ ........ ~ ~ ~0~ (6) I IRoute 902 I I -- / /~ns~c, on Unde~ay' T 1220 - IRoute 220 South~nd PE ]Roan~e lover No~lk and RW ]Bridge ]Sou~em Rai~ay CN ¢~;:~ ~ ' IS~und [ ~nstm~ Undemay _ .. 13509 220- J0.1 Mile N~ of ' PE ~ ! J ................ J ' Roanoke I Route 715 (No~ RW ~,~%~,. ~nes S~thb~nd IO.2 Mile South of TO IRoute 715 (South Ilntem~~) lConslruc~0n C~plete ......... I.~ Mlies I · , , , 3167 ,,, (t) Naaonal H~hway S~tem AII~U~s (4) STP R~l~al AIl~on~~ ............. ~ .................... ' .............. ~era6ve Pr~ect wilh ~er L~li~ (2) CTB/STP Statewide Ailerons (5) F~a ~m~s~a~ Funds - (6) ~emave Pr~e~ wl~ ~er System (9) B~ds/Interest (3) TEA-21 High P~od~ Funds (8) Fund~ on a Proteus P~t PRIMARY SYSTEM 202 SALEM DISTRICT I I I il i i I ! ! ' ! I I I i 1 ' ! ! : ! i ~ of Roan~e 4to6 Lanes PE RW CN TO Railroad * 2 to 4 Lanes km West 13593/13O67 PE RW CN Feres~ Lanes Intersection ~oute 752 - RW CN TO (PE Only) 717 ?to4 Lsnas ~, 1 km South o! RW CN 'TO 1.5 I~m 1311 - ;).1 km South (PE O.~y) blew Castle Mile West Route 864 5OOO6 RW CN ?O 16597 RW CN TO 14828 (6) ~ I IStudy to Dete~ine k ethod oflmproveme0t ,, , ' ' , .... National Highway System Allocations I CTB/STP Statewide Allocations TEA.21 Hkjh Priority FUnds (4) STP Regional Nlocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Projec~ (9} Bonds/Interest SALEM DISTRICT PRIMARY SYSTEM 203 ~.19- At Hidden Valley I PE ~1 I ! ! I I I I I Roanoke Drive I RW I I / !LI ! I I I Construct Right I CN I ~.1 460- ' BIG OTTER RIVER ........ I 0EI ! .............. / .....................I Bedford (Str.# 1037) & I RW I ~ / I Bridge LITTLE OTTER RIVER I CN I ~ / I Replacement (SIr, #1035) ITO ~'~ I / / co, struc,o,.Com"~et~, ......... I ....... I .- ,c.co,,. I' g / ---[ ........... --I o,es I(S~r. ~OlO) I RW / ~ / I Bridge 10.5 Mile East I CN . / / ~ ~ . / Replacement IRoute~4~- I TO ~! 11.3 M,es West WCL I ................... i .............. I ......................... IPearisburg I / / Cons~c~ Unde~a-- _ I 116035 · I I B~STP a~tgome~ ISou~Corporate I RW ~i / ' I I / ~den ng and ILim ts 8 a~sburg- I CN / 1 {1) ~ / Relo~ to 10.5 km Sou~ R~te 81 I TO 863~ Relieve Tr~fic I ! ............. ! ............ I ......... ~nges~on ] i / ] S~H/ [PE&~Iv) I 19~3/!~. / . , I STP 460- 11.4 km East ! PE ! I I ~o.t, ome~ I"~t~ 4e0 ~.~.~ ! ,W ~ i i ~dening and I(Chdsfiansburg). J CN J J fl) ~36~ / Re.ton 1.1 km South SCL TO ~?~. ~h~ I ! ! / Constm~ion Uede~a .......... 4,4Bm I 118512 I J N~STP i~0-F~~- ~ ~, .- . .... ~ ........ . . . I ~ ....... ~ · . . . 60- I1.1 km S~ SCL I PE )! / I ' I I ~d~ing and i~.~ km N~ SCL I CN I I ...... ,~*S~a;~ I Rel~aU~ IBla~burg I TO ~}~1 ~~a,~ (2) ,. (2) ~j~ I ~.~m I It0~50 ~ ! .... I NH/STP : ' 1 [2) CT~STP Stat~ide Nl~ati~s (5) F~M ~mons~aUon Fun~ (8) Fund~ ~ a Pm~s Proj~t [3) TEA.21 HBh Pd~ty Funds (6) ~m0ve Projed ~th ~her System (9) Bonddlntemst PRIMARY SYSTEM 204 SALEM DISTRICT I I I ! ! I I I I I ! I I Main 3ouCh Main Street [Blacksburg) - 1.3 km North SCL Blacksburg RW CN TO Blacksburg - 1.6 km North SCL E~lacksbur9 18032 PE RW CN TO Lane 11- South Route 611 (South of Big Island) 18427 PE RW CN TO Island - WCL Lynchburg 15756 PE RW CN TO Big Island - 16036 PE RW CN TO Route 723 - Lanes on 4.Lane Route 1-81 RW CN TO (1) National Highway System Allocations CTB/STP Statewide Nlocations Pdority Funds (3) (3) (3 ~;~/18 (3) )~: I(NFO) 0501-009-11( PE10t RW201~C501, .... ' / ' ' .... ' {6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest (e) PRIMARY SYSTEM SALEM DISTRICT 205 ,- Smart Road Route 723- Route 1-81 PE RW CN TO Lanes on 4.Lane RW Only) Lanes 2.3 km .) Lanes on 4-Lane Right of Way [Smart Road) Route 460 Bypass - 723 (Bridge over Wilson Creek and Test Bed for ITS [Stoat{ Road) Route 460 Bypass Route 723 (Smart Road) 9.2 km West Rte.723 Route 723 (Bridge RW CN TO 14828 PE RW CN TO 14826 PE RW CN TO Headquarters off Route 743 RW CN TO Motorist Assistance Unit National Highway System Allocations CTB/STP Statewlde Nlocations TEA.21 High Riority Funds RW CN TO 52417 (5) Federal Bemoustration Funds (6] Cooperative Project with Other System Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 206 SALEM DISTRICT [ I I !1 ! ! Dislrictwide Disffictwide Bddges Improvements (1) ~4~ (~) (1) ~ Newlnstalla~ons State Traffic Variable Message Sign (~) for Optic Resource Sharing Initiative Guardrail National Highway System Allocations CTB/STP Statewide Nlocations High Riorily Funds (4) STP Regional AllOcations (5) Federal Demons~ation Funds (6) Cooperalive Projed with Other System (B) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM SALEM DISTRICT 207 CTB/STP STATEWIDE ALLOCATIONS NATIONAL HIGHWAY SYSTEM ALLOCATIONS ~-' TEA'21 HIGH PRIORITY ALLOCATIONS I PRIORI~ ALL.ATlaS ADDITIONAL TEA-2t Ht~H (ENHANCEMENT & SECONDAR~ , (1) Nati~al Highway Syst~ All. Boils (4) STP ~i~81 ~l~ons ~pera~ve Proj~ wi~ ~er L~liUes 1(2) CTBISTP Sbtewide AIl~tions (5) F~81 ~m~s~ati~ Funds (8) Fund~ ~ a Previous Proj~t (3) TEA.21 High Pdofi~ Funds (6) C~ra~ve Proj~ ~ ~h~ System (9) B~ds/Inter~t PRIMARY SYSTEM 208 SALEM DISTRICT ' ! I I ! I ! '~R~n~e (2BedyonChassts Buses) (1 Minlvan) Buses and2Vans ReplacementBuses and2Vans PE RW CO TO PE RW CO TO PE RW CO TO PE rw CO TO TOTAL CTB/STP STATEWIDE ALLOCATIONS: h Pdori~Funds (5) Federal Demonsl~ati(~ Funds (6) Cooperalive Project with Other System (8) Funded on a Previous Project (g) Bonds/Interest Localities PUBLIC TRANSPORTATION - CTBISTP STATEWIDE SALEM DISTRICT 209 Connector Road Route 8 South RW CO TO trEA-21 HIGH PRIORITY ALLOCATIONS I 1) National Highway System Allocations CTB/STP S~[atewlde Allocations TEA-21 High Pdority Funds (4) STP (5) Federal Demonstration Funds (6) Cooperative Project wilh O{her System Other Localities (8) Funded on a Previous Project (g) Bonds/Interest SECONDARY - TEA-21 HIGH PRIORITY PROJECTS I 210 SALEM DISTRICT I I I I I ' I 11 CO TO 50538 rEA-21 HIGH PRIORITY ALLOCATIONS (1) National Highway System Allocations (2) CTBtSTP Statewide Allocations (3) TEA.21 High Priority Funds (5) Federal (6) Cooperative Project with Other System Other Localities (8) Funded on a Previous Project (g) Bends/Interest ENHANCEMENT - TEA-21 HIGH PRIORITY PROJECTS SALEM DISTRICT 211 River Gorge PE CO TO ,, 50538 SPECIAL APPROPRIATIONS REQUIRED BY TEA-21 National Highway System Allocations CYB/STP Statewide Allocations TEA-21 High Priority Funds {4) STP (5} Federal Demonslratlon Funds (6) Cooperative Project ~th Oiher System Project with Other Localities (8) Funded on a Previous Project (g) Bonds/Interest SPECIAL APPROPRIATIONS - TEA-21 212 SALEM DISTRICT J I J i I I I I I I I I I ! I 460 PEt01, 15839 .~ on 4-Lane RW 11290 [NFO) U000-150-109, 17682 Required for Federal Safety Pr~ram in Rd. Lane :ranklin Street PE101, J(l) National Highway System Allocations (2) CTB/STP Statewide Allocations (3) TEA-21 High Priority Funds (4) Includes National Highway System Allocations 8746 (5) Incl~es CTB/STP statewide Allocations (6) Includes TEA-21 High Priority Funds (7) Plans, Right of Way and Contract Administration by Municipality ...... (8), Plans and C~,ptract Administration ,b,,~/,,,, ,M, ,u, nic parity ,, , (9) Mion~ Construction Project by Mun cipa ty (10) Cooperative Project with Other Systems URBAN SYSTEM SALEM DISTRICT 213 Franklin Street {Route 460) at Independence Boulevard PE RW CN TO Extension 4 Lane Galax 0460-154- W. Main St. to N, Franklin St, U000.154.t02, PEt01, C50t East Stuart Drive ClifMew Road 4 Lane U000.113-105, PE101, Madinsvitle Road Widening and Street Undemass Replacement at N & S Railroad Lane 5Lane C501 at Clean/Jew Dr'we and Stullz Road (NFO)0174-120-102, C501 York Street to NCL 0174-120.t03, PEt01 RW CN TO PE RW CN TO 3931 14797 15837 15836 ~..~.,~0 Pr n Transfer 000-t20-V04 ~ , CTB/STP Statewide Allocations ](3) TEA-21 High Priority Funds (4) Includes National.Highway System Niocatk)ns (5) Includes CTB/STP Statewide Allocations (6) Includes TEA-21 High Priority Funds (7) Plans, Right of Way and Conlmct Mministration by Municipality {8) Plans and Contra~,,A, ,d, mln~i,stmtion by Mun cIpa ty (9) Minor Construction Project by Municipality (10) Cooperative Project with Other Systems URBAN SYSTEM 214 SALEM DISTRICT I I I I ! ! ! I I I to E. Church St. St, and 2 Lane 2Lane Lane Brid.qe 4 Lane km/1.3 M Lane B~le UOOO-120N04, PEI01, Improvement U000-266-103, PEI01, C501 Fort Branch Road U000-279.102, PE101, Fimt St, Brid0e over Peak Ck. ,PEI01, FirstSt, B(~fleoverPeakC~ UOOO-125-VlO,PE101 3929 8749 1461: 12533 tn~udesNat~nal (5) Allocations (6) Includes TEA:21 High Priority Funds (7) of Way and Contra~ Administration b (9) Mino~ Construction Pro~ect by Municipality (10) Cooperative Prc~ect with Other Systems URBAN SYSTEM SALEM DISTRICT 215 Lane B~id~le Mite Avenue Lane St. to First St, Br dfle over Peak Ck, UOOO-125-Vlt ,PEI01 (NFO) U000-125-113, PE101, RW201, C501, B607 2 Lane M (NFO)00I 1-126-103 Memorial Brid.qe (NFO) 00t 1-126.104, PEt01, RW201, C501, Ave. Lane on RW , PE10t. C50t WadsworthSt, St, U000-126-V04, PEt0t, It) National Highway System Allocations CTB/STP Statewide Allocations High Priority Funds PE RW CN TO 17680 CN TO 16644 17686 13446 15675 3928 (5) Includes CTB/STP Statewide Allocations (6) Includes TEA-21 High Priority Funds (7) Plans, Right of Way and Contract Administration by Municipality (9) Minor Construction Project by Municipality (~10) Cooperative Project with Other Systems URBAN SYSTEM 216 SALEM DISTRICT II I ' I I ! I ]1 Il ]1 I ' I Il I [ Extension to Norwood St. Lane U000-126-10§, PEI01, C501 WCL ~011-128.F02, PEt01 C501 13O83 10576 lOth St. Reconstruction loth SI, 13th St.& 117-128-101, C502, B602 U000-128-V12, PEt02, UOOOd28-V12, PEt03, Ave. UOOO-12&113, RW202, C502, (4(3) TEA-21 High Priority Funds ) Includes National Highway, System Nlecatlo?s, URBAN SYSTEM 15680 7o9 11908 (5) Includes CTB/STP (6) Includes TEA-21 High Primely Funds 7)Plans, Right of Way and Contract Admin strat on by Municipality 8) Plans and Contrac-{ Admlnistr,,,a, tion by Munic pa!,i~ ,, , i r (9) Minor C0nstmdion Project by Municipality (10) Coeperative Project with Other Systems LI 2 17 SALEM DISTRICT Lane u Street U000-128-116, PEt01, C501 PE RW CN TO 4678 19029 Roanoke , Mount Floyd Avenue to WCL Street Mount 11 7220-157-105, PE101 at Electric Road (RT419) 00t1-129-106, PEt01, RW201, C50t, B601, SA TO CN ~;~ TO ~ 5207~ 17692 52076 National Highway System Allocations OTB/STP Statewide Allocations ~ Funds {5) Includes OTB/STP Slatewide Allocations (6) Includes TEA-21 High Priority Funds (7) Plans, Right of Way and Contract Administration by Municipality t Administration b (9) Minor Construction Project by Municipality (10) Cooperative Project with Other Systems URBAN SYSTEM 218 SALEM DISTRICT Thompson Memorial Blvd. Cleveland Street PEI01, Kessler Mill Rd, Lane ~/1.2 M C501 Rte. 419 8753 Lane Extension 3 Lane , Road PEI02, Barnett Road U000-129-108, PE101, ECL 12532 12536 Lane kin/1.0 M J000-149-107, PE101, C501 Street Io ECL 11911 INFO) U000-149-108, It) NationatHighway System Allocations CTB/STP Statewide Allocations ](3) TEA-21 High Priority Funds {4) Inc udes National Hi~jhwa~( System Allocations 17681 (5) Includes CTBtSTP Statewide Allocations {6) Includes TEA-21 High Priority Funds {7) Plans, Right of Way and Contract Administration by Municipality , ,,(8) Plans and Contrad Adm, nistration bYT Mun Ci~a'_it¥ (9) Minor construction Project by Municipality (t0) Cooperative Project with Other Systems URBAN SYSTEM 219 SALEM DISTRICT SALEM DISTRICT TOTALS NOT ALLOCATED STP/CTB STATEWlDE ALLOCATION {1) National Highway System Allocations CTB/STP Statewlde Allocations (3) TEA-2'I High Priority Funds (4) Includes National Highway System Atlocatio,?? , , (5) Includes CTB/STP Statewlde Allocations (6) Includes TEA-21 High Priority Funds (7) Plans, Right of Way and Contract Administration by Municipality {81 Plans and Contract Administration by Muni~ipaliW (g) Minor Conslruction Project by Municipality (t 0) Cooperative Project with Other Systems URBAN SYSTEM 220 SALEM DISTRICT I I II Il ! I ! I ! I I I I I I SALEM DISTRICT SECONDARY SYSTEM CONSTRUCTION IMPROVEMENT PROGRAM FISCAL YEAR ALLOCATIONS Bedford ::.:~.,, .¢.820,300. ";,,,~,.,~:~' -,'~ 809 ,0 .'~6 .¢,,.;":~ 4 ,076' . 107 :*;?::: 4 ,143_837:'~' , . ,.$:,:; ........... 4 ,_323 ,o>.' '9 .:*'*~:"~' ............................ 4,7o8.' 136' ::.*'"*::';. ......... 24,910,776' .............. "'""'~ Botemu, ,:'; 2,021,382 ~? 2,015,620 ~:~ 2,155,868~;;~~ 2,191.834~?:i~ ,';,. 2.286,629~::*~:. 2.505.361 ¢~. 13,176,695 Carroll .~;:~ 2,528,540 ;~? 2,513,468 }~ 2,687,023~.:..:¢ 2,731,720.~; 2,853,590.::.7. . .:.,..:. 3,135,016};:~¢. 16,449,358 Craig .~'"~, 4..33.3o8' :~*'~; 4¢0,528' z.:;:;460.694 .~;~;;{ 468.395[% 489,307 ~'~ 538,075 '~':'~¢~ 2,820,337 Floyd ' ~ ':'~:': · ~ 1,585,658 ,~?~} 1,569,164~{(?~ 1.678,174~ 1,706,019~ 1,785.254~;. 1,969,862i~;;.(10,294,132 Franklin ~:.~';2,707,215 ~?:?~ 2,702,137 ;;:3: 2,890,363'~;): 2,938,756 ~::.~ 3,064,469 ~:';) 3~354,760 ~(~ 17,657,700 Giles ...? 1,130,955 ~?~ 1,1'23.939 :~¢~;~; 1,2()0.915:?~{~1,221.005::);~.:: 1.275.521:}.~:~ ' ..... ~ 7,353,758 Hen~ 2,899,775 ~;'?~ 2,919.398 ~;~ 3.115,961 (:: 3~ 168.731~? * ~o*, :::: ~ ::'~>; 3,572,905 ~?~ 18,969,952 Montgome~ 3~51 2.012.947 ,;':~'2.006,134 ~ 2 .. ' . . .. .144.%0 ?;; 2,180,645 ;'~ 2,275,581 ¥; 2,494,070 ~'~;~13,114,306 Patrick ~(~: 1,648.052 '~.:~,'~;~ 1,637,796 1,751,094 .:~ t.780,407 ':~';:~ 1.859,787 ;~'7~J ' 9 · ' . , 2.04..96..;:E'~;:~ 10,721,106 Pulaski 1,674,050 3' 1,673,734 ?,:::~ 1,788.120 :~;~? 1.818~120 ;?;: 1.894,780 ~::~ 2,069,922 ~"5 10,918,725 Roanoke "; 3 . :~ ' ' " ?:. · ~;,. · :. .,583,a15 ~*; 3,611,683 ?: 3,856,2723;~ ¢, ¢21,288 ~:¢~4,07.,,734;~:' 4,415,416~(~ 23,461,708 Total . .~. 26,045,527,~,;:'~:i 26,012,635 ~;~ 27,805,522 (:~! 28,270,756 :~;~,} 29,475,197 ?~} "32,238,915~ 169,848,553 SECONDARY SYSTEM 221 SALEM DISTRICT ! J I I ! Corem on w~alth Yranap orta tion ~o a(d fi~ cai y~ar Staunton D/str/ct SMunton District i i I i ! I Staunton District (In Thousands of Dollars) Fiscal Years Allocation PRIMARY URBAN SECONDARY 28,081 0 15,814 11,536 21,099 TEA-21 HIGH PRIORITY CMAQ TOTAL CTB~STP STWDE. TOTAL STP REGIONAL TOTAL 0 ENHANCEMENT SAFETY RAIL SAFETY MASS TRANSIT TOTAL 756 0 1,825 951 991 650 83,903 28,291 0 15,417 11,410 21,032 756 0 2,1501 ot 79,056i 25,7881 26,854 0 16,565 12,121 22,489 798 0 2,000 0 0 17,042 12,338 22,864 798 2,000 0 .. 27,577 0 20,085 164,724 0 102',819 17,896 12,902 14,215 74,522 22,857 0 0 1,000 26,144 0 0 0 0 ANNUAL ALLOCATIONS 136,485 3,108 0 9,350 0 1,825 ANNUAL ALLOCATIONS 951 ANNUAL ALLOCATIONS 991 ANNUAL ALLOCATIONS 650 88,021 82,106] 8o,83ol 81,5o9l 495,425 222 Median Barrier East West Virginia RW State Une and CN Rockbridge County TO Line (Exception Between 13451 MP 17 and RW CN ~4~ RW CN TO rede Water System ~Eun 17437 PE RW CN TO Run Rest National Highway System Allocations CTB/STP Statewide Allocations TEA-21 High Priority Funds RW CN TO RW (4) STP Regl~nat Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM STAUNTON DISTRICT 223 i i I ] I ' I ! i i ! I ~ I I I I i I I At Covington PE RW CN TO Detection 61- 81- 232N&S) 11 Area (MP 320 S) RW CN TO 15478 PE RW CN TO 19O18 PE RW CN TO 18979 PE RW CN TO PE RW CN TO §2295 National Highway System Allocations CTBISTP Statewtde Allocations Funds (4) STP Regional NloCatlons (5) Federal DemonstraUon Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM 224 STAUNTON DISTRICT (MP 320 S) 1.8 Miles North Route (South of Winchester)- 2.3 Miles No~th Route 37 PE RW CN TO 52318 RW CN TO Capacih, 199NB) Area (MP 199 S) Area (MP 199 S) RW CN TO 13542 RW CN TO RW CN TO 18887 0.5 Mite North Route 710 RW 12325 1 National Highway System Allocations CTBtSTP Statewide Allocations TEA-21 High Priority Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System ~ Cooperative Project with (7~her Localities {8) Funded on a Previous Project (g) Bonds/Interest INTERSTATE SYSTEM 225 STAUNTON DISTRICT I I I I i I I I I i I i I I I ! 81 - Route 711 PE Mile North Route 710 RW CN Reconslruction TO 12327 1- ;.11. 1.5 Mi. No~ Route 710 RW ',Fairfield) CN SBL TO 18888 3uffalo Creek RW - 186.1) CN TO PE [North of Natural Bridge) RW IMP 183 - 184.6) CN TO 18889 PE RW 190.0) CN Reconstruction 11 S (S. of Har~isonburg)* RW 1.8 Miles No~ Route CN N (N. of Harrisouburg) TO ~ System Allocations CTBISTP Statewlde Allocations High Priority Funds {4) STP Regional Atlocalions (5) Federal Demonstration Funds (8) Cooperative Project with Other System (?) C~x)pefative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM 226 STAUNTON DISTRICT Une and Lanes and South Parking System (ITS & TMS) Beautification Improvements 31strictwide t CTB/STP Statewide Allocations I TEA-21 High Priority Funds RW CN TO 17811 PE RW CN TO RW CN TO 11822 RW CN TO 17813 (4) STP Regional Allocations (5) Federal DemonstralJon Funds (6) Coope~ative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previ~s Project (9) Bonds/Interest INTERSTATE SYSTEM 227 STAUNTON DISTRICT ! I ! I I i I ! I I I I I I I I Rumble Strips Highway Advlso[y Ra~o Network ~0': I · ~;;~i;~ :~: ~ !~ !~.~i~i~i~;~i;~,~ ................ NH ...... , ..... DIS~ICT SUM~RY ~ ~:~;~.~ .... TEA.21 HIGH PRIORIW ALL.ATlaS _, , ~1 .................. ! System Allocations ~ CTBISTP Sate,vide Allocations f Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) CooperaUve Project with Other Localities (8) Funded on a Previous Project (9) Bonds/thtemst INTERSTATE SYSTEM STAUNTON DISTRICT 228 RW CN TO 0.8 km (PE & RW Only) StotmWater 18980 Lexington) Route 11/631 East- 0.1 km Soulh Harfisonburg. West of Hinton RW CN TO 12813 PE RW CN TO Route 33 Bypass at ~ddge PE RW CN TO South * Route 11 &81 North PE RW CN TO Route ~22 11725 PE RW CN TO 17807 National Highway System Nlocattons CTBtSTP Statewide Allecations (4) STP Regional Ntocat~ons (5) Federal Demonstretio~ Funds (6) Cooperative PrOject with Other System (8) Funded on a Previous Project (9) Bonds/interest PRIMARY SYSTEM 229 STAUNTON DISTRICT ! I I ! ! ! I i ! i i ] I I ! I I and Drive Harvest D[ive Route 37 (Includes Interchange) 0.1 km West Inteseclion Route 739- Intersection Route 829 RW 12822 PE RW CN TO 5O518 PE RW CN TO 18891 Over Mill Creek (Sir, 1033) PE RW CN TO 16016 0.2 Mile West WCL Clifton Forge- Clifton Forge - PE RW CN TO 11088 At Glasgow over Mau~j River (Sir. 1024) RW CN TO t60t7 National Highway System Allocations CTB/STP Slatewlde Nloeations Funds (4) STP Regional Allocations (5) Federal Demonsiralion Funds (6) Cooperative Project with Other System (8) (g} Bonds/Interest PRIMARY SYSTEM STAUNTON DISTRICT 230 Between Augusta Ceunty Line and Spot Impmvemeets Monterey 2-Lane TnJck Climbing 6.3 km East Route 678 &3rd Street (Route 256)- At Intersection with Route 142t usta km East 2 Lanes ~n 4*Lane Route 11 ~ km West km West 2 Lanes on 4-Lane Route 252. km North New Location RW CN CN 18893 14789 RW CN TO 14791 PE RW CN TO 18981 PE RW CN TO 2771 RW CN TO i (1) National Highway System Allocations (2) CTB/$TP Statewide Allocations (3) TEA-21 High Priority Funds (5) Federal Demonstration Funds (6) Cooperative Roject with Other System Othe~ Localiti~ (8) Funded on a Previous Pro~ect (9) Bonds/interest PRIMARY SYSTEM 231 STAUNTON DISTRICT t I ' I ! i I I ! ! ! ! i I ! Lanes on 4-Lane to 5 Lanes 2 to ,5 Lanes 1.6 Miles 2to4 Lanes .! km Nor[h Route 250 613 1.6 Km Route 1-81 636 North Corporate Limits Waynesboro- 1.6 Miles Norlh Nodh Corporate Umits Waynesboro No~ Corporate Limits Waynesboro RW CN TO 12823 RW CN TO 17367 PE RW CN TO 18003 RW CN TO 383O PE RW CN TO South South SCL PE RW CN TO 9192 NaSonal Highway System Allocations CTB/STP Statewide Nlocations High P~iority Funds (5) Federal DemonstraUon Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Inte_rest PRIMARY SYSTEM STAUNTON DISTRICT 232 WalTen Lns.on 4-Ln,RAN Lns.on 4-Ln. RNV Lns. on 4.Ln.R/W 1.3 km Railroad and Route 683 1014) 1.7 krn S. Warren County Line - PE RW CN TO 16018 C~unty. Une (S~r.# ~gS)0) RUN: 7.1km S, Wa~en County L~e- $.Warren Une ~oo4) 3,9 km $. Warren Line- 2,6 km S, Warren County Line [str,# t002) RW CN TO 11092 11093 PE RW CN TO 11091 5,7 krn S. Warren Line - RW CN TO 11090 County Line Lns.on 4-Ln. RAA/ 1003) RW Route 638 - Norfolk Southern RW CN TO System Allocations CTB/STP Statewide Allocations TEA.21 High Priorib/Funds (,5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bends/Interest PRIMARY SYSTEM 233 STAUNTON DISTRICT ! i i ! i i I ! i ] i I I Lanes Lanes & Increase 1,3 km L2 km South km South 19- SHENANDOAH RIVER: Limits Front Royal) [Sir. 10t5) Line - Route 127 - 1.5 km North Route 127 RW CN TO 14794 PE RW CN TO 19017 RW CN TO 12825 RW PE RW CN TO 6012 RW CN TO (2) (2) ....... (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Projectwlth Other System Other Localities (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM STAUNTON DISTRICT 234 (Str. t015) Creek PE RW CN 1'0 16019 Improvements Guardrail National Highway System Atlocalions CTBtSTP Statewide Allocations TEA-21 High Priority Funds {5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9] Bonds/Interest PRIMARY SYSTEM 235 STAUNTON DISTRICT ! I i I I ! I ! I I I I I ! ! DISTRICT SUMMARY CTBISTP Statewide Allocations ~ Funds (5) Funds (6) Cooperative Project wi~ Other System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM 236 STAUNTON DISTRICT Bus Purchase (3 Buses) (1 Body on Chassis Bus) RW CN TO PE RW CN TO ALLOCATIONS (PUBLIC TRANSIT) National Highway System AIIocalJons CTBfSTP S/atewide Allocations ~ Funds (4) STP Regional Nlocations (5) Federal Demo~sffation Funds (6) Cooperative Project with Other System Other Localities (8) Funded on a Previous Project (9) Bonds/interest PUBLIC TRANSPORTATION - CTBISTP STATEWIDE STAUNTON DISTRICT 237 I ! I ! I I I I I - I I ! I I I I I Street 4 lanes knV3.5 M PEt01, Route 257 at Route 738 Mt. Crawford Avenue (NFO) 0257-176-101, PEI01 16445 17541 Lane , PE101 JDr~e 4498 18th Street to Ave. Ave. PEt01, Hollow Rd. PEI02, J(1) Nalional Highway System Allocations (2) CTB/$TP 81atewide Allocations (3) TEA-21 High Priority Funds (4} lncluder National Hlflhway System Allocations 1,t4tl 14653 10192 (5) Includes CTB/STP ~atewide AIIocalio~s (6) Includes TEA-21 High Priority Funds (7) Plans, Right of Way and Contrac~ Administration by Municipality t81 Plan~s ,and Coqtract Administration,,,b¥ M, unicip~l~ , (9) Minot'Construction Project by Munlcipalily (10) Cooperative Project with Other Systems URBAN SYSTEM STAUNTON DISTRICT 238 ~5th St. and PE101, Replacement over 0060-t05-101, RW201, C501, ~ U000-107-105, 3822 16447 J ' i2~ {2) [* 619 Prior Allocation Transfer.r~d from ,022 )-107-V01' J(10) ........... Lane , Creek C501 15781 National Highway System Allocations CTBtSTP Statewide Allocations TEA-21 High Prio[ity Funds (5) Includes CTB/STP Storewide NIo~ations (6) Includes TEA-21 High Pdority Funds (7) Plans, , and Contract Administration by Municipality ~t Administration I: (9) Minor Construction Project by Municipality (10) Cooperative Project with Other Systems URBAN SYSTEM STAUNTON DISTRICT 239 I I I I I i I Route 340 Roule256 ~Lane Lane h Si. tO PE101 3828 4Lane PEI01, Neff Street [Bridge over 1.81) 14633 ~Lane Required for Federal Safety Program in Flarrisonburfl Approaches over ~ River , PEIOI, CTB/STP Statewlde Allocations ~ Priority Funds (5) (6) Includes TEA-21 High Priority Funds r and Contract Administration by Municipality (9) Minor Construction Project by Municipality (10) Cooperative Project with Other Systems URBAN SYSTEM STAUNTON DISTRICT 240 U000-117-'t03, PE101, Hawksbill Creek C501. Ave. Over Route 254 and 13410 National Ave. 2 Lane Staunton PE101 C501 National Ave. to Rtd]mond Road (Relocation) U000-132-105, PEt01, Plan Phase Streetscape Improvements U000-132.t07, PEI01 National Highway System Allocations CTB/STP Statewide Allocations TEA-21 High Priority Funds !ncluder N ,a, tional Highway System Niocations 15811 (5) Includes CTBISTP b"tat~ivide Aliocat{ons (6) InclUdes TEA-21 High Pdoidty Funds (7) Plans, Right of way and Contract Administration by Municipality (8) P, lans a,nd Contact,Administration by Municll)ality {9) Minor Construction Project by Municipalily (10) Cooperalive Project with Olher Systems URBAN SYSTEM 241 STAUNTON DISTRICT 1 { { ' I I ! I ! ! I I Mile East Lane 1.0 km/O.6 M Lane PEt01, to Street PEI01, Main Street to C501 [Jrt)an Matching Funds Safety Proflmm in 12527 16446 Lane Lane VRd. Pike ,0502 3605 U000-138-105, PEI03, IConstruction Comple :e .......... I , ........... [PEa. RW.Only CTBtSTP Statewlde Allocations (5) Includes CTB/STP b"tatewide Allocations (6) Includes TEA*21 High Priority Funds (7) of Way and Contract Administration by Municipality (9) Minor Construction Project by Municipality (10) Cooperative Project with Other Systems URBAN SYSTEM STAUNTON DISTRICT 242 Drive to on , PE10t, 16444 Early RW mprovement , PEI01, U000-138-112, PE101 Pleasant Valley Rd. ,PEt01, ~.& Rd, 18749 52435 4485 NOT ALLOCATED TOTAL STP/OTB STATEWIDE ALLOCATION National Highway System A{Iocations OTB/STP Stalewide Allocations 'rEA-21 High Priority Funds Includer National (5) Includes OTB/STP 8tatewlde Allocations {6) ll~cludes TEA-2! High Priority Funds {7) Plans, Right of Way and Contract Administration by Municipality (g) Minor Construction Pro~ect by Municipality (10) Cooperative Proiect with Other Systems URBAN SYSTEM 243 I I I I i STAUNTON DISTRICT I ! ! ! ]1 ! I I I ! ! ! ! ! I I ! STAUNTON DISTRICT SECONDARY SYSTEM CONSTRUCTION IMPROVEMENT PROGRAM FISCAL YEAR ALLOCATIONS Alleghany ~': 834,685 }}i .......... ~';} Augusta :i;: 4,268.982 ii!)) 4.259.897 iii¢ 4,555.090 ;'i~. 4.6.,0.934 ::ii:' 4,830,149.0: 5,287.846 :..:!~ 27,832,900 ' ' ':'i <5' ' ' ;'; ': ': ' ':"' ' .';: Bath :!i,~ 599,497 7i-i 593,291 i:iii,i 634,542 ~; 645,170 ~:)~: 674,998;}: 744.a62 ?~ 3,892,361 Clarke ~ 891,272~ 889,908 ~ ~ ' . 5~811,005 Frederick ~ 3,M3,771 }~ 3,M~,450. ~ ~,>75,443 ~:)'~.~ 3.634.908 ?} .~,788,69_ 4. t41,530 ~2 21,826,793 Highland ~5:~ 564,385 ~ 555.523 , 630,649 ~}: 702.953 3,655,374 Page ~ 1,283,005? 1,280.850 ~? I.,369,151 ~ 1,392,015:~::: 1,451,6067( 1,588,315~:.:, 8,364,940 ~15':: ~'~ r ~ ~:}( 1.945,029 ~'? 1,977,490 ~ 2,066.309 }( 2.2'72.4~6 }~ 11,911,918 Rockbridge ;}~:~}: 1.831,661 ~':; 1,8 I~¢,01.,_~. ...... Rockingham ~.::~:3,958,456 ~,:~:.~3,949.058 ~:~ 4,222,511 :~:} 4,292.817 ::~.4.477~. 9~,2 ~:~':~ 4.903~296~ }~}} 25,804,070 Shenandoah ?? 2,403,215 ~:~ 2,389,036 }~ 2,555,086 ~ 2~597,464 :::~2,713,330 ?~ 2,98,,~ao ~ 15,639,312 Warren ~ 1,119.720 ~ I~1.17.200 ~.,~!~:~:.~ 1,194.580~:~; 1,214,467 :~ 1,266,779~?.. ¥ . 1~386.956;¢~~ ~ .. ~: 7,299,703 Total .. 2i,098,6~8 :~::~ 2i,03i,603.~¢:~ '"'22}489}168 }~}~ 22,803,998 i~::~ 23,856,817 :~:~ 26,143,819 }~¢~: 137,484,054 SECONDARY SYSTEM STAUNTON DISTRICT 244 ! I ' } I I ! ! '1 I I I I ! I I ! ! Commonwealth Yranapo(tation 8oa(d f [a ca/ y~a( Su~olkDistrict SuffolkDi~trict i I I Suffolk District (In Thousands of Dollars) Fiscal Years Allocation NHS-INTERSTATE NHS-NONIN TERSTATE 43,197 13,630 PRIMARY 20,578 URBAN 80,415 SECONDARY 13,836 TEA-21 HIGH PRIORITY* CMAQ TOTAL STP REGIONAL TOTAL (1) ENHANCEMENT SAFETY RAIL SAFETY MASS TRANSIT TOTAL *Includes projects unidentified by system. 11,944 5,120 22,136 2,050 971 933 13,715 235,525 48,254 13,200 20,216 78,543 58,790 10,000 21,539 75,076 4,000 75,422! 79,286 2,700 21,860 22,991 84,199 85,641 90,004 13,777 14,765 15,011 15,667 12,611 12,611 11,944 7,087 7,422 7,240 7,422 2,700 25,472 100,666 17,024 22,750 0 7,422 3,400 7,400 400 0 23,178 23,586 24,589 25,103 ANNUAL ALLOCATIONS ANNUAL ALLOCATIONS ANNUAL ALLOCATIONS ANNUAL ALLOCATIONS **ReductionS and/or undistributed balances shown on Primary System. Local MPO to make final determination. (l)Additional funding shown in Fredericksburg District, 257,673 380,025[ 46,230 132,656 519,468 90,080 49,110 41,713 22,200 141,342 2,050 971 933 13,715 1,440,493 245 Lanes plus M~les Traffic ~ Lanes ptus 1.1 Miles Indian River Road Battlefield Boulevard Indian River Road Battlefield Boulevard Route 464 Battlefield Blvd. - Route 464 Road) Determined) (At Yadkin Road) Route 264 (Bowers Hill) RW CN TO 12228 RW CN TO 13738 13739 RW CN TO RW CN TO 13740 RW CN TO 12920 RW C~ TO 12833 (I) National Highway System Allocations CTB/STP Statewlde Allocations (4) STP Regional Allocations (5) Federal Oemonstration Funds (6) Cooperetive Project with Other System (7) Cooperative Project with Other Localittes (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM SUFFOLK DISTRICT 246 I I i It -! I I 11 I ! I PE RW CN TO (Bowers Hilt) Route 464 16526 PE EW CN TO nterchange 16O43 PE RW CN TO City 6 Lanes New Kent County Line Determined) Route 199 2058 16494 PE RW CN TO 13114 PE RW CN TO Road Landing 16042 PE RW CN TO 17825 1) National Highway System Nlocations CTB/STP Statewide Nlocations TEA-21 High Priority Funds 0351.114-t02,PE101,C501 from CMAQ Reserve J (7) (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localilbs (8) Funded on a Previous Project (g) Bonds/Interest INTERSTATE SYSTEM 247 SUFFOLK DISTRICT Reute 134 (Magruder Boulevard)- Mallory S~reet Bridge Tunnel Southwest and Northwest Communication Hampton Roads Bridge Tunnel and ~astbound ~lampton Roads Tunnel runnel 13.5 Kml ~Vest Route t43 Interchange [Construction Priorities to be (I) National Highway System Allocations CTB/STP Statewlde Allocations TEA-21 High Priority Funds RW CN TO 13743 RW CN TO 12827 RW CN TO 12828 RW CN TO RW CN TO RW CN TO 12835 (4) STP Regional Nlocatio~s (5) Federal Demo~strat~n Funds (6) CoopemUve Project with other System (7i Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM SUFFOLK DISTRICT 248 ! I I I I I I I I I I I I I I I I Newport News, pnterchange- RW and James City IRoute 199 CN Widen from 4 I(Consfructien TO to 6 Lanes IPriortties to be IOetermined) 7,,4 km/4.6 Mi. I 13113 Newport News IRoute 17- RW Bridge 10,3 Mile East CN Widening and IRoute 17 TO Widen from 4 to 6 Lanes 0.9 Mile I · 12402 Newp~ News IJefferson Avenue RW Widen from 4 I(Route 143)- CN to 6 Lanes 10.6 Mile West TO Including IRoute 17 (J, Clyde Noise IM~s Boulevard) Abatement Wall ! 12403 Newport News IRente 143 Widen from 4 to 6 IO.9 Mile East CN Lanes Including IRoute 143 TO ~4. IAt Bland Avenue / PE Newport News I aw Construct I CN Interchange I TO ........ I ~4- ~ewport News ICommuter Lot (Lee Hall) RW Commuter Lot I(At Yorktown Road) CO [RW O~ly) 2317 ..... [1) National Highway System Allocations (4) STP Regional Nlocations (7) Cooperative ProJect wdfl Other Localities [2) CTB/STP Statewide Allocations (5) Federal Demonstration Funds (8) Funded on a Previous Proiect [3) TEA-21 High Pderity Funds (6) Cooperative Project with Other System (9) Bonds/interest INTERSTATE SYSTEM SUFFOLK DISTRICT 249 0.3 Mile East Route 17 Km Route 17 - Roads Center Parkway Roads Center ~ B 1-664 Military Highway Little Creek Road System Allocations OTB/STP Statewlde Allocations TEA-21 High Priority Funds RW CN TO 14697 PE RW CN TO RW CN TO 17388 RW CN TO 13272 PE RW ON TO 1914 14892 RW CN TO 17973 (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Protect with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM 250 SUFFOLK DISTRICT I I I I I I I Parking Street. RW CN TO Elizabeth River Bddge- 0.1MileEast ElizabelhEiver Bddge Road & Reon Ddve RW CN TO PE RW CN TO PE RW CN TO 17066 Vadous Locations PE RW CN TO 163O8 RW CN TO (4) CTB/STP Statewide Nlocations High Pdodty Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other ~stem (~i Cooperative Project with Other Localities (8] Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM SUFFOLK DISTRICT 251 C~s~ PE RW CN TO M.P. 17 11642 PE 7.3 and RW CN TO 17823 (MP 0.00) ~reensville Coun~ {MP 7.30) RW CN TO 18022 (MP 22.3)- Sussex County (MP 33.0) RW CN TO Inlerchanges f8042 PE Bird, RW CN TO Interchange 17822 PE RW CN TO 17~g National Highway System Allocations CTB/STP Statewide Allocations TEA-21 High Priority Funds (4) STP Regional Allocations (5] Federal Demonsffation Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM 252 SUFFOLK DISTRICT i I I I I I I I I I I I I ! I ! I I ! ~u~nbleton Avenue - RW CN TO 16045 Mile West PE RW Mile West CN Military Highway TO Route 264 ~ 0.2 Mile North Route 264 (Route t3 interchange) Military Highway 1.1 kin/0.7 Mi. East Military Highway. 1.8 kin/1.1 Mi. East Military Highway 2024115790 RW CN TO 13741 RW CN TO 13732 PE RW CN TO 13731 RW CN TO 15791 1 Allocations CTB/STP Statewide Allocations (3) TEA~21 High Priority Funds (4) STP Regional Allocalions (5) Federal DemonStration Funds (6) Cooperative Project ~lh Other System (8) Funded on a Previous Project (9] Bonds/Interest INTERSTATE SYSTEM SUFFOLK DISTRICT 253 Route 13 Interchange km South Portsmouth Intersection Improve Sreenwood Drive- inia Beach inia Beach inia Beach System 3reenwond Drive PE RW CN TO 18218 RW CN TO 18433 PE RW CO TO 18970 PE RW CO TO PE RW CN TO 17630 PE RW CN TO 12297 (1) National Highway System Allocations CTBISTP Statewide Allocations High P~i~ity Funds (4) STP Regional Nlocations (8) Federal Demonsffation Funds {8) Cooperative Project with Other System (7) Conpemtive Project with Other Localities (8) Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM ! I I 254 SUFFOLK DISTRICT I i I I I i I I I I I Management System and RW LighUng CN Rosemont Road to TO Parks Avenue 16194 ~) - Road PE inia Beach Improve Turning Radius at RW t Loop CN Ramp TO inia Beach Route 64 - Route 264 r Avenue Interchange Beach [1) National Highway System AIIocaUons I CTB/STP Statewlde Allocations Funds 18379 RW CN TO 519O3 RW CN TO 52305 RW CN TO RW CN TO 16641 (4) STP Regional Allocations (5) Federal Demonst~atlen Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localilies (8) Funded on a Previous Project (9) Bonds/interest INTERSTATE SYSTEM SUFFOLK DISTRICT 255 ~ of Gates 3,3A Norfolk Naval Base Interchange Intermodal MonitorlMerrimac Memorial Tunnel Merrimac Tunnel. (Bowers Hill) Allocations Funds RW CN TO 13273 PE RW CN TO 17821 RW CN TO 18968 CN TO 13745 PE RW CN TO 13744 RW CN TO 16047 (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (7) Cooperative Project with Other Localities (8] Funded on a Previous Project (9) Bonds/Interest INTERSTATE SYSTEM I 256 SUFFOLK DISTRICT I I I I I I I I I I I I ! i I I ! I I Districtwide Guardrail Hurricane Preparedness Smart Travel Center ns Districtwide Suardrail Barrier Rumble Strips Pavement Markers RW CN 18969 RW CN TO 18190 Initialive [1) National Highway System AllecaUons ~ State',vide Nlocations Funds (4) STP Regional Allocations {5) Federal bemonstratlon Funds (6) Cooperative Project with Other System (7) CouperaUve Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest INTERSTATE SYSTEM SUFFOLK DISTRICT 257 DISTRICT SUMMARY TEA-21 HIGH PRIORITY ALLOCATIONS National Highway System Allocations CTB/STP Statewlde Allocations High Priority Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project wilh Other System (7) Cooperative Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest INTERSTATE SYSTEM I 258 SUFFOLK DISTRICT I ! I I I i I ! I I 1.0 km !0- I0- 1.6 km 10- *1 # Iin~i~ecti°n 2011 County Line - Intersection Route 676 - Intersection Route 624 Easl InL Route 40 - Rou~e ~0 Route 617 - 1.1 km North Route 617 Line - Prince George County Line Highway System Allocations CTB/STP Slatewide Nlocations High Pdority Funds RW CN TO 1655O PE RW CN TO 17627 RW CN TO 18548 PE RW CN TO PE RW CN TO 50126 PE RW CO TO 523O4 (~) (6) Federal Demonstration Fund~ (6) Cooperative Project wilh Other System ( ) ~%, (3) (3) (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM SUFFOLK DISTRICT 259 13- and Signal Modifications 0.2 km & Improve 1.1 km 13- ~,hesapeake Bay Bridge Tunnel qoute 626 km South Route 603 - intersection 13- Line - Route 600 CBBT Turn Lanes km North Route 606 RW CN TO 16527 RW CN TO 16392 RW CN TO 16393 RW ON TO 17629 RW CN TO 16394 RW CN TO 1) National Highway System Nlocations CTBISTP Statewide Nlocations TEA-21 High Priority Funds (5) Federal Demonstration Funds (6) Cooperative Project with Other System Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest PRIMARY SYSTEM 260 SUFFOLK DISTRICT ! I ! Lanes on New i km .) lo 4 Lanes 17- 17- i km WEST BYPASS: East Route 13132 South (Carolina Rd,)- West Route 58 BusfByp (Holland Road) North Carolina State Line- South Intersection Route t04 North Carolina State Line - 1.3 Miles North North Carolina State Line North Carolina North Carolina Slate Line km North North Carolina State Line - North Carolina Slate Line No,lb Carolina State Line- Route 104 (Dominion Boulevard) PE RW CN TO CN 11520 PE RW CN TO 19t5 PE RW Cl~ TO 1730 RW CN TO 11077 RW CN TO 1890 CTS/STP Statewide Allocations Pdorlty Funds (5) Federal Demonstration Funds (6) Cooperative Project wilh Other System (8) Funded on a Previous Project (9) Bonds/Interest Localities PRIMARY SYSTEM SUFFOLK DISTRICT 261 Isle of Wight BRIDGE RW 11929 Lanes) & RW Only) km At the Suffolk and RW 3180 3t79 17 - PE RW ~ and Corporate CN TO Lanes) 10,1 km West & RW Only) Co,orate Umits 3181 17- l to 6 Lanes RW CN TO Roule 630 12836 PE RW CN TO Lane with Lanes 147O1 Left RW CN TO 16115 1) National Highway System Allocations ) TEA-21 High Pdority Funds (4) STP Regional Allocations (5) Federal Demonslration Funds (6) Cooperative Project with Other System Project with Other Localities (8) Funded on a Previous Project (9) Bonds/interest PRIMARY SYSTEM I 262 SUFFOLK DISTRICT i i i i ! i i I i I I I I 32- 10,7 km South I PE ~ ~ I i I I ! I C~yofSuffo~k IRouto ~7- I RW / ! ! I ! ! Demolition of 10,1 km South I CE ..... I--'-- I I I.Bridge. over.__ IRate ...... ~7 I TO ~". ~'"'""~ ~"~'"' ~ ~ / i~ana~ea u~ I[~erpa~ oT ~ux I ' ! / ! i / / ~ I I lat Numey) I / I~s~u~i~ Und~ay / ........... I I , 1~5632 / B~TP 1~32~-V~,PE~0~,k~0~,USO~ '"1 140- INo~ay River I PE ~ ...... I / ........... ISu~ex land ~e~ Channel I RW I IR~la~ Iof Nou~ay River I CN ........... I , ~ / IBddge and 1(3.3 km W~t tht. I TO ~ I IH~eville) I / /~suuc~ 0nde~ay / .... ]0 5 K~ ] 115633 J 8~STP 1~0~91-Vll,PE101 RW201 M501~8603 140. INo[[~a1"~ve~ ' I' ~E " I ....... l" ISu~ex It.1 kmlO. l Mi, E~t I RW ~l I I~proacnes ~0.4 Km I 1156~ 1. B~STP 1~91 -Vll,PE102,RW202;M~02,8605 ...I " ~o- F~.ofWavedy: ' I .E ' ~ ~J I ..... I ........... ISussex IExis0ng Rou~,0- I RW ~1 I IReI~U~ IRate 460 I CN ~l / 14o- I~c~a~w~: I ~ / ....... Isussex I(su., 1021) I Rw / r / F,d,e ! I CE ~] / ~ I I~- !o.3 km W~t I PE ~i ~ ofw ht ICo omte Umi I RW / ' IBridge IFranklin- I CN ~01 . I / IRep~mont 10.3km East~s~e I TO ~i ~ ~~ (Bl~t~r ~i~) " ~ · ........... I(1) Na~al H~hway Sys~ Atl~ons (4) STP Rqi~ ~raUve Pr~e~ wi~ ~er L~i~ 1(2) CTBISTP Stat~ide Nl~ns (5} F~eral ~ns~aU~ Funds 3) TEA-21 High Pd~ty Funds (6) ~peraUve Pr~wi~ ~her S~tem (9) Bonds~nt~t PRIMARY SYSTEM SUFFOLK DISTRICT 263 2 to4 Lanes 5.6 km e RW (Armory Drive) CN TO 18971 Between ECL RW ~/illlamsburg CN WCL Newport News TO Routes: 648,654,655, S75 and t305 14703 PE Newport News - RW 6.8 km West West CN Corporate limits TO Newport News Route 17- 13496 RW CN TO 16048 Route 143 - RW Route 17 CN TO ~er the Nansemond River 1.5 km West Route 629 - 13497 PE RW CN TO 1869 (4) ~ I (4) tI H(1) National Highway System Allocations (2) CTB/STP Statewide Allocations igh Priority'Funds (5) Federal Bemonstratlon Funds (6) Cooperative Project with Other System Project with Other LocaliUes (8) Funded on a Previous Project (9) Bonds/interest ,I PRIMARY SYSTEM SUFFOLK DISTRICT 264 ! ! ! I t75- (Big Bethel Road) RW TO ~ 175 - 14706 PE and Black Narrows RW St~. # 1006 CN Str. # 1005 TO Lanes 1896 Queen Sound, Cockle PE Creek, Mosquito Creek, RW and Wire Narrows CN Str.# 1003 TO Str.# 1002 Str. # 1001 1808 1815 Tm of Onancock: )f 13- Cape Chades Route 5 South of National Highway System Allecatious CTB/STP Statowide Nlocatious ~ Funds RW CN TO 147O7 RW CO TO PE RW CN TO 3542 ~provement (5) Federal Demonstration Funds (6) ConperalJve Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM SUFFOLK DISTRICT 265 Lanes on Location 612) Extension- Lanes on Location Route 60 EBL - Intersection Route 612 Route 612 - South Route 615 RW CN TO 15637 RW CN TO Extension - Lanes on 199 - 1.Skin ClovedeaO 0.2 Mile South Route 5 Route 60 (Pocahontas Trail) - Route 60 (Pocahontas Trail) 1.0 km East Route 31 (Jamestown Road) - 2.8 km East Road) Connector Road/ Route 603 PE RW CN TO 98OO 15636 PE RW CN TO 18972 RW CN TO 16973 RW CN TO t6050 CTB/STP Statewlde Allocations t TEA-2t High Pdodty Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System ~ Other Localities (8} Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM I 266 SUFFOLK DISTRICT I I I ! I I I Drainage 258. Isle of Wight Realign Mile South Monticello Avenue- ~.4 Mile North Monticello Avenue BapU~Road Engineering and 0.8 Mile South Scotts Factory Road ',Route 620)- Shady 0.5 Mile West Route 655 Intersection Route 646. Inteme~on Funds PE RW CN TO 16649 RW CN TO 14708 PE RW CN TO 16051 PE RW CN TO PE RW CN TO 14709 PE RW CN TO 12331 (4) (4) ~ 0 (6) ConpemlJve Projectwith Other System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM SUFFOLK DISTRICT 267 Lone Sussex Lane 1.5 km Entrance to Jamestown Se~ement OF IVOR: Intersection Rte, 616 Route 606 Ronte 258 - RW CN TO 50O35 RW CN TO RW CN TO 18978 RW ~ of Suffolk Occupational Center Rd. (Rte.682) & S, End of Treasure [Rou~617) RW CO TO 52466 RW CN TO 17632 National Highway System Allocations CTBfSTP Statewlde Allocations TEA-21 High Priority Funds (4) STP I (5) (6) Cooperative Project with Other System Project with O~er (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM I I I 268 SUFFOLK DISTRICT ! I I ! I ! ' ! I I I I i I i i ! Class I Bikeway/ Pedesffian PE RW CN 1'0 17633 RW CN TO 17634 Bike Lanes RW CN TO 17635 Bikeway Sweeper Advance Funding for Preliminary Bridges Beautification Improvements NSO~ TEA-21 High P[iorily Funds ItSTF Federal Demoflsffation Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) BOnds/Interest PRIMARY SYSTEM SUFFOLK DISTRICT 269 IDslrc~de ......... IGuardral I!{~i! ~ ;2 ~ ~-iI I I ' ! ........ I Signs Primary Matchlng Funds Required for ~,esource Sharing ~ATIONAL HIGHWAY SYSTEM ALLOCATIONS STP REGIONAL ALLOCATIONS TEA-21 HIGH PRIORITY ALLOCATIONS CTB/STP Statewlde Allocations TEA-21 High Priority Funds (4) STP Regional Allocations (5) Federal Demonstration Funds (6) Cooperative Project with Other System (8) Funded on a Previous Project (9) Bonds/Interest PRIMARY SYSTEM I 270 SUFFOLK DISTRICT I I ~UUI/IUI'~L ~t1" KI:I~IURP. L/~Lu~v~/{|lul~l~)CUAe, PUBLIC T~NSIT, SEC~DARY & ENHANCEMENT) ,, Sh~n in Fr~ert~sbu~ ADDITIONAL TEA-21 HIGH PRIORI~ ALL.ATlaS (4) STP Regional Allocations )tojecl with O~her Localities CTBtSTP Statewlde Allocations (5} Federal Demonstration Funds (8) Funded on a Previous Project ~ Funds (6) Cooperative Project wtth Other System (9) Bonds/Interest PRIMARY SYSTEM SUFFOLK DISTRICT 271 Regional Bikeway RW CN TO Service PE RW CN TO Shuttle RW CN TO PE RW CN TO HAMPTON Trolley Shuffle RW CN 1'O r of Williams- Between Route 5 & Brookwood Drive RW CN TO 736~ (4) (1) National Highway System Nfocations CTBISTP Statewide Nlocatiens High Pfimity Funds (5) Federal Demonstration Funds (6) Cooperative Project wilh Other System Other Localities (8) Funded on a Previous Project (9) Bends/Interest CMAQ UTILIZING STP REGIONAL FUNDS 272 SUFFOLK DISTRICT I ! I TOTAL STP REGIONAL ALLOCATIONS (CMAQ) CTB/STP Statewide NlocatJons High Priority Funds (4) (5) Federal Demonstration Funds (6) Cooperative Project with Other System Other Localities (8) Funded on a Previous Projecl (9) Bonds/interest CMAQ UTILIZING STP REGIONAL FUNDS 273 SUFFOLK DISTRICT Enhancement RW CN TO 16554 1) National Highway System Allocations CTB/STP Statewide Allocations TEA-21 High Primity Funds (4) STP Regional Allocations (5) Federal Demonslration Funds (6) Cooperative Project with Other System Other Localities (8) Funded on a Previous Project (9) Bonds/Interest ENHANCEMENT UTILIZING STP REGIONAL FUNDS 274 1 SUFFOLK DISTRICT i 1050 Ext.- Between Route 17 and Route 173 ~ City ~Mdening 2 Lanes Loughill Road/ Ironbound Road PE RW CN TO 8322 PE RW CN TO 10790 PE RW CN TO 14627 RW CN TO 137181 I CTB/STP Statewide Allocations Funds (4) STP (5) Federal Demonstration Funds ($) Cooperative Project with Other System (8} (9) Bonds/Interest Other Loc~lilies SECONDARY UTILIZING STP REGIONAL FUNDS 275 SUFFOLK DISTRICT TO Regional TDM Program: TRAFFIX TO (FY 96 Operations) TO Vehicle Rehab.t Bus Wash Rack TO New Medium Size Buses (2) TO TO TO Light Rail Transit PEtDEIS TO (Military H~jhway) TO rTDC Route 12 River Road) TO PTDC Buses (Purchase 2) TO National Highway System Allocations CTBtSTP Statewide Nlocati~ns Funds (6) Federal Demonstration Funds (8) Cooperative Project with Other (9) Funded on a Previous Project SUFFOLK DISTRICT PUBLIC TRANSPORTATION UTILIZING STP REGIONAL FUNDS 276 · I , ! PiuC CSXLRT PE&Land^cquisition rS~tions Replacement Buses(2) & Van(l) (ADA Services) (ADA Services) Engines, Transmissions Work P~i~i~ Capital Maintenance Items Service (Purchase ~ew BuSes (22) Enhanced Locelion/GPS National Highway System Allocations CTB/STP Statewlde Allocations Funds (6) Project with Other System (8) CoopemUve Project with Other Localities (9) Funded on a Previous Project PUBLIC TRANSPORTATION UTILIZING STP REGIONAL FUNDS 277 SUFFOLK DISTRICT Purchase Fare Boxes Improvements TTDC for NewTranstt TO Service TO lot New Service TO Se~ce TO TO ~ Paratransit Transition Project TO TOTAL STP REGIONAL ALLOCATIONS ',I) National Highway System Allocations CTBISTP Slatewide Nlocations TEA-21 High Priority Funds (4) STP Regional Allocations (5) NoVa Transperlation Dis~ct Program go~ds/InteresI (6) Federal Demonstration Funds (8) Cooperative Project with Other Lecatities (g) Funded on a Previous Project PUBLIC TRANSPORTATION UTILIZING STP REGIONAL FUNDS I I I I I I I 278 SUFFOLK DISTRICT i I I I I I I I I ! I I i i I I Minivan) STATEWIDE ALLOCATIONS CTBISTP Statewide Allocations TEA.21 High Priority Funds (4) STP Regional Nlocations (5) NoVa T~ansporta~on Diskict Pregmm Bonds/Interest (6) Federal Demons~ation Funds (8) Cooperative Project with Other Localities (9) Funded on a Previous Proje~ PUBLIC TRANSPORTATION - CTBiSTP STATEWlDE 279 SUFFOLK DISTRICT 2007 PE RW CN TO 50519 I I National Highway System Niocations CTB/STP Statewide Allocations TEA.21 High Priority Funds (5) Federal Demonstration Funds (6) Cooperative Project with Other System Other Localities (8) Funded on a Previous Project (9) Bonds/Interest TEA-21 HIGH PRIORITY PROJECTS SUFFOLK DISTRICT 280 Lane ~Lane Southern Branch Elizabeth River ,PEI01, Phase Construction [NFO) 0013-131-106, ~t Bainbridge Blvd. 1904 17636 Prior TEA-21 F [NFO) 0013-13t -1 C501 52152 Pleasant Road (NFO) 0165-13t-101, Fentress Airfield Road 10165-131-102, 17827 52151 6Lane ., PEI03, RW202, 0168-131-104, C502, 1) National Highway System Allocations CTB/STP Statewide Allocations High Priority Funds 1945 15673 ('5) Includes National Highway System Allocation (6) Includes CTB/STP Statewide Allocation (7) Includes TEA-21 F Funds (9) Plans, Right of Way and Contract Administration by Munic{pality (10) Plans and Contract Administration by Municipality (11) Minor Construction Project I URBAN SYSTEM SUFFOLK DISTRICT 281 N.C. State Line Lsne Lane 8oulh Lane ~168-131-102, PEt02, ?E103, PEI04, RW202, C504 PE10t, RW201, C501, B617, includes Dralna~le Outfall 0168-131-F04, PE104, RW204, #ayne Avenue to 3168-131-111, PEI01, Relocated Pump ~tations 88i5 16652 3718 3719 1829 t5672 18592 Lane ECL 2011 National Highway System Allocations CTS/STP Statewlde Allocations TEA-21 High Pr{o~ity Funds (5) Includes National Highway System Allocation (6) In61udes CTB/$TP Statewide AIIocalion (7) Includes I'EA-21 High Priority Funds (9) Plans, Rlgh! of Way and Contract Administration by Municipality (10) Plans and Contract Administration by Municipality (11) Minor Construction Pro~ect by Municipality URBAN SYSTEM I 282 SUFFOLK DISTRICT ! !.9 kin/1.2 M Battlefield Bird, Greenbrier Parkway 0190-131-V01, PE105, 0190.131.V01, PEt04, C504 Blvd. 0337-131-104, PE101, 12543 12542 Winl~lield Ave. U000-131-109, PE101, Point Rd. 1886 4 Lane UOOO-131-V13, RW201, ROad to ECL Lane U000-131 -Vl 8, PE10t (1) National Highway System Allocations CTB/STP Slatewide Allocations ~ Pdority Funds 12544 13485 (5) Includes National Highway System Allocation (6] Includes CTB/$TP Statewide Allocation {7] Includes TEA-21 High Priority Funds (9) Plans Right of Way and Contract Administration by Municipality (10) Plans and Contract Administralion by Munlclpalily (11) Minor Construction Project by Municipality URBAN SYSTEM SUFFOLK DISTRICT 283 6 Lane 15 kmf2.58 M Interchan~le to Battblied B~vd. UOOO-131-F20, PEI 0t, ~ North to 14595 (NFO) UOOO-131-12g, NCL to Sitverwood Bird, U000-131-130, C501 Oak Grove Connector ECL 17637 17725 lin coniunction with Portsmouth project UO0 )-124-V09 I . Citywlde Signal U~rade Signal Upgrade U000-131-t3t, 17828 U000-131-t32, i{1) National Highway System Allocations (2) CTB/STP Statewide Allocations (3) TEA-21 High Priority Funds (4) STP R~§ional Allocation ... 17B29 (5) Includes National Highway System Allocation (6) Includes OTB/STP Statewide Allocation (7) Includes TEA-21 High Pdority Funds 18),!n,,,ctude,s STP Reg!,~,, al Allocation ......... (9) Plans, Right of Way and Contract Administration by Municipality {10) Plans and Contract Administration by Municipality (1!) Minor Construction Project by Municipality t,t,,2t In Coniun~ion. with Other System Prolect ,,,,., , URBAN SYSTEM 284 SUFFOLK DISTRICT I I I I I I ~ Hole Road Lane Required for Federal Proflmm in : Boulevard to Dock Road , PE101, C501 Main St, to ~Lane Rd, , PEt01, (NFO) U000-109-110. PE101. RW201, G50t, And Pretlow St. PE10t. C501 Stewart Drive to Clay Street UOOO-145*V12, PEI01 Highway System Allocations CTB/STP Statewide Allocations Funds 146O6 3810 17544 146O4 14725 I f Includea Ulocation Funds (9) Plans, Right of Way and Contmc{ Administration by Municipality (10) Plans and Contract Administration by MuniClpa ity (11) URBAN SYSTEM SUFFOLK DISTRICT 285 Road 4 Lane W~he Creel( Road/Armlstead 4 Lane Mercury Count[,/Club Road U000-145-114,PE101 C50! Mafirader Bird; Improvements Phase I 0172-tt4-Vo2, PEt01, Interconnect 52O57 13428 Pembroke Ave. 2 Lane (NFO) 0258-114-t 1 t, C501 Marshall Slreet to Holly Street 0351-114-V01,PE101, PE102, RW201, C501, 8602 Over Newmarket Creek 4Lane (NFO)0351-114-103, PE101, RW20t, C501, 1.64 & 1.664 Blvd. 4L~ne t, PEt01, RW201, C501, B611 (1) National Highway System Allocations (2) CTB/STP Statewide Allocations TEA-21 High Priorr~y Funds 13431 52074 2O67 (5) Includes National Highway System Allocation (6) Includes CTS/$TP $tatewide Alio(~tion (7) Funds (9) Plans, Right of Way and Contra~t Administration by Municipality (10) Plans and Contract Administration by Municipality (11) Minor Construotion Project by Municipality URBAN SYSTEM ! 286 SUFFOLK DISTRICT i,~"~ ~,~,~ . ~LA · Hampton IWCL to Bill · I' PE ~ I I I I I I East-West IBethe~ Rd. I RW ~! / ~ I I I I IPE101, RW~I,C~, I ~ 1.9~.2M IL~l I ~, I i STP '~~~'--_- ' Ha~ton IPa~latlnter~an~ I PE ~~l Kin, Street Iatl'~ IRwON ~1 ~~ I( ) ~ .t26, I ~ ~ ~ & RWOn~ and A~ Funds Towards Constru~ion 3.8k~0.5 M IPE10I, RW201,~01 I 1~ I I STP ~a.~i=~ IC~ide S~nal I PE I ..... I ~ ISvstem UP~fadeI ~ ~1 I ............. I ~ · I IIN~uI u~114-121, I I ~ ISupple~nal Alii [~ to CMAQ Pm~ I I ' IPE~O~,C501 I ~S~m I I STP I ' '"'1 ...... I ~a~l~ IMa~m~r B~d, to I PE ~! , ' ...... ,,, -I I ~o~r IBi, Semel Road i RW I I ' -- I =he,ard ~d. I I C. / I I IU ~<" ~ ' ' ~ I - - , O, I ~ ' ~.8~1.5 M IRm0~, C50t I 1.0 I Haii~{a~ IBig Be~el R~d ' I PE ' Saunders Road Ito WCL I RW I ~La,e TO . IRW~O~.C~ I ... ~ Ha~t~ ~' .... ~ IU~an Mat~in~ Fun~ I SA ~ IRequimd for Fe~ml I CM ~! Isafetv and CMAQ / TO ]Pr~ram in Hampton / ~ ' ,, I I ........ I I , ,: I ' (1) Nati~al H~hway System N~ti~s (5) Inclu~s Nat~al HBhway Sya~ Al~ti~ ..................... i~)~ans, Ri~t of Way a~ C~tmd AdminM~t~ by Mun~l~ (2) C~STP Statew~ Al~t~ (6) tndu~s CT~STP Slatew~ ~ (10) Plans and ~ntm~ Ad~nistmli~ by Mun~l~ (3) TEA.21 High P~o~ Fu~s (7) I~s T~.21 H~h Pr~ Fun~ (1t) Minor Constm~l~ Pr~_by Musicality (4) STP Refll~al Nl~ti~ (8) Includes STP R~I~aI,, ,,,, Nl~ti~ URBAN SYSTEM 287 SUFFOLK DISTRICT Morri~ 3 Lane Blvd. Lane Blvd. Lane Blvd. 0501 ;Blvd. ;Dr. ~'~0-121-V14, PEI01, 4482 10797 14598 [NFO10060-121-117, C501 Buchanan Drive to Ave, ,3teen Grove Lane Lane I)143-121-F05, PE101 Lane Yorktown Road D143.121-10g, PEI01 17739 13429 National Highway System Allocations CTBtSTP Statewide Allocations TEA-21 High Priority Funds STP Refiional Allocation (5) Includes National Highway System Allocation {6) tndudee CTB/STP Statowide Allocation (7) Includes TEA-21 High Priority Funds {8) In, ciodes STP Regional N, Iocation {9) Plans, Right of Way and Contract Administration by Munioipatity (10) Plans and Contract Administration by Municipality (11) Minor Construction Project by Munlclpality ....... (!,,2,)!n,,C, oniunction with Other System Pro,oct , URBAN SYSTEM 288 SUFFOLK DISTRICT I ! I ! ! I ! I I I I ! Street Lane kin/0.8 M :{oad & 5 Lane .4 ImY0.9 M Lane 6 Lane 4 Lane PE101 1, PE101, PE102, RW210, CS01, ~601 (NFO) U000-121-110, PE101, RW201, C501, L801 , PEI01, B604, Fort Eustis Blvd. U0OO-121-V18, PEt01, 16642 3812 ! IWarwick Blvd. To For Eustis Blvd. For Corridor I I h I_ t4) I 14) ~;: (4) ~ ~;~¢~'~ ~:;;;;~';':~:~:',~' ~ ! I .__ IExcludes 50o Reduc~ k)nin Regional STP Funds {FY99) I Highway System Allocations CTB/STP Slatewide Allocations Priority Funds (5) Includes National Highway System Allocation (6) Indudos CTB/STP Statewide Allocation Includes TEA-21 High Priority Funds (9) Plans, Right of Way and Contrac~ Administration by MUnlcipa ity (10) Plans and Contract Administration by Municipality (t 1) by Municipality URBAN SYSTEM SUFFOLK DISTRICT 289 4 Lane Road 6Lane t.8 kin/1.1 M '., PE101, {NFO) U000-121-127, .~to Warwick Blvd. U000-121-131. g Funds Required for Federal & Safety in 11816 17735 19O25 Military HwV. Norfolk 1-264 Interchange) , B603 B605 )f Rd, 1) National Highway System Allocations {2) CTB/STP Statewide Allocations Priority Funds 1764 11O96 (5) Includes Ne, tionat H{ghway SYslem Allocat{on {6) Includes CTB/STP Statewlde Allocation {7) Funds (§) Plans, Right of Way and Contract Administration by Municlpalily (10) Plans and Contract Administration by Municipality ('it) URBAN SYSTEM I I I 290 SUFFOLK DISTRICT i I ! ! I i I I I I ! I Northampton Blvd. Lane 9783 Circle Entrance Lane Beach 1,3 knY0,78 M 0058-122-104, PEI01. C501 BHd~eoverPre~y 4 Lane Replacement PE10t, Pinners Point Interchan{]e 4&6Lane (1) National Highway System Nlocations CTB/STP Statewide Allocations 5O726 17546 4388 1175O I* 2~800 Prior Allocation Transferred From 0 165-122-V04 (~) (6) Includes OTB/STP Statewide Allocatlo~ High Priority Funds (9) Plans, Right of Way and Contract Administration by Municipality (t0) Plans and Contract Administration by Municipality (11) URBAN SYSTEM 291 SUFFOLK DISTRICT Lane Lane ~Lane Lane , PE101, atKilmerLane 0168.122-V03, PE101, RW20t, C501 , PE101, E. Ocean View Ave. BIvd. 0194-t22-103, PE101, gl)Ih Street PEI01, t Natlo~al Highway System Nlocations CTB/STP Statewide Allocations Pdority Funds 52150 1876 1727 14672 (5) (6) Includes CTB/STP Statewide Allocation Includes TEA-21 (9) Plans, R ght of Way and Contract Admin stration by Municipality (10) Plans and Contract Administration by Municipality (11) Minor Co~s~mclion Project by Municipality URBAN SYSTEM ! I I 292 SUFFOLK DISTRICT .to Includes Railroad Bivd. at Gresham Drive River Rd. 4 Lane 1.0 km/0.6 M Lane , PE101, 8601 U000.122-116, PEI02, ECL UOOO-122-116, PE101, RW201,C501, B$11 1) National Highway System Allocations CTB/STP Slatewlde Allocations Funds 1783O 52059 17547 1885 (5) Includes National Highway System Nlocation (6) Includes CTa/$TP Statewide Allocation {7) Includes TEA.21 (9) Plans, Right of Way and Contact Administration by Municipality (10) Plans and Contract Administration by Municipa ty (11) Minor Construction Projec! by Municipality URBAN SYSTEM SUFFOLK DISTRICT 293 At Ocean View Ave. (Route 60) & Tidewater Drive Norfolk 1.9 kin/l,2 M Goff Street to 1 Street )rive to Drive t U000-122-t32, (Includes Duke Street to Boush StmeO (NFOI U000-122-t35, 11183 18708 Facilities and Relaled equipment U008-122-136, C501 Wide Urban 50099 52149 National Highway System Allocations CTBtSTP Statewide Allocations High Priority Funds (5) Includes National Highway System Allocation (6) Includes CYB/STP Statewide Allocation (7) Rior~ (9) Plans, Right of Way and Contract Administration by Municipality (10) Plans and Contract Administration by Municipality (1 t) Minor Constmdion Project by Municipality URBAN SYSTEM I 294 SUFFOLK DISTRICT ! I i ' i ! ! ! I il 4 Lanes at 35th Street (New Z~o Entrance) (NFO)UO00-122-t38, Northhampton Blvd. to ECL (NFO)U000-122-140, Urban Matching Funds Required for Federal Safety Prngram in Norfolk PE RW CN TO 52147 Jln Conjunction W~h ~ irginla Beach Project J Hudgins Rd. to Ck. Browns Neck Rd. 3&5Lane 1.9 km/1.2 M Creek Lane eCL , PE101, C501 to PEt01, 1942 Street High Street over Weetem Branch of Elizabeth River CTB/STP Statewide Allocations J(3) TEA-21 High Priority Funds (4~ STP Re~ional Allocation 146O9 (5) Includes National Highway System Allocation (9) Runs, Right of Way and Contract Administration by Municipality (6) Includes CTB/STP Statewide Allocation (10) Plans and Contract Administration by Municipality (7) includes TEA-2t Nigh Priority Funds (11) Minor Construction Project byMunicipality (8) includes STP R~ional Nlecation .......... (121 In Coniunction with Other Sy"s,t,em Prolect URBAN SYSTEM SUFFOLK DISTRICT 295 4&6Lane M Airline Blvd. Connector (FO) 0017-t24-108, Miles NoMh of Route 337/17 PEI01, RW201, C50t, B639, B640 B6,14 B645, B646 15825 (2) Freeway Lane 4 Lane Lane Rd. to Portsmouth Blvd. · PEI01, Sunset Point PE102 National Highway System Allocations CTB/STP Statewide Allocations High Pdority Funds 11750 8294 3950 13481 (5) Includes National Highway System Allocation (6) Includes CTB/STP Statewide Niocatlon (7) Includes TEA-21 ' Funds Includes STP t (9) Plans, Right of Way and Contract Administration by Municipality (10] Plans and Contract Administration by Municipality (1t] Minor Construction Project by Municipality URBAN SYSTEM 296 SUFFOLK DISTRICT I ! I I ! I I ! I ! ! High St. W. to Lane ,8 knYt,1 M RW201, High St West 3948 15677 Lane U000-124-V05, PE101, RW201, km/0.7 M Lee Ave to Virginia Ave Lane U000-124-107, PEI01 6 kin/0,1 M C501 SCL to Neck Churchland Bird, Lane L~OOO-124-VOCJ, PEI01, ;edarLane Lane J000-124-VI0, PE101, (NFO) U000-124-t12, PEIOt,PEI02, RW201, (1) National Highway System Allocations CTB/STP Statewide Allocations (3) TEA-21 High Priority Funds (4) STP Regiohal Allocation ,,, 3947 15676 14841 14842 17545 (5) (6) Includes CTB/STP StateWlde Allocation {7) Includes TEA-21 High Prio~ty Funds {8) IndudseSTP R,e~ional Alioc~tion (9) Plans, Rlghl of Way and Cunlract Administration by Municipality (10) Plans and Contract Administration by Municipality (1;I) Minor Construction Project by Municipality I12~ In Cuniunction w, ith Othe, r,,,S,,v,s,!e,m I:q'olect URBAN SYSTEM SUFFOLK DISTRICT 297 Boulevard 4 Lane 0,53 Mile tO t-264 (NFO) U000-124-136, Urban Matchinfi Funds Required for Federal Safety Program in Portsmouth S. Church St. 3 Lane km/0.7 M S. Church 5 Lane Suffolk 4Lane North Main St. to Battery Park Rd. 7010-300-101, PE102, Batter,/Park Rd. to Route 10 Bypass 7010-300-10t, PE101, Road to to ECL 0337-133.t01PE101, ~ of Intemection Route 58 Business to t.1 km 5 Lane 58 Business 0460-t33-F01, PEt01 System Nlocations CTBtSTP Statewide Allocations High Priority Funds 5J863 t920 13486 (5) Includes National Highway System Allocation (6) Includes CTB/STP S~atewlde Allocation (7) h~ludss TEA-21 High Priority Funds (9) Plans, Right of Way and Contrac{ Administration by Municipality (1 O) Plans and Contract Administration by Municipality (ii) URBAN SYSTEM I t ! 298 SUFFOLK DISTRICT J J J ! I J J ~ Ave. lane Rd. Lane Grade N&W Railway U000-133-V03, PEI01 Avenue Birdneck Road , PEIO~, Rd. Holly Road Lane , PE101, .0 Mile C501 Rd. / [Includes PE to General ]ooth Blvd.) 6 Lane RW (NF0)0165-134.108, Highway System Allocations CTBISTP Statewide Allocations , Funds 12545 15826 12546 14601 52O58 I I I I I I I (6) Includes CTB/STP Statewide Nlooation Includes TEA.21 High Priority Funds (9) Plans, Right of Way and Contract Administration By Municipality (10) Plans and Contract Administration by Munlclpality URBAN SYSTEM SUFFOLK DISTRICT 299 a 8each Road [NFO) 0t65-134-I07, Lane Lane , PE101 C501 Pembroke Blvd. to Road Improvements [, PE101, otLvnnhaven Blvd. First Lane First Lane @enemlB~lh Blvd,~ Gate ~ain Gate to 0.7 Mile S. PEIO1, Beach Blvd. to , C503 [1) National Highway System Allocations CTBISTP Statewlde Allocations {3) TEA-21 High Priority Funds {4) STP Regional Allocation 14602 51865 2075 18207 (5) Includes National Highway System Allocation (6) Includes CTB/STP Statewide Allocation (7) Includes TEA-2t High Priority Funds {8) Includ~es STP Regional (g) Plans, Right of Way and Contract Administration by Munioip~lity (10) Plans and Contract Administration by Municipality (11) Minor ConstructiOn Project by Municipality .................. {12) In Conlufi~{~q. with Othg? System Proiect URBAN SYSTEM 1 I I 300 SUFFOLK DISTRICT ! ! & Chesapeake Lane Lane I, PE100 ~, PE100 Dam Neck Road to Route 44 PHASE I Corridor Preservation LJOOO-134.F23 Ferrell Parkway to 3241 3240 16566 Lane U000-134-126, PE101, Blvd to Southern Bird 8603 k'm/2.2 M inia Beach London e Road U000-134-V27, PE101 C$01 11754 4 Lane U000-134-V29, PE101 RW201, 11756 16414 Road 4Lane , PEI01 RW201, 12547 16415 y System Allocations CTB/STP Statewide Allocations (3) TEA-21 High Pdority Funds (4) STP RegiOnal Nlocation {5) Includes National Highway System Allocation (6) Includes CTB/STP Statewlde Niocalion (7) Includes TEA-21 High Priority Funds (8) Includes STP Regional Allocation (9) Plans, Right of Way and Contact Administration by Municipality (10) Plans and Contract Administration by Municipality (11) Minor Construction Project by Munlclpality {12) In conlunction with Other System Prelect URBAN SYSTEM 301 SUFFOLK DISTRICT Parkway to Ltshelle Place Parkway Beach U000-134q32, PEt01 Contervilio Tumpike U000-134-V39, PE101 C501 Centerville Turnpike Indian River Road 12549 13487 fLine Lane inla Beach inla Beach Lane U000-134-V42, PE101, Providence Road 1.54 U000d34d45, Anne Road U000.1~4.t4~. 14603 15827 15828 National Highway System Nlocatlons OTB/STP b-'tatewide Allocations Ii(3) TEA-21 High Priority Funds 4) STP Re.qtonal AIIocalion (5) Includes National Highway System Allocation {6) Includes OTB/STP Statewide Allocation (7) Includes TEA-21 High Priodly Funds {8) l,n..c,,!,,u,~,,s STP Regional ,N,,,!ocation (9) Plans, Right of Way and Contract Administra/ion by Mu~cip~tlity (10) Plans and Contact Administration by Municipality {11) Minor Construction Project by Municipality (12) !~,,,C, onlunction with Other System Pmjec~ URBAN SYSTEM 302 SUFFOLK DISTRICT Lane Lynnhaven Road to Elbow Road Extensio~ (NFO) U000-134-147, Resort Area Variable Messa.ae Signs [NFO) U000-134-149, ITS Project at Vadous ~81o7 [NFO) U000.t34-153, O50t TO Elbow Road 17826 iNFO) UOOO-134-t58, 51864 Urban Matching Funds Required for Federal CMAQ & Safety Pr~ram i~ Virginia Beach 52148 (3) TEA-21 High Priority Funds (4) STP Regional Allocation , (5) Includes National Highway System Allocation (6) Includes CTB/STP Statewide AllOCation {7) Includes TEA-2! High Priority Funds - {8t,l,n, c, ludes STP Re~t~al Allocation .... (9) ~blans, Right of Way and Contract Adm n stration by Munic pality (10) Plans and Contract Administration by Municipality (11) Mi[ior Construction Project by Municipality , {t2) In Con unction with Other System Pro ect URBAN SYSTEM SUFFOLK DISTRICT 303 Rd. 4 Lane Mount Vernon Patriot Lane and $i~nall PEI01, C501 PEr01, Imnbound Road Rou~ 199 t, PE101, (1) National Highway System Allocations High P~iority Funds 177~ 18851 1885O 1~54 16053 TOTAL TEA-21 HIGH PRIORITY ALLOCATION STPICTB STATEWIDE ALLOCATION STP REGIONAL ALLOCATION (5) {6) Includes CTE/$TP Statewlde Nitration (7) Includes TEA-21 Funds (9) Plans, Right of Way and Contract Administration by Municipality {10) Plans and Contract Admlnlslration by Municipality (it) UR BAN SYSTEM SUFFOLK DISTRICT 304 SUFFOLK DISTRICT SECONDARY SYSTEM CONSTRUCTION IMPROVEMENT PROGRAM FISCAL YEAR ALLOCATIONS ~'.'L" ' ~::~'~'-:"~'~'""~5~:.'.! ~ i.' :~ ~ ~'":'~'~'~<'~,~ ~,:.~ ~ ~"~'~5~'~*~'~?~ ~ :.~:'~ ~"~;~.'~"~"~'~"~'~'."-' ~', .~.'~' "~ ~,r~"'~'~'~'~. ?~: ~9~:~'~ ~.:'~'~:}:"~':~' ' :~ ,~ :~,~ ~'~'~?~':~:~,~ Accomack '~:~ 1.680.622 ~ 1.685.121 ;~ 1,800,343 ~/ 1.830.789 ':::: 1.905.582 ::~ 2,076.314 :.? 10~78,772 Greensville .;-:~ 814~172 :~ ~810~270 ~(~ 867.705 882~215 ~:~ '920}927 :: i.011}425 :~} 5,306,715 -~). . ~ ~( .... Isle of Wight :.~:. 1.~.~8..129~.~.~,1.535,406 ~ 1.,641,74~ I.,669,209~.~ 1.740,631 .,~:~1.905.003 ~.;~:~ 10,030,126 JamesCity ~ 1,811. 6~ ?~ 1:812,240 ~}~ 1,951,327 ~?( 1.982.641 :?~ 2.066,272 ~::~2.262~787:~}~ 11,887,129 Suffolk ~}}} 1,936,977 ~r.. 1,903,854 ~ 2,031,613 ~ 2,067,104 ~-~:2,167,124 ¢.?~? 2.405.828'~ 12,512,500 No~hhampton ?: 778,676 ;;;~ 780,420 ~:?~ 8~3.464 (~. 847.610 ~? 882,35., ~;(~. ~961 ~689 . ~ ,~ 5,084,213 Southampton ~:~ 1.611.927 ..... 1,601.914 ~}?~}1.712.~,2 }~.~ 1.741.465 ?~{.~1,818,913 ~? 1.999.114~ 10,485,964 ::~ ~.;:,~606,229 ;;',~ 616,478 ;~: 643,876 7 708,002 3,711,805 Sussex .;.:~ 1,042,547 ~::~ 1,034,124 ~ 1,105,842~¢~ 1~124,522~'~ 1,175,293~ 1.294,191 6,776,520 York ~ 2.051'.055 5? 2,046,597 ~ 2,214,510~ 2.248,926:~ 2,346,313}:~:~ 2,579,578~ 13,486,979 Total ~'~:~ 1~,836,417 ~} 13,7.76z715 ?~:14,765,415 .~: 'iS}01~}960~ 15,~67,285 ~ 17,203,930 ~ 90,260,722 SECONDARY SYSTEM SUFFOLK DISTRICT 305 BrJstolDJstrl~t ~rededcksbur~ Distr~t L?nchbur~ Distr~t No~thern ~yS~i~~trj~t l~hmond ~tr~t Staunton DJ~tr~t SuffollrD~tr~t